HomeMy WebLinkAboutNCG030251_Inspection Report_20200901ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
September 1, 2020
Watts Regulator
Attention: Tiffany Crosby, Sr EHS Engineer
100 Watts Road
Spindale, North Carolina 28160
Subject: Compliance Evaluation Inspection
Permit: NCG030000
Certificate of Coverage: NCG030251
Rutherford County, North Carolina
Dear Ms. Crosby:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on August 25, 2020.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Sincere
Isaiah Reed, Q, MS4CECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
NOPIHCMDWJP
o:ewn.om�uxanmeoweoaih 828.296.4500
Compliance Inspection Report
Permit: NCG030251 Effective: 11/01/18 Expiration: 05/31/21 Owner: Watts Regulator
SOC: Effective: Expiration: Facility: Watts Regulator
County: Rutherford 100 Watts Rd
Region: Asheville
Spindale NC 28160
Contact Person: Tiffany Crosby Title: Sr EHS Engineer Phone: 910-865-6235
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 08/25/2020
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Certification: Phone:
Entry Time 02:45PM Exit Time: 04:30PM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Metal Fabrication Stormwater Discharge COC
Facility Status: E Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG030251 Owner- Facllity:Watts Regulator
Inspection Date: 08/25/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On August 25, 2020 this facility was inspected for compliance. I met with Tiffany Crosby on site. No major issues were
noted during the inspection. However, the site map did not meet all requirements of the NCGO30000 General Permit. Please
modify and update the site map as necessary as outlined in the NCG030000 General Permit.
Additionally, be advised that the previously issued Tier Relief and Representative Outfall Status shall be considered
rescinded upon receipt of this report and a re -instatement of these conditions shall be requested and evaluated as needed.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCG030251 Owner- Facility:Watts Regulator
Inspection Date: 08/25/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0 ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
N ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
0 ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0 ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
N ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
0 ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
E ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
E ❑ ❑ ❑
Comment: See summary for notes on Site plan.
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually?
0 ❑ ❑ ❑
Comment
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ N ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? 0 ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment:
Page 3 of 3