Loading...
HomeMy WebLinkAboutNCG030251_Inspection Report_20200901ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality September 1, 2020 Watts Regulator Attention: Tiffany Crosby, Sr EHS Engineer 100 Watts Road Spindale, North Carolina 28160 Subject: Compliance Evaluation Inspection Permit: NCG030000 Certificate of Coverage: NCG030251 Rutherford County, North Carolina Dear Ms. Crosby: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on August 25, 2020. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincere Isaiah Reed, Q, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NOPIHCMDWJP o:ewn.om�uxanmeoweoaih 828.296.4500 Compliance Inspection Report Permit: NCG030251 Effective: 11/01/18 Expiration: 05/31/21 Owner: Watts Regulator SOC: Effective: Expiration: Facility: Watts Regulator County: Rutherford 100 Watts Rd Region: Asheville Spindale NC 28160 Contact Person: Tiffany Crosby Title: Sr EHS Engineer Phone: 910-865-6235 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/25/2020 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 02:45PM Exit Time: 04:30PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: E Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030251 Owner- Facllity:Watts Regulator Inspection Date: 08/25/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On August 25, 2020 this facility was inspected for compliance. I met with Tiffany Crosby on site. No major issues were noted during the inspection. However, the site map did not meet all requirements of the NCGO30000 General Permit. Please modify and update the site map as necessary as outlined in the NCG030000 General Permit. Additionally, be advised that the previously issued Tier Relief and Representative Outfall Status shall be considered rescinded upon receipt of this report and a re -instatement of these conditions shall be requested and evaluated as needed. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG030251 Owner- Facility:Watts Regulator Inspection Date: 08/25/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? N ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? N ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? E ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? E ❑ ❑ ❑ Comment: See summary for notes on Site plan. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ N ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? 0 ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3