HomeMy WebLinkAboutNCG030227_DMR_20200315Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000
Date submitted 03/16/2020
CERTIFICATE OF COVERAGE NO. NCG03 0 2 2 7
FACILITY NAME Corning Optical Communications, LLC
COUNTY Forsyth
SAMPLE COLLECTION YEAR 2020
SAMPLE PERIOD [:] Jan -June ® July -Dec
or E]onthlyl February (month)
PERSON COLLECTING SAMPLES �1DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
LABORATORY TestAmerica Laboratories, Inc. Lab Cert. # 434 RECC 1\3 P ❑Zero -flow ❑Water Supply [:]SA
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
MAR 2 3 2020 ❑Other
CENTRAL HLE PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 �
DIAM SECTION,
FM n/„
Outfall No.
Date Sample
Collected 1
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
P H
Standard units
Total Copper
—
Total Lead
y� L,,,a
Total Zinc
PC,,vu:
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks
_
100 mg/L or 50 mg/L4
6.0 — 9.0
0.010 mg/L
0.075 mg/L
0.126 mg/L
15 mg/L
1 mg/L
Parameter Code
-
46529
C0530
00400
01119
01051
01094
00552
78141
1 Monthl sam Lin (' t d f
I
y p g Ins ea o semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
'For sampling periods with no discharge at any single ouifaii, you must stiii submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 1 of 3
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES []NO[:]
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES Q NO Q
REGIONAL OFFICE CONTACT NAME:
Mail an original copy of this DMR including all "No Discharge" reports within 30 days of receipt of the lab results (or at end of monitoring period in the
case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
3-) & Z0Zo
Date
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 3 of 3