Loading...
HomeMy WebLinkAboutNCC203809_ESC Approval Submitted_20200901ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality August 13, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Pinnacle Homes USA, LLC Attention: Ben Russell, Manager 4389 Indian Trail -Fairview Road Indian Trail, North Carolina 28079 RE: Project Name: Buck Acres Lots 13-17 Acres Approved: 3.33 Project ID: UNION-2020-072 County: Union, City: Buford Address: Old Hwy Rd. River Basin: Catawba Stream Classification: Other Submitted By: Matthew Kirchner, PE, Eagle Engineering Date Received by LQS: August 4, 2020 Plan Type: Revised Dear Mr. Russell: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NC GO 1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: ' North Carolina Department of Environmental Quality ; Division of Energy, Mineral ant! Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 E Mooresville, North Carolina 28115 4Ncr=.n. <A;; NA aepfte. of pne&msna w O.Hty 70d.663.1699 Letter of Approval with Modification August 13, 2020 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, 4_4_11_).�) Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: Inspection Department ec: Matthew Kirchner, PE Letter of Approval with Modification August 13, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Buck Acres Lots 13-17 Project ID: UNION-2020-072 County: Union The diversion berm and slope drain into skimmer basin from the NW shall be moved uphill as much as possible, while maintaining positive drainage to the basin. The inlet invert of the slope drain shall be located high enough in elevation so that when the emergency spillway is activated, flows do not occur through the slope drain and circumvent the skimmer basin. 2. The silt fence below NW side of skimmer basin shall be installed along the limits of disturbance.