Loading...
HomeMy WebLinkAbout20200941 Ver 1_Site Plan Explantions_20200826Strickland, Bev From: Jim Mason <james.mason@threeoaksengineering.com> Sent: Wednesday, August 26, 2020 2:31 PM To: Johnson, Alan Cc: Nathan Howell; Michael Wood; Nancy Oberle; Roden Reynolds, Bryan K CIV (US); mdonham@albemarlenc.gov Subject: [External] RE: Corporate Center - Albemarle Attachments: COA_Agent Authorization_ All Sig natures_UPDATED.pdf, Albemarle Corporate Center -Concept Map -August 2020.pdf External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Alan - I hope that you are doing well. Thank you very much for the comments on our permit application. I apologize that it has taken so long to respond; we have been gathering information for both NCDWR's and USACE' comments on the application. Below are our responses to your requests/questions in red. Please let me know if you have any questions or require any additional information. Thanks and have a great day, dill From: Johnson, Alan <alan.iohnson@ncdenr.gov> Sent: Monday, August 10, 2020 11:08:15 AM To: Nathan Howell<nathan.howell@threeoaksengineering.com>; mdonham@albemarlenc.gov <mdonham@albemarlenc.iaov> Cc: Roden Reynolds, Bryan K CIV (US) <Bryan.K.Roden Reynolds@usace.army.mil> Subject: Corporate Center - Albemarle A few comments regarding the application: The "owners" name was not printed on the agent authorization form. Please provide Michael Ferris, the City of Albemarle City Manager, was the person who signed the agent Authorization Form have updated the form to include his printed name in the Property Owner portion of the signed form and attached an updated copy. Only a road(s) is shown for the corporate center. Is there no proposed site diagram for this project. Future development may require or request impacts for additional streams. That may could be avoided if understanding the needs. Attached is the most recent concept map for the Albemarle Corporate Center. I had intended to include this in the application package and apologize that I did not. The diagram is preliminary at this point and the final layout will be dependent on the future development needs in the center. The current concept plan avoids additional impacts to streams and wetlands and, although not developed yet, the future layout will also attempt to avoid/minimize impacts related to future utilities. Also, storm water management will be required for the site and any future connections to the sewer line and must be reviewed and approved by DWR for any future development in the park and sewer line. We spoke with our prime, Chambers Engineering, regarding the stormwater management and they said that there are not any proposed permanent stormwater measures because the area is not a State managed Phase II Stormwater area and Albemarle/Stanly County in this location does not have any local stormwater standards. The project, however, does have an Erosion Control Plan for the construction of the roadway that has been approved by DEQ (provided with the ePCN). Does NCDWR have additional requirements that supersede this designation? It seems mitigation is actually the draining of the pond. Are any measures being taken to ensure to protect the channel from pond degrading (loss of sediment) We are currently developing a pond drainage plan to outline what steps will be taken for the pond drainage and to avoid/minimize loss of accreted sediment downstream during and after the ponds are breached. USACE has also requested a pond drainage plan and we will provide that to both agencies when it is completed in the near future. Thanks Alan DWR Dkkion of WAter Revourcc% Alan D Johnson — Senior Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2200 Fax: (704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. I all -w- r, 1001000 SF A r �•`J 1 1 11 . 1 , , t S � r M jw 1 1 \ 1 \ \ 1 \ 1 t i \ 1 50,000 SF 50,000 SF PROPOSED 12" GRAVITY SEWER C ' oZ / / �I 501000 SF' PROPOSED 12"` ii GRAVITY SEWER r I I I I I I y P PROPOSED ROAD — 2001000 SF � I I I I 1 , I 60' 000 SF PROPOSED ROAD i 60,000 SF I / \ 75,000 SF I I I � I 601000 SF FUTURE ROAD 90,000 SF 1 1011250 S APPROXIMATE LOCATION OF FUTURE BUILDINGS (TYP) 100,000 SF PRELIMINARY - NOT FOR CONSTRUCTION I r ALBEMARLE NORTH CAROLINA A1 6w, tf;,. Laird 01Po� t LEGEND Existing Stream Existing Wetland Existing Pond I, chambers engineering, pa 129 North First Street I 704.984.6427 ph Albemarle, NC 28001 www.ce-pa.com ii 0 200' 400' SCALE V =200' CITY OF ALBEMARLE ALBEMARLE BUSINESS CENTER Concept Map AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. PLAN NO. PARCEL ID: 654702867363 STREET ADDRESS: 24524 South Business 52 S., Albemarle, NC 28001 Please print: Property Owner: City of Albemarle Property Owner: ATTN: Michael Ferris, City Manager The undersigned, registered property owners of the above noted property, do hereby authorize Nathan Howell of Three Oaks Engineering (Contractor/Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): Telephone: 704-984-9419 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorize Signature Authorized Signature Date: Z04 C Date: 02/05/2020