HomeMy WebLinkAboutSW3190201_Operation and Maintenance Agreement - ROD - O' Reilly Wingate, NC_20200901FILED
UNION COUNTY, NC
CRYSTAL, D. GILLIARD
REGISTER OF'DEEDS
FILED Aug 12, 2020
AT 03:5i4 pm
BOOK 07770
START PAGE 0595
END PAGE 0597
INSTRUMENT # 309!60
EXCISE TAX (None,)
CIS,
Project Name: I O'Reilly Wingate NC
Project Location, 13628 West Highway 74, Wingate, NC
Cover Page
MlawrdieThis records sharl be k 71—M-115 �Bmpl-) T -11- 1-c-d 'shallb. kept in =�.gin . known set set =.c�,.n
'an -et
Any defident DIMP elements noted in the inspection will be corrected, repaired, or replaced lmrvxrimf.ciy. These deficienciat can
affect the integrity of structures. Safety of the puipic, and the pollutant remova8 efficiency of the i
The BMP(s) on thus project induce Rcheck allthat apply & corres ond fl
Eitoratention Cell
Quantdy:
I
Dry Detention Basin
Quantity:
Grassed Swale
Quantity:
Green Roof
Quantity:
InrIt"'bon Basin
Quantity:
lnfilh-Ouon Trench
Quantity;
i Spread erfVFS
Quantity:
PerrneaUe Pavement
Quantity:
Proprietary System
0—tity:
Rainwater Harvesjqg
Quantity,
Send Filter
Quantity:
Sarm-ater Wedand
Quantity.
Wet Detention Basin
Quari
Diisconnected Impervious Area
Present:
User Defined b1i
Present;
l acknowledge and agree by uny siginalure below that I am responsible for the performance of the maintenance procedures: listed for
each DMP above, and attached C&M tabier- [ agree tD notify NCDENR of any prublems with the system or prior to any changes to
the system or resporraMe part).
' Responsible Party:Scott Kraus
Tide & Qrqanizatuori SVP of Real Estate O'Reilly Automotive Stores, inc,
Street address. 233 S. Patterson Air
City, state, zip:: Springfield, MG, 65802
Phone niumbei 417-062-2674
Email: 5kraus@crei[lyauto,.com
ope
Date:
I is k a r L111,4 ",uc a Notary Public ic for the S tate of ff\,W
County of -Dcxdxc- — do hearb�y certify that
person ally appeared before me this 4AAN day of V),, t F,2 tD arid:
acknowledge the due execution of the Operations and Maintenance Agreement,
Witness my hand arid officW seal, VqAAA A I—sh: �—1
,JKAREN�MARIE- -DAMEL
:blic Nov Sli
OF ZI.Sso IPI
My Cornmitisiolni Ex- --- Apr, 13, 2024
Pi"
se?/
$TQRM-r;Z 717fZ020
V—m, 1.4 O&M M--I Fag. 1 of 3
NCDEQ Operattions and
Maintenance Agreement
O'Reilly Auto, Wingate, NC
Return to: Bohler Engineering
1927 S. Tryon St., Suite 310
Charlotte, NC 28203
�3iure4dnti�rn Natlaintdnance Re uar^esnents
Importa,n& operation and maintenance procedures:
Immediately after the biaretentior cell is establistled, the ,plants will be watered twice weekly if needed until the plants
hecome established' (commonly sax weeks).
Snow, mulch or any other rnaterW will NEVER be piled on the surface of the bioretentdon celi.
Wheeled or tracked egttiprnerit wall NEVER be driven over the biicretention planting surface,
Special care will be taken to prevent sedirrie-rut from entering the bioretentaon ceC
- If standing water Is present 2. days after rainfall, conduct an infiltration test Of the soil media.
After the bicreteniaon cell is established, Inspect it quarterly... Inspection activities .. shall he peromied asfollows and maintenance
activates shall commence immediately to remediate, any pr>oblerals observed per the table below.
STORM-EZ
Version 1.4 O&M Manual' 7)171202G
Page 2 of 3
B%'cftl�E#�&d[Gern. PaGeamienariceR igVrenQscanfinam�c9:,.
07CRM-EZ
707f2020
"Je+t3ion 1.4 O&M Manual Page 3 of "3