Loading...
HomeMy WebLinkAboutNCC203782_ESC Approval Submitted_202009015216 TUCKASEEGEE RD Charlotte Immanuel Church Permit Number: LDGP-2020-00175 Printed On: 8127120 CH r'l RLOTTE . Expiration Date: 27-Aug-23 City of Charlotte - Engineering and Land Development Permit Status: In Progress 600 East Fourth Street Status Date: 27-Aug-2020 Charlotte, North Carolina 28202-2850 Grading PermitINA/NA CompanylIndividual Name Address Phone Owner CHARLOTTE IMMANUEL CHURCH OF A 4770 ASHERTON PL NW 7043603998 CONCORD,NC28027 Applicant - Key Contact SEEDWATER ENGINEERING, INC. (ZACHARY HOWZE) 120 ACADEMY STREET FORT MILL,SC 29715 Financially Responsible Party Charlotte Immanuel Church of All Nations, Inc. ( Ricky Williams) 4770 Asherton PI NW Concord,NC 28027 Contact SEEDWATER ENGINEERING, INC. (ZACHARY HOWZE) 120 ACADEMY STREET FORT MILL,SC 29715 Parcel Nbr Tract Block Lot 05905109 1 09 Application Information Acreage 4.92 Disturbed Acreage 2.85 Fees Description Amount Total Fees Due: Total Fees Paid: This permit conveys approval from the permitting entitiy to conduct land -disturbing activity by the Owner or his agent as shown on the approved plan in accordance with the Sedimentation and Erosion Control Ordinances, Tree Preservation Ordinances and related policies. This permit is valid until the project is complete or 3 years from the issuance of the permit, whichever comes first. If erosion control measures required by the plan prove to be inadequate to control sediment as required by the Ordinance, the applicant will be required to submit a revised plan and take corrective measures. By issuance of this permit an isnpector has the right to inspect the permitted property for complaince with the Ordinance at any time during or after construction. Signature: Date: Applicant Signature: Date: Inspector File Copy Site Copy Applicant Copy Inspector Copy