Loading...
HomeMy WebLinkAbout820051_INSPECTIONS_20171231Type of Visit: (>-Com Hance Inspection U Operation Review Q Structure Evaluation O Technical Assistance I Reason for Visit:Routine O Complaint O Follow-up O Referral O Emergency Q Other O Denied Access Date of Visit: J+ Arrival Time: i v Departure Time: L rLl_J County: j4VU PA-W Region: Farm Name: Owner Email: Owner Name: A o2 T 4 C Phone: -V Mailing Address: Physical Address: Facility Contact: C.'t,.v.+i s Be.y-t,z:Gr Title: Onsite Representative: u Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: C Integrator: pi-e-ct46,e, Certification Number: 2 O 8 Certification Number: Longitude: Design Current Design Current Swine. Capacity Pop. Wet Poultry Capacity Pop. Design Current Cattle Capacity Pop. Wean to Finish Layer Non -Layer Dai Cow Dai Calf f Wean to Feeder _ Feeder to Finish 1 0 a 4 F Dai Heifer Farrow to Wean Design Current Dr. l;ouftr; Ca aci P.o . [DrvCow Farrow to Feeder Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Other .' Turkeys Turkey Poults Other Other t� Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: ❑ Yes L24o ❑ NA ❑ NE a. Was the conveyance man-made? ❑ Yes ❑ No BINA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No [ NA ❑ NE c. Whafnis the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWR) [:]Yes 0 No CTINA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes Q o ❑ NA 0 NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes allo ❑ NA ❑ NE of the:State other than from a discharge? Prr ge I of 3 21412015 Continued Facility Number: - Date of Inspection: a b A.60 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [3-NV— ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No D-<A ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): $� , 39 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑'Kb ❑ NA ❑ NE waste management or closure plan'? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [ -5o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [3-No 0 NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [3 No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes Fa*"&o ❑ NA ❑ NE maintenance or improvement'? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes C3-No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): L � r' -tL_ Qh s (z f'u tt t r � - IJAID Caw � W r 13. Soil Type(s): 19� �-1 �ey � !o�/ 14. Do the receiving crops differ from those designated in the CAWMP? f ❑ Yes [3 o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Lrd,< ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑,lo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes []"No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes D10 ❑ NA ❑ NE Required Records & Documents 'No 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes El ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes EKO ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists [:]Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes <o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis 0 Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22, Did the facility fail to install and maintain a rain gauge? ❑ Yes E No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ <o ❑ NA ❑ NE Page 2 of 3 21412011 Continued (Facility Number: - 51 1 Date of Inspection: R G 24. Did the faciUty fail to calibrate waste application equipment as required by the permit? ❑ Yes Q-No 25. Is theifacility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes CD46 the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes E No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification'? ❑ Yes L_I "o Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern'? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑ Yes [i]'No ❑ NA ❑ NE ❑ Yes FrNo ❑ NA ❑ NE ❑ Yes 2<o ❑ NA ❑ NE ❑Yes [D o [DNA ❑NE ❑ Yes F:;Ko ❑ Yes 7 N' o ❑ Yes [�rNo ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE Comments {refer to question #1) ,Expliiin any YES,answers and/or any additional recommendations or any other comments., Useldrawings;of,facili ;;to befter:explaln situation`s.,,(use adddlttlonal ages. as necessary). 7c CIC( 0110-- 3 0�_- 6M Reviewer/inspector Name: 3 I �{ Phone (� Reviewer/inspector Signature: � Date: Page 3 of 3 21412015 I i I Di"vi"sion of Water Resources Far-lity Number - Division of Sail and Water Conservation DQ Other Age -M- Type of Visit: QMompliance Inspection n Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Cl"Rioutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Mt '� Arrival Time: Departure Time: n�pcounty: ;54 n( Farm Name: 1169, FAVott, " Owner Email: Owner Name: oc; �it/i� Phone: Mailing Address: Physical Address: Region: Facility Contact: c,c� idv'-t'✓ l C� Title: Phone: Onsite Representative: f ` Integrator: T-14 11, Certified Operator: Jty t Certification Numher: �? —f 'IV Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Dgn Cfu`�nt � " ' Design Curren Swine Capacity Pop, Wet Poultry Capacity Pop. Cat le Capacity Pop Wean to Finish La er Dair y Cow Wean to Feeder Non -La er Dairy Calf Feeder to Finishr u,a, } DairyHeifer 1, My �' '"m Design Current Dr Cow Farrow to Wean �di'.;�� t ,.r:S rr trasr Farrow to Feeder Ur Pbultr Ca acrt P,o y Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation'? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes [ No ❑ NA ❑ NE ❑ Yes ❑ No (� NA ❑ NE b. Did the discharge reach waters of the State? (Ifyes, notify DWR) ❑ Yes ❑ No LNA ❑ NE c. What is the estimated volume that reached waters of the State (gal Ions)? d. Does the discharge bypass the waste management system'? (if yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge'? ❑ Yes ❑ No ❑ Yes Ej�No ❑ Yes F!J*"'No El"NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page I of 3 21412015 Continued >iacili Number: - Date of inspection: ' Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 19-f1° D NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in):3 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ZIo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 2<0 ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes 'ff No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Q No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 5KNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes eNNo ❑ NA ❑ NE maintenance or improvement? 11, Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Jo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > I0% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window/ ❑ Evidence of Wind Drift ❑ Application Outside of ffyApproved Area 12. Crop Type(s): 13. Soil Type(s): j+ L&- L e DA Y7l1) t 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. is there a lack of properly operating waste application equipment? Reouired Records & Documents ❑ Yes ❑ Yes ❑ Yes [?rNo ONo [];Ao ❑ NA ❑ NA ❑ NA ❑ NE ❑ NE ❑ NE ❑ Yes GgAo ❑ NA ❑ NE ❑ Yes ❑No ❑ NA ❑ NE 19. Did the facility fail to have the Certificate of Coverage & Permit readily available'? ❑ Yes [Io ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [<o ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? if yes, check the appropriate box below. ❑ Yes [✓] No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute lnspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 2No ❑ NA [] NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [frNo ❑ NA ❑ NE Page 2 of 3 21412015 Continuer! F'aclilty Number: 1 Date of Inspection: 24. Did lie facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Z34<_ ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [R-15—o— ❑ NA ❑ NE the appropriate box(es) below. 0 Failure to complete annual sludge survey [] Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [2-?�o' ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 3 o ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes I?wu ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes �To ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [:J<o ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes D-Go ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes D-Qo 0 NA ❑ NE Corninet is (refer to question #): Expiitin-any.YES answers and/or any additional recommendations or any other cotnrnents. Use drawings oi'.facility to Better explain situations (use additional pages its necessary}. Cl7 Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Cw q10- JC)8'-66S( Phone: tv``�'J'� Y i Date: 21412015 9 l W s- [� `[ h R) C9'Division of Water Quality ,Facility Number ®- 0 Division of Soil and Water Conservation 0 Other Agency ................ ----: _....- __ -- - ___ __ Type of Visit: (D-Com fiance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit:gili Arrival Time: Departure Time: County:,g4 ` ` Region:,Fx�) Farm Name (13 '0.7 5WoA_f Owner Email: Owner Name: aM�2jA_ �G Phone: Mailing Address: , .Q "&C�-W 60,�rr Physical Address: Facility Contact: �e. I S 3ao-4+1.C(t Title: Onsite Representative: V Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Phone: Integrator: _ C—&) .5 F Certification Number:[ Q eK �— Certification Number: Latitude: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. [±Layer on -La er Design Current Dry Poultry Capacity Pop. La ers Non -Layers Pullets Turke s Turkey Poults Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non-Dai Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes [q'No ❑ NA ❑ NE [:]Yes [:]No [ 'NA ❑ NE ❑ Yes ❑ No El NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWQ) [:]Yes [:]No [3*NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? [:]Yes [3'-No ❑ NA C] NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes [�No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of f 3 21412011 Continued Facility Number: JDate of Inspection: lb I Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? [] Yes G5At—__❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No E3-<A 0 NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: eL� i�`►� Spillway?: Designed Freeboard (in): Observed Freeboard (in): r b 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes E3-No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes P�'No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes E3 no ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [:]Yes C2'Ro ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Q-No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [i]'No ❑ NA ❑ NE maintenance or improvement? 11. is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [rNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Applicati on Outside9fffApproved Area 12. Crop Type(s): [�.rQ� _�'__G 0 Cwlf � 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? I S. Is there a lack of properly operating waste application equipment? WC, ❑ Yes [[&No ❑ NA ❑ NE ❑ Yes [50-No ❑ NA ❑ NE ❑ Yes 0 o ❑ NA ❑ NE ❑ Yes [3'Tlo ❑ NA ❑ NE ❑ Yes 0"No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes [3No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [] Yes ❑"No ❑ NA ONE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes CJ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [�'No ❑ NA ❑ NE 23. if selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [�No ❑ NA ❑ NE Page 2 of 3 21412014 Continued Facilitv Number: Date of Inspection: 24'Did thhacility fail to calibrate waste application equipment as required by the permit? t ❑ Yes [B<o ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [B"No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey [:]Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes E'No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes 2 No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document [] Yes []�No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [ENo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [ff�fo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes �o ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? [] Yes dNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes dNo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes O No ❑ NA ❑ NE Comments (refer::to q'uestioir #): _I~xplain,aiiy .YES answers and/or any additional recommendations or atiy.other comments. Use drawings,of facility to better explain situations (use additional pages as necessary). WIL% t4rm."L — iv_ 6—(5 ate- 3,3 d-s 3 . C �( Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: 33�3a Date: 21412011 Facility Number - ,Si O Division of Soil and Water Conservation Q Other Agency Type of Visit: Comp lance Inspect€on Operation Review Q Structure Evaluation Q Technical Assistance sit: Rou Reason for Vitine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: �J /�1. Arrival Time: Departure Time: County: Farm Name: t+0:2- 1a/r"' Owner Email: Owner Name: /4 - j�{-a � f -a.--M,$ ,$'h g_, Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Integrator:r�-•�ilr�«c� S P Certified Operator: Certification Number: Region: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Latitude: Phone: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Design Current Dry Poultry Capacity Pop, La ers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Daia Heifer Dry Cow .Non-Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes FA No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes C] No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes No ❑ Yes No ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE Page 1 of 3 21412014 Continued Facili Number: - Date of Inspection: 4 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [[No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes allo ❑ NA ❑ NE Structure 1 Structure Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): _ 3 3_ 5. Are there any immediate threats to the integrity of any of the structures observed? [:]Yes allo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ® No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes JQ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [] Yes ® No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 5�No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ® No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes fZ] No ❑ NA ❑ NE Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground [] Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12, Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ® No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ® No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [ No ❑ NA ❑ NE Renuired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes Q No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes © No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ® No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall []Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [5No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes q No ❑NA [3 NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑NA ❑NE Page 2 of 3 21412014 Continued Facility Number: - Date of Inspection: O" 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes gNo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes EZNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes fC No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes r7i No ❑ NA ❑ NE ❑ Yes C.No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes rC No ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [allo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [,No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes � No ❑ NA ❑ NE Comments,.(refer to question #): Explain.any YES answers and/or any additional recommendations or any other comments. Use drawings of facility tobetter explain situations (use additional pages. as; necessary). 6 Cf''ti—_nh.Yt7G U3 i] rk ti 7— B', V 7cn" 1�- v Reviewer/Inspector Name: Reviewer/Inspector Signature Page 3 of 3 Phone: Date: ,/ D / Z.5_ 21412014 q -3--lk Wo'Division of Water Quality Facility Number 5�j77 - p® 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: (grCompliance Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: a, routine 0 Complaint 0 Follow-up 0 Referral 0 Emereency 0 Other 0 Denied Access Date of Visit: ? f - Arrival Time: I 4,Q-c-j Departure Time: Countys Farm Name: r+.,, F", Owner Email: Owner Name: 1- ie,4 ramu _2:�na. Phone: Mailing Address: Physical Address: Facility Contact: _ azrNer- ne) /' -r— Title: Phone: Region: Onsite Representative: ,� � Integrator: 6_ne� fVj *—Z*a(Z: Certified Operator: I red 6p6 Certification Number: y*_gDk1' f Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Other Other Certification Number: Latitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. La er Non -Layer Design Current Dry Poultry Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Page I of 3 Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow .Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow []Yes El No ❑ NA ❑ NE [:]Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes No ❑ Yes [allo ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE 21412011 Continued Facility Number: - Date of Ins ection: 7�- Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure I Structure 2 Structure 3 Structure 4 Identifier: 3ack om i J Spillway?: Designed Freeboard (in): J 9 Observed Freeboard (in): 3 �- 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) Structure 5 [&No ❑ NA ❑ NE ❑ No ❑ NA ❑ NE Structure 6 ❑ Yes ®,No ❑ NA ❑ NE 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ®-No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Ej�No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): Be 'm Q s 13. Soil Type(s): vi ar rV 0L' 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [R No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes FU1 No Va ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes g No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ® No ❑ NA [ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes [&No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes E.No ❑ NA ❑ NE the appropriate box. ❑WUP []Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ® No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall [:]Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [gNo 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �a No ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑NA ONE ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: - Date of Inspection: .. 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes RNo 25. Is the facility out of compliance with permit conditions related to sludge? If yes, cheek ❑ Yes (;A_No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ® No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes allo Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [g No and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes O No If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes E� No permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes [ No ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes f% No 34. Does the facility require a follow-up visit by the same agency? ❑ Yes 5jNo ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE 6!nrn6ts {refee;to:questi6 #} Explain"any YES'answers and/or any additional recommendations or any other comments. t se drawings of.facIIIty`to better explain situations (use additional pages as necessary). Reviewer/lnspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: 9/"33L-.TJm Date: 21412011 tl'Division of Water Quality Facility Number :s, - © 4 Division of Soil and Water Conservation l 5� Q Other Agency Type of Visit: Comp lance Inspection Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit: outine 0 Complaint 0 Follow-up 0 Referral Q Emergency 0 Other 0 Denied Access Date of Visit: //— Arrival Time: C) 1. p b7 Departure Time: i i r ' "? County:` Farm Name: 24--��� Rrt-t Owner Email: Owner Name: j��- pry ,mar �n C, Phone: Mailing Address: Region: ! D Physical Address: Facility Contact: ��rYd 'Wtyry— Title: Phone: v - Onsite Representative: Integrator: au2e>*f g Certified Operator: a�b Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Design Current Design Current Capacity Pop, Wet Poultry Capacity Pop. Layer Non -Layer Pullets Poults Design Current Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow .Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow []Yes 0 No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes [:]No []Yes ® No ❑ Yes ® No ❑NA ❑NE ❑NA ❑NE ❑ NA ❑ NE Page 1 of 3 21412011 Continued Facili Number: - / Date of Inspection: Zl= lxl',go�7 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure I Structure 2 Structure 3 Structure 4 Identifier: '00 00 Spillway?: Designed Freeboard (in): 17 Observed Freeboard (in): Z3:L r_ 1 .3_ 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? Structure 5 F721 No ❑ NA ❑ NE ❑No [3 NA ❑NE Structure 6 0 Yes 10 No ❑ NA ❑ NE ❑ Yes g No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [g No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [allo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require Yes jig "`" ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [] Yes Ig No ❑ NA ❑ NE maintenance or improvement'? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [] Yes allo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? /k ❑ Yes � No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes allo [DNA ❑ NE ❑ Yes � No ❑ NA ❑ NE ❑ Yes [@ No ❑ NA ❑ NE Required Records & Documents 19, Did the facility fail to have the Certificate of Coverage & Pen -nit readily available? ❑ Yes ® No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [�No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps []Lease Agreements ❑Other: 21. Does record keeping need improvement? if yes, check the appropriate box below. []Yes C&No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis [] Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 " Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [a No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes .® No ❑ NA ❑ NE ❑ Weather Code []Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes RLNo 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes JZ No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑Yes No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ® No Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑ Yes E�j No ❑ NA ❑ NE ❑ Yes EQ No ❑ NA ❑ NE ❑ Yes allo ❑ NA ❑ NE [-]Yes ® No ❑ NA ❑ NE ❑ Yes [�j No ❑ NA C1 NE ❑ Yes ®. No ❑ NA ❑ NE ❑ Yes W No [DNA ❑ NE Comments (refer to question;#} Explain any YES answers and/or any additional recommendations or any other comments. Usefdrarvings'.of facility to.better explain situations (use additional pages as necessary), Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: 9/Q-yam' 3-3-'roD Date: 11-1y p20/3 21412011 It Type of Visit: Complianee Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: (Ercoutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access -- 7_> Date of Visit: Arrival Time: :3 D Departure Time: ', DD CountyRegion:� Farm Names r' Owner Email: Owner Name: M-p ;L Phone: Mailing Address: Physical Address: Facility Contact: (Crr /%%r`C_ Title:,—c. Phone: Onsite Representative: Integrator: Certified Operator: fjr"( �- Z2 latz Certification Number: Rack -up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current S�vinc Capacity Pap. Wet Ppultry Capacity P. Cattle Capacity Pop. Wean to Finish Wean to Feeder La er Non -La er Dairy Cow Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Doi Cow Farrow to Feeder Farrow to Finish Layers Non -Dairy Beef Stocker Gilts Non -Layers Beef Feeder Soars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes MNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes []No ❑ NA ❑ NE b. Did the discharge reach waters of the State`? (if yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. is there evidence of a past discharge from any part of the operation? ❑ Yes IN No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes CD ❑ NA ❑ NE of the State other than from a discharge? -No Page 1 of 3 21412011 Continued Facili Number: - Date of Inspection: -- Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes Z, No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: f 00 VD 426TC)— Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes allo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes M No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes RLNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes allo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require Egly_,es ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Aaulication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ELNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): r ar�7.7-r�irrr� l�yrr .--•- 13. Soil Type(s): j J o 125LXZy --1Anti 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Q No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ® No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes EI No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes Jallo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes JELNo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [S-No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E,No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes D�LNo ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of a 21412011 Continued Facili Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 0 No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 3l. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ® No ❑ Yes E?j No ❑ NA ❑ NE ❑NA ❑NE ❑ Yes MMNo [3 NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes (3 No ❑ NA ❑ NE ❑ Yes CEINo ❑ NA ❑ NE ❑ Yes ® No ❑ Yes ® No 0—Yes ❑ No ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE Comments (refer. to question #): Explain any YES answers and/or any additional recommendations or any other comments Use drawl4gs:of facility,to better explain situations (use additional Pages as necessary). �Dw n uj , f( f6((D.Lr a wi L 71, ray-m,b_ Reviewer/inspector Name: Reviewer/Inspector Signature: Page 3 of 3 C�W-303 _D1 Sl_� Gr It Phone: 2z�- 3�33 Date: 2/412011 Division of Water Quality �C Facility Number ®- �� Division of Soil and Water Conservation /�7,4 Q Other Agency Type of Visit: O Compliance Inspection 0 Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: O Routine 0 Complaint O Follow-up 0 Referral 0 Emergency O Other 0 Denied Access Date of Visit: —/ Arrival Time: a Departure Time: 1 O : D County: Region: Farm Name: Owner Name: Mailing Address: Physical Address: Owner Email: Phone: Facility Contact: ���'`�tv' /I'Iaor^`C_ Title: ��, sp Phone: Onsite Representative: a-- Integrator: Certified Operator:/ate C Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. l a er Non -La er Design Current DrX Poultry Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dai Heifer Dry Cow .Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes 2� No ❑ NA [] NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE d. Does the discharge bypass the waste management system? (if yes, notify DWQ) ❑ Yes [] No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ENo ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Facili_0 Number: - Date of —Inspection: Waste Collection & Treatment t 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes allo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 2100 '�0 T O Spillway?: Designed Freeboard (in):9- Observed Freeboard (in): �3 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Q No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes E] No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? O Yes No ❑ NA ❑ NE S. Do any of the structures lack adequate markers as required by the permit?-Y eS ®.No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require F. Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [-]Yes ® No ❑ NA ❑ NE maintenance or improvement? 11. 1s there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 0 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence off Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): � ,. /fl�r r'����i�i�1r� �` ce_ Cent / ..,k.•f%5��. ,.�-- f 13. Soil Type(s): 4. 71 / 2504 f 4r./ % _/o of /,„.., i�Av��, 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ® No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ® No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [S No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? ❑ Yes 2] No ❑ NA ❑ NE ❑ Yes allo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? [] Yes ®. No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [:]Yes ER -No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists [:]Design [:]Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 5a No ❑ Waste Application 0 Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ,LNo 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes _S No ❑NA ❑NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 21412011 Continued _, Facili Number: -I Date of Inspection: —/-- / J 24, Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes M No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [S-No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ® No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes gNo [DNA ❑ NE ❑ Yes f�L No ❑ Yes ac No []Yes E No ❑NA ❑NE [DNA ❑ NE ❑ NA ❑ NE Comments (refer to question.#): Explain any YES.answers and/or any additional recommendations -or any other comments,�' A.`'Yy* Use drawings of facility to better explain situations (use additional ages as necessary)), 0,-- %Sf Gl/D rlrC fil arty rr-� o[ 0 - G eat+ r �i �'- �-r�►I� t pry. bn ac � �<r� a>� f� %a uS r z- �f 5 i � �p 0 Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: gA* .3 3 o 0 Date: 12 21412011 Type of Visit Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit Q46utine O complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: �! D Arrival Time: IT'D Departure Time: : H� County: Region; -_ Farm Name: Ad-!3 Owner Email: Owner Name: A- i+ w%_ = n e,, Phone: 01 Mailing Address: Physical Address: Facility Contact: (f-Z>�L-= Title:. % j:aL ��r� Phone No: Onsite Representative: C� - Integrator: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts u Other ❑ Other Operator Certification Number: Back-up Certification Number: Latitude: = o F--I = " Longitude: 0 o =' = Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer ❑ Non -La er Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkev Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Daia Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures., b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes gNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE El NA El NE El yes El No ❑ Yes allo ❑ NA ❑ NE ❑ Yes 9,No ❑ NA ❑ NE 12128104 Continued Date of Inspection $10 Facility Number: — g' Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ®No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure l Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: DZJ 0V AZOV Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes KNo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes RNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? 5.Yes ❑ No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes [9 No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require R[Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes &No ❑ NA ❑ NE maintenance/improvement? 11, Is there evidence of incorrect application? If yes, check the appropriate box below. Cl Yes RNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) [:]PAN ❑ PAN > 10% or l0 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of AcceptableCrop Window ❑l Evidence of Wind Drift ❑ ApplicationOutside of Area 12. Crap type(s) '�`M-rfi s /%hl�/ / T �5 f�LIC .�f f f�wi I.SMr-'roa -o' 13. Soil type(s) ���I �ED $ L- G !`-'Dd�J�� 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [2.No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ® No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes ® No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes 21No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [3-No ❑ NA ❑ NE irw7 ii Commen ss,ire r toque lion #)€ _ plain any YES'answers and%or Any re r',l y commendations or'an other comments. Use drawings of facility to better explainAsituptlans. (use additional pages;as necessary): . _ . . . 7, of A 1 C j A'M Reviewer/Inspector Name F1CvG-y�j——^� Phone: Reviewer/Inspector Signature: Date: Page 2 of 3 12128104 Continued 1 Facility Number: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes 54-No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes allo ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design [I Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 5,01�ZNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes RNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes E4 No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes K No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes 9No ❑ NA ❑ NE 26, Did the facility fail to have an actively certified operator in charge? ❑ Yes &No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification'? ❑ Yes RNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes QSNo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes gNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately .2 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ® No ❑ NA ❑ NE General Permit? (ic/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes allo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? iayes ❑ No ❑ NA ❑ NE tonal!gComments,andlar Drawin s;,' ","'' .P Page 3 of 3 12128104 Page 3 of 3 12128104 6XR45 l a. w Zz - ZO 0 9 , ivision of Water Quality Facility Number O Division of Soil and Water Conservation 0 Other Agency Type of Visit ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit outine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: iZ� -09 Arrival Time: i0; 3�` Departure Time: lQSSCounty: Region: GAO Farm Name: B� �� �' Owner Email; Owner Name: f� 8 �D-i �'Tt vim', �' Phone: Mailing Address: Physical Address: Facility Contact: -laow e— , __ Title: Phone No: Onsite Representative: ��'<<- ✓ ILlrrO✓� Integrator: 54f-110 Certified Operator: �0�Y4� 5�c-y Operator Certification Number: 2025Y Back-up Operator: Location of Farm: Back-up Certification Number: Latitude: o = ' = Longitude: =0=1 Design Current Design Current Swine Capacity Population -Wet Poultry Capacity Population Cattle ❑ Wean to Finish ❑ Wean to Feeder Feeder to Finish �z00 Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other ❑ La er ❑ Non -Layer Dry Poultry Other Poults Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made'? b. Did the discharge reach waters of the State? (If yes, notify DWQ) Design Current Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Pfeifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow c. What is the estimated volume that reached waters of the State (gallons)? Number of Structures: M d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? []Yes No ❑ NA ❑ NE ❑ Yes ❑ No El NE ❑ Yes El No ,[_,_',—A DNA ❑ NE B< ❑ NE ❑ Yes ❑ No ❑ Yes C7 No ❑ NA ❑ NE ❑ Yes Ala ❑ NA ❑ NE 12128104 Continued Facility Number: 8 -��Date of Inspection Waste Collection & Treatment �� 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? []Yes EK ❑ NA ❑ NE a. If yes, is waste level into the structural Freeboard? ❑ Yes l.7 No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: -2-/0 a ZZO�L Z_5-D2o Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 2 o ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ETNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ETNo ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [l Yes Io ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes Io ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes 2'No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area 12. Crop type(s) ?+cleCYy. (H6 (pia loss%%t FSeu 6< l r�a✓a.� ` Cr O� S� 13. Soil type(s) 4r4, PC �e- /q- AfO 4 LAf6L,g 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ET< ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Q o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination';[:] Yes 2 Igo ❑ NA ❑ NE 17, Does the facility lack adequate acreage for land application? I S. Is there a lack of properly operating waste application equipment'? ❑ Yes D o ❑ NA ❑ NE ❑ Yes 2<o ❑ NA ❑ NE Reviewer/Ins c, v Inspector Name p Phone: Wo . S43.3, 3.3-n0 Reviewer/Inspector Signature: Date: 1z -Z/— 09 12128104 Continued Facility Number: ° �Z-,s/ Date of Inspection Reguired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes E'go_ ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? if yes, check ❑ Yes CTNo ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 3 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification [--]Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? 23, if selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWNW? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? Comments and/or Drawings: ❑ Yes 2<o ❑ NA- ❑ NE ❑ Yes 2<oo ❑ NA ❑ N6 ❑Yes El NA El NE ❑ Yes Zo ❑ NA ❑ NE ❑ Yes B o ❑ NA ❑ NE ❑ Yes � ❑ NA ❑ NE ❑ Yes a<0 ❑ NA ❑ NE I / El Yes €�No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes LH'No ❑ NA ❑ NE ❑ Yes No NA ElNE ElYes o ❑ NA ❑ NE 1?,128104 Facility. Number; Q"iiivision of Water Quality Q Division of Soil and Water Conservation Q Other Agency Type of Visit &'i,ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit outine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: /Z-/8-0Arrival Time: /d �3S` Departure'rime: //; /Q County: a^°"� Region: Farm Name: $ hfj Owner Email: Owner Name: -A/ L Phone: Mailing Address: Physical Address: Facility Contact: „ 2 re4_ r'___ O-v-` _ Title: i a! Li Phone No: Onsite Representative: Integrator: c¢oz✓!-ect_ FVI - 1-5 Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Operator Certification Number: Back-up Certification Number: Latitude: = 0 0 6=Ig Longitude: ❑ o= 6 Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er _ - 1 10 Non -La cr Other ❑ Other T. Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turke s ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy 1-Ieifej E]Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: Fal b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No EY<A ❑ NE ❑ Yes ❑ No IA ❑ NE Ea< ❑ NE ❑ Yes ❑ No ❑ Yes D 5o ❑ NA ❑ NE ❑ Yes 3< ❑ NA ❑ NE 12128104 Continued Facility Number: $� _ ,S� Date of Inspection I rZ- I S P; Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes CIONo ❑ NA ❑ NE a. if yes, is waste level into the structural freeboard? ❑Yes LTNo ❑ NA [I NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ZAd D bG 2200 Z fOD n[ Spillway?: Designed Freeboard (in): Observed Freeboard (in): 20 VD Zto 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 3<o ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) � 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes B o ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes C7 No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? [:]Yes ❑-tro— ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [31o- ❑ NA ❑ NE maintenance or improvement? Waste Application 10, Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [ io ❑ NA ❑ NE maintenance/improvement? �� 11. Is there evidence of incorrect application? If yes, check the appropriate box below. [I Yes Elgo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes E No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 2<oo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes B tvo ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes 2' -oo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes E;-Ko ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name iG I" S Phone: Reviewerllnspector Signature: Date: r2 zoo 12128104 Continued Facility Number: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropiate box. ❑ WUP ❑ Checklists ❑ Design El Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes C"J�No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes;N>o NA ❑ NE 24. Did the facilityfail to calibrate waste application equipment as re required b the permit? ❑ Yes NA ❑ NE pPq Y 25, Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ffrNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes to ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) �,� 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? El Yes L7No�❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? El Yes E3<o ❑ NA ❑ NE Additional Comments and/or Drawings: 12128104 alAIS /L//9/0o0.7 Aft DiV>sion of Water Quality n Facility Number; �Z / Q'.Division of Soil24atid Water Conservation =�,D Other Agency. Type of Visit G-Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason far Visit 9 outine O Complaint O Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: 27 / r e-. Departure Time: !S% /�.� County: H. 36M Region: �'� Farm Name: Imo' 1 �-io�+ +^—. Owner Email: Owner Name: _ A �- �SY►"��- Phone: Mailing Address: Physical Address: Facility Contact: Title: 1 � Sfe�. Phone No: Onsite Representative: Integrator: 494.1/1Z14 /::;SCcpDf� Certified Operator: Back-up Operator: Location of Farm: "Swine.. Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Other ❑ Other Operator Certification Number: Back-up Certification Number: Latitude: = O ❑ 1 Longitude: ❑ ° = i Design Current Design Current Capacity Population Wet Poultry Capacity Population PElLa er Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current' Cattle Capacity Population;.. ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ DpL Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State`? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system'? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes T No ❑ NA ❑ NE ❑ Yes [� No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ® No ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 12128104 Continued Facility Number: $Z— Jr+< Date of Inspection Z /3-07 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [P No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes [j§No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 'Z I d-o Spillway?: Designed freeboard (in): Observed Freeboard (in): 2-rf g e17 / 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 54 No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes PNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [p No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) r 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement'? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes [?No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidenceof Wind Drifl [IApplication Outside of Area 12. (paslvr� Crop type(s) �* /�.L,�c.- fr Pa �,L j JW, /fd(P.,S-L j R-Sccaa-01 J \ . 5. G •�avus J 13. Soil type(s) tt�, gg_ �<-Ar lQ0 h, t*Jtie ►-Z; 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [4 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement'? ❑ Yes 7 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes [P No ❑ NA ❑ NE 17, Does the facility lack adequate acreage for land application? ❑ Yes J� No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes P No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name ; R"C_u Phone: 9Vd - 1�33 • 3 3.00 Reviewer/Inspector Signature: Q e�-�a�i� Date: 1 Z -13 " Z.oQ 7 12128104 Continued J Facility Number: Z — j/ Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes M No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [A No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [21 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22, Did the facility fail to install and maintain a rain gauge? ❑ Yes t No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes V No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [A No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes [� No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes 17 No ElNA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ® No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes 10 No ❑ NA ❑ NE General Permit? (ie/ discharge, Freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ® No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes No ❑ NA ❑ NE Comments and/or Drawings: 12128104 Type of Visit ® Compliance Inspection Q Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit *Routine O Complaint O Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: /Q 2 -p(o Arrival Time: //,'�fJ -, Departure Time: County: • Farm Name: F S yob 6&,Ls3 Owner Email: f)wnPr NAmP- TtL Ak'P_u �lll1`Y� _ PhnnP! Mailing Address: Physical Address: Region: Facility Contact: (s kLe-jc lif"i,irTitle: le-ch, 4zri- . Phone No: Onsite Representative:4��-t.. ✓ )Wo,iv,C . Integrator: 60111.'d /�s� r5 Certified Operator: ,p�rad-6rci L ` cpo�+S _— Operator Certification Number: 95f_90gT�` Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: E] o E 3 = 11 Longitude: = ° 0 t = t, Swine Design Current Design Current Design Current Capacity Population Wet I sultry Capacity Population CattleMMLUapcity Population ❑ Wean to Finish ❑ Laver ❑ Dair Cow JE1 Non -Layer I ❑ Dairy Calf / O` El Dairy Heifer Dry Poultry ❑ Dry Cow ❑ Non -Dairy ❑ Layers ' El Beef Stocker ❑ Non -Layers ❑ Beef Feeder ❑ Pullets ❑ Beef Brood Cow ❑ Turke s ❑ Turkey Poults ID Other I Number of Structures: ❑ Wean to Feeder Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes UfNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes [)I No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes R No ❑ NA ❑ NE other than from a discharge? Page 1 of 3 12128104 Continued : Facility Number: $Z — 5/ Date of Inspection 0-20% Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: Zl UD 2ZOV 25-00 Spillway?: Designed Freeboard (in): J# a �i Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? []Yes [M No ❑ NA ❑ NE ❑ Yes [B No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes [A No ❑ NA ❑ NE ❑ Yes R No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7, Do any of the structures need maintenance or improvement? ❑ Yes [A No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes R No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ® No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [% No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes E�No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) BGYfuu.�a . A z r _ /�./�� � . R� t� Gvitl�u fl'�e �. Fstu � C ►zz -e .r 13. Soil type(s) e�o / a A Ib i ida, 14, Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [A No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes El NA El NE 18. Is there a lack of properly operating waste application equipment? ElIg Yes ,WpNo No ❑ NA ❑ NE Comments (refer to question #) Explain any YES answers and/or any.recommendadons or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): T Reviewer/inspector Name I T l� PC:VPhone: 9/0 .3 'J d� Reviewer/Inspector Signature: Date: /6 - 2V - Z ffb (p Page 2 of 3 12128104 Continued Facility Number: �Z j / Date of Inspection o zy—oG Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes [p No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ® No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes �3 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ® No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ® No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit'? ❑ Yes [51 No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 26, Did the facility fail to have an actively certified operator in charge? ❑ Yes [Z No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification'? ❑ Yes [;gNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes M No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes H3 No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [A No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes [gNo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative'? ❑ Yes M No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes C9No ❑ NA ❑ NE Page 3 of 3 12128104 Type of Visit ® Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit ® Routine O Complaint O Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: : d u q,h Departure 'Time- County: s�oeags-�— Region: Farm Name: /3, Owner Email: Owner Name: f� 12 He s 11'-ar$..,a tahe p Phone: Mailing Address: �'1 od 311 is i.a � I�dC !l os, A:(� Physical Address: ,�pp Facility Contact: hi l{roa r { Title: Phone No: Onsite Representative: - __e,r_+t'SrIntegrator: Certified Operator: �dt g r�v 1 /G / J Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: = o = 1 = " Longitude: = o = , 0 Swine Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er ❑ Non-Layet Other ❑ Other - 1k Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ urkey Poults ❑ Other Discharges & Stream Impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stoekei ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c, What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes VNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑-No ❑ NA ❑ NE ❑ Yes [QNo ❑ NA ❑ NE ❑ Yes R No ❑ NA ❑ NE 12128104 Continued Facility Number: ,ti — 6-1 Date of Inspection Waste Collection & Treatment �� 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? [I Yes M No ❑ NA ❑ NE a. if yes, is waste level into the structural freel�oa d?, [I Yes ❑ No El NA ❑ NE ti '6. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: a/ 0 v aal 0 o 0'2 6- 0 a Spillway?: Designed Freeboard (in): Observed Freeboard (in): ' " R D " A $ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [ENo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes [RNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes allo ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes [RNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Es No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes EFNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes Q"No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) �r r., c.4 Civn e _;;C,/l -A A s2ze P 13. Soil type(s) 2, R _ �_ A. 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [9 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes allo ❑ NA ❑ NE 16, Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination:❑ Yes [qNo ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA [I NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ,[-9,,,'CCN'�o ED/No ❑ NA ❑ NE (gax,_ haSuu•1 13es J� ' oV- stet :1/o0 A-vSae,, r Reviewer/Inspector Name :j.�d�it�.. a �i t �'' ° Phone: Reviewer/Inspector Signature: Date: 12128/04 Continued r Facility Number: — S 1 Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes [g"No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes QNo ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 52"No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes EgNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes G 'No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [�rNo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes 0'No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes 2No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes D No ❑ NA ❑ NE Other Issues 28, Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 0'No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes allo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern'? ❑ Yes ['No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes M No ❑ NA ❑ NE General Permit`? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative'? ❑ Yes ED No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes [0,No ❑ NA ❑ NE and76rawings �►iilkditional Comments i'p _day[s �/jdSi+ if I'/7 OR le -/oi/iCc 12128104 Facility Number Z S ( Date of Visit: Time: Q Not Operational Q Below Threshold ® Permitted ® Certified 0 Conditionally Certified 13 Registered Date Last Operated or Above Threshold: . » ..._..... Farm Name: ..» .... _i .......11`7a1 ... �"� ._rrfl,C:lniCounty:....» Owner Naive: . „ �.�»»..»... :.1 Lt Tl�.� !!lAr.�t_ ,� t!k,f�� ._ . _ .... Phone No: Mailing Address:. Facility Contact: .. „..{,�.1 1�r3�.. _..!!�Q(1x' .» _ Title:..__.. ._..__...._. ._. ..._w_. _ _. Phone No: Onsite Representative: �.�.__t2�..�_..._.__..__._ ..» » ».... Integrator: Certified Operator:.._...-r GS ... _ »Goa�^� 4_ _.... _........ ...... Operator Certification Location of Farm: a Swine ❑ Poultry ❑ Cattle ❑ horse Latitude ' 4 44 Longitude • 4 « Discbaraes & Stream I, mMEts 1. Is any discharge observed from any part of the operation? ❑ Yes ]$ No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes ❑ No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) [] Yes ❑ No c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes J&No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes JMNo Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: _.__,» . ».. r ..��__ ... Z,rt? ... ...__ .... _...._... . _....._. ........ _____._....__ ....» Freeboard (inches): 12112103 Continued Facility Number: gz — SI Date of Inspection to 4 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes SLNo seepage, etc.) 6. Are, there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes 0No closure plan? (If any of questions 4.6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes RNo B. Does any part of the waste management system other than waste structures require maintenancelimprovement? ❑ Yes Rio 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes KNo elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes R No 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes JR No ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type CCOL4.,.1 . S vr+ w� ¢ r i , (.7 i 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes KNo 14. a) Does the facility lack adequate acreage for land application? ❑ Yes J&No b) Does the facility need a wettable acre determination? ❑ Yes No c) This facility is pended for a wettable acre determination? ❑ Yes ja No 15. Does the receiving crop need improvement? ❑ Yes ;KNo 16. Is there a lack of adequate waste application equipment? ❑ Yes P No Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes ❑ No liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ® No 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes ® No roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes JANo Air Quality representative immediately. J iMJ W V.d WliNIl /i6(i Faciliyy Number: Date of Inspection O t 0 1; Required_ Records & Documents 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes W No 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUV(E"hecklis$4esign, maps, etc.) ❑ Yes KNo 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ® No ❑ Waste Applicatioe[3 FreeboarOl"❑ Waste Analyses(] Soil Sampling 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes Ca No 25. Did the facility fail to have a actively certified operator in charge? ❑ Yes j$No 26. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes Q No 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes Q No 28. Does facility require a follow-up visit by same agency? ❑ Yes KNo 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes Flo NPDES Permifto Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) ® Yes ❑ No 31. if selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ®,No 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes ® No 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes ®,No 34. Did the facility fail to calibrate waste application equipment? ❑ Yes ELNo 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes allo [I Stocking For Crop Yield Form ❑ Rainfak-'❑ Inspection After 1" RaiW/' ❑ 120 Minute Inspection❑ Annual Certification Form/ No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. 1Z/s/03 z. 2.1 , z.1 ��ti /oy 2•N, s.y, Z•? 7410 /o4 2,41 3. &I , Z.Z g�Z�oy 2•�, 1.Z, O.q� 3 S . � 1�.� 7�(.�,e S� oc�H r•c� t•arw�g C 40 � '[�. �r..e�� Sw•.i {{,�. �a..tti«� S, °�� a..nK ua� c f-�-;�: a.`iti`c�► �o�v�s i *� 0+1 - 5 4e- r-e c_o r v6 . 12112103 r/to State of North Carolina Department of Envir6nmant, Health and Natural Resources A00^ i Fayetteville Regional Office 74fA James B. Hunt, Jr„ Governor p E H N F� Jonathan B. Howes, Secretary Andrew McCall, Regional Manager DMSION OF ENVIRONMENTAL MANAGEMENT September 14, 1995 A&B Hog Farm ATTN: Mr. Aubrey Moore 100 Balkcum Road Rose Hill, NC 28458 SUBJECT: Compliance Inspection Sampson County Dear Mr. Moore: On July 26, 1995, an inspection of your animal operation was performed by the Fayetteville Regional Office (FRO). Please find enclosed a copy of our Compliance Inspection Report for your information. It is the opinion of this office that this facility is In compliance with 15A NCAC 2H, Part .0217, and that Animal Waste Management is being properly performed. Should you have any questions regarding this matter, feel free to contact me at (910) 486-1541. Sincerely, Ricky Revels Environmental Technician IV RR/bs Enclosure cc: Facility Compliance Group Wachovia Building, Suite 714, Fayetteville. North Carolina 28301-5= Telephone 910-486-1541 FAX 910-486-0707 An Equal Opportunity Affirmative Action Employer 5096 recycled/ 10% post -consumer paper Site Requires Immediate Attention: D Facility No. F 2 - S I O DIVISION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERATIONS SITE VISITATION RECORD Farm Name/Owner: /4 Mailing Address: i00 County:_ 56meg-C, ,✓ Integrator:- - L t 5 9= On Site Representative: — Physical Address/Location: DATE: 1995 Time: 17- : 0 Z � 8 h�� �u rrs•ti ,C3alKcur� Rd. Fd.r� s r_ e 0 o ele- 2 S4S Phone: Sz 9 - 4&53cv Phone% 532 u�er+r G?r %r A4, I[Sy4-y 41V 5, Near ' .rat. r re `lp Type of Operation: Swine _/ Poultry Cattle Design Capacity: 5575 F�ov, Number of Animals on Site: DEM Certification Number: ACE DEM Certification Number: ACNEW Latitude: 34 ° `+" 1 ' '+ 3 " Longitude: 'IS ° / & ' / 0 " 34 50 14 Circle Y es-% No19 oc, Does the Animal Waste Lagoon have sufficient freeboard of 1 Foot + 25 year 24 hour storm event (approximately 1 Foot + 7 inches) ® or No Actual Freeboard: 3 Ft. (� Inches Was any seepage observed from the la oon(s)? Yes or� Was any erosion observed? Yes oro Is adequate land available for spray? or No Is the cover crop adequate`! Qor No Crop(s) being utilized: 5er a.. Does the facility meet SCS minimum setback criteria? 200 Feet from Dwellings? or No 100 Feet from Wells? (r s_ r No Is the animal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes orb Is animal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line: Yes 0(9�) Is animal waste discharged into water of the state by man-made ditch, flushing system, or other similar man-made devices? Yes or(j;W If Yes, Please Explain. Does the facility maintain adequate waste management records (vol nes of manure, land applied, spray irrigated on specific acreage with cover crop)? Yes ortN.o' Additional Comments: 9"C' , R2 V ?_ & / 7 , /' "-?.� Inspector Name Signature cc: Facility Assessment Unit Use Attachments if Needed. ly- nI_ Water Resources Environmental Quality A & B Hog Farms, Inc A&BHog Farm 2207 Moores Bridge Rd Rose Hill, NC 28458 Dear A & B Hog Farms, Inc: RECEIVED DEQIDWR JUL 18 2017 WQROS FAYETTEVILLE REGIONAL OFFICE July 12, 2017 ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS820051 A&BHog Farm Animal Waste Management System Sampson County The Division of Water Resources (Division) received your sludge survey information on July 5, 2017. With the survey results, you requested an extension of the sludge survey requirement for the lagoon #2100 at A & B Hog Farm facility. Due to the amounts of treatment volume available, the Division agrees that a sludge survey is not needed until December 31, 2021. The next sludge survey for the lagoon #2100 at A & B Hog Farm facility should be performed before December 31, 2021. Please call me at (919) 807-6340 if you have any questions. Sincerely, -z-9 � Miressa D. Garoma Animal Feeding Operations Program cc: Fayetteville Regional Office, Water Quality Regional Operations Section Permit File AWS820051 Nothing Compares':-, State of North Carolina I Environmental Quality I Division of Water Resources Water Quality Regional Operations Section 1636 Mail Service Center I Raleigh, North Carolina 27699-1636 919-707-9129 Water Resources w Environmental Quality A & B Hog Farms, Inc A & B Hog Farm 2207 Moores Bridge Rd Rose Hill, NC 28458 Dear A & B Hog Farms, Inc: RECEIVED DEQ/DWR JUL 18 2017 WQROS FAYETTEVILLE RFGIONAL OFFICE July 12, 2017 ROY COOPER Governor MICHAEL S. REGAN secretory S. JAY ZIMMERMAN Director Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS820051 A&BHog Farm Animal Waste Management System Sampson County The Division of W rTlivision) received your sludge survey information on July 5, 2017. With the su -"'-e sludge survey requirement for the lagoon #2100 .tnts of treatment volume available, the Div 3 until December 31, 2021. The next sludge,,; ��� � S� p gn E-:Nc'e rtn facility should be performed before Decembe, if you have any questions. .tions Program cc: Fayettc-----. !l Operations Section Permit File AWS82UU:r r.�Nurhing Cempares:- :- State of North Carolina I Environmental Quality I Division of Water Resources Water Quality Reglonai Operations Section 1636 Mail Service Center I Raleigh, North Carolina 27699-1636 919-707-9129 Nutrient Management Plan For Animal This plan has been prepared for: A&B Hog Farm Aubrey Moore 100 Balkum Road Rose Hill, NC 28458 (910) 532-4855 11-22-2005 Wastelutil'009 2. LOW�ol This plan has been developed by: Greer Moore Private PO Box 338 Harrells, NC 28444 (910) 53 -4493 , �z�- Developer Signature Type of Plan: Nitrogen Only with Manure Only Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. Signature ( er) Signature (manager or producer) /) -;� �;L, -� Date Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Co servation Commission. Plan Approved By:� Technical Specialist Signature D e 821949 Database Version 3.1 Date Printed: 11-22-2005 ��Cover Page 1 Narrative Coastal Bermuda may he applied on from March 1 st thru October I5th, unless frost occurs first. a ,-wow 1 `""� 821949 Database Version 3.1 Date Printed: If -22-2005 Narrative Page I of I a .-' Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. S7 Swine Feeder -Finish Lagoon Liquid waste generated 7,638,480 gals/year by a 8,240 animal Swine Finishing Lagoon Liquid operation. This roduction facility has waste storage capacities of approximately 180 day!. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 17593 Incorporated 30214 Injected 33274 Irrigated 19123 Actual PAN Applied (Pounds) Actual Volume Applied (Gallons) Volume Surplus/Deficit (Gallons) Year 1 28,027.80 11,195,452 -3,556,972 tiote: In source 1D, S means standard source. U means user defined source. 821949 Database Version 3.1 Date Printed: 11-22-2005 Source Page I of 1 =idle table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop in the plan. In addition, the Leaching Index for each field is shown, where available. Planned Crops Summary Tract Field Total Acres Useable Acres Leaching index (LI) Soil Series Crop Sequence RYE 6425 10 4.70 4.70 N/A Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagmss Pasture 4.5 Tons 6425 11 5.40 5.40 NIA Woodington Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 4.5 Tons 6425 12 5.70 5.70 NIA Woodinoon Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 4.5 Tons 6425 13 4.80 4.80 NIA Autryville Small Grain Overseed 1.0'I'ons Hybrid Bermudagrass Pasture 5.5'rons 6425 14 1.40 1.40 N/A Autryville Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 5.5 Tons 6425 15 5.40 5.40 NIA Au ille Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 5.5 Tons 6425 5 5.40 5.40 NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 4.5 Tons 6425 6 5.40 5.40 NIA Norfolk Cereal/Annual Ryc O/S, Hay4n Harvest 2.0 Tons Pend Millett, Pasture 5.5 Tons 6425 7 5.40 5.40 N/A Norfolk Cereal/Annual gyeMS, HayAn Harvest 2.0 Tons Pearl Millett, Pasture 5.5 Tons 6425 8 4.20 4.20 NIA Norfolk Cereal/Annual Rye O/S, Hay-4/7 Harvest 2.0 Tons Pearl Millett, Pasture 5.5 Tons 6425 9a 1-201 1.20 NIA Blanton CcmaUAnnual Rye US, Ha-4/7 Harvest 2.0 Tons Pearl Millett, Pasture 4.1 Tans 6425 9b 1.20 1.20 NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 4.5 Tans 7090 1 3.60 3.60 N/A Blanton Sma11 Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 4.5 Tons 7090 2 2.00 2,00 N/A Blanton Small Grain Overseed 1.0 Toms H rid Bermudagrass Pasture 4.5 Tons 7090 3 2.30 2.30 N/A Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 4.5 Tons 7090 4 4.50 4.50 NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bcrmudagtass Pasture 4.5 Tons 7091 16 4.10 4.10 NIA Leon Small Grain Overseed I.0 Tons on I AA!1 nw.t-o.. ll.,e:.,.. i 1 rUtr %4: F.A I I r)-Inm; Planned Crops Summary Tract i Field 'total Acres Useable Acres Leaching Index (Ll) Soil Series Crop Sequence RYE Hybrid Bermudagress Pasture 3.0 Tons 7091 1 17 3.101 3.10 NIA lAutryville Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 5.5 Tons 7091 18 1.30 1.30 NIA Autryvillo Small Grain Overseed 1.0 Torts Hybrid Bermudagrass Pasture 5.5 'Cons 7091 19 3.90 3.90 NIA Autryville Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 5.5 Tons 7091 20 4.70 4.70 NIA Au ille Small Grain Overseed LO Tons Hybrid Bermudagrass Pasture 5.5 'rons 7091 21 6.10 6.10 NIA Au ille Small drain Oversoed 1.0 Tons Hybrid Bermudagrass Pasture 5.5 Tons 7091 22 6.10 6.10 NIA Awryville Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 5.5 Tons 7091 23 5.40 5.40 NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagmss Pasture 4.5 Tons 7091 24 4.60 40 NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 4.5 Tons 7091 25 5.70 5.70 NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bcrmudsgrass Pasture 4.5 Tons 7091 26 1.50 1.5 NIA Blanton Small Grin Overseed 1.0 Tons Hybrid Bermudagrass Pasture 4.5 Tons 7091 27 3.70 3.70 NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 4.5 Tars 7091 28 3.80 3.80 NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 4.5 Tons 7091 29 3.80 3.80 NIA Blanton Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Pasture 4.5 Tons PLAN TOTALS: 120.40 120.40 LI Potential Leaching Technical Guidance < 2 Low potential to contribute to soluble None nutrient leaching below the root zone. >= 2 & Moderate potential to contribute to Nutrient Management (590) should be planned. <- 10 soluble nutrient leaching below the root zo ne. High potential to contribute to soluble Nutrient Management (590) should be planned. Other conservation practices that nutrient leaching below the root zom improve the soils available water holding capacity and improve nutrient use efficiency > 10 should be considered. Fxamples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No-Td1(778), and edge -of -field practices such as Filter Strips (393) and Riparian Forest Buffers (391). 0'1 s n 4n ne,olwr. V..ai.... 'Z 1 rlat. Ur4m.A r r l7 MMK Waste Utilization Table VnAr 1 Tract Field Source ID Soil Series Tonal Acres Use. Acres 1 Crop RYE APplic, Period Nitrogen PA Nutrient RegV (Ibs/A) Canm Fert. Nutdcnt Applied (Ibs1A) Res. (lbs/A) Applea Method Manure PA Nutrient Applied (1bs1A) Liquid MmmrA pp5od (acre) Solid Manure Applied (acre) Liquid 1 Manure Applied (Field) Solid Manure Applied (Field) N N N N IOOD gal/A Tans 1000 gals tons 6425 7 S7 Norfbtk 5.40 5.40 CereallAnnuai Rye O/S, Hay-4n Harvest 2.0 Tans 10/1-3/31 100 0 0 1 brig. 100 39.94 0. 215-70 O.Ot 6425 7 S7 orfaik 5.40 5.40 Pearl Millem Pasture 5.5 Tons 4/1-9/15 209 0 0 brig Z 83.48 0. 450.$1 0.41 6425 8 S7 Norfolk 4,20 4.20 Cemd/Annuel Rye O/S, Hay-4n Harvest 2.0 Tons 10/1-3131 100 0 0 brig. 100 39.94 0. 167.7 0.04 6425 8 S7 Narfolk 4.20 4.20 Pearl Millets Pasture 5.5 Tons 4/1-9/15 209 1 0 0 Irri& 209 93.48 0. 350.63 0.41 6425 9a S7 Blanton 1,20 1.20 Cereal/Annual Rye OIS, Hay4n Harvest 2.0 Tons 10/1-3/31 100 0 0 brig. 100 39.9 0. 47.93 0.0( 6425 98 S7 Blantion 1.20 1.20 Pearl Millett, Pasture 4.1 Tons 4/1-9/15 162 0 0 Ini& 162 64.71 0.00 77.65 0.04 6425 9b S7 Blwiton 1.20 110 Small Grain Overseed 1.0 Tons 1 OA-3/31 50 0 0 brig. 50 t9.97 0. 23.97 0.0( 6425 9b S7 Blanton 1.20 1.20 Hybrid Bermudagmss Pasture 4.5 Tons 1 *311-10/15 161 0 0 Irrig, 161 64.31 0. 77.17 0.01 7090 1 S7 Blanton 3.60 3.601 Small Grain Overseed 1.0 Tons IQ/ 1-3/31 50 0 0 Irri& S t9.97 O. 71.90 0.01 7090 1 S7 Blanton 3.60 3.60 Hybrid BermudWws Past= 4.5 Tons •311-10/15 161 0 0 Irri& 161 64.31 0. 231-52 0.01 7090 2 S7 Bleoton 2.00 2.00 Small Grain Oveaseed 1.0 Tans 1011-3/31 SO 0 0 Irri& 50 19.97 OA 39.94 0.01 7090 2 S7 Blanton 2.00 2.00 Hybrid Bamudagrass Pastore 4.5 Tons •311-10115 161 0 0 Irri& 161 64.31 O.00 128.62 0.0( 7090 1 3 S7 Blanton 2.30 2.30 Small Grain Overseed 1.O Tons 10/1-3/31 50 0 0 Irri& 50 19.9 0. 45. 0.01 7090 3 S7 Blanton 2.30 2.30 Hybrid Bermudagress Pasture 4.5 Tons •3/1-10115 16t 0 0 Irrig, 161 64.31 00 147.91 0.01 7090 4 S7 Blanton 4.50 4.50 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irri& 50 19.97 0. 99.87 0.01 7090 4 S7 Blwton 4.50 4.50 Hybrid Bennudagress Pasture 4.5 Tons *311-10/15 161 0 0 Uri& 161 64.31 0. 289.40 0.01 7091 16 S7 1xon 4.10 4.10 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 brig. 50 19.9 0. 81.99 0.01 7043 16 S7 4.10 4.10 Hybrid Bermudagtass Pasture 3.0 Tons 03/1-10/15 100 0 Q brig I 39.9 0. 163.77 0.01 7091 17 S7 Autryville 3.10 3.10 Small Grain Overseed 1.0 Tons 1011-3131 50 0 0 Irrig. 50 19.97 0.0 61.91 OD 7091 17 S7 Autryvillc 3.10 3.10 Hybrid Bennudagrass Pasture 5.5'Ibns *3/1-10115 202 0 U Irrig. 202 80.69 0.00 250.13 0.01 7091 18 S7 Autryville 1.30 1.30 Small brain Overseed 1.O Ttwns 10/ 1-3131 50 0 U brig, 51 19.4 0.00 25.96 0.04 7091 18 S7 Auuyvillc 1.30 1.30 Hybrid 13ermudagrass Pasture 5.5 Tuns *3/1-10115 202:] 0 U Irrig. 20 80.6 O. 104.89 0.04 �+C, Database Version 3.1 Date Printed: 11/22/" j WUT Page 4 J ,. � Waste Utilisation 'rable Year 1 Tract Field Source ID Soil Series Total Acres use. Acres Crop RYE Applie Period Nitrogen PA Nutrient Req'd OWA) Camm Fert. Nutrient Applied (Ibs/A) Res. (lbs/A) Applic. Method Man= PA Nutrient Applied (lbs/A) LigW ManurcA pplied (acre) Solid M=nc Applied (acre) Li4tid AAmnue Applied (Field) Solid Manic Applied (Field) N N N N ga1000 OD tons 1000 gain tons 7091 19 S7 utryville 3.90 3.90 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 brig. 50 19.97 0. 77.89 0.01 7091 19 S7 Autryville 3.90 3.90 Hybrid Bermudagrass Pasture 5.5 Tons *311-10115 202 0 0 Irrig. 202 80.69 0.0 314.69 0.01 7091 20 S7 Aunyville 4.70 4.70 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 19.4 0. 93.87 0.01 7091 20 S7 Autryvillc 4.70 4.70 Hybrid Bermudagrass Pasu" 5.5 Tons *311-10115 202 0 0 brig. 202 80A9 0. 379.23 0.01 7091 21 S7 Aunyville 6.10 6.10 Small Grain Ovcrseed LO Tons 1011-3/31 50 0 0 Irrig, 50 19.97 0.0C 121.93 0.01 7091 21 S7 Autryvillc 6.10 6.10 Hybrid Bermudagrass Pasture 5.5 Tons *3/1-10/15 202 0 0 trrig. 202 80.69 0. 492.19 0.01 7091 22 S7 ALruyville 6.10 6.I0 Small Grain Oversecd 1.0 Tons 1011-3131 50 0 0 brig. 50 19.9 0. 121.93 0.01 7091 22 S7 Autryville 6.10 6.10 Hybrid Bermudagrass Pasture 5.5 Tons *3/1-10/15 202 0 0 Irrig. 202 80.69 0. 492.19 0.01 7091 23 S7 BlftntM 5.40 5.40 Small Grain Oversced LO Tons 10/1-3/31 50 0 0 brig. 50 19.9 0. 107.85 0.01 7091 23 S7 Blanton 5.40 5.40 Hybrid Bermudagrass Pasture 4.5 Tons *311-10M 161 0 0 brig. 161 64.31 0. 347.27 0.01 7091 24 S7 Blanton 4.60 4.60 Small Grain Overseed I.0 Taas 1011-3/31 50 0 0 Irrig. 50 19.97 0.0 91.87 0.01 7091 24 S7 Blanton 4.60 4.60 Hybrid Bermudagrass Pasture 4.5 Tons *31L-10/15 16I 0 0 Irrig. 161 64.31 0. 295.83 0.N 7091 25 S7 Blanton 5.70 5.70 Small Grain Overseed I.0 Tons 10/1-3131 50 0 0 Irrig. 5 19.97 0. 113.94 O.Or 7091 25 S7 Menton 5.70 5.70 Hybrid Bermudagrass Pasttm 4.5 Tons $311-10/15 161 0 0 brig. 161 64.31 0. 366.57 0.04 7091 26 S7 BIMMM 1.50 1.50 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 19.9 0. 29.96 0.01 7091 26 S7 Blarrton 1.50 1.50 Hybrid Bermudagrass Pasture 4.5 Tons 63/1-10/15 161 0 0 Irrig. 161 64.31 0. 96.47 0.01 7091 27 S7 Blanton 3.70 3.70 Small Grain Overseed L.0 Tons 1011-3/31 50 0 0 brig. 50 19.97 0. 73.90 0.01 7091 27 S7 Blanton 3.70 3.70 Hybrid Bermudagrass Pasture 4.5 Tons *3/I-10/15 161 0 0 Irrig. 161 64.31 0.00 237.95 0.01 7091 28 S7 Blanton 3.80 3.90 Small Grain Overseed 1.0 Tons 10/1-3131 50 0 0 Img. 50 19.97 0.00 75.89 0.01 91 28 S7 Blanton 3.80 3.80 Hybrid Bermudagrass Pasture4.5Tons •311-10/15 161 1) 0 1rris. 161 64.31 0. 244.38 O.Ot 91 r70 29 S7 Blanton 3.80 3.80 Small Grain Overseed LO Tons I(VI-3131 50 0 0 brig. 5 19.97 0.00 75.89 0.01 7091 29 S7 Blanton 3.80 3.80 11lyhrid Berrnudagrass Pastum 4.5'rons *311-10115 16E 0 0 Irrig, 161 64.31 0.00 244.38 0.01 Database Version 3.1 t Date Printed: 11/22r,k� tit WUT Page " ` 4 r235LE RJcuunt[VU InUIC xcur 1 Tract Field Source ID Soil Series Total Acres Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient R4d Qbs/A) Cam. Fert. Nutrient Applied pbs/A) Res. Obs/A) Applic. Meftd Manure PA Nutrient Applied pbs/A) Liquid ManurtA pplied (a=) Solid Manure Applied (am) Liquid Manure Applied (Field) solid Manure Applied (Field) N N N N 1000 gd/A Tons 1000 gals tons ToW Applied, 1000 gallons 11,195.4 Total produced, I000 gallms 7,638.4 Balance, 1000 gallons -3,556.9 Total Applied, tons 0•04 Total Prodaccd, tons 0.01 Balance, tons 0.01 Notes: 1. In the tract column, — symbol means leased, otherwise, owned. 2. Symbol * means laser entered data. �'� Database Version 3.1 Date Printed: I I/22r WUT Page f } 4 The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure other by-products, commercial fertilizer and residual from previous crops. An estimate ofthe quantity of solid and liquid waste that will be applied on each field order to supply the indicated quantity of nitrogen fi-orrl each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Waste Utilization Table VPnr I Tract Field Source ID Soil Series Total Aces Use. Aces C 14P8� RYE Period trcgen PA Nutrient Req'd (IWA) Cornm Fert. Nutrient Applied Qbs/A) Re, (lbs/A) Method Manure PA Nutrient Applied OWA) Liquid ManurrA pplied (acre) Solid Manua: Applied (acre) Liquid Manure Applied (Field) Solid Manuro Applied (Field) N N N N aUA Tons 1000 1� toms 6425 10 S7 lanton 4.70 4.70 Small Grain Overseed 1.0 Tons I011-3131 So 0 0 brig. so 19,97 0, 93.87 0.01 6425 10 S7 Bhurton 4.70 4.70 Hybrid Bermudagmss Pastare 4.5 Tons •311-10/15 161 0 0 brig. 161 64.31 0. 302.2 0.0t 6425 11 S7 Woodington 5.40 5.40 Small Grain Overseed LO Tons 1011-3/31 50 0 0 Irrig, 50 19.97 0.00 107.95 0.04 6425 It S7 Woodington 5.40 5.40 Hybrid Bermudagress Pasture 4.5 Tons •311-10115 146 0 1 0 brig. 146 58.3 0.00 314.92 0.01 6425 12 S7 Woodingbon 5.70 5.70 Small Grain Overseed LO Tons l0fl-3/31 50 0 0 Irrig. 50 19.9 0. 113.94 0.01 6425 12 S7 Wooft9ton 5.70 5.70 Hybrid Bermudagrass Pasture 4.5 Tons 03/1-10/15 146 0 0 Irrig, 146 58.32 0.0C 332.42 0.01 6425 13 S7 Autryvdlc 4.80 4.80 Small Grain Ovcrsmd 1.0 Tons 10/1-3131 50 0 0 Irrig, 50 19.97 O.01 95.87 O.Of 6425 13 S7 utryville 4.90 4.80 Hybrid Bermudagrsss Pasture 5.5 Tons *311-10115 202 0 0 Irrig. 202 80.69 0. 387.30 0.01 6425 14 S7 Autryville, 1.40 1.40 Small Grain Ovase d 1.0 Tons 10(1-3/31 50 0 0 brig. 50 19.97 0. 27.96 0.01 6425 14 SZ Antryville 1.40 1.40 Hybrid Bermudagrass Pasture 5.5 Tons •3/1-10/15 202 0 0 Irrig. 202 80.69 0. 112.96 0.04 6425 15 S7 Autryville 5.40 5.40 Small Grain Overseed 1.0 Tons 10(1-3/31 50 0 0 Irrig. 50 19.97 0. 107.85 0.0( 6425 15 S7 Autryville 5.401 5.40 Hybrid Bermudagress Pasture 5.5 Tons '311-10/15 202 0 0 brig. 1 202 80.6 0.00 435.71 0.01 6425 5 S7 Blariton 5.40 5.40 Small Grain Overseed LO Tons 1011-3131 50 0 0 brig. 50 19.0 O.00 107.85 0.01 6425 5 S7 Blunton 5.40 5.40 Hybrid Bermudagnas Pasture 4.5 Tons '3/1-10/0 161 0 0 brig. 161 64.31 0,00 347.27 0.01 6425 6 S7 Norfolk 5.40 5.40 Cereal/Annual Rye O/S, Hay-4n Harvest 2.0 Tons 1011-3/31 100 0 0 Irrig. 100 39.94 ().00 215.70 0.0E 6125 6 S7 orfalk 5.40 5.40 Perri Millen Pasture 5.5 Tons 4/1-9/15 204 0 0 lrrig. 2 83A8 0.0 450.81 0.04 �lr Database Version 3.1 r Date Printed: 11/22/, } WUT Page ' , j 4 The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity ofthe facility. If the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. Ifavailable storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste Storage Canacitv Source Name I Swine Feeder -Finish oon Liquid Desi n Stora a Capacity Da Start Date 9/1 180 Plan Year Month Available Storage Capacity (Days) I 1 115 1 2 102 I 3 133 1 4 143 l 5 180 1 6 180 1 7 180 1 8 180 1 9 180 1 10 180 I 11 174 1 12 155 * Available Storage Capacity is calculated as of the end of each month. 821949 T Database Version 3.1 Date Printed: 11-22-2005 Y Capacity Page I of I The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number ofacres needed for '-=vJr % sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not possible, care should betaken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. 1� Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lb/ac Maximum Sludge Application Rate IOW gal/ac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Yeats Accumulation Swine Feeder -Finish Lagoon Sludge - Standard .orn 120 bu 150 13.16 103.30 206.60 309.90 Nay 6 ton R.Y.E. 300 26.32 51.65 103.30 15495 Soybean 40 bu 160 14.04 96.84 193.69 290.53 821949 Database Version 3.1 Date Printed: 11-22-2005 Sludge Page I of 1 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. Irrigation Application Factors Tract Field Soil Series Application Rate (inches/hour) Application Amount (inches) 6425 10 Blanton 0.75 1.0 6425 1 11 Woodington 0.40 I.0 6425 12 Woodington 0.40 1.0 6425 13 Autryville 0.60 1.0 6425 14 Autryville 0.60 1.0 6425 15 Autryville 0.60 1.0 6425 5 Blanton 0.75 1.0 6425 6 Norfolk 0.50 1.0 6425 7 Norfolk 0.50 1.0 6425 8 Norfolk 0.50 1.0 6425 9a Blanton 0.75 1.0 6425 9b Bunton 0.75 1.0 7090 1 Blanton 0.75 1.0 7090 2 Blanton 0.75 1.0 7090 3 Blanton 0.75 1.0 7090 4 Blanton 0.75 1.0 7091 16 Leon 0.65 1.0 7091 17 Autryville 0.60 1.0 7091 18 Autryville 0.60 1.0 7091 19 Autryville 0.60 1.0 7091 20 Autryville 0.60 1.0 7091 21 Autryville 0.60 ).0 7091 22 Autryville 0.60 1.0 7091 23 Blanton 0.75 1.0 7091 24 Blanton 0.75 1.0 7091 25 Blanton 0.75 1.0 7091 26 Blanton 0.75 1.0 7091 27 Blanton 0.75 1.0 7091 28 IBlanton 0.75 1.0 7091 29 Blanton 0.75 1.0 0'%1 nAn n...,,1..,_„ /..«.:,,.. 1 1 r%-.-11 nItnnni TAC it„..„ 1 wC 1 Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. S7 Swine Feeder -Finish Lagoon Liquid waste generated 7,638,480 gals/year by a 8,240 animal Swine Finishing Lagoon Liquid operation. This production facility has waste storage capacities of aperoximately 180 da s. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 17593 Incorporated 30214 Injected 33274 Irrigated 19123 Actual PAN Applied (Pounds) Actual Volume Applied (Gallons) Volume Surplus/Deficit (Gallons) Year 1 28,027.80 11,195,452 -3,556,972 dote: In source 1D, S means standard source. U means user defined source. 821949 Database Version 3.1 Date Printed: 11-22-2005 Source Page I of I 1N A rFjQQ Michael F. Easley, Governor William G. Ross Jr., Secretary v3 r North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality July 1, 2007 A & B Hog Farms Inc 1� A&B Hog Farm '11�� 2 7 K.1 100 Balkum Rd Rose Hill, NC 28458 Subject: Certificate of Coverage No, AWS820051 A&B Hog Farm Animal Waste Management System Sampson County Dear A & B Hog Farms Inc: In accordance with your application received on 4-Jan-07, we are hereby forwarding to you this Certificate of Coverage (COC) issued to A & B Hog Farms Inc, authorizing the operation of the subject animal waste management system in accordance with General Permit AWG 100000. This approval shall consist of the operation of this system including, but not limited to, the management and land application of animal waste as specified in the facility's Certified Animal Waste Management Plan (CAWMP) for the A&B Hog Farm, located in Sampson County, with an animal capacity of no greater than the following swine annual averages: Wean to Finish: 0 Feeder to Finish: 8240 Boar/Stud: 0 Wean to Feeder: 0 Farrow to Wean: 0 Gilts: 0 Farrow to Finish: 0 Farrow to Feeder: 0 If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until September 30, 2009 and replaces the NPDES COC issued to this facility with an expiration date of July 1, 2007. You are required to continue conducting annual surveys of sludge accumulation in all lagoons at your facility; the one-year extension in Condition I11.19 does not apply. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read this COC and the enclosed State General Permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please pay careful attention to the record keeping and monitoring conditions in this permit. Aquifer Protection Section 1636 Mail Service Center Internet: wwwnewateraualitv.ora I oeation: 2728 Capital Boulevard An Equal OpportunitylAffirmative Action Employer— 50% Recycledl10% Post Consumer Paper N r Carolina Natumlly Raleigh, NC 27699-1636 Telephone: (919) 733-3221 Raleigh, NC 27604 Fax 1: (919) 715-0588 Fax 2: (919)715-6048 Customer Service: (877) 623-6748 If your Waste Utilization Plan has been developed based on site -specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 02T .01 I l(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100-foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Per 15A NCAC 02T .1306, any containment basin, such as a lagoon or waste storage structure, shall continue to be subject to the conditions and requirements of the facility's permit until closed to NRCS standards and the permit is rescinded by the Division. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Fayetteville Regional Office. The Regional Office Aquifer Protection staff may be reached at 910-433-3300. If you need additional information concerning this COC or the General Permit, please contact the Animal Feeding Operations Unit staff at (919) 733- 3221. Sincerely, for Coleen H. Sullins Enclosures (General Permit AWG100000, Record Keeping and Reporting Package) cc: (Certificate of Coverage only for all cc's) Sampson County Health Department Sampson County Soil and Water Conservation District Fayetteville Regional Office, Aquifer Protection Section AFO Unit Central Files Permit File AW S820051 C, 0O w A T��vG Michael F. Easley, Governor Uj r William G. Ross Jr., Secretary Noah Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E, Director Division of Water Quality December 1, 2006 CERTIFIED MAIL RECE:fZU RETURN RECEIPT REQUESTED Tl A& B Hog Farms Inc ['DEC 0A&B Hog Farm art . 100 Balkum Rd .�AYETiEH Rose Hill, NC 28458 Subject: Application for Renewal of Coverage for Expiring NPDES General Permit Dear Permittee: Your facility is currently approved for operation under one of the Animal Waste Operation NPDES General Permits, which expire on July I, 2007. Due to changes in federal rules, facilities that do not discharge nor propose to discharge may choose whether or not to retain coverage under an NPDES General Permit. Copies of the draft animal waste operation NPDES general permits and the State Non -Discharge General Permits are available at http://h2o.enr.state.nc.uslaps/afou/downloads.htm or by writing or calling: NCDENR — DWQ Animal Feeding Operations Unit 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 733-3221 In order to assure your continued coverage under one of these two types of general 12ermits, you must submit an application for permit coverale to the Division. Enclosed you will find a `Request for Certificate of Coverage Facility Currently Covered by an Expirin NPDES General Permit.' The application form must be completed and returned by January 2, 2007. Please note, you must include two (2) copies of your most recent Waste Utilization Plan with the application form. Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty. Operation of your facility without coverage under a valid general permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. If you have any questions about the draft general permits, the enclosed application, or any related matter please feel free to contact the Animal Feeding Operations Unit staff at 919-733-3221. Sincerely, e Ted L. Bush, Jr., Chief Aquifer Protection Section Enclosures cc (w/o enclosures): Sampson County Soil and Water Conservation District Fayetteville Regional Office, Aquifer Protection Section AFO Unit Central Files - 820051 Garland Farm Supply Aquifer Protection Section 1636 Mail Service Center Raleigh, NC 27699-1636 Internet: www.ncwatMuality.org location: 2728 Capital Boulevard Raleigh. NC 27604 An Equal OpportunitylAffirmative Action Employer— 50% Recydedl10% Post Consumer Paper Telephone: Fax l: Fax 2: Customer Service: N�o"�`Karolina (919) ✓ aturally (919)715-0588 (919)715-6048 (877)623-6748 The following crop note applies to field(s): 6, 7, 8 Cereal/Annual Rye Overseeded— Hay CEREAL RYE The cereal rye should be planted by October 15 to provide the best opportunity to get winter growth. The most consistent stands are obtained from drilling rye into short (less than 3 inches tail) bermudagrass sod. If drilling is not possible, the seeds may be broadcast on short Bermuda sod followed by a light cultivation with a disc or tillage implement. The seeding rate for broadcast planting of seeds should be 1.5 times the rate for drilled seeds. The last application of animal waste is to be applied to the bermuda prior to August 31. An application of 50 lbs/acre of Plant Available N (PAN) may be applied between September 15 and October 30. An additional 50 lbs-acre of PAN may be applied in February -March. If rye growth is harvested on time and does not significantly shade the bermuda, PAN rates for the subsequent bermuda crop are based on realistic yields of bermuda. A harvest is required prior to heading or April 7, which ever comes first. This is necessary to minimize the potential for shading bermuda and reducing its yields. ANNUAL RYEGRASS Annual ryegrass should be planted by October 15 to provide the best opportunity to get winter growth. The most consistent stands are obtained from drilling ryegrass into short (less than 3 inches tall) bermudagrass sod. If drilling is not possible, the seeds may be broadcast on short bermuda sod followed by a light cultivation with a disc or tillage implement. The seeding rate for broadcast planting of seeds should be 1.5 times the rate for drilled seeds. The last application of animal waste is to be applied to the bermuda prior to August 31. An application of 50 lbs/acre of PAN may be applied between September 15 and October 30. An additional 50 lbs. acre of PAN may be applied in February -March. If additional PAN is applied to the ryegrass in April -May, the PAN rate for the bermuda must be reduced by a corresponding amount. This is necessary because ryegrass growth during April -May will reduce bermuda yields and shorten the time bermuda can fully utilize the N. A harvest is required by heading or April 7, which ever comes first to prevent shading of emerging bermuda during April -May period. To favor the production of the bermuda, additional harvests of ryegrass will be required when the ryegmss canopy reaches 12 to 15 inches height. The following crop note applies to field(s): 9a Pearl Millett: No Comment The following crop note applies to field(s): 6, 7, 8 Pearl Millett: No Comment 821949 Database Version 3.1 Date Printed: 11-22-2005 Crop Note Page 6 of 6 The following crop note applies to field(s): 9a Cereal/Annual Rye Overseeded — Hay CEREAL RYE The cereal rye should be planted by October 15 to provide the best opportunity to get winter growth. The most consistent stands are obtained from drilling rye into short (less than 3 inches tall) bermudagrass sod. If drilling is not possible, the seeds may be broadcast on short bermuda sod followed by a light cultivation with a disc or tillage implement. The seeding rate for broadcast planting of seeds should be 1.5 times the rate for drilled seeds. The last application of animal waste is to be applied to the bermuda prior to August 31. An application of 50 lbs/acre of Plant Available N (PAN) may be applied between September 15 and October 30. An additional 50 lbs.acre of PAN may be applied in February -March. If rye growth is harvested on time and does not significantly shade the bermuda, PAN rates for the subsequent Bermuda crop are based on realistic yields of Bermuda. A harvest is required prior to heading or April 7, which ever comes first. This is necessary to minimize the potential for shading Bermuda and reducing its yields. ANNUAL RYEGRASS Annual ryegmss should be planted by October 15 to provide the best opportunity to get winter growth. The most consistent stands are obtained from drilling ryegrass into short (less than 3 inches tall) bermudagrass sod. if drilling is not possible, the seeds may be broadcast on short bermuda sod followed by a light cultivation with a disc or tillage implement. The seeding rate for broadcast planting of seeds should be 1.5 times the rate for drilled seeds. The last application of animal waste is to be applied to the bermuda prior to August 31. An application of 50 lbs/acre of PAN may be applied between September 15 and October 30. An additional 50 lbs. acre of PAN may be applied in February -March. If additional PAN is applied to the ryegrass in April -May, the PAN rate for the bermuda must be reduced by a corresponding amount. This is necessary because ryegrass growth during April -May will reduce bermuda yields and shorten the time bermuda can fully utilize the N. A harvest is required by heading or April 7, which ever comes first to prevent shading of emerging bermuda during April -May period. To favor the production of the bermuda, additional harvests of ryegrass will be required when the ryegrass canopy reaches 12 to 15 inches height. 821949 Database Version 3.1 Date Printed: 11-22-2005 Crop Note Page 5 of 6 The following crop note applies to field(s): 13, 14, 15, 17, 18, 19, 20, 21, 22 Bermudagrass: CP, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs i" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. 821949 _ Database Version 3.1� Date Printed: 11-22-2005 � Crop Note Page 4 of 6 The following crop note applies to field(s): 16 Bermudagrass CP, Mineral Soil, Poorly Drained to Somewhat Poorly Drained. Adaptation: Effective artificial drainage MUST be in place to achieve Realistic Yield Expectations provided for these soils. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs I" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 1, 10, 2, 23, 24, 25, 26, 27, 28, 29, 3, 4, 5, 9b Bermudagrass: CP, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs 1" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. 921949 Database Version 3.1 Date Printed: 11-22-2005 Crop Note Page 3 of 6 The following crop note applies to field(s): 13, 14, 15, 17, 18, 19, 20, 21, 22 Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15 November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. The following crop note applies to field(s): 11, 12 Bermudagrass CP, Mineral Soil, Poorly Drained to Somewhat Poorly Drained. Adaptation: Effective artificial drainage MUST be in place to achieve Realistic Yield Expectations provided for these soils. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs 1" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced V to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and duly. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. 821949 Database Version 3.1 Date Printed: 11-22-2005 Crop Note Page 2 of 6 Crop Notes The following crop note applies to field(s): 11, 12 Small Grain: CP, Mineral Soil, low -leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/dri11 row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. The following crop note applies to field(s): 16 Small Grain: CP, Mineral Soil, low -leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 1 S November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushelslacre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. The following crop note applies to field(s): 1, 10, 2, 23, 24, 25, 26, 27, 28, 29, 3, 4, 5, 9b Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting.. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. 921949 Database Version 3.1 Date Printed: 11-22-2005 Crop Note Page 1 of 6 Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 14 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). 821949 Database Version 3.1 Date Printed: U /2212005 Specification Paize 1 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1,1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1,1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 821949 Database Version 3.1 Date Printed: 11/22/2005 Specification Pale 2 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 821949 Y� Database Version 3.1 Date Printed: 11/22/2005 Specification Page 3 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. 821949 Database Version 3.1 Date Printed: 11C22/2005 Specification Page 4 State cif North Carolina Department of Environment and Natural Resources Fayetteville Regional Office Michael F. Easley, Governor William G. Ross, Secretary Mr. Aubrey Moore 100 Balkum Road Rose Hill, North Carolina 28458 I LT?WA 4 • NCDENR NORTH CAROLINA (DEPARTMENT OF ENVIRONMENT ANo NATURAL RESOURCES June 16, 2004 DEINR-FRO JUN 17 2001 DWQ SUBJECT: Re-evaluation of the Notice of Referral for A&B Hog Farm, Facility Number 82-51, Sampson County Dear Mr. Moore: After talking with Ms. Osborne with Enviro Ag Compliance about your irrigation records, she stated that pull 15 had accidentally been credited to pull #5. This had caused an over application requiring a referral to the Division of Water Quality. After reviewing the Irr-1 forms and the corrected Irr-2 forms, there was no over application to either pull #5 or pull #15. This was brought to DWQ's attention and was cleared up. Make sure in the future to keep the irrigation records up to date on approved forms for review on the day of the operation review. The Division of Soil and Water Conservation appreciates your cooperation and the assistance provided to you by your irrigation record keeping company. If you have any questions regarding this letter, please do not hesitate to contact me at (910) 486-1541 or at the address listed below. Sincerely, Trent Allen Environmental Engineer cc: Paul Rawls, Division of Water Quality Sam Warren, Sampson Soil and Water Conservation District Carroll Pierce, Division of Soil & Water Conservation Alfred Smith, Garland Farm Supply 225 Green Street, Suite 714I Systel Bid, North Carolina 28301 Telephone 910/48611541 FAX 910/486/0707 An Equal Opportunity Affirmative Action Employer State of North Carolina Department -of Environment and Natural Resources Fayetteville Regional Office Michael F. Easley, Governor William G. Ross, Secretary Division of Soil & Water Conservation May 17, 2004 Mr. Aubrey Moore 100 Balkum Road Rose Hill, North Carolina 28458 SUBJECT: Operation Review Notice of Referral for A&B Hog Farm, Facility Number 82-51 Sampson County Dear Mr. Moore, NCDENR NORTH CAROL-INA DEPARTMENT OF ENVIRONMENT AND NATURAL- RESOURCES DENR--FRO MAY 17 2004 DWQ On April 20, 2004, an operation review was conducted of A&B Hog Farm, facility number 82- 51, in Sampson County. This review, undertaken in accordance with G.S. 143-215.1 OD, is one of two routine site visits scheduled for all subject animal operations in 2004. Staff from the Division of Water Quality will conduct a separate compliance inspection. During the operation review, the following item was noted: Over application of nitrogen to pull #5 (5.4 acres) small grain. The waste plan allows 50 pounds of nitrogen per acre to small grain, and 70 pounds was applied. This may have been a result of the wrong nitrogen rate being used on the Irr-2 form, It was for this reason that your operation was referred to the Division of Water Quality for further investigation. G.S. 143-215.10E requires staff from the Division of Soil and Water Conservation to notify the Division of Water Quality and the owner/operator of these observed violations. A copy of the operation review report is enclosed for your information. Site findings and recommended corrective actions as discussed are noted in the comment sections. 225 Green Street, Suite 714 1 Systel Bid. Fayetteville, North Carolina 28301-5043 Telephone 910-486-1541 FAX 910-486-0707 An Equal opportunity Affirmative Action Employer Mr. Aubrey Moore May17, 2004 Page 2 Please remember that in order for your facility to remain in compliance with environmental regulations, animal waste cannot be discharged into the waters of the State, and the.animal waste collection, treatment, storage and disposal systems must be properly maintained and operated under the responsible charge of a certified operator. On behalf of the Division of Soil and Water Conservation, I appreciate your cooperation with this operation review. Please do not hesitate to contact me at 910-486-1541 if you have any questions, concerns or need additional information. Sincerely, Trent Allen Environmental Engineer cc: Paul Rawls, Division of Water Quality Sam warren, Sampson Soil & Water Conservation District Carroll Pierce, Division of Soil & Water Conservation Alfred Smith, Garland Farm Supply 225 Green Street, Suite 714 / Systel Bid. Fayetteville, North Carolina 28301-5043 Telephone 910-486-1541 FAX 910-486-0707 An Equal Opportunity Affirmative Action Employer FARM NAME FIELD SIZE (ACRES) FARM OWNER OWNER'S ADDRESS OWNER'S PHONE CROP TYPE Moore Farms 5.4 Aubrey Moore 100 Balkcum Rd Rose Hill, NC 28458 910-533-4855 Coastal / Rye IRRIGATION RECORDS FIELD NUMBER (PULL) IRRIGATION OPERATOR OPERATOR'S ADDRESS OPERATOR'S PHONE RECOMMENDED P.A.N. Pumping Dates 5 Charles Coats 2207 Moore's Bridge Rd Rose Hill, NC 28458 910-532-2847 - 161 + 50 Mar - Sep Oct - Mar NO. OF FLOW OXN. PER 1,000 GAL PAN_ APPLIED __-....._....-..._.- (Ebslacre) NITROGEN BALANCE ..--.__- _ ._. (Ibslacre) START END TOTAL SPRINKLERS RATE TOTAL GALLONS DATE Crop Lagoon TIME TIME MINUTES OPERATING _ in) (gal/min) GALLONS PER ACRE fil aW Coasts! 2500 360 1 150 54000 10000 712M Coasts. 25W 7:00 12:00 300 1 150 45000 8333.333333 2.6 _ 21.66686G7 113.3333333 el20103 Coastal 2100 8:00 1:00 300 1 150 45000 8333.333333 2.1 -- 17.5 95.83333333 8f31103 CO2stai 2200 7:00 12:00 300 1 150 45000 8333.333333 2.5 20.8333333 75 - 61-3—W Coasiai 2200 7:00 1:00 360 1 150 .54000 10000 2.5 11/6/03 Rye. 2100 6:00 4:00 480 1 150 72000 13333.33333 2.1- 28 - - - 133 - -- 12118= 1 Rye 2100 1 10:00 4:00 360 1 150 54000 10000 2.1 21 112 1112/04 a 2100 1 10':00 1 4:00 360 1 1 150 54000 1 10000 1 2.1 21 1 --91 -- �D� Technical Assistance Site Visit Report Division of Soil and Water Conservation Natural Resources Conservation Service Soil and Water Conservation District Other... Facility Number $2 - 51 Date: 120104 Time: 1 12:45 1 Time On Farm: 210 FRO Farm Name A&B Hog Farm County Sampson Phone: Mailing Address 100 Balkum Road Rose Hill NC Onsite Representative Aubrey Moore & Louis Moore Integrator lGarland Farm Supply Type Of Visit Purpose Of Visit ® Operation Review ❑ Compliance Inspection (pilot only) ❑ Technical Assistance ❑ Confirmation for Removal ❑ No Animals -Date Last Operated: ❑ Operating below threshold ® Swine ❑ Poultry ❑ Cattle ❑ Horse Design Current Capacity Population ❑ Wean to Feeder ® Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars 8240 8240 Q Routine O Response to DWQIDENR referral O Response to DSWCISWCD referral O Response to complaint/local referral O Requested by prod ucerlintegrator O Follow-up O Emergency O Other... Design Current Capacity Population ❑ Layer ❑ Non -Layer ❑ Dairy ❑ Non -Dairy ❑ Other 910-532-4855 28458 GENERAL QUESTIONS: 1. Is waste discharging from any part of the operation and reaching surface waters or wetlands? ❑ yes ® no 2. Is there evidence of a past waste discharge from any part of the operation that waste reached ❑ Dairy ❑ Non -Dairy ❑ Other 910-532-4855 28458 GENERAL QUESTIONS: 1. Is waste discharging from any part of the operation and reaching surface waters or wetlands? ❑ yes ® no 2. Is there evidence of a past waste discharge from any part of the operation that waste reached ❑ Other 910-532-4855 28458 GENERAL QUESTIONS: 1. Is waste discharging from any part of the operation and reaching surface waters or wetlands? ❑ yes ® no 2. Is there evidence of a past waste discharge from any part of the operation that waste reached ❑ yes ® no surface waters or wetlands? 3. Does any problem pose an immediate threat to the integrity of the waste structure (large trees, ❑ yes ® no seepage, severe erosion, etc.)? 4. Is there evidence of nitrogen over application, hydraulic overloading or excessive ponding ® yes ❑ no requiring DWQ notification? 5. Is there evidence of improper dead animal disposal that poses a threat to the environment ❑ yes ® no and/or public health? B. Is the waste level within the structural freeboard elevation range for any waste structure? ❑ yes ® no Structurel Structure 2 Structure 3 Structure 4 Structure 5 Identifier 2100 2200 2500 Level (inches) 33 21 1 3 CROP TYPES Icoastal Bermuda -graze small grain overseed Millet 771 IRye grass (graze) Fescue -graze SPRAYFIELD SOIL TYPES BOB Wo Au NoA LeA 7. What type of technical assistance does the onsite representative feel is needed? (list in comment section) 03/10/03 Facility Number 82 - 51 Date: 4/20/04 PARAMETER 0 No assistance providedlrequested ❑ 8. Waste spill leaving site TECHNICAL ASSISTANCE Needed Provided ❑ 9. Waste spill contained on site El 10. Level in structural freeboard 5. Waste Plan Revision or Amendment 2 ® ❑ ❑ 11. Level in storm storage 26. Waste Plan Conditional Amendment ❑ ❑ 27. Review or Evaluate Waste Plan w/producer ❑ ❑ ❑ 12. Waste structure integrity compromised 28. Forms heed In El El El 13. Waste structure needs maintenance (list comment section) 29. Missing Components (list in comments) ® ❑ 014. Over application >= 10% & 10 Ibs. ❑ ❑ ❑ 15. Over application < 10% or < 10 Ibs. 30. 2H.0200 re -certification ❑ 16. Hydraulic overloading - 31. Five & Thirty day Plans of Action (POA) ❑ ❑ 32. Irrigation record keeping assistance ❑ ❑ ® 17. Deficient irrigation records ❑ 18. Latelmissing waste analysis 33. Organizelcomputerization of records ❑ ❑ ❑ 19. Late/missing lagoon level records 34. Sludge Evaluation ® ❑ ❑ 20. Late/missing soils analysis ® 21. Crop needs improvement 35. Sludge or Closure Plan ❑ ❑ ® 22. Crop inconsistent with waste plan 36. Sludge removal/closure procedures ❑ ❑ ❑ 23. Irrigation maintenance deficiency 37. Waste Structure Evaluation ❑ ❑ ❑ 24. Deficient sprayfield conditions 38. Structure Needs Improvement ❑ ❑ 39. Operation & Maintenance Improvements ❑ ❑ 40. Marker check/calibration ❑ ❑ Reguilatory Referrals 41. Site evaluation ❑ ❑ ❑ Referred to DWQ Date: 42. Irrigation Calibration ® ❑ ❑ Referred to NCDA Date: 43. Irrigation des ignlin El El El Other... system stall ation Date: 44• Secure Irrigation information (maps, etc.) ❑ ❑ LIST IMPROVEMENTS 45. Operating Improvements (pull signs, etc.) ❑ ❑ MADE BY OPERATION 46. Wettable Acre Determination ❑ ❑ 1 47. Evaluate WAD certificationlrechecks ❑ ❑ 48. Crop evaluation/recommendations ❑ ❑ Z 49. Drainage worklevaluation ❑ ❑ 50. Land shaping, subsoiling, aeration, etc.3. 51. Runoff control, stormwater diversion, etc. ❑ ❑ ❑ ❑ 52. Buffer improvements ❑ ❑ 53. Field measurements{GPS, surveying, etc.) ❑ ❑ 4. 54. Mortality BMPs ❑ ❑ 55. Waste operator education (NPDES) ' 56. Operation & maintenance education ❑ ❑ 57. Record keeping education ❑ ❑ 6. 58. Croplforage management education ❑ ❑ 59. Soil and/or waste sampling education ❑ ❑ 03/10/03 Facility Number 82 _ 51 Date: 4120104 COMMENTS: 1- Field #2 needs work where the cows are feed. The feeding area needs to be rotated to avoid destroying the bermuda stand. 22,25 - Pull #19 is written as bermuda graze. This is a fescue field. Pull #17 is written as fescue. This is a bermuda graze field. Contact your technical specialist to correct the waste plan. 33,41- This farm has a NPDES permit and needs the irrigation system calibrated and the lagoons need a sludge survey completed. 29- Needs to start keeping approved Irr-1 forms, daily rainfall events within 24 hours, stocking records, and all other information required by the new permit on DWQ approved forms. Needs to send the annual certification in as soon as possible. 4,14- Pull #5 on the Irr-2 form shows over application to small grain. The waste plan allows 50 pounds of nitrogen per acre, and 70 pounds was applied. This may have been caused because the wrong rate was used on the Irr-2 form. Need to review Irr-2 forms to avoid over application in the future. The over application will be reported to DWQ, TECHNICAL SPECIALIST rrent Allen SIGNATURE Date Entered: 5/17/04 Entered By: rent Allen 3 03/10/03 North Carolina Department of Environment and Natural Resources Water Pollution Control System Operator Certification Commission Michael F. Easley, Governor William G. Ross Jr., Secretary Coleen H. Sullins, Chairman February 21, 2001 A & B Hog Farms, Inc. 100 Balkum Road Rose Hill NC 28458 SUBJECT: Designation of Operator in Charge Farm Name: A&B Hog Farm Facility ID #: 82-51 County: Sampson Dear A & B Hog Farms: NCDENR MAR 2 7 2001 AEG �OFFICEE Senate Bill 1217, An Act to Implement Recommendations of the Blue Ribbon Study Commission on Agricultural Waste, was enacted by the 1996 North Carolina General Assembly. This legislation requires owner of a certified operator for each animal waste management system that serves 250 or more swine, 100 or more confined cattle, 75 or more horses, 1,000 or more sheep, or 30,000 or more confined poultry with a liquid waste management system. Our records indicate that the operator designated as the Operator In Charge (OIC) for your animal waste management system is no longer certified. Therefore, you must designate a properly certified animal waste management system operator as the OIC for your facility. The enclosed designation form must be returned to this office by April 1, 2001. This office maintains a list of certified operators in your area if you need assistance in locating a certified operator. Failure to designate a properly certified Operator in Charge for your facility is a violation of N.C.G.S. 90A-47.2 and 15A NCAC 8F .0201(a) and may result in the initiation of enforcement action. Please be advised that nothing in this letter should be taken as resolving you of the responsibility and liability for any past or future violations for your failure to have a properly certified Operator in Charge designated for your animal waste management system. If you have questions concerning this matter, or if this office can be of further assistance, please call Beth Buffington at (919)733-0026, extension 313. Sincerely, Dwight Lancaster, Supervisor Technical Assistance and Certification Unit Enclosure cc: TAC Files Non -Discharge Compliance/Enforcement Unit Fayetteville Regional Office Central Files 1618 Mail Service Center, Raleigh, North Carolina 27699-1618 Phone: 919 — 733-0026 1 FAX: 919 — 733-1338 AN EQUAL OPPORTUNITY 1 AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST CONSUMER PAPER 11 %L lw I r &VZ7j „ywsr GdH v(aww6a% (d M I- sloo)) 56c'da Mod f�v�ar1 '�i i � .l rYi'YcL'-r �` SlS r7 -EQ)h 1�1 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director Aubrey Moore A&B Hog Farm 100 Balkum Rd Rose Hill NC 28458 Dear Aubrey Moore: A1 • • NCDENR NORTH GARC 'OF ENviRONMENT AND NffuRAL RESOURCES July 6, 1998 0 8 1998 FfiYE i i EV9 IE REG. OFFICE Subject: Certificate of Coverage No. AWS820051 A&B Hog Farm Swine Waste Collection.7reatment, Storage and Application System Sampson County In accordance with your application received on May 21, 1998, we are forwarding this Certificate of Coverage (COC) issued to Aubrey Moore, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG 100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the A&B Hog Farm, located in Sampson County, with an animal capacity of no greater than 8240 Feeder to Finish and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143-215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Certificate of Coverage AWS820051 A&B Hog Farm Page 2 This COC is not automatically transferable. A nacnelownership change application must be submitted to the DWQ prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Fayetteville Regional Office. The Regional Office Water Quality Staff may be reached at (910) 486-1541. If you need additional information concerning this COC or the General Permit, please contact J R Joshi at (919) 733-5083 ext. 363. A. Preston Howard, Jr., P.E. cc: (Certificate of Coverage only for all cc's) Sampson County Health Department Fayetteville Regional Office, Water Quality Section Sampson County Soil and Water Conservation District Permit File .'� State of North Carolina WA :QU� n Department of Environment and Natural Resources Division of Water Quality MQY 2.1 1998 Non -Discharge Permit Application Form General Permit Existing PHOTOCOPIEDHIS FORM MA Y BE ORIGINAL) j Liquid Animal Waste OT erations�° �e�l The following questions have been completed utilizing information on file with the Division.-`Pleffsc+w-mw review the information for completeness and make any corrections which are appropriate. If a question has not been completed by the Division, please complete as best as possible. Do not leave any question unanswered. 1. GENERAL INFORMATION: i R1=\0L_ 'I 1.1 Facility Name: A&B Hog Farm f 1.2 Print Land Owner's name: Aubrey Moore ' ' t n 8 1998 1.3 Mailing address: 100 Balkum Rd N'CIIC City, State: Rose Hill NC Zip: 28458 RIM r— Telephone Number (include area code): 910-5324855 1.4 County where facility is located: Sampson 1.5 Facility Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): Take 421 S. from Clinton towards Harrells go approx. 10 miles to secondary Rd. 1 140 turn riaht on road 1140 and Fo aDnrox. 3 miles operation will be on left. 1.6 Print Farm Manager's name (if different from Land Owner): L7 Lessee's / Integrator's name (if applicable; please circle which type is listed): DogwoodtFarms 1.8 Date Facility Originally Began Operation: 01/01/92 1.9 Date(s) of Facility Expansion(s) (if applicable): %zo g 4 2.1 Facility No.: 82T (county number); 51 (facility number). 2.2 Operation Description: Swine operation Feeder to Finish 8240- Certified Design Capacity Is the above information correct? Xlyes; =no. If no, correct below using the design capacity of the facility Thu "No. of Animals" should be the maximum numberfor which the waste management structures were designed. T ee of Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals 0 Wean to Feeder 0 Layer 0 Dairy 0 Feeder to Finish 0 Non -Layer 0 Beef 0 Farrow to Wean (# sow) 0 Turkey 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) Other Type of Livestock on the farm: No. of Animals: FORM: AWO-G-E 1/26/98 Page 1 of 4 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): 145 Required Acreage (as listed in the AWMP): 84.2 2.4 Are subsurface drains present within 100' of any of the application fields? YES or PO (please circle one) 2.5 Are subsurface drains present in the vicinity or under the lagoon(s)? YES or(please circle one) 2.6 Does this facility meet all applicable siting requirements? (Swine Farm Siting Act, NRCS Standards, etc.) (Swine Only) (�S)or NO (please circle one) What was the date that this facility's swine houses and lagoon were sited? What was the date that this facility's land application areas were sited? 3. REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your initials in the space provided next to each item. Applicants Initials 3.1 One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; lie A )71 3.2 Two copies of a general location map indicating the location of the animal waste facilities and y� field locations where animal waste is land applied; 81)91 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit fj(1 application for animal waste operations. f The CAWMP must include the following components: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, infection, etc.) 3.3.3 A map of every field used for land application. 3.3.4 The soil series present on every land application field. 3.3.5 The crops grown on every land application field. 3.3.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP. 3.3.7 The PAN applied to every, land application field. 3.3.8 The waste application windows for every crop utilized in the WUP. 3.3.9 The required NRCS Standard specifications. 3.3.10 A site schematic. 3.3.11 Emergency Action Plan. 3.3.12 Insect Control Checklist with chosen best management practices noted. 3.3.13 Odor Control Checklist with chosen best management practices noted. 3.3.14 Mortality Control Checklist with the selected method noted. 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.) if your CAWMP includes components not shown on this list, such as an irrigation design, or site evaluation, please include the additional components with your submittal. FORM: AWO-G-E 1/28/98 Page 2 of 4 Facility Number: 82 - 51 Facility Name: A&B Hog Farm 4. APPLICANT'S CERTIFICATION: I, (Land Owner's name listed in question 1.2), attest that this application fot 4 —1� 4 A FGt/-1 , —Tv C (Facility name listed in question 1.1) has been reviewed by me and is accurate ancc comple a to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be re ed to me as i omplete. / Q Signature Date 5. MANAGER'S 4TIFICATION: (complete only if different from the Land Owner) M (Manager's name listed in question 1.6), attest that this application for (Facility name listed in question 1.1) has been reviewe y me and is accurate and complete tote best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this. application package will be returned as incomplete. Signature Date THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 FORM: AWO-G-E 1/28/98 Page 3 of 4 v ANIMAL WASTE UTILIZATION PLAN Producer: Aubrey Moore Location: 100 Balkcum Rd. Rose Hill NC 28458 Telephone: 910-532-4855 Type Operation: Existing Feeder to Finish Swine Number of Animals: 8240.00 hogs (Design Capacity) STORAGE STRUCTURE: Anaerobic Waste Treatment Lagoon APPLICATION METHOD: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 x ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 8240 hogs x 1.9 tons waste/hogs/year = 15656 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 8240 hogs x 2.3 lbs PAN/hogs/year = 18952 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 r r ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME 7090 1 BOB BH 4.5 225 3.19 717.75 I MAR-OCT 7090 SG I�1 1I 11 150 13.19 1159.5 SEP-MAY 7090 2 BH 4.5 IBoB I I 1225 1 118.5614176 MAR-OCT 7090 SG 1 1-2 1 I 150 1 118.56�928 SEP-MAY 6425 2 BH 6.1 INOA II I 1305 1 12-5.001762.5 MAR-OCT 6425 SG 1 50 25.00 1250 1-2 1 I I I I I SEP-MAY 6425 NEW BH 4.5 IWO I 1 �225 1 120.7 �4657.5 MAR-OCT 6425 -NEW SG 1 I I 150 1 �20.7 11035 SEP-MAY END I I ' TOTAL120548.7 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 3 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED __--- or ------- APPLY RESID. APPLIC METH _ N TIME END TOTAL 10 .. Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. In interplanted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, hay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. in fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain to reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. Page: 4 ANIMAL WASTE UTILIZATION PLAN ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT BH SG HYBRID BERMUDAGRASS-HAY SMALL, GRAIN OVERSEEDED TONS AC 50 50 TABLE 1 TABLE 2 TOTAL TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED 67.45 20548.75 0 0 67.45 20548.75 * BALANCE -1596.75 *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 5 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total • acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 3048.8 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 15244 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 50.8133333333 acres of land. if you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 121.952 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could vary by.25% depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 6 ANIMAL WASTE UTILIZATION PLAN amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract Field Soil Type Crop Application Rate (in/hr) Applic. Amount (inches) 6425 2 NoA BH 0.50 *1.30 6425 NEW Wo BH 0.40 *1.30 6425 �2 SG 6425 "NEW SG 7090 1 BOB BH 0.75 *0.65 7090 2 BOB BH 0.75 *0.65 7090 7090 " 1 SG " 2 SG * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 160.00 days of temporary stowage and the temporary storage must be removed on the average of once every 5.33333333333 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Page: 7 ANIMAL WASTE UTILIZATION PLAN Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION Page: 8 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. G. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such.that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 9 WASTE UTILIZATION PLAN REQUTRED_SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to • take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 10 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5 ) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 11 ANIMAL WASTE UTILIZATION PLAN n WASTE UTILIZATION PLAN AGREEMENT Name of Farm:A & B Hog.Farms Inc. ' Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Aubrey Moore (Please print) Signature: & Date: Name of Manager(I different from owner): Signature: Date: Name of Person Preparing Plan: (please prin Affiliation a��r7ah cJ. SGe I Dos wa. d FFa/M1' / T.,C, Address (Agency) : �o. �uX Lo, q10- S47_- zl u 4 Signature: ij Date: 'Y /4 Page: 12 • .;7 _;��:''rr,� ''r-:Y�:;}��^y�. t�•- ice• .�. t '^„f1'• ��!J,}�Fs�f.+s�` �'� � r ��[ry� J= �y �' � f� x } r%T[`�i4� )%r'�' �► "•"•r r�� � S .:Sr1 it lip 27 J .AK`=�'�'"'''t�.*}',�`� ti -47 .. ^'4 aye ✓' Y^'f t' r •ri(♦�•.• � rw •� �: ``mil• '.r :.�:;. :j,.'.r �.>- .: % ��:r .fi:c'• .Y.-�ww,. �+". r'-.:' ,S k.'�lL�.� a1�„L'•_'r� •� ,� •a yl' ftr ^`w A..•..• ice` dry ._: JyYJ'b�l�,. yam. •�:� y�"�' �. �' �x!r•� a� _, 1'.,a: `� .a•7r. +.':�.}�, .i� 13 14 � r�y• ! r{��•°L. .t,,'•3r'-tr ti ... ,,." •, �, ..� 1' �t (. ;f 1s].r .. I �J r''t 1�!�� t r' i '� y Fc •F� i' 3 4.:;-0 lji.:a :i-. if:.'".y- .�:''jAl�!•r"•'�'r� ;i��%{ L-ir.i �• ��a�•t a�'�:r• ���,f�lpM� �'.-;Y''. • �Z�'s: 1 . c'r� . _"�'�r !'. J 'e�y ► 1`a� `S- � i � r.. � -�.� • [• * �i • ..L. r f� s,�. �(���fl.'-. /, r�� r_-!: �,A T ti� 4 .4,: r j y' i . ��4::.•'� .� ,; r� !~�/f 'j , '� �' t �.- ._L - rti . +{�f�,lr'' �_11. 1117�1 1.5 r• 7 • 'Syia= H �I!t.,�'.•,i • - 'fir env r7` -�.. }e i�� f Si.�x� 1 Tlr r�• / " �� ,►pr tr -vi yjj�S'.I�►i. ��iY�# i �' !�"Y�' ,':. t{ ;{ ,T! l,` ,� 7 _I IL .� r, ,'+ �"' r � J •k'• Y`.5,�'`. �' �t �;�1}�:�f3��%'�.'�,I jr;j'.., %- on �' tom' �1 I t 4 r i ri �� •.!/: ' f •' .al'�(. t,' . I i � 1 ` ••,_; t :�• Flu r +Xi "; t'M� 1 f - ,} r.� r M fir 1' r ��'i1 k .�. 1 - •t- L �' t? !�• •{'►•S ! ', y . -. ~''. I _ I I �" '} �\!..- � .•� w �� �j� ..�� ��:,t ,r�Y. t k•7+� � (f� rti a _ -1 II sir„ �;J�1• Jv�'' ��' � ����, :i yy � �. C�1.��. �;•i3. '���.�':v {] 4Sy�i•�: .���7{::�:'+��� �,� �-� �"� �i '�` �-' u _ i ` ,'ti".?i �r �w `ij +j":' •;i, .:x� 5/`•s �r � 3 � ir. um wig r�i r(' 40 rSi• ^r I(L� wr'.¢ l� // f.• -its i - a- .ir. F M JI r":r ••r iVy i �``. { Ly � f il�rA \" � � '� •:'-. '� Si , ; 'R�[f�� y x �-y,'J I n _y I If]�, .r . `a1��' - •. O J si '} ..1iy-jC..,:,,I;,_ • .i • { y4�.,J. 7 * a _ r rl+ 'r.�r�}'t'k I :•'} fi.. -pt l,' .�! .�Lr fly yf•,•r�:^•' 4�•' .$..i � - - .� �C• J_- 4 ��' ' y•, �•ar i'� .1-. _ .k ? �. \`ti ` .��' ir`-L j r� '' V r/� _ �" r ,L� •Ywt1• ,�,�. � �-,f .�` -\ �r�fs �r�-j •'{r��/�r{y�,.,Y �• ,r'yiy�:►-'�� i . r � y��,,,y' ,�- � i df/ o' f �' I. • /•^GO k• �` 'i �rji 'S.7=��'Yj��/y _!� 1 �x �4 1��,�iR,f.y sr : r - :t` r �t { 1� t 11� {.. 4'• ^}�hiis`;`., � - �•�` �4 r�y�.Y s+�_�.r`f'�'.' -*„J Y / •�'i•7..` ,,\ :•-!.i 4, :. jt+ ` ••S�J+•'j '�4 'r:''is•1{`?.(y:[- y.��`}r•r++{��jillr�'; •/� 1,•QIr1 �'� r • �' •.t �Y � i 1'. i-F�T r Y� , S_ � �?JF+�'#.��'�iR'= r - .^ I •` .4 h t „:.''• ,f! * ' • J*: y _• e • ` 1, if .S� r s 1 .. �Ar�'k ,bt'J ✓�� ;y, +y��`+ 'J aY �Fh�,jw, .� k • �1w} , k .,>�•^wr s17, • ; '�•jx�'Ii, •��. �+fr�)+rl� :- /' S� ' �''� - �.• !i� •_ IN, -r' , .f. 1 • 3' /i •.Lr�•', �a .(;1. �7Ct r _ _ •�i•� �! .i ,lr •�• r ` '�•!}ji-.t•'•� i E.. r r•.•� 1.' •..r!�-. r ��Et,, . �'\ r K.l �' a�1 ti . ��r � •r :r,�;,yq t� �-. f �•� ,� � :i �,a�. �• ,,(�;�,',�1,a ►�._� L Y r':.•-�..'d: ,, r� J' •'ir- Jr •r-7,.:... �,•�{• ({ �,, :u{,, i i _�s � `t?q�• iY?. .7 *• r •:''.`�yyyrl '�� q -lr�r' ''r,{`''ti �r: _.. • :1 L- - r: �, s r L'��ri��--'Lw �I.rt0.�iKF� - -' 'r. '$y'.r � {.. �.� - f��(.4Z su .�• ,�' r'• —.rjt r: .'�' .. S` sir M `.k x Y{:?1:t ti` �e. }tii. ��ll t .;:::�'rJ' • •j y; A 91 -1M� p'_ 'i }�,p, ry'�-r TrJ� �. ( -_ ~ �S .tt 't� , 44 i �r'' / ♦ - y. ir' h• a i' s ss 4[ r d J�y. •; r'1 �• :�iJ � iY -Ar _i {`. • �j�1,',,i(�� !=••s�� - J j� , '`Ir 6 I'. * �%�, # • ij • ; 1, a.���if'' ;} �.gg7y z• 1. + F ty�=� (.('..; .� t :Y ' f Polk ,. r�.. r •� ry , r• 4 is ;{ i� : y� �y h;'•r rr �( r �s "'t ; F(� {�rl.� .,. �• i_^ i j(s ' l �' x f'�T��"j� � � f. �:..'� it,�',• ,yam'- r_t �.'•.v�, xy�s`{•r f' +(y,Y' •k �'•,Xr"' ��� r " f,�:'ii�:.'K7•-. •'ri �Y-. fyyT'= , �'!. � 4:� _ ' ,S••4 •. a�.e:sr� '4-�_;!`.��.� S ai•,� p Ali r ��ye '�( y/' :r/�i�r '•�� fi' i. .� �. ppY` 'd1 1 S�i;'•* ���%ij•i'` ' N +`.t'x••_. r �; ! +ei',�J L 'S• •s y'!•r T• si � � .r S� ki .x �a S _r: + ^rn = Tr�rr 'k ., yZ1 r' �:'' n Y',f: r� s c,- tiF• .t �%ir, ;�j'►�lz ' h /J ��. 1r:; "t'„s iT s•� •''�"� 't-''- 1�' l�e'�tj '.r,-��r1r' s. r,� L:�►y �. �' - •-b4 w — � • �- ¢ _ ���w '.•`, .. • - i.., � • .�. 1��r,� r`r, !0. � � "' J� �[ `Y'�•��.;y �'��, 1 ..I r'-. Y ��� - !1 _ � +` ^t, r'^ .) (� ,I•s :�t ` - / ��::,- Z: �. i �.5 Y;�ir`+f I i k Ti r 111 t: - •'s. 4A ''ar r+.} a � �'��-` '," ,1}•,, s i.�i':s:z' �' �,rEr� _� Y '•; ,, r r. '.F�:�;�!•y�' J�,.:�7 - :� ?+�! �y'!' _ �l. t '��'a t �' �• �'r"[��y�f�,'�S'�=�� -�•1". 7 t'i r i �' 'iS::' '�:.= 1 .'l .i� ,1 _ .,. ��`'t . "•SST � Y q � '•r•^ i Y.4-� •-r...��T •t � �.�ry •�r,. t�.��i _� e�•-•'rttii �' ^�S t;•►"�'. 'i is ,r: •� y� .1 t/ l �.�'} '.� � � ` �.: , kC �: _ ._ `,� '."Zb ;_, �' 'r-- a�...� r '/;.ti�..::l.t i)u.. � .tif + -�+' �'�,►,•t. �''tR..- .�' "-� ' 1,� : ,�: 1,R' } _ ./e1�.i:��'i� /w--! Y* k'l 'ti • '+dxlJ±ii f'' i�.� �',y r.'�,dr r;t% / '.:.,�, ` �' •r.: .� ` _ _ ` '�' , _ .,:+.-� Si ; �rr�� .. .i ':. .� �„= • /�� • 3r r �'c�' k i Q ik .�y,r: ,� I r� � ,r vs .ItYit,t. t' a�• �, yr i fii Ali * f�� �i•�'' liri �tS �7y� {jr �S t`T'�t l �t r .5•� ' i, .�. r,. .tsr.'' sic:' ~, �' "t .__ �'•�'�` ti1•_i.�.M��":;�'r+1'. !� •'i ('.y •,�, �.,•rVIM i. 4, r,. ��.r";-;V,:+J1T`S• r,-r .fAT j •� - n' _ %r,'f.�` k T / ty a ~ 4._ ...R_y► r `iy i �O1� '-�plfi+j�' r�jy�t L..•�t�'y r{ '•! :' i �l,-'Ii /;'i .v a ': j� • r _ }� r ��'�r { ! �' t 4�. ii�•,+i``. r•�/{'t �d� �•r� ,s �If r. i�'.' r- /'( ',K+\ii4` � � �, ;r'�t„�-„��l;ti��' •=M.' ir.. •4��Y [.' 't' . i Ij• �.�-la'��'f'.'`•j'� j�."�'�,+f` �,��+�,�, '+�1 �f �1��•�i`�', J', ;•.H� }y a L- r• I;� '1t • J s •�{�i4a��•l4. f •� - =s�� r � t• ,ti..�•a w r �a^� •�t{�,�•T.t�''S'�' •t'j. yA.�a�•,��t��I�� ����' •-��r.��.'•r.ti��.s.�~. i-�.. .. .� s J { f�• 5r -I�I<x `� iifa� ">-, /+. `�- ri•;�ilr .� _=ti� ',�_ #' '�• .'j�"_j �.g:a- �' �.'��.�4s:•r' JAf; �r •i• �r.!••�i.- �.ry� . i �; •-�� � •'' r': � t .#* .Y. _ �' wN.k:'.-� _ .. tIti 2 sY( �'� '!r.•: ti' -'L �'- :')' :•','� �t :_. ,r '.t ri_ '.y VA(!_ ..w'wb�'�=�'•n•.' '•r,. .i '.�'i •�-.. .p 4,ra. f'_ •\.7..% - . - r '�%. �' ' `1�� ;4 �L • is-'l r 7^• 4• .� • -t� }.-. f�•- ^� rti... 14} 71r: y, _ •,• rr� ?� A.. _ _ i.' ., �• _ _ i Idki - _ 1.{•�, ., •'.,�� : �. •ti �,i +i� C+� _^�;:; :�: ��{;iy? fop ~�'•'���"= �` } �' } ,,y>,t,��r.� :ti ; f. r�•� �;4 • 4e-� •,ik"►`��c�'�.i5''' j5,]} - .yr-•,:r'.� - i#'�, t fILL- z }-/,ti;t.:'� " }jc�•!'9••!- _y',• _�.,•L:• ',- t.i ti: •i i 'r `ti + • �'"�':.0 1� sjsj �• W:•-��s�A-'1ti�'� � '�� ��.."-l`� ' � r i L �yr �� ��.]*�' J• �1 ti •.;k��' r� :r. , ���`�- '.t. 'rr �t>< �+ •t"i 1 y11Y�(; Z. r JV "K s .t -�!{#►rVi. -i. `•.�f1lF, • .. •. rt .� .:i /' _ ' 1 i n•i'!t, '.f:ir+�"': :- L � -•J t.�'; I t 6 'yy .,:,,r•' �s2 ''�J ja: -, -.Y'', -f�- i r �,� . ' ,. ;`�1 . -•i__ •, ` •.'A- 3.' R fLyrf, _ .r :'-iN:� e,,i ':t'.k .i _�; .�.;' .i..`:i3t_: q r s.�•'�+`.'-'y.,'..�'r -i�i: ;:1�r'- i C t-•' � M�'rt. r" yr. YS ' ,} i?.° \ t ti y . •+- � - - - r 1'.. '-Y A 1 .t' -F. {•-:asf.�i4 '.j�'a.;;� r� ." c.• ;yr •'��.�'r'' ir'"f "I•}}�,sL na.r' (' � .rs:�•� r} t. t-;. � . ,'�. i. '�' _ i,.�-.::y_�; i J.i,�'• �r1t�C} i''':"_iJ .:� .riT- La�f..Jt'�'1�,+..' -�. :1 + ".►• �1['�' t. • � �•f[.i.�:y r �{;•.{'r a' j. __ , J �;� R � �: } �,fs r �. .�.� r.C' s.• .�f�. �.-ii�'•h i� Sf•�'• � ;4-�.^=�� ri. �,�,•?'-.� �' ;: rti:�ti,:cj,r'T.:,�+. •.` -�� 4 t � 4 ��:• •.. � " '."+.`. �:;; «•�.i=r �� -r;••: I�R ,qr�' '.�'� . �,: �lh � •j �,r: •_�•.• • s: �};�� � ',- ,l' L �� ,�,•-i.-.,�'"�* ,j- �., ' •Q �-� �'• .s7:a:•+S.ti ..,y.(; r�, 4{�.*tee �-._ -. �.''WY,{/:'-�i•rr'' -;?{ Y"� �- J," _ � r- � ^� .i •tf '- '1•".•4.i s ��:T�=•-.r �i�tr.:� 'tf •:w, $' �>`• w:-���^ 4} f ', i s.+y d ; r -.i y yJ lr '�� ' mat •+ 4p ' �R1; $.• k- 't, J Mll: f`r r r�j 11 ' r�Y 7r••": �.�..'-S.^�i��1•j'_�}y � (r2 ).r 'a ._a..-. - - - • - -i. .Y. {. ... �i. y. YTJ. •J �i i, • :_d.l r,r l�.. � .+- lt':� ..pia :Y�� �`�r�T'a���5.1 • farm Approved - OY$ rlo. 0560-0004 A04026 lua-174p UNITED STATES DEPARTMENT OF AGRICULTURE HIGHLY ERODIBLE LAND CONSERVATION MELC) AND WETLAND CONSERVATION (WC) CERTIFICATION `LAC 3, Nam of PnxkxW 2. Identification Number 13. Crop Year 4. Do the anald AD-1026A(s) list all -your farming interests by county, and show current YES NO SCS determinations? If "No", contact your County ASCS Office before completing this form. S. Are you now applying for, or do you have a FmHA insured or guaranteed loan? 6. Do you have a crop insurance contract issued or reinsured by the Federal Crop 1<as uwce Corporation? 7. Am you a landlord on any farm listed. on AD-1026A that will not be in compliance with HELC and WC provisions? 1 & Has a HELC exemption been approved on any farms listed on AD-1026A because the landlord refuses to comply? - 9. List bere or attach a list of affiliated persons with farming interests. See reverse for a r _ e hmadon. Enter "None', if applicable. .}�-- 9 kettns 7 tw Sar>e answered 'YES', circle the applicable farm number on AD- 1026A. CWfng eMi,er the crop year entered In Item 3 above, or the term of a requested USDA loan: .a .li ti 10.' Will you plant or produce an agricultural commodity on land for which a highly erodible YES NO land determination has not been made? IL Will you plant or produce an agricultural commodity on any land that is or was a wet area on'-vrbkh planting was made possible by draining. dredging, filling, or leveling or any other Ll .means a b;r December 23, 1985? 12. W1�1.yva,.oi- ave you since November 28, 1990, made possible the planting of any crop, pasaare dgricultuml commodity, or other such crop by: (a) converting any. wet areas by draining, dredging, filling, leveling, or any other means, or, (b) improving, modifying, or E� maintaining; an existing drainage system? l3. Will you convert any wet areas for fish production, trees, vineyards, shrubs, building construction, or other non-agricultural use? If anS7I m 1D lilM8 'YES' for any one of these items, sign and date in item 14 below. Circle the applicable tract number on AD-1026A, or list tract number in item 12 on AD- 1026A. ASCS will refer this AD-1026 10,11, 12, or 13 are: to SCS for a determination. DO NOT sign in item 16 until SCS determination is complete. 'NO" for all of these items or SCS determinations are complete. complete item 16, covey flint the above Information, and the information on attached AD-1026A's, Is true and correct to the best of my 14. S>ijnaltue of and belifef r ; PraoducMir ! Da 1S. Referral To SCS Enter a V a SCS determination is needed because Date Aelened Sigl1nature of ASCS Representative j (Com pMW by ASCS) -Yes is answered in item 10, 11, 12, or 13. ,� 1 L/ - e( �P i ! ' ; i ` C f ! ( r ! iii►I 1 =M = a ti?� Ining in Item 15, 'Head AU-1025 Appendix. l hereby certify that the above information,. and the Information on attached AD-1026A's, is true and correct to the best of my llo►o krcfge and bellef. if Is my responsibility to fife a new AD-1026 in the event there are any changes in my farming Operationfs). In signing this form, 1 also certify that I have received and will comply with the compliance requirements on AD-1026 Appendix, and any addendum thereto. { 16. swoture of PloducCr-00- scs COPY 1 -1026 (Rdv®rse) toe-1?-94j INSTRUCTIONS FOR ITEM S of AD-1026 3 p oducet requesting benefits on AD-1026 shall attach to AD-1026 a list of the applicable affiliated persons with farminn intorAsts whe are raaulred to file AD-1026. Follow the rules In this table. producer requesting ietitx is a(an) ... THEN affi'llated persons who must file AD-1026 if they have farming interests are... vidual} Iminor 7E...If khe individual 3 is minor child, the er and mother shall be rd as 0illates spouse with separate farming interests, or who receives benefits under their individual ID number. children with separate farming interests, or who receive benefits under their individual ID number. estates, trusts, partnerships. and joint ventures that the individual filing or the indlMdual's spouse or minor children have an interest. corporations that the individual filing or the individual's spouse or minor children have more than 2we interest. eras a eartnership first level members of the entity - ' venture 'ed partnershi a icable trust an tribal venture an group iocable trust -)oration with stockholders first level members with more than 20% interest in the corporation. 'a none .rch or other rRable organization nt 4c school )oration with no :kholders KEY TO SCS DETERMINATIONS IN ITEMS 8 THROUGH 11 LISTED ON AD-1026A HEL = Highly Erodible Land: 9.. 027 = Approved Farm Plan (CPA-M7): "Y" = SCS determined highly erodible land. "Y" = Tract has an approved farm plan. "N" = SCS determined no highly erodible land. "N" = Tract does not have an approved farm plan. " = SCS has not made a determination. "X" = HEL flag is "Y". Producer has a 2-year grace period after soil survey is available to obtain an approved farm plan. A027 = Applying Farm Plan: "Y" = Producer is actively applying an approved farm plan. "N" = Producer is NOT actively applying an approved farm plan 11. W = Wetlands: "Y" .= SCS determined wetlands on this tract. (* See footnote.) "N" = SCS determined no wetlands on this tract. " = SCS has not trade a wetland determination on this tract. SCS has determined a wetland does exist on this tract. Contact your local SCS office or ASCS office for details concerning the location of the wetlands and restrictions applying to the land according to SCS determination before planting an agricultural colrtmodity or performing any drainage or manipulation on this tract. • .` ,fir 4�_. �a srrrr�rr er r•■sr�e�s It1rC*�1r► +tRnme�+ratrrow aewwwmw earrnce Ht REOUQST FOR COMMED WETLAND MI-----.Z10i.;QQLIfNKJiTFr: N ftM ~ rrr ON" +ewtMM a awetlsb . tvame� r OWNER 4 aa7-o- z- -RA I Ad&m, 5 Q,�-•-e• Are you a USDA program Parbdpsrt? (tt yW AD-IM UMN be an ft,) 4, No AQWT • ( PV%ATOR) Have you previously rw erved a wed" detenrxnatw or ctakww eon on fts VW kom Vw NM unW Resources Coreeervsbon $&moo ff wwoy Sdt Carrwvwkw Sr "m) or the Corps of Enpr wws? Yet /�No Umban of Im*W y (dee+d;ptbon): f tl. a-�Us qa I _ hT/? r Igo S t! 3 a.�.� [ I' m No.: � ? `� � � Trad No.: 702 ( Aeras in tract me or snit Ofta um ft Iowan euft Ley ' PURPOSE OF ww FOR D£TEAMtNATiOWDELPOEATiON pima err aw avow 4-4 y w*v 00 erre , a1 OLMOp., Am.) Non-AQria�barai pspose(t?: r'� as: arerrrrsreW drrerlopn+nC rear. a�.l lntonr{Isoorat twrpoee(sl: • I Certify to i am the owner or agent of rw owner tar the property prOVKYrtiy deacr1w. • 1 76rt 1M NsLgW PAmmumme Gwaarwsbn Service for t%w artepnsrro R~+w Vw V9 to enlrr Vw p►aMly p wAOLWy descried to ascertain V e eresrtt of wso,-wu an sad property. • l undwsWO" Vw irairarnise, w oodecteed and the comfied +retard is pubtio Wft,nttlon ud my bs rOm b to y,ubk or ultiised in any of be age cm, dwa beset, or pub abed on Wkw wwtiend rrnpt. Stgnmrs of Owrwr Oft: 5 use of Aq*M:. ALIP%Wgw ay rw awry, L7ets: I a U. S.C. Seceare tool prowd" rm: vvhoovw. n Ow rf wvw wwvn the pnsdre*an at mw daparrane ar s" tcy or Tew umm sm"s womm we spy — tsrMna. a� ar aorew up sM WW rck m&w ms. or qi no s nam%w Ise or wdow tear tails. r ama or A w wWm A MWWwwa* w mp a#rw maw MOM Or 1MM am tares war♦ Or OMMM rarr (f W" MOM ro QWNW wW :wa• bCMWA Or VEWS " rIMUNent Or $my, sW"d bi cyan fig ware rw t 1 or dnpnmm" nay MGM rw M years. or balm SCS-C✓pA4U26 1. Name and Aooress of Person J'SoilConsdtivationService (June91) Au„brey Macr7-t3 d' - HIGHLY ERODIBLE LAND AND WETLAND '4J 3 CONSERVATION DETERMINATION 2. Date of Request 14/,/4�� 3. County r 4. Name of, USDA Agency or Person Requesting Determination 5. Farm No. and Tract Np P7S A- 1 13091 T-_7bgl.-_Lln.tL4.01 SECTION i. HIGHLY FRoniRLF LAND 6. Is soil survey now available for making a highly erodible land determination? Yes ❑ No FIELD NO-W TOTAL. ACRES - x 7. Are there highly erodible soil map units on this farm? Yes ❑ No 6. List highly erodible fields that, according to ASCS records, were used to produce an agricultural commodity in any crop yeas during 1gal .1985, 9. List highly erodible fields that have been or will be converted for the production of agricultural commodities and, according to ASCS records, were not used for this purpose in any crop year during 1981.1985; and were not enrolled ih a USDA set -aside or diversion program. 10. This Highly Erodible land determination was completed in the- Office Field ❑ tz SFt_TrnN II . WFT1 ANr1 FIELD NO.(% TOTAL ACRES 11. Are there hydric soils on this farm? Yes No 12. Wetlands (W), including abandoned wetlands, or Farmed Wetlands (FW) or Farmed Wetlands Pasture (FWP). Z,tN !` Z. 3� Wetlands may be farmed under natural conditions. Farmed Wetlands and Farmed Wetlands Pasture may be 4 S farmed and maintained in the same manner as they were prior to December 23, 1985, as long as they are not �t S abandoned. 13. Prior Convened Cropland (PC). Wetlands that were converted prior to December 23, 1985. The use, management, drainage, and alteration of prior converted cropland (PC) are not subject to the wetland conservation provisions unless the area reverts to wetland as a result of abandonment, 14. Artificial Wetlands (AW). Artificial wetlands includes irrigation -induced wetlands. These wetlands are not subject to the wetland conservation provisions. 15. Minimal Effect Wetlands (MW). These wetlands are to be farmed according to the minimal -effect agreement signed at the time the minimal -effect determination was made. 16. Mitigation Wetlands (MIW). Wetlands on which a person is actively mitigating a frequently cropped area or a wetland converted between December 23, 1985 and November 28. 1990. 17. Restoration with Violation (RVW-year). A restored wetland that was in violation as a result of conversion after November 28, 1990, or the planting of an agricultural commodity or forage crop. 16, Restoration without Violation (RSW). A restored wetland convened between December 23, 1985 and November 28. 1990, on which an agricultural commodity has not been planted. 19. Replacement Wetlands (RPW). Wetlands which are convened for purposes other than to increase production, where the wetland values are being replaced at a second site. 20. Good Faith Wetlands (GFW+year). Wetlands on which ASCS has determined a violation to be in good faith and the wetland has been restored. 21. Converted Wetlands (CW). Wetlands converted after December 23, 1985 and prior to November 28, 1990. In any year that an agricultural commodity is planted on these Converted Wetlands, you will be ineligible for USDA benefits. 22. - Converted Wetland (CW+year), Wetlands converted after November 28, f 990. You will be ineligible for USDA program benefits until this wetland is restored. 23. Converted Wetland Non -Agricultural use (CWNA). Wetlands that are converted for trees, fish production, shrubs, cranberries, vineyards or building and road construction. 24. Converted Wetland Technical Error (CWTE). Wetlands that were converted as a result of incorrect determination by SCS. 25. The planned alteration measures an wetlands in fields are considered maintenance and are in compliance with FSA. 26. The planned alteration measures on wetlands in fields are not considered to be maintenance and if Installed will cause the area to become a Converted Wetland (CW). See item 22 for information arrCW+year. 27. The wetland determination was completed in the office ❑ field r'p,16nd was delivered❑ mailed[,PT'10 the person on U. Remarks. Area,::-- ea.S " A l vV 4 Ca^- r7@� (� �L-r� ! La'i+^1Ct s CL^-tr H'I �+-P b E t� iG`�p•� �� 29. 1 cerrrfi� that the aho%-e determinarinn is rorrerr and adequate Jhr use in derermrnnv ekwhilirr for• USDA program heneltts, and that ++erland hedrolovy. M-dric soils, and h.drnpkrnc reaeranon under normal rrrcumstanr•es exist on ail areas outlined as to of SCS District Conservationist 31. Date Assistance and programs of the Soil Conservation Service aratiebte without regard to race, SCS ("vy "fax, 'sgv, or handicap. i STATE: g'r 3 KDRESHtri) mprf t nhs�s. ntLL, f'!1. eme»t.al to AD--i 02b! PAGE f 2. _MLWY : SAWSON 163. 3_ W.' YEAR -. 9`6 4..I D '10. 2T,7-Aa-!.64 ---_ *^'y:;p, �. ,M V�v cx:trC wart{ AnY+JI.L.14 ro VVI ♦VA. .1 tgt8? s3?-1855 EMPI' ;.ikPi7f ESA ';PEKE (910) 80 CCUt+M CWLEY. RD. C:.. TnC4 • !IC �8318-4?27 i. %irCie Eacri i-r, cct for vinic i a 'YEEZ' aalY3�;er apClies-to the t-an Tor -Items io, ii, i2, OR 14 an AD-076. 'CF = ' era cr; (N = Wner: M = Owner sperafcr). F9PK Cr, 7A7 UM"rLA 34;ia KNO/GRID '-SC.S k7EPHINATIONS- .NO OW/ 'm 8. 9. iD. 11, w ' . 02. R0,27 Uetland 106 CU 6960 M ps-_-Y 3 MOChf ;{ 19.r33 N N N i 3C91 OG 0`424 6,7 AUBRE'f R itOO.RE' OWN 9 N N N N i3091 QF 6421 aa,' LOUISE H �',GOTEE i(19/2A Z sti31 00 G': =; '.'T � ,UBFI.Y �: .� Ki 912.4 ,N 1Y sNf N �N ;II !:• a - �� .an, J ...� 110 —... Alj r,Ey C' 4n+-c I:vr'1 .�. .. !"4..i V4C`7r i. yr 1l_: ?.i 1 �[ `1 1't 1 i3Pi I12w 6424 N.9 LOU147 " MCCOK . 'd1U7,c N N N Y 642 ?4,4 A,;MfjPPE � 4K/'so N ►i �� v _ .. L'0 6 r. E' ,, , . I V 1 At 1ryW : „ %: �:., _ iZ I •W.a.1 ^� •t^.7 I�•ri tt •.I.v`! r^ a *n U 11 '..V�11V 1 ,nr.n �.1 1 ITACi (Sy.� Ula �,� van /L�,�I��it�b'yR AUuf'E R MOCTSir t 18"2- f" i30 , GF Ll �C1a.f +'i ��A ..:LA:a L.'❑i«V f[ �'�: i1 It� 0$91 0O 6439 v.6 AUPJRLI,•R ' K19/B N N N Y 1'591 00 Wi 18.1 A UBREY R K 19/23 N N N i3D9i CP 643i i8ai LOUISE m mm W/2S N N N 3v?' r a i2 29.a "4;=f ; ;�i'w';E Wi2A N Ni N i 3V7 i UU 8Y 7 iiIJP T n ! J?= ;� 14 #v59: :w 7=A .� 117nJ [ ,�E�Brltf fi ;if�4E airy+r2A �� w 1; .f +7rlei • Vv r1-V� �V_a.uL .. 41VL: ,r ,4V %y. r L r.: v Si 1 091 M 7P991 .7 Atur-lY 2 Wz i_i3i.A kf N N 4 780. ne. -,•� u ynn^► 4 ^ a., y }, V:9!^r xl � 11 N Y '� CtiL i .ti. l .1 ji•JV 'J.J �.:r�7L Vr. .'iC!RE _I.a r.+ i• ''i IT c�,yo, CC gatic :r� RL; z- urn; L.i2 -U i7ocI CP i°4Cc ?_.c ;cj T z lc.."M v17lip .J•Jii i i'�ta] :G._ _...L 1,*i -A7 . _.. ".::tl l:-ii�! .a VCj :.~ i'`'. •.�vGl _. _CIF71:J JI :ll'J... J�a': ill N1� ji !•) iiii'IJC� . LiJ-'^�. IJ JC.JIi. G,CdY --C1i :ti i� __.. `..-1 �A�+., i'v 3' .a'41M3 _ 'J: NO :n •:le. [1.a•...Ji•JC7:Jr? .]dr� JI _... ,'11'V,j�;' C�-•:� ,C :il'�a.:as-11Q�"'CI- JQ:i �la'? >11. ice- —li_ w.. ——.. ].... : ..s ,�. .ti al, aJ:•'= ie- �i�... �IJ �'. ',C"_ _ �3: 1:'::~� :lit.l _. �i it .;j'li'�r- i, n� 3^. ?..,J iir'7TiiJ� 3 i'?:4 s{''.'i -3 -;ti '.,-.L—:J.57 •:. ,;i;+_� 1 :".' .. 'zi: 'IQ;C4; l yL''`i •, SIB. '^' � .—ryatY Jy�r`.�, -.. •,--n�.J rl^.:.. . �t ,.... rit 1` DATA FORM ROUTINE WETLAND DETERMINATION 11987 COE Wetlands Delineation Manual) Project/Site: `e-1 - Date: .3 Ap0licant/Owner: 74v County: - r Investigator: State: DolNormat Circumstances exist on the site? Yes'; No Community ID: Is the site significantly disturbed (Atypical Situation)? Y No Transect ID. - Is the area a potential Problem Area? Yes, No Plot ID: Ilf needed, explain on reverse.) LrN ! rt Z VEGETATION Dominant Plant Species ;, Stratum Indicator Oomininr-Plant Species Stratum I iestor _. j�,ln , +ems dic, s. 4. tr ie, i r. 4. ii& i, 12. 5. 13.�_ e. 14. 7. is. a. 1 a. Percent of Dominant Species that are OBL. FACW or FAC 5 lexcluding FAC-).✓✓�, r _ / Remarks: HYDROLOGY _ Recorded Onto (Describe in Remarks): _ Stream. Lakes or Tide Gouge _ Aerial Photographs _ Other ec �No Rorded Data Available Field Observations: Depth of Surface Water r lin.) Depth to Free Water in Plt: (in.) Depth to Saturated Soil: ri (in.) Wetland Hydrology Indicators: Primary Indieatore' .,*'Inundated Saturated it Upper 12 Inches Water Marks Drift Lines Sediment Deposits _ Drainage Panama in Wetlands Secondary Indicators (2 or more required): Oxidized Raw Channeis in Upper 12 Inches Wetar•Stsin"d Leaves 71ocal Soil Survey Date _ � AC•Neutrsl Test Other lEmisin in Remarkal Remarks: j+r rA..-:... �:.:-•.r.:rn nwr `C °.Z.^. /•-!./I �1 = C ��,`�1 ._yS.'Y• II � r r. J1� ?i, fry}V Jr' ryr J SOILS Map Unit Name 'S (Sense and Phase): I,� i / Drainage Close: r..xrr r'��rn.,••eE� Taxonomy iSubwmml: T i c Field Ob+ervations Confirm K40ped Typo? Yee No ' Profile Dssmretion: Depth Matrix Color Moitls Colon Mottle Texture, Concretions, [Inches) Horizon_ ( neall Moir).! (Munseq Wgistl Abundance Controot 5 r,,,(t etu►e. etc. Hydric Sail Indicators: Histasol Concretions Histie Epipedon- _:�Oigh Organic Content in Surfece Lsvnr in Sandv Soils _ Sulfldic Odor _ Organic Streaking in SwWv Soils Moisture Regime r/Liated on Local Hydric Soils Get _CAquic _ Reducing Conditions _✓Lined an National Hydrie Soils List kf'Glsved cr low-Chroma Colon Other (Emisin in Romarksl Remarks: WETLAND DMRM1NATiON F egetation Present? �a�' No (Circle) ICirelel logy Present) Yes N ovoW `Y.i No Is this Samaiing Point YAINn a Wetland? Yee..• No ;vvrovadl Dy 3,92 i L DATA FORM ROUTINE WETLAND DETERMINATION { 1987 COE Wetlands Delineation Manual) Project/Site: �l -Date: Applicant/Owner: "Jo County: _ -) _ Investigator: l- State: J,f Do Normal Circumstances exist on the site? Yes ; No Community ID: Is the site significantly disturbed {Atypical Situation)?_ Yet- Na Transect ID: LIse area a potential Problem Area? ,I Yes . No Plot ID: ff needed, explain on reverse.) /tN 1 ri L VEGETATION Dominant Plant ,2vecies . Stratum Indicator 2. 3, sl . r4 A, 4. mini S. e. Dominant Plgr I Soertes Stratum I icato► 10. 12. 13. 14. is. se. Percent of Dominant Special that are QBL. FACW or FAC {excluding FACA. �JJ Remorkeda 1 r HYDROLOGY _ Recorded Data (Describe in Somarke): _ Stream, Lake, or Tide Gauge Aerial Photographs Other _,:,'INo Recorded Dote Available Field Observations: Depth of Surface Water: _ On,) Depth to Free Water in Pat: ^� tin.) Depth to Saturated Soil: 1 lin.l Watland Hydrology Indicators: ✓'emery Indicators: /inundated ,_seturated 1n Upoef 12 Inches _ Water Marks Drift Lines Sediment Do-pasite �_ Drainage Patterns in Wetlands SeconQary Indicators (2 or more required): _ Qxidited Raor. Channels on Upper 12 Inches _ Water•Stoin,,l Leaves _✓LDeal Soil survey Date /FAC•Neutrel Test other IEsplatn In Remarks! {.i: ,r.; .l .. 5 :l•4...1 `CL�-+,V/�f J/w� r. r'.�i } �:. . . ra I I SODS Map Unit Name (Series and Phes@):C %�^-S _ „ Drainage Class:�� Taxonomy (Subgrotatsl:T c i<�Q Field Obgarvetions Confirm Mapped Type? Ye No eroAla Dasrri o Depth Matrix Color Mottle Colors Mottle Texture. Concretions, Agghavi Horizon M nsell Moist M nsell moisTI.. AbundencelContrest Structure, e o -S 10` YR ;; 5c Hydric Soil Indicators: Histosoi Concretions _ Histic Epipedon High Organic Content in Surface Layer in Sandy Solis _ Sulfidie Oder Organic Streaking in Sandy Sails AQuic Moisture flegime/Cisted on Local Hydric Solis List _ Reducing Conditions _&:fListsd on National Hydric Soils List �Gleyed or Law-Chroma Colortr _ Other (Explain in Remarks$ Remarks: WETLAND DETERMINATION HydrolDhyde Vegetation Present? No (Circle) (Circle) Wedend Hydrology Present? Y-W No Hydric Soil@ Present? .,x43 No In the Sampling Point Wirr+in a Wetland? Yew No I Remarks: m United States Natural ❑epar"ent of Resources Agriculture Conservation Service Waste XANAG ' 01M T IF kC -= S= EVALIT IYIOIY NC-CPA-17 REV. 1, 2-W czvM-a.A.L �rFORasaTio�v✓1n d S• ��� �tb., NAME �.jorc. l ► t a ate- LOGiION S � /l40 .� .r ;1I G zas TELEPHONE (9 / o�- S3 a- - 4 gSS S= OPERA77ON 1*3 LOCATION DATA DMTANCr FROMNEARYST R=ENCr Y0T OWNED BY PROOL'CIM I (000'OF1; DLST,ANCE FROM,NEAUSI' PUBLIC FACE fFY C=bwL chutsti. dA) -> f_;, ida Fr. iS SITE WLIHN 100-YE.ARFLOOD PLALV7 YES _ NO If yes, MRCS cannot provida assistance. M SITE AT LEAST 100 FL FROM A "BLUE ICE- PERMPNtAL STREAM? YES V/ NC _ If on, site must be relocated. IS SITE W11mN 1 MILE ZONING =DIC ION OF A ]rl=C2ALITC7 YES NO -Z If yes, Iandowner should consult with local zoning board about required permits Permits must be obtained prior to design approvaL AM tj7TM IES Di CONSTRUCTION A EA7 . YES _ NO If yes, sea Part 103 of the National Engfneering Xanual and follow policy. {Copies of maps or other reference materials may be attacked to site WILL SIT INVOLVE CLEARING WOODLAND O"NYNON-CROPLAND? YF.S Z NO If yes, producer must complete Form MRCS-CPA-38 (Acquest for Cardfled o zL Wetland Determinatlao/Deiineation). .41 F Z e WILL ACTION RESULT LV SWAN(PBUSiuVG7 YES NO IF WET"NUS ARE INVOLVED, IT LS THE RSSPONSMMrrY OF THE PRODUCER. TO CONTACrMM US AR34T CORP OF ENGINEERS ,AND THE DIVISION OF L"11 RONMENT.AL M ANAGE rtENf TO DETE U,= IF PER&= ARE REQUIRED. IF WETLANDS ARE INVOLVED. THE PRODUCER SHOULD NOT CL-41LANY LAND UNTILA WETLAND DF.LLVEA=N IS MADE NRCS will provide technical assistance is wetlands only under the following condtttonL For namrai wetland inCiusioas Iess than one acre In sue, MRCS will provide assistance only if the functions and values Iasi are fully mitigated. For natural wetlands greater than one acre In size, MRCS will provide assistance only after a rigorous sequencing prates: to include avoidsace, mimimiz+ciaa of Impacts, and compensatory mitigation is arried out In that order of preference. ODOR CONTROL HAS ODOR CONZc OL BED DISCUSSED WITH PROOUC—r-R.: • PREDOMINANT WZM DfRE,=GN? YESZ NO • PRECH RGEVO L:COCN WiT:i r'R: SH WA M TO AT L ..AS v: YES NO O F T rI= CAPACIT.^t • us= GCOO SO4ND XMGMfE. m'IN LkNu •?PL'CATION YES V YQ OF w.uT7 R.o {"- NC-CPA-17 REV. 1, 2-96 Page 2 OT= E.WMON.MFU ITAL FACTO RS IS ENDANGERED AMWOR TM ATE` M SPECLES HABITAT PRESENT? YES— YO iS A DESIGNATED NATURAL SC_'k4C AREA M4CLUDElb V TIE PLANMO O REA 0R, WILL PL4PF = ACTIONS MIPAC: ON AN ADIACMI T NATUR.IL SCM4C .ARSA? YES NO IS AN ARCII AEO LOGICAL OR MS MRICAL SITZ LOCATED IN rrM PLANNED AREA.? YES INFO —Z ARE THMME ?MZ UNIQUE, STAM OR LOCALLY L1 PORTANI' F.AR1"N1DS L4 THE YES NO OPERATING UNIT? � WILL THE AC^OK RESULT IN SODEUSTING7 YES NO Y Yf the saswer to any of the above is yes. ?MRCS will not provide tech- c=l assistance unless agency policy is followed. WASTE N(A.YAG1MMN T DOES PRODUCEEROWN LNOUGH LAND TO PROPERLYI.A.'tO APPLY ALL. WASTE YES Z NO INCLUDING SLUDGE, ALTHOUGH SLUDGE MAY ONLY BE APPLIED INFREQUENTLY? IF NO, DOES ice. ODUCE1 HAVE ACCESS TO MORE "%M? YES � NO _ IF LAND ISNOT O WNM BY PIRODUCM CAN PRCOUCS& GET ACRZMMN T ON LAND YES � NO _ ON WHICH TO ,APPLY WA z? (Attach Waste Udiintion PIan to site evaluation.) VALM ONLY IF SOLL SS=.A= AC= IS SOCL SUITABLE FOR LAGOON? IS ALt .q—cQumm? TYPE OF L 24M TO BE USED: IF CLAY L24EM IS TO BE USF,3a. IS S=TAM—v CLAY AVALLABLE ON SITE? IF CLAY LS NOT AVAM.ABL` ON SITr. DOES LANDOWNERHAVE ACCESS TO CLAY? 18 A. CORE ME`ICH.Ze.QUL M? (Attach soil investigadom sheet to site evaluadon.) L5 SUBSURFACE DRALN=- ?RESMN ? (If yes, rile must be removed or plugged) YFS �/ NO _ YES V YO CLAY Zm?TONITB SY?ETiCETIC _ YES z NO YES NO YES NO ram_ NO� Bevy cr. CGMTS f �G ✓� .a.f i e Ir i .i l�l �i R-:A.77'h.� I—Sys---.��e/`.- T'o"++�If'�P, y THIS SITc INVESTIGA ON IS VALM FOR TWELVE 1 iONTci5 FROM THE DAZE SHOWN BELOW. IF CONSTRUCTION HAS NOT BELAY START'M WTT-xM4 TWELVE MCN rAS. %NEW SITE NV=OATION WILL SE REQLM=. Y SIGNATURE -A-' DATE _jL-L_-JZ96 u CIzanges is the local or state law or changes in the stsadard maid require(a arm site iin/vestigat'an. l � �� : f r iL r =S r, • a G�' r i . . 'SFr I9 c ,�-; !►•, r # / Q.a} / �•- •' n. S a� �^ 4-0 L ''� r �.... r. .�` M ..i V i.�rr1] '�r!"'r-• A'"-!trl r. '^r Gc.f� l.. '�'1. w..J--�+. 2'- r S � /-4.+^eF� -� f' operator. Aubrey Moore County: Sampson Date: 08/23/96 • Distance to nearest residence (other than owner): 1575.0 feet 1. AVERAGE LIVE WEIGHT (ALW) • 0 sows (farrow to finish) x 1417 Ibs. = 0 Ibs 0 sows (farrow'. feeder) x 522 Ibs. = 0 Ibs 2880 head (finishing only) x 135 Ibs. - 388800 Ibs 0 sows (farrow to wean) x 433 lbs. = 0 lbs 0 head (wean to feeder) x 30 lbs. = 0 Ibs • Describe other: 0 Total Average Live Weight = 388800 Ibs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 388800 Ibs. ALW x Treatment Volume(CF)/Ib. ALW Treatment Volume(CF)llb. ALW = 1 CFllb. ALW Volume = 388800 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet 4. TOTAL DESIGNED VOLUME Inside top length (feet)-------------- 320.0 Inside top width (feet)-- --------- 270.0 Top of dike elevation (feet) 53.5 Bottom of lagoon elevation (feet)---------- 43.5 Freeboard (feet)-- ---------- 1.0 Side slopes (inside lagoon)- 3.0 :1 Total design volume using prismoidal formula SS/END1 SSIEND2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 314.0 264.0 9.0 AREA OF TOP LENGTH * WIDTH = 314.0 264.0 AREA OF BOTTOM LENGTH *WIDTH = 260.0 210.0 AREA OF MIDSECTION LENGTH * WIDTH * 4 287,0 237.0 82896 (AREA OF TOP) 54600 (AREA OF BOTTOM) 272076 (AREA OF MIDSECTION * 4) CU. FT. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM) * DEPTHI6 82896.0 272076.0 54600.0 1.5 Total Designed Volume Available = 614358 CU. FT. 6. TEMPORARY STORAGE REQUIRED • DRAINAGE AREA: Lagoon (top of dike) Length * Width = 320.0 270.0 86400.0 square feet Buildings (roof and lotwater-) 0.0 square feet Describe this area. TOTAL DA 86400.0 square feet Design temporary storage period to be 180 days. 5A. Volume of waste produced Feces & urine production in gal./day per 135 lb. ALW 1.37 Volume = 388800 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days Volume = 710208 gals. or 94947.6 cubic feet 5B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storagel7.48 gallons per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall — 7.0 inches Volume = 7.0 in * DA 112 inches per foot Volume = 50400.0 cubic feet 5D. Volume of 25 year - 24 hour storm Volume = 7.5 inches 1 12 inches per foot " DA Volume = 54000.0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 94948 cubic feet 5B. 0 cubic feet 5C. 50400 cubic feet 5D. 54000 cubic feet TOTAL 199348 cubic feet 6. SUMMARY Temporary storage period____________________> Rainfall in excess of evaporation=====______> 25 year - 24 hour rainfall__________________> Free board=====_____=________________________> Side slopes_________________________________> Inside top length___________________________> Inside top width____________________________> Top of dike elevation_______________________> Bottom of lagoon elevation__________________> Total required volume_______________________> Actual design volume________________________> Seasonal high watertable elevation (SHWT)===> Stop pumping Must be > or = to the SHWT elev.====______> Must be > or = to min. req. treatment el.=> Required minimum treatment volume=====______> Volume at stop pumping elevation=====_=__=__> Start pumping Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.- 24 hr. rainfall==> Volume at start pumping elevation=====__=___> Required volume to be pumped________________> Actual volume planned to be pumped=====_____> Min. thickness of soil liner when required==> 7. DESIGNED BY: }L.�h^� J��'`I APPROVED BY: �z DATE: DATE: NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: 180 days 7.0 inches 7.5 inches 1.0 feet 3.0 : 1 320.0 feet 270.0 feet 53.5 feet 43.5 feet 588148 cu.ft. 614358 cu. ft. 44.4 feet 49.9 feet 44.4 feet 49.5 feet 388800 cu. ft. 410339 cu. ft. 51.8 feet 560358 cu. ft. 557176 cu. ft. 145348 cu. ft. " 146837 cu. ft. 1.5 feet rator:AUBREY MOORE County: SAMPSON Date: 08/19/92 stance to nearest residence (other than owner): 1200.0 feet STEADY STATE LIVE WEIGHT 0 sows (farrow to finish) x 1417 lbs. = 0 lbs 0 sows (farrow to feeder) x 522 lbs. 0 lbs Z480 head (finishing only) x 135 Ibs. = 334800 lbs 0 sows (farrow to wean) x 433 lbs. — 0 lbs 0 head (wean to feeder) x 30 lbs. = 0 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 334800 lbs MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 334300 lbs. SSLW x Treatme.nt Volume(CF)/lb. SSLW Treatment Volume(CF)/Ib. SSLW= I CF/lb. SSLW Volume = 334800 cubic feet STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume 0.0 cubic feet ; "Owner requests no sludge storage. Sludge will be removed as needed." TOTAL DESIGN VOLUME Inside top length 326.0 feet ; Inside top width 200.0 feet Top of dike at elevation 45.0 feet Freeboard 1.3 feet ; Side slopes 3.0 : 1 (Inside lagoon> Total design lagoon liquid level at elevation 43.7 feet Bottom of lagoon elevation 33.0 feet Seasonal high water table elevation 35.0 feet Total design volume using prismcidal formula 3S/END 1 SS/E`1D2 SS; 3I DE 1 SS,'S IIDE2 LENGTH W I D T H DEPTH 3.0 3.t7 . .o 3.0 318.2 192.2 10.7 AREA OF TOP LENGTH i� WIDTH = a1a.2 13 .2 AREA OF BOTTOM LENGTH * WIDTH = 254.0 128.0 AREA OF MIDSECTION LENGTH * WIDTH * 4 236.1 160.1 61158.0 (AREA OF TOP) 32512.0 (AREA OF BOTTOM) 133213.4 (AREA OF MIDSECTION * 4) CU. FT. = CAREA TOP + cY�rRE�. MIDSECTION) + AR+EjA BOTTOM: * DEPTH;,E, 61153.0 IV3218.4 3'2512.0 1.s VOLUME OF LAGOCN AT TOTAL DESIG"v LIOUiD LEVEL = 493734 CU. FT. '" TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 326.0 200.0 65200.0 square feet Buildings (roof and lot water) Length * Width = 0.0 0.0 0.0 square feet TOTAL DA 65200.0 square feet Design .temporary storage period to be 180 days. Volume of waste produced Approximate daily production of manure in CF/1-6 SSLW 0.00136 Volume = 334800 Lbs. SSLW * CF of Waste/Lb./Day * 180 days Volume = 81760 cubic feet Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day 180 days storage/7.4c`•3. gallons per CF Volume = 0.0 cubic feet Volume of rainfall in excess of evaporation Use period of time when rainfail exceeds evaporation by largest amount. 180 days excess rainfall - 7.0 inches Volume = 7.0 in * DA / 12 inches per foot Volume = 38033.3 cubic_ feet ume of 25 year — 24 hour storm Volume = 7.0 inches 1 12 inches per foot DA Volume = 38033.3 cubic.feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 81760 cubic feet 5B. 0 cubic feet 5C. 38033 cubic feet 5D, 38033 cubic feet TOTAL 157827 cubic feet S. SUMMARY Total; required volume 492627 cubic feet Total design volume avail. 493784 cubic feet Mi'h.-req. treatment volume iglus sludge accumulation 334800 cubic feet At.`elev. 41.0 feet Volume is 339584 cubic feet tend pumping) Total design volume less 25yr-24hr storm is 455751 cubic feet F,y4 A+t elev. 43.0 feet Volume is.. 451720 cubic feet (start pumping) r� efi Seasonal high water table elyevatan 35 0 feet a�,� 4t 7..r' DESIGNED BY: °APPROVED BY r 1 .% n+ DATE: r S iNOTE. AC • SEE SAT S ILY ATION PLAN �'E a: a ` w SAMPSON COUNTY NORTH CAROUNA • 1rt _ ►RE►AMEN EY THE to 'u` �`� Lm NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ! `e'l DIVISION OF HIGHWAYS —PLANNING AND RESEARCH BRANCH IN COO►iRATlpM WITH THE U.S. DEPARTMENT OF TRANSPORTATION •�o FEDERAL HIGHWAY ADMINISTRATION I ti bl4p. SCALE S91 0 1 l 1'T„G 0 1 Au 'J ° SCALE FOR ENLARGEMENTS lul Lw ti Lm - L(el �, , •o 1' LTs imLIU !t]t 1, ^ Lift Lm ta1 JUL 4 1/ `/ 7.! '/iSi7 ,� 1+�9 ii IQ•, j �. '+ r/ .7 1.0 t 1.2 /� Teylas l,id !!JS '''.o 71 Lm ! I 1374 v 11 LN �9 Iy LI ti ' 1lIE !i • an r `�• ;i r' v MILS .Do, C.... 7 din LLa 17 ` Y Ltu # 1 1144] ,1 1 ie7 I Ull LU2 LIM �g r J ��-, r� .. •LNIc4w Eun ){PI BL;CA dil l 4 I Crw# �A 1# ✓ IJ_LS 1i7lti ,. !!_il 1�1 fuwaher, j f 71i 1301 Lul = )yid ,o, • {"'.'- ''% 1' 1 �j 16 Operator: Aubrey Moore County: Sampson Date: 06/17/98 • Distance to nearest residence (other than owner): 1575.0 feet 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish) x 1417 lbs. = 0 lbs; 0 saws (farrow to feeder) x 522 lbs. — 0 lbs 2480 head (finishing only) x 135 lbs. = 334800 lbs 0 sows (farrow to wean) x 433 lbs. = 0 lbs 0 head (wean to feeder) x 30 lbs. = 0 lbs Describe other: 0 Total Average Live Weight = 334800 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON E� E V E D Volume = 334800 lbs. ALW x Treatment Volume(CF)/Ib. ALW WATER QU�.iTYSECT,0,14 Treatment Volume(CF)/Ib. ALW = 1 CF/lb. ALW .JUN 1 81998 Volume = 334800 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Nor Lzischarge permitting Volume = 0.0 cubic feet 4. TOTAL DESIGNED VOLUME Inside top length (feet) 326.0 Inside top width (feet)------------------- 200.0 Top of dike elevation (feet)--»-- 45.0 Bottom of lagoon elevation (feet)-------- 33.0 Freeboard (feet) 1.0 Side slopes (inside lagoon)--------- 3.0 :1 Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 320.0 194.0 11.0 AREA OF TOP LENGTH * WIDTH = 320.0 194.0 62080 (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH 254.0 128.0 32512 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 287.0 161.0 184828 (AREA OF MIDSECTION * 4) CU. FT. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 62080.0 184828.0 32512.0 1.8 Total Designed Volume Available = 512270 CU. FT. 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA; Lagoon (top of dike) Length *Width 326.0 200.0 65200.0 square feet Buildings (roof and lot water) 0.0 square feet Describe this area. TOTAL DA 65200.0 square feet Design temporary storage period to be 5A. Volume of waste produced Feces & urine production in gal./day per 135 lb. ALW Volume = 334800 lbs. ALW1135 Ibs. ALW " 1.37 gal/day Volume = 611568 gals. or 81760.4 cubic feet 513. Volume of wash water 180 days. 1.37 180 days This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day • 180 days storage/7.48 gallons per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall = 7.0 inches Volume = 7.0 in ' DA / 12 inches per foot Volume = 38033.3 cubic feet 5D. Volume of 25 year - 24 hour storm Volume = 7.5 inches 1 12 inches per foot * DA Volume = 40750.0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 81760 cubic feet 5B. 0 cubic feet 5C. 38033 cubic feet 5D. 40750 cubic feet TOTAL 160544 cubic feet 6. SUMMARY Temporary storage period============c=======> Rainfall in excess of evaporation=====______> 25 year - 24 hour rainfall_____________----__> Freeboard_____________________________=====_> Side Inside top length======-___=________________> Inside top width____________________====---=> Top of dike elevation====___________________> Bottom of lagoon elevation__________________> Total required volume===____________________> Actual design volume________________________> Seasonal high watertable elevation (SHWT)===> Stop pumping Must be > or = to the SHWT elev.====______> Must be > or = to min. req. treatment el.=> Required minimum treatment volume=====______> Volume at stop pumping elevation=====_______> Start pumping Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.- 24 hr. rainfall==> Volume at start pumping elevation=====______> Required volume to be pumped=__ ____________> Actual volume planned to be pumped=====_____> Min. thickness of soil liner when required==> 7. DESIGNED BY: APPROVED BY: DATE: DATE: NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: 180 days 7.0 inches 7.5 inches 1.0 feet 3.0 : 1 326.0 feet 200.0 feet 45.0 feet 33.0 feet 495344 cu. ft. 512270 cu. ft. 35.0 feet 41.0 feet 35.0 feet 39.0 feet 334800 cu. ft. 339584 cu. ft. 43.3 feet 471520 cu. ft. 469565 cu. ft. 119794 cu.ft. 129981 cu. ft. 1.8 feet w w w SHEET 1 OF 2 OPERATION AND MAINTENANCE PLAN This lagoon is designed for waste treatment (permanent storage) and 180 days of temporary storage. The time required for the planned fluid level (permanent and temporary storage) to be reached may vary due to site conditions, weather, flushing operations, and the amount of fresh water added to the system. The designed temporary storage consists of 180 days storage for: (1) waste from animals and (2) excess rainfall after evaporation. Also Included is storage for the 25 year - 24 hour storm for the location.. The volume of waste generated from a given number of animals will be fairly constant throughout the year and from year to year, but excess rainfall will vary from year to year. The 25 year rainfall will not be a factor to consider in an annual pumping cycle, but this storage volume must always be available. A maximum elevation is determined in each design to begin pumping and this is usually the outlet invert of pipe(s) from building(s). If the outlet pipe is not installed at the elevation to begin pumping, a permanent marker must be installed at this elevation to Indicate when pumping should begin. An elevation must be established to stop pumping to maintain lagoon treatment depth. Pumping can be started or stopped at any time between these two elevations for operating convenience as site conditions permit, such as weather, soils, crop, and equipment in order to apply waste without runoff or leaching. Land application of waste water is recognized as an acceptable method of disposal. Methods of application include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent damage to crops. The following items are to be carried out: 1. It is strongly recommended that the treatment lagoon be pre - charged to 1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. When precharging is complete, flush buildings with recycled lagoon liquid. Fresh water should not be used for flushing after initial filling. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see attachment) before land application. 3. Begin temporary storage pump -out of the lagoon when fluid level reaches the elevation 43.3 as marked by permanent marker. Stop pump - out when the fluid level reaches elevation 41.0 . This temporary storage, less 25 yr- 24 hr storm, contains 129981 cubic feet or 972261 gallons. SHEET 2 OF 2 4. The recommended maximum amount to apply per irrigation is one (1) inch and the recommended maximum application rate is 0.3 inch per hour. Refer to the waste utilization plan for further details. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous stand. G. Repair any eroded areas or areas damaged by rodents and establish In vegetation. 7. All surface runoff is to be diverted from the lagoon to stable outlets. 8. Keep a minimum of 25 feet of grass vegetated buffer around waste utilization fields adjacent to perennial streams. Waste will not be applied in open ditches. Do not pump within 200 feet of a residence or within 100 feet of a well. Waste shall be applied in a manner not to reach other property and public right-of-ways. 9. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Heatth, and Natural Resources, Division of Environ- mental Management, has the responsibility for enforcing this law. Operator: Aubrey Moore County: Sampson Date: 06/17/98 Distance to nearest residence (other than owner): 1575.0 feet 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish) x 1417 lbs. = 0 lbs 0 sows (farrow to feeder) x 522 lbs, = 0 lbs 2880 head (finishing only) x 135 lbs. = 388800 lbs 0 sows (farrow to wean) x 433 lbs. = 0 lbs 0 head (wean to feeder) x 30 lbs. = 0 lbs Describe other: 0 Total Average Live Weight = 388800 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 388800 lbs. ALW x Treatment Volume(CF)/ib. ALW Treatment Volume(CF)/Ib. ALW = 1 CFAb. ALW Volume = 388800 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet 4. TOTAL DESIGNED VOLUME Inside top length (feet)--- 326.0 Inside top width (feet) 220.0 Top of dike elevation (feet)-------w------ 45.0 Bottom of lagoon elevation (feet)-------- 33.0 Freeboard (feet)------------w-------- 1.0 Side slopes (inside lagoon)------------- 3.0 : 1 Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 320.0 214.0 11.0 AREA OF TOP LENGTH • WIDTH = 320.0 214.0 AREA OF BOTTOM LENGTH ' WIDTH 254.0 148.0 68480 (AREA OF TOP) 37592 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH "4 287.0 181.0 207788 (AREA OF MIDSECTION "4) CU. FT. = [AREA TOP + (4'AREA MIDSECTION) + AREA BOTTOM] ' DEPTH/6 68480.0 207788.0 37592.0 1.8 Total Designed Volume Available = 575410 CU. FT. 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length " Width = 326.0 220.0 71720.0 square feet Buildings (roof and lot water) 0.0 square feet Describe this area. TOTAL DA 71720.0 square feet Design temporary storage period to be 120 days. 5A. Volume of waste produced Feces & urine production in gal./day per 135 lb. ALW 1.37 Volume = 388800 lbs. ALW1135 lbs. ALW * 1.37 gal/day 120 days Volume = 473472 gals. or 63298.4 cubic feet 5B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in SA. Volume = 0.0 gallons/day ` 120 days storage/7.48 gallons per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 120 days excess rainfall = 7.0 inches Volume = 7.0 in * DA 112 inches per foot Volume = 41836.7 cubic feet 5D. Volume of 25 year - 24 hour storm Volume = 7.5 inches / 12 inches per foot " DA Volume = 44825.0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 63298 cubic feet 5B. 0 cubic feet 5C. 41837 cubic feet 5D. 44825 cubic feet TOTAL 149960 cubic feet 8. SUMMARY Temporary storage period====================> Rainfall in excess of evaporation===========> 25 year - 24 hour rainfall==================> Freeboard=---=============================_=> Side Inside top length=----=----------============> Inside top Top of dike elevation=-- ====__==============> Bottom of lagoon elevation==================> Total required volume=======================> Actual design Seasonal high watertable elevation (SHWT)===> Stop pumping Must be > or = to the SHWT elev.-===___===> Must be > or = to min. req. treatment el.=> Required minimum treatment volume====—====> Volume at stop pumping elevation==—=======> Start pumping Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.- 24 hr. rainfall==> Volume at start pumping elevation===========> Required volume to be pumped===----.=====--===> Actual volume planned to be pumped==========> Min. thickness of soil liner when required==> 7, DESIGNED BY: APPROVED BY: DATE: DATE: NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: 120 days 7.0 inches 7.5 inches 1.0 feet 3.0 : 1 326.0 feet 220.0 feet 45.0 feet 33.0 feet 538760 cu.ft, 575410 cu.ft. 35.0 feet 41.1 feet 35.0 feet 39.0 feet 388800 cu.ft. 389998 cu.ft. 43.3 feet 530585 cu.ft. 528255 cu.ft. 105135 cu.ft. 138257 cu.ft. 1.8 feet SHEET 1 OF 2 OPERATION AND MAINTENANCE PLAN This lagoon is designed for waste treatment (permanent storage) and 120 days of temporary storage. The time required for the planned fluid level (permanent and temporary storage) to be reached may vary due to site conditions, weather, flushing operations, and the amount of fresh water added to the system. The designed temporary storage consists of 120 days storage for: (1) waste from animals and (2) excess rainfall after evaporation. Also included is storage for the 25 year - 24 hour storm for the location. The volume of waste generated from a given number of animals will be fairly constant throughout the year and from year to year, but excess rainfall will vary from year to year. The 25 year rainfall will not be a factor to consider in an annual pumping cycle, but this storage volume must always be available. A maximum elevation is determined in each design to begin pumping and this is usually the outlet invert of pipe(s) from building(s). If the outlet pipe is not installed at the elevation to begin pumping, a permanent marker must be installed at this elevation to indicate when pumping should begin. An elevation must be established to stop pumping to maintain lagoon treatment depth. Pumping can be started or stopped at any time between these two elevations for operating convenience as site conditions permit, such as weather, soils, crop, and equipment in order to apply waste without runoff or leaching. Land application of waste water is recognized as an acceptable method of disposal. Methods of application include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent damage to crops. The following items are to be carried out: 1. It is strongly recommended that the treatment lagoon be pre - charged to 112 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. When precharging is complete, flush buildings with recycled lagoon liquid. Fresh water should not be used for flushing after initial filling. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see attachment) before land application. 3. Begin temporary storage pump -out of the lagoon when fluid level reaches the elevation 43.3 as marked by permanent marker. Stop pump - out when the fluid level reaches elevation 41.1 . This temporary storage, less 25 yr- 24 hr storm, contains 138257 cubic feet or 1034160 gallons. SHEET 2 OF 2 4. The recommended maximum amount to apply per irrigation is one (1) Inch and the recommended maximum application rate is 0.3 inch per hour. Refer to the waste utilization plan for further details. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous stand. 6. Repair any eroded areas or areas damaged by rodents and establish In vegetation. 7. All surface runoff is to be diverted from the lagoon to stable outlets. 8. Keep a minimum of 25 feet of grass vegetated buffer around waste utilization fields adjacent to perennial streams. Waste will not be applied in open ditches. Do not pump within 200 feet of a residence or within 100 feet of a well. Waste shall be applied in a manner not to reach other property and public right-of-ways. 9. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ- mental Management, has the responsibility for enforcing this law. Operator: Aubrey Moore County: Sampson Distance to nearest residence (other than owner): 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish) x 1417 lbs. 0 sows (farrow to feeder) x 522 lbs. 2880 head (finishing only) x 135 lbs. 0 sows (farrow to wean) x 433 lbs. 0 head (wean to feeder) x 30 lbs. Describe other: Total Average Live Weight = 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Date: 06/17/98 1575.0 feet 0 lbs 0 lbs -- 388800 lbs 0 lbs = 0 lbs 0 Volume = 388800 lbs. ALW x Treatment Volume(CF)/Ib. ALW Treatment Volume(CF)/Ib. ALW = 1 CF/Ib. ALW Volume = 388800 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet 4. TOTAL DESIGNED VOLUME Inside top length (feet)------ ------ 320.0 inside top width (feet)----------- 270.0 Top of dike elevation (feet)»---------------- 53.5 Bottom of lagoon elevation (feet)- ----- 43.5 Freeboard (feet)--------------------- 1.0 Side slopes (inside lagoon)------------------ 3.0 : 1 Total design volume using prismoidal formula 388800 lbs SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 314.0 264.0 9.0 AREA OF TOP LENGTH * WIDTH = 314.0 264.0 AREA OF BOTTOM LENGTH * WIDTH 260.0 210.0 82896 (AREA OF TOP) 54800 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 287.0 237.0 272076 (AREA OF MIDSECTION * 4) CU. FT. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 82896.0 272076.0 54600.0 1.5 Total Designed Volume Available = 614358 CU. FT. 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length ` Width = 320.0 270.0 86400.0 square feet Buildings (roof and lot water) 0.0 square feet Describe this area. TOTAL DA 86400.0 square feet Design temporary storage period to be 180 days. 5A. Volume of waste produced Feces & urine production in gal./day per 135 lb. ALW 1.37 Volume = 388800 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days Volume = 710208 gals. or 94947.6 cubic feet 5B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7.48 gallons per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall = 7.0 inches Volume = 7.0 in * DA 112 inches per foot Volume = 50400.0 cubic feet 5D. Volume of 25 year - 24 hour storm Volume = 7.5 inches 112 inches per foot " DA Volume = 54000.0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 94948 cubic feet 5B. 0 cubic feet 5C. 50400 cubic feet 5D. 54000 cubic feet TOTAL 199348 cubic feet 6. SUMMARY Temporary storage period===================> 180 days Rainfall in excess of evaporation===========> 7.0 inches 25 year - 24 hour rainfall=============== --=> 7.5 Inches Free board________________--__________---____> 1.0 feet Side siflpes_________________________________> 3.0 : 1 Inside top length===--===========--=========> 320.0 feet Inside top width____________________________> 270.0 feet Top of dike elevation=======================> 53.5 feet Bottom of lagoon elevation============ =====> 43.5 feet Total required volume=======================> 588148 cu. ft. Actual design volume========================> 614358 cu. ft. Seasonal high watertable elevation (SHWT)===> 44.4 feet Stop pumping elev.----__=====w----_______-_> 49.7 feet Must be > or = to the SHWT elev.==========> 44.4 feet Must be > or = to min. req. treatment el.=> 49.5 feet Required minimum treatment volume===========> 388800 cu. ft. Volume at stop pumping elevation============> 395580 cu. ft. Start pumping elev.====w_====_______ ________> 51.8 feet Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.- 24 hr. rainfall==> 560358 cu. ft. Volume at start pumping elevation===========> 557176 cu. ft. Required volume to be pumped================> 145348 cu. ft. Actual volume planned to be pumped==========> 161596 cu. ft. Min. thickness of soil liner when required==> 1.5 feet 7. DESIGNED BY: APPROVED BY: DATE: DATE: NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: SHEET 1 OF 2 OPERATION AND MAINTENANCE PLAN This lagoon is designed for waste treatment (permanent storage) and 180 days of temporary storage. The time required for the planned fluid level (permanent and temporary storage) to be reached may vary due to site conditions, weather, flushing operations, and the amount of fresh water added to the system. The designed temporary storage consists of 180 days storage for: (1) waste from animals and (2) excess rainfall after evaporation. Also Included is storage for the 25 year - 24 hour storm for the location. The volume of waste generated from a given number of animals will be fairly constant throughout the year and from year to year, but excess rainfall will vary from year to year. The 25 year rainfall will not be a factor to consider In an annual pumping cycle, but this storage volume must always be available. A maximum elevation is determined in each design to begin pumping and this is usually the outlet invert of pipe(s) from building(s). If the outlet pipe is not installed at the elevation to begin pumping, a permanent marker must be Installed at this elevation to indicate when pumping should begin. An elevation must be established to stop pumping to maintain lagoon treatment depth. Pumping can be started or stopped at any time between these two elevations for operating convenience as site conditions permit, such as weather, soils, crop, and equipment In order to apply waste without runoff or leaching. Land application of waste water is recognized as an acceptable method of disposal. Methods of application include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent damage to crops. The following items are to be carried out; 1. It is strongly recommended that the treatment lagoon be pre - charged to 112 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times, When precharging is complete, Rush buildings with recycled lagoon liquid. Fresh water should not be used for flushing after initial filling. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see attachment) before land application. 3. Begin temporary storage pump -out of the lagoon when fluid level reaches the elevation 51.8 as marked by permanent marker. Stop pump - out when the fluid level reaches elevation 49.7 . This temporary storage, less 25 yr- 24 hr storm, contains 161596 cubic feet or 1208738 gallons. SHEET 2 OF 2 4. The recommended maximum amount to apply per irrigation is one (1) inch and the recommended maximum application rate is 0.3 inch per hour. Refer to the waste utilization plan for further details. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous stand. 6. Repair any eroded areas or areas damaged by rodents and establish In vegetation. 7. All surface runoff is to be diverted from the lagoon to stable outlets. B. Keep a minimum of 25 feet of grass vegetated buffer around waste utilization fields adjacent to perennial streams. Waste will not be applied in open ditches. Do not pump within 200 feet of a residence or within 100 feet of a well. Waste shall be applied in a manner not to reach other property and public right-of-ways. 9. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ- mental Management, has the responsibility for enforcing this law. EMERGENCY ACTION PEAK PHONE XLTI4LBERS DWQ (ce)- 731-50R3 EMERGENCY NI NAGEMEINT SYSTEM SWCD (91flL-592-7963 N-RCS (910) 592-7963 This plan will be irnplem==d in the eve -it that wastes from your operation are leaking. overflowing, or running off site. You should not wait until wastes reach surace waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible Iocation for all employees at the facility. The following are some action items you should take - I . Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Laaoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B. Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields whe:,- runoff ocz:=,ed. C: Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. C. Close vza yes to eliminate further discharge. d. Repair all leaks prior to restarting, pumps. D: Leakage from flu-sh ,;stems. houses. solid secarator_-action Mc?uoe: a. Stoc recvcle ourno. b. Stop irrigation pump. C. MUke sure nQ siphcn occurs. � . Stop 'ail '!ow.i in thl- !buss- _dpu:.'I( S. e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a. Die a small sump or ditch away from the embankment to catch all seepage. put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trao or remove animals and fail holes and compact with a clay t., a soil. c. Have a professional evaluate -the condition of the side walls and lagoon bortom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. A. Did the waste reach any surface waters? b. Approximately how much was re'.eased and for what duration? c. Any damage noted, such as employer injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f.. Could a future rain event cause the spill to reach surface waters? a. Are potable water wells in danger (either on or off of the property)? h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office: Phone - - After hours, emergency number: 919-7J3-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact Iocation of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number C. Instruct EMS to contact local Health Department. d. Contact CES, phone number - - , IocaI SWCD office phone number and local MRCS office for advice/technical assistance phone number - - 4: If none of the above works tail 911 or the Sheriffs Department and explain your problem to them and ask that person to contact the proper agencies for you. Contact the contractor of your choice to begin repair of problem to msnimize off -site d =-.e. a. Contractors Name: h. Cvntrac:ors AddrZ:=: r n r✓[ c. Ccmractor=_ Phone: 4 0- z - 3 b: Contact the technical specialist who certified the lagoon (MRCS, Consulting Engineer. etc,) - a. Name: ;6;27et b. Phone: Teo - se, y S-t?r i s Implement procedures as advised by DWQ and technical assistance agencies to rectify' the darnage. repair the system. and reassess the waste management plan to keep problems with re!e_se of w' astes from haupenina again. Insect Control Checklist for Animal Operations Suer ce Cause - 11p11's to Control Insects - Site Specific I'ractices - - Litluitl Systems — -- Flush (i1111CI5 . Accmnulalion of solids _ .$'luslt system is designed and operaled Y sufficiently to remove accuntulaled solids from milers as designed. Ra - Remove bridging of accmnulated solids ill discharee Lagoons and Pils 0 Crusled Solids 13' Maintain lagoons, stilling; basins and pits when: pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6 - !�tcbes over more fluor 30% of sm-fa c. -Fxce:s�.ive Vegc1illivc . 1)ecuying vegelalion Maintain vegetative control along hanks of (it meth lagoons and (tiller iutponn(menls In prevent acculnatlation of decaying vegetative matter along; seaters edge on impundment's perimeter. Itry 5ystenas ee:Jee:. 1'CCAI Silillcegt Design, uper;dt and naaiulain Icet1 syslcuas hunkers and (roughs) to minimize the sntudation of decaying wastage. ga' Clean up spillage nn a rnuline basis (e.g., 7 - 10 day inle mil daring smnnaer; 1 S-30 day interval t wing winler). I'ecel Slotiige Accmmdalions of feed residues Reduce nmistttre accunnllalion within and around immediale perimeter of Iced storage areas by insuring draiu;Ige away Irool rile :Ind/or providing adetluale containntcnl (e.g;.. covered hiu for brewer's grain Noel similar high e tlisnlre grain proelocis). FT' ]nspe cl for and remove or We,& Iagti accnnmlcaled solids in filler ships around 1i cd storage as needed. AA11C-Novem1wi- 11, 1996, ('age I Snurce Cause IMPS lu Control Insects. Site Specific Praclices Animal l lolding Areas Accinnnlations of animal wastes • Eliusinale low areas flim trap moisture along and feed wastage fences and other locations where waste accumulates and disturbance by animals is. �untmal. L1 Maintain fence rows and rilter'sirips around animal bolding areas to minimize accumulations of wastes (i.e., inspect For and remove or break np accuniulaied solids as needed). my h1milue i landlinb Aecununlalions of animal wastes f3fteenove spillage on a ronflin; basis (e.g., 7 - 10 Systems day interval during summer; 15-30 day interval during winter) where manure is loaded for land application or disposal. n Provide for adeclnate drainage around manure stockpiles. n Inspect for and remove or break tip accumulaled wastes in filter strips around stockpiles and manure Dandling areas as needed. Fair Inure inlilnnalion contact Ilse Cooperalive Fxlension Service, Department of Entomology, llox 7613, North Carolina Stale Universily, Raleigh, NC. 27695-7613. ANHC - t•luvember 11. 1996. Page 2 Swine Farm Waste Management Odor Control Chm-ldist Swim; ploductioll RRIPS to Mitlilslize -----�Fv,zeIa-trvc or wooded httf"I: is; wll-t ecolil lite ntled best imall-agell telvi placlit-CS-1 jildellICIII -11111 Common Sense A nimal 1111d)' :Ms fill:c-i Dilly maillile-Clivaell animals Dry Ilools I- 1111pi %Ill I.ik C'. WaA mal till t;-Ci Wci cd fitpois rA- 1`1---Widucus located liver slolled floni -s; P-I'veders al high end of snlid floors; P--s-napt.: manure hilildilp froull floors; How venlilalioll ["tic (hying; M.111111': ClAICtAilm fill-. 0 1 J1 ille; Fleclulcull limallic FC111ov;ll by Thol. )I[ Ict-11.11ge. 4 Pailial Illicillhial decoollmi11it111 I1 •Crape; M, t mlei floor mitilal imi W1161,11i'lit C\11;111%1 1.111), • VC)hlilc 1!;ISL.S- I 111.11111civa11Ce; 1-3111117Ificicill air Intivellicill I C wil lit, 1-1401111.; 431'attimals; r Feed addifives; -I'Cll r4-- delively 1I111V nl)(1111 ex(Clitlev; to Is.-l-des Covets A1111alitsn of recycled lag min 0 f SJl tank Coves-S., litillit) while lank -Sate fillilig, fill jillf-S 10 IIL'.'If IM1111111 ill'IMILS Wills alm-Sipholl Vt!IIIS alh-)-. Af,ilulinu diiiiiig wastmall(Ir PI Indi rfloor flush wills mideoililor velilihiloo ronveymice Agilalimi ol'iccycled lag-mm rl"-l"XIC1111 inn Ilfpils liquid while pits are filling, wills ami-Siliblin VCIIIS Lill !J.11JOILN A gilmion (filling sump lank 171 Sump Imik covers and 11rawdown lilhidC dlikilk U011CCliMll • Agil;ilimt 1141filln W;1Nl1C%Vi1II-F F1 Ilox towels lit 111111-11tall I)MICS Cilliveplice At, 14 -11 owulkiller I 1, 1996. Ila Cc 3 �I14I 1'l'l: {,Il llSC HMI's Ht 114iuinllIC {11In!Sill: Specific I'l-ac[icts 1'1lII UI dI:11i411111C] :11 Agilalllllt dllrllljj 1Yitsle\V:ItI'r I.xlelldi discharge point (if pipcs lll+llcl-ne:lth I:l1;17[1r1 conveyance lagonn liquid level I.:lpoll Surfaces Volatile gas eillisomy Proper lagnnn liquid capacity; • Biological mixing; C.4�Cnnecl lagoon slallilp proeednres; • Agilation f�' Aliuitnnul surF+cc alca In w►I+In+c r:+lilt; W"Minimum agilalinll when pn+nping; 91 blbl ethnical aciatiun; N 1'1'11Vt:11 biological additives IIlrl;anl+n Sill rlll,ler I lll;ll ptessillt! agilalloll; Illlg:ltc on Illy days 1VSIh Illlle or ntl wink; nuirl�' Mild thin _/ f�Mtininuun recnnutlended ollcrlling pressnll:; r Plimp intake near lagoon li<luid sulfact:; {-1 1'nmp from second-slaf;e hil,norl ilnl.rl.41;1111.uIIGc.111 • I',Ilh;llllllcrul►I:Ildcl'111111101illiln; (1 1initrli11orinitllevelIo:+dr111'. mu Lme • kllxltlg whilc lilting; n 'I'ilnk C11Ver S; • Agilolion when Cinplytllh 1-1 Basin Sill fact` Vials Ill Solids; n hovel. biological a1111ilives Ilr oxidants 51 nlin�; Il.I,ill �n+I;II c I'ailial lui, ubial Ifccnlill}usiliml; ("1 lixll:nd drainpipe outlet:: —1111(fellicalh 1i11uid • Nfixilig while filling; Icvel; • Agilaliun when culptying 17.1 Itemove Settled SI11ids regularly T k�l.lmll e, Sll,it}' lal ]lilt ll'C~y A1; II:Ir 11111 ►YIICI1511tCalllilt„ Pr- HI Ill slllt rylslodres; slntad�t uu{leis Volatile gas vinissi{Ills %ash residual nrulllrc linnl sprcai Ul' :lllcl' list,'; VP,t)vcri biological adliilives or oxidants I Iniu►Cll ll lu:,uulc, Volallk has cI- issiuns tYllilc4 Soil iujcctiun tit sluilylslullgcs s1111r1' of ShIA!;C Ill. lidd (11'yiiil; Fr, -Soil incolporatioll within'iH his.; Star Llrct. ca,l.in Thin imilinnl I:+yers fill- ral►id dipiij-,; I"rnvcn binlogical additives of oxidmils I t�a�l al,im.115 - [',,Ir.,ss deu►Inposiulrn per dispositionof carcasses 11, .I11 anlu,.lk II ,I��1.:11 - - [:;ur, iss III tuulposilinn -- --n Complete covering of calcasse5 in Luiial tills; 1u1.1 11 Proper Inratianlronshul:linn of dispa►sal piss Inl.lul_l:"Inl, Int:nny►Irlt cunlbil•'lil►ll 171 Seconll:ny 51.1a bnrlleci H 1,11 1r ; - I lovcn,hcr 11, 1996, hake •1 �- inlice — � —CnnsC 11M1's If) Rlinimlcc I1duI' — - ---Silo SI►rcitir I'IarticcsLL ����_.. Slaulling %VACI alnund • lulproper drainal;e; FrOadc and landscape such Ural water drains --� - --- - -- -- -- lal:ifitic� Micrnhial rlecunlposilion of away from Facilities organic manor A1.115111e (IilAcd own 6 foully maintaoled access roiuls 0f F.11111 access road 11miolenancc_.--.---..---.--- 1111111ic lo.uls liom Iarni a+rl:css ,l�Illiliooal Infuin►iilinn : _ —Swine MoIllile Al.lwagemCelt ; 021111 I1111CI NII' Packet- %winc 19ndoclioll Fame Polcnlial I tdor S011FCCS and Itenredies ; FIIAF. Fact Sheet ;urine {'lnll wOor! Facility Manure Management: Pit Itecllarge - Lagoon'i'realment ; I?1IAIi 129-88 `;wine I'MILIlrClilltr Facifily 1O:lolr:e lv{anagemenl: Untlei floor FhISI! - Laguon Ticalmerll ; FBAE 129-88 I..Iguun IIcsips arld Managemem li►r Livestock Manure Ticatment a11SI Storage ; IillAF 103-111 ( .1111ll.ltiulr 41(1A nine Well Wastewaler Applicalion F(pliptuenl ; FHA;? Fad Sheet I'nurlulliog 1ldurs liner S%VillC IiniliingS ; I'll1-33 Lli ilginn►culid Assurance I'Iogiam ; NI'11C Manual 1 1111ilu11 lur Malloglnl, ( tllor ; a icpmi liom the Swine Odor Task Force I Ims-mice ('nocems in Animal Manure Alanagcnrcnt: Odins mid Flies ; I'M )107, 1995 Cmd'emicc 1'rorcedings I%MI tl • - 11.)vI:11111cI 11. 1996. P.11;C 5 Avail:dlll� ]�ulm —PII'SI I, 1'11n►!ty i{Alrnsinn ('1�n11:1 - ---_-- - - 14CSI I - I{AI: 1ICSI1 - IIAF NCSI I - I I A F NCSI1 - IIAI: HCSI I - 11A1: Nt Sl 1 - Swine FKICIISirlr! N(' Poll, I'Iullucels Assnc N1."ill AgiI ('u mmmiralimis 1:111II11i1 (-111111vialive 1:%tv Iv.illl! `lortality Management tilethods (check which methods) are bung implemented) '.� Burial three feet beneath the surface of the ground within ?= hours after knowledge of the death. The burial must be at Fast S00 feet from anv flowing • stream or public body of water. Renderng at a rendering plant Iicensed under G.S. 106.163.7 r1 Complete inc;ne aticn ❑ In the case of dead poultry only, piacing in a disposal pit of a size and design approved by the Department of Agriculture rs Anv method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the Srate Vet.--inarian must be attached) z,. K EMERGENCY ACTION PEAK PHONE vZJ%iBERS DWQ (219) 71._j_;0f3j E.%'tERGE`CY .vI.-NACE';'vMNT SYSTEM SWCD (910) 592-7963 N-RCS 910 592--796 This plan wi11 be impiamenced in the event that wastes from your operation are leaking. overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make a ery efr-crt to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should t.ke. I. Stoo the release of wastes. Depending on the situation. this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to be.:-rt to increase elevation of dawn. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. CalI a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a te:noorary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields whe runoff occurred. C: Leakage from the waste pipes and sprnklers-action include: a. Stop recycle pump. b. Slop ir:ization pump. c. Close valves to eliminate funher discharge. d. R.pair all leaks prior m restartim: pumps. D: Leakage from flush _ 'sie.TS. houses. solid inc'.ude: a. Stop rec cld nur c. �'. Stop irn_YLicn pu.—,-p. C. �['sl:� su-z n-, ril'hQrl �.. SIJp 71l ll? .. in �. iL_1 s%:zes= crs. M e. Repair all leaks prior to restartinz pumps. E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a. Dig a small sump or ditch away from the embankment to catch all seepage. put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals. trap or remove animals and €iil holes and compact with a clay rune soil. c. Have a professional evaluate thecondition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was re'.esed and for what duration? e. Any damage noted. such as ernplov= injury, fine kills, or propery damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f.. Could a future rain event cause the spill to reach surface waters'? g. Are potable water wells in danger (either on or off of tre property)? R. How much reached surface waters? 3: Contact appropriate agencies. a. Dunne normal business hours, call your DWQ (Division of Water Quality) reaionai office: Phone - - Ate: hours, emergency number: 919-t -319-?. Your phone call should include: your narre, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the Iocation or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number C. Instruct ENIS to contact local Health Department. d. Contact CES, phone number - - , local SWCD office phone number - - and local tiRCS office for advice/technical assistance phone number - - 4: If none of the above works call 911 or the Sheriffs Department and .--,plain your problem to them and ask that person to contact the proper agencies for you. Contact the contra,aor of your choice to begin repair of problem to minimize off site damzJ=. a. Contrac.crs me: F1'e y=)A, b. Contractors :ire`: G//d,g NC c. Ccntr:,c:crs ?"cr.e:, V40- �7111 . 6: Contact the technical specialist who cerifted the lagoon (MRCS, Consulting Engineer. etc.) a. Name:e b. Phone: frc� _Sv-si'�r 7: Implement procedures as advised by DW'Q and technical assistance agencies to re.tifv the darnage. repair the system. and re_ssess the waste management plan to keto problems with re'.ease of w=es from happening again. Insect Control Checklist for Animal Operations 5uurcc C iussc I1MI's Ili Control I:1scels- - - - Sift Sliccific Praclices - - - __ —. Liquid Syslcnls ---� lush I tuners Accnuiullation of solids OFT11 sh system is designed and operaled r suflicieluly to remove accumulated solids from � rtters as ticsigned. fX itemove bridging of accumulated solids ,il discharge I-ugouus and NIS C;rosted Solids Maintain lagoons, scllling basins and Bits ►vhere pesl hrceding is apparent In nuninii-te the crostiug of solids Io a delilh of uo more than 6 - H inches aver utnre Ilum 30% of surface. I:Hcessivt: vct;cl;wive • Decaying vegelatioll Fr Maintain vegetative emurol along banks of I iris+►Ih lagoons and other impoundments to premil accmnulalion of decayinrg vegclalivc miller Moog miler's edge on impoundnlcul's perimeter. Dry Systems 1:Ce-lcrr, • Fecd Spillanc ee Design, nperale and ro dolnii: Iced syslcurs (e.g., blinkers mud limighs) In minimite Ilic trurtilaliou of decaying waslage. F-r 1 lean tip spillage on a routine basis (e.g., 7 - Its day inhaval dining sumnner; 15-311 day iatcival iog ► biter). I-'eed Slurage ��— Accuoml;rlions of feed residues Reduce nwislnte accimmialion within and around iminediale lies imeler of Ii cd storage areas by insoriog, alraimrge awtiy (rum rile and/or providing, adctguale coulainnicat (e.g., a►vered bin for hre►ves's grain and similar Irigh �i oislure grain prodocls). Fr Irislicd lilt arld remove or Inca- tlp accrosud; fed solids in filler strips around 1ecd slnrage as needed. AMIIC - November 11, 1996, Pagn Snares Ca Ilse IIN11's to Ci1nIr41 Insects. Sile Specific Practices Animal I14041ing Amv; • Accumulations of animal wastes Eliminate low areas that Irap mnislure along -� and reed wastage fences and other locatimis where waste accunmlales and disimbance by animals is. DI y Mmulle I landling Accumulations of animal waslcs Syiicuts animal. r lviaintain fence rows and filler strips ainttnd animal holding areas to minimize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as Needc(l). W'Remove spillage on a rouline hasis (e.g., 7 - 10 day interval during sutnnter-, I5-30 day inlerval during winler) %Yltcre manure is loaded for land application or disposal. Cl Provide for adequate drainage around rtIant►rc stockpiles. C7 Inspect for and remove or break up accimmialed waslcs in liller strips around stockpiles aml m:uunc handling areas as needed. For mere inlimmalion contact Ilse Cooperalive Extension Service, Depar411enl of I:nlomnlogy. Box 7613, With Carolina State I INivcrshy, ItalciGh, NC, 27695-7613. AMIC - 1-lovember 11, 1996. Page 2 Swine Farm Waste Management Odor Control Checklist llNlI,.S 10 Njilliolite (ipflos, Silt: SlIccilit: Practicr% 1��Vvc�lafivc or woollcil bolfi:ls; wl-i ecol III lien (tell hest 111.111.1g1,l) IC131 placlices-1 Fr-11C.,ml jililgillelil and comillon Scilse A ijimal Molly --ov fact"; • Dilly F Dry Itools U 1111 iF .III 1 -11 1*% IIICII Hums. r.Kv.ticl CFS located over Slimed flom S. f-4- lecilers at lkigh evil ofsnfid Hoots; D--Sciapc immure buildop front liom-,;; W-11�111(11-1 1111or VC111ilmiull For Illyilig 111.110111C IJI 111c; PI-1 FIC(locill oulnule FvIlloval by HIISII. 161 ICL-II;IIJ'C, �I , , cr;lliv; vr 1111lclllool vcilfilatioll VC11111,111-111 COIAIIA 1.1IL5 • VOIL1111C gww%; ninvitlocill ti r-1 cder uveis; F�Fccll ddivcty Ilimmllool exlentica.; 101 14"t-fIct Agiml imi. of Pecycicil lago011 Fr�'-I-Sll wok -covets; lilloid while milks me lilloll. vllcllfl fill fillf."i 143 III-af litiliflol of Lull.': wilh . -tilli -Sillholl velits conveyaklcc I'll I.. 11.1111t, Viblill', • Al,,ilmimt III it-cycicit lagqino k-fli"Ill IC(lialge lilies it) heal b(IIII)III of Itils hy6d while pits are filling Ividl ant i-Silillon VC111.5 Lill i1.7111I11i Agilation ilotiog snout wok- Fl 51111111 wok. Covets fillifig and c1lawflown 111150c dwin collcclimi Agilation doringwaAmalet 171 Box covels III Illimlloo 111mes Conveyance A Nit )C - I lowcoilict 11. 1996, Pare I a .0 # A 1,1111 ol'41willpilles .11 lagnorl • Agiulimi during waslewaler conveyance IM111's Ill M111hilize 041411. Silt slictilic I'l arfiuc% R*Fxlcnd discharge point of pipes midemeadi lagnon lipoid level Lisploll Sill I'accs Volillile gas emissions; Proper lagnon liquid cap;lcily; • Biological mixing; rr--(.,()FICCI lacrion 51.111111) procedures; Aghalimi W'*-Nlipdnmm surface aica-lo'-whillic Falio-I F-KNfininjum agilalicin when litimpirig, acialion; additives Iglit-alioll S'plllllklcr U."SINIC al"ilallml; I i h i igale em Illy days with fillic or im wind; ih olicralioil; pessuit-1- licar larooll filplid sull-acc.; flom second -slake lagoon Pallial Illiclubial decailillosilioll; N Holloull or midlevel IlImIt'1111: :,Ill late • Mixing While filling; Fl Tank covets; • Agilalimi when emplyirig (A 11asill surface orals of, Solid%; rl hoveit biological addifives or oxidatils Pallial mi':sollial ducomposilioll; F1 I-XII-Ild (Imillpille (3110cls Illitlellicnill lilloid • Mixing while filling; lcVcI; • Agitation when cipplyirig Cl Remove ScIlIC(I Solids sel"Illatly H-milve. •Alll I y 411 %lodre a Agiwlimi Micui Sspicmhng; 5 HI illicc(ioli ol'shilly/511111res; * Villatile gas 1.11lissiolts ash residual numme limn spreader after iise, wProven biological addilives or (millaills- (jllq:'oVc'lcIl 111.1-111AIC, Villatilc gas cloh-sillils .111101. Ill 5-ing iticcoporalim wilhin 49 his.. > S, read in 11iiii unifill ill laycis I'ir Falvid ill yirig; :1xillaills 11mven biological addilivvs or decumposillon j7 Ili c I'raprr (itioll arC.ISSCS 'alcass decomposilinli. fl Con plac Covering fit' calcas%cs in I ill ial Ails; 17 Proper localioll/colislilli'lion 0i'llinposal pils 111174 kill Illoc L1111111infillik 171 secollifal). slack Illillicis 1,11 W - I lovellilict 11. 1996. Pajo'c -1 7%uulc! f'uusc H1111's fn I4lininli-re (1dol��—_w—_�..-•--�------,tine. tiperi(i,-..I'ra+•lirrs—.----.._.�_.. Slaudinl; walcr al+,nod • Imploper draillal;e: _ (dada anti Iclndscallc such that wafer drains — ---- - — - -- -- �--- la,:ilities0 Microbial decomposition of :away from Glcililies organic n1a11er Ll.ulwc 11acLc+! crntn • 111141tly mamlauled :access ItIMIS FaIlla 11CCC55 1011I I11a1n1ellinlCC -- y 11111pli4 to,ul; li,lnl linen aa:css Additional Infi11r11:ati+m : Availahl+7 I'mm Shine hlanuse h1miagollcul ; 021111 IIIlle/11KI1' Packcl M('SI I, ('smelly Fx lcllsioll ('clllcl "Wine I't+,d+t,.6011 I:an11 I'+llcnlical ( Wor Sources and Itcnlc+lies ; FIIAI: Fact Sheol II('SI I - IIAIi titville INM1114:6011 1=:lcility Manure htamlgement: Pit Itecipuge - Lagrlou •Trealuacnt ; I:IIAIi 1211-88 M(_'SI I - 11A1: Swine I'mducliou Facilily hlatlule Managenacnl: I Indetlloor flash - Lagoon-Tsealment ; UBAE 129-89 MIN I - IIAE I.;+gorin Ihaign 111+1 hlanagelncns for I.ivcsloek Manure Tlcatsllenl and Simage ; I:IIAI? 103-113 I CMI - IIAF I',+111ualiou of Maltule an+l Wastewalcr Applicaliutl Ftlui;anactll ; I-IIAE Tact Shect II('S! I - IIAI. I'u►11110flig I IIIIIrS Irons Swint: Illsildings ; PM-33 NCSI I - swille Extenyiun I.uvil++mocntal Assurance I'robrllm ; MI111C Manua) PI(' I'usl. I'unlllccls Ass+lc ( 11+(i++us I hlanal;inI,( Mor ; it rept)l( linul the Swine (3+lor -Task I'm Cc IWNI I Ag1i ('mimmitivarions I III ISMILC ('unL:rrns its Anirnal Malls IF hIallagemem: Odols and I:Iies ; I'ItI M17, 19+15 Con IcIvilre I'slice col ill gs Flotilla t'ollp -l: liv+. FK14-u64111 txhl( It' - I IovrinLcs 11. 1996, 1'.11;c 5 • 40 1 0 IN-lortality Management Methods (check which me.hod(s) are being imolemented) ..! Burial three feet beneath the surface of the around within 3= hours after knowledge of the death. The burial must be at least ;OQ feet frorn any Flowing stream or pubiic body or water. • Rende-;ng at a rende;.ng plant licensed under G.S. 106-163. i Complete incine aticn In the case of dead poultry only. piacing in a disposal pit of a size and design approved by the Department of Agriculture 'Anv method which. in the professional opinion of the State Veterinarian would make possible the salvage of p= of a dead aninzl's value xithout endangering human or animal health. (written approval of the Smct Veterinarian must be attached)