HomeMy WebLinkAbout20130918 Ver 11_August Site Inspection_20200831 Wetland Inspection Report
Project Num: 20130918 Version: 11 Status: Issued
Project Name: NCDOT- Greensboro Eastern Loop(U-2525 B &C) Project Type: New Road/Highway
County: Guilford Region: Central
Location: NCDOT- Greensboro Eastern Loop (U-2525 B & C)
Latitude: +36°07' Longitude: -79°42'43"
SW Plan Location:
Site Owner Name: NC DOT PDEA
Inspection Date: 8/27/2020
Reason for Inspection: Routine
Inspection Type: Site Inspection(DOT)
Inspection Contact Person: Title: Phone:
On-Site Representative(s):
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
II Permit(401 WQC)
Inspection Summary:
page 1
Site Number: 20130918 Owner: Thorpe,Gregory
Inspection Date: 8/27/2020 Inspection Type: Site Inspection(DOT) Reason for Visit: Routine
Permit(401 WOC) Yes No NA NE
Does the impact(s)match what was approved in the 401 WQC or non 404 permit? • ❑ ❑ El
Are the culverts and/or filled areas installed properly? • El El El
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? • El ❑ ❑
Comment: DOT Div 7 DEO, inspectors and contractors met at project office and proceeded to review eight permit
sites. All sites were completed and built to plans. Project was in the process of filling to grade in some
areas. Other areas were at grade elevation and covered/seeded. Investigated one area of sediment loss
from last week. The site was repaired and wottles place around storm drain. Sites 10, 10a, 13, 13a, 14,
15, 15a and 16 were reviewed.
page 2