Loading...
HomeMy WebLinkAboutGC 3492WQC #3492 LAKE AND RESERVOIR ACTIVITY CERTIFICATION GENERAL CERTIFICATION FOR PROJECTS ELIGIBLE FOR CORPS OF ENGINEERS REGIONAL PERMIT NUMBER 198200030 (TVA, OR FERC REGULATED PUBLIC UTILITIES) AND REGIONAL PERMIT 198200079 (COE LAKE AND RESERVOIR MAINTENANCE, I~~ REPAIR AND CONSTRUCTION ACTIVITIES) AND AND RIPARIAN AREA PROTECTION RULES (BUFFER RULES) This .General Certification is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality Regulations in 15A NCAC 2H, Section .0500 and 15A NCAC 2B .0200 for the discharge of fill material to waters and wetland areas as described in the Wilmington District's Regional (General) Permit Number 198200030 and Regional Permit Number 198200079 and for the Riparian Area Protection Rules (Buffer Rules} in 15A NCAC 2B .0200. This Certification replaces Water Quality Certification (WQC} Number 3373 issued on March 18, 2002. This WQC is rescinded when the Corps of Engineers re-authorizes these Regional General Permits or when deemed appropriate by the Director of the DWQ. The State of North Carolina certifies that the specified category of activity will not violate applicable portions of Sections 301, 302, 303, 306 and, 307 of the Public Laws 92-500 and 95-217 if conducted in accordance with the conditions hereinafter set forth. Conditions of Certification: 1. Activities which require approval under either of these General Permits but do not result in fill, dredging or excavation of waters or wetlands (such as docks, piers or boathouses} do not require written concurrence from the Division of Water Quality as long as they comply with all other conditions of this General Certification. However, Condition No. 5 is applicable to all streams in basins with riparian. area protection rules; 2. In accordance with Noah Carolina General Statute Section 143-215.3D(e), any request for written concurrence fora 401 Water Quality Certification must include the appropriate fee. If a project also requires a CAMA Permit, one payment to both agencies shall be submitted and will be the higher of the two fees. The fee shall be collected and distributed between the two agencies in accordance with agreements reached between the Division of Water Quality and the Division of Coastal Management; 3. Activities which result in fill, dredging or excavation of waters or wetlands under this General Certification require written concurrence from the Division of Water Quality; 4. Measures shall be taken to prevent live or fresh concrete from coming into contact with waters of the state until the concrete has hardened; 5. Impacts to any stream length in the Neuse, Tar-Pamlico, Randleman and Catawba River Basins (or any other river basins with Riparian Area Protection Rules [Buffer Rules] in effect at the time of application) requires WQC #3492 written concurrence from DWQ in accordance with 15A NCAC 26.0200. Activities listed as "exempt" from these rules do not need to apply for written concurrence under this Certification. New development activities located in the protected 50-foot wide riparian areas (whether jurisdictional wetlands or not) within the Neuse, Tar-Pamlico, Randleman and Catawba River Basins shall be limited to "uses" identified within and constructed in accordance with 15A NCAC 2B .0200. All new development shall be located, designed, constructed, and maintained to have minimal disturbance to protect water quality to the maximum extent practicable through the use of best management practices; 6. For sites with buffer rules in effect at the time of application, forested vegetation removed from buffer areas for construction access purposes shall be re-established within the next growing season following construction of the project; 7. That appropriate sediment and erosion control practices which equal or exceed those outlined in the most recent version of the "North Carolina Sediment and Erosion Control Planning and Design Manual" or the "North Carolina Surface Mining Manual" whichever is more appropriate (available from the Division of Land Resources (DLR) in the DENR Regional or Central Offices) shall be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to assure compliance with the appropriate turbidity water quality standard; 8. Rip-rap shall be installed waterward of bulkheads installed in freshwater lakes to ensure protection of aquatic habitat. Construction over wetlands shall be elevated at least three feet above any wetlands, and floating structures shall not rest periodically on the bottom; 9. All sediment and erosion control measures placed in wetlands or waters shall be removed and the natural grade restored after the Division of Land Resources has released the project; 10. If an environmental document is required, this Certification is not valid until a Finding of No Significant Impact (FONSI) or Record of Decision (ROD) is issued by the State Clearinghouse; 11. Piers and boat houses shall be constructed to provide for storage and removal of sewage rather than allowing raw waste or other sewage to be disposed directly into surface waters; 12. Additional site-specific conditions may be added to projects proposed with fill under this Certification in order to ensure compliance with all applicable water quality and effluent standards; 13. Concurrence from DWQ that this Certification applies to an individual project shall expire three years from the date of the cover letter from DWQ or on the same day as the expiration date of the corresponding Regional Permit 198200030 or 198200079, whichever is sooner; WQC #3492 14. Projects with any impacts to streams, wetlands, andlor waters that have received a Notice of Violation from the Division of Land Resources andlor the Division of Water Quality are required to submit a complete application and receive written concurrence to use this Certification regardless of the proposed impact amount to streams, wetlands, and waters. 15. When written concurrence is required, the applicant is required to use the most recent version of the Certification of Completion form to notify DWQ when all work included in the 401 Certification has been completed; 16. Standard Erosion and Sediment Control Practices: Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina j' Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. e. Sufficient materials required for stabilization andlor repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 17. No Impacts Beyond those in Application No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre- construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 18. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and WQC #3492 erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. Non-compliance with or violation of the conditions herein set forth by a specific fill project shall result in revocation of this Certification for the project and may result in criminal andlor civil penalties. The Director of the North Carolina Division of Water Quality may require submission of a formal application for Individual Certification for any project in this category of activity if it is determined that the project is likely to have a significant adverse effect upon water quality including state or federally listed endangered or threatened aquatic species or degrade the waters so that existing uses of the wetland or downstream waters are precluded. Public hearings may beheld for specific applications or group of applications prior to a Certification decision if deemed in the public's best interest by the Director of the North Carolina Division of Water Quality. Effective date: 31 December 2004 DIVISION OFWATER QUALITY By Alan W. Klimek, P.E. Director WQC # 3492