Loading...
HomeMy WebLinkAbout20100124 Ver 1_401 Application_201002102_0100124 The following is an abbreviated application form for those applying for a 401 Water Quality Certification to impact FERC (Federal Energy Regulatory Commission) regulated lake shore or bottom under the U.S. Army Corps of Engineers Permit GP30. This Application cannot be used for wetland or stream impacts. Please provide seven () copies of this application and supporting information as well as a non-refundable application fee to the Division of Water Quality of $200.00 for impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom of greater or equal to 1 acre. Applications should be sent to: Division of Water Quality Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 I. Applicant Information ??U k'%:7L90W[9 P FEB 1 G 2010 WVNDM AND STDRMWATER BRANCH 1. Owner/Applicant Information Name: Robert Fairbrother Mailing Address: 2464 NW 64th Street Boca Raton FL 33496 Telephone Number: 561)997-9291 Fax Number: (561)988-91uz E-mail Address: brf007@belIsouth.net 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: II. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries - and_ deyel9pment plan§ , iu,, wlation to surrounding properties. You may use the diagram below to make a hand sketch of your project Also, see the example below for guidance. Both the vicinity map and site plan must include a scale and north arrow. The footprints of all buildings, impervious surfaces, or other facilities must be included. 1. Location County Jackson Nearest Town: C a s. h i e r s Subdivision name or site address (include phase/lot number): L I L Switzerland Lot & 39 Directions to site please include mad numbers, landmarks, etc. (This is not necessary if an adequate vicinity map is included): From crossroads in Cashiers, take Hwy. 107N. to Norton Road (Landmark - Blue Ridae School). Turn left on Norton Road and go about 1.3 miles to Guise Lane (LIL Switzerland). Take Guise Lane to last house (0.5 miles). Note: Where road forks bear Teft &' continue to last house. 2. Describe the existing land use or condition of the site at the time of this application: H o me s i t e 3. Property size (acres): 0.82 4. Nearest body of water ( s t r e a m / r i v e r / s o u n d / o c e a n / l a k e ) : Lake G l e n v i l l e 5. Describe the purpose of the proposed work: To stabilize eroding shoreline and prevent-further Prosinn 6. List the type of equipment to be used to construct the project: Excavator & Barge 7. Amount of impact (including all excavation, backfill, rip rap, retaining walls, etc. below the normal pool lake level in square feet or acres: Dotal amount of impact area is 450 square feet. 8. a. Amount of impact (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level and 50 feet land-ward in square feet or acres: Total amount of impact area is 450 square fppt _ b. Please describe vegetation above the normal pool lake level and 50 feet land- ward to be impacted (number of trees for instance): Minimal - some small scrubs and-just a few trpps (less than 4" in diameter). 2-9-2010 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) N Lake (Full Pond) S E Full Pond Robert Fairbrother 362 Guise Lane Cashiers, NC 28717 Parcel ID #: 7563-64-3414 LIL Switzerland Lot 38b & 39 I)OCX 2-2;' % SD v U Q .M i goy--* -- Nowa. ?Tlw 4 sdidt,2.5 x 180 >3elow €vti del Sisk aba+ia ?'vtl ? oot . I Please approximately sketch the following information on this plan (please provide dimensions for each item, such as 10 ft. x 180 ft): 1) All proposed vegetation clearing (provide dimensions) 2) Location of rip rap or fill to be placed above the Full Pond elevation 3) Location of rip rap or fill to be placed below the Full Pond elevation 4) The location of any proposed structures such as buildings, retaining walls, docks, etc. 5) The location of any excavation or driedging below the Full Pond elevation. 6) Location of construction access corridors. .1J .. Ln` l (V3UV MOMS) o? } 1HOSH )INVG t- S Z? ? W G ?? o w 60 o? W ?- l v y Z Z JU a I '?. ° 0 ° ~OI ,L , . w Q V 0 Zz w I A ? 6Y M ? N ? I f • W Q t W J o ? a m = ? Y CD ,Z W 7 _ o ? Z Z w Q s M z m ? O L. W- o 0 W J ? J D J Q O Z V V Q U U z ?J O U c ?I I V r1 H c? G U0 V W Z O Z W n F .I: ? S j. " %i '1 y ? v ,ri 7 d. n o u u u no d -{s N 'r~4 C14 - .-: ' ,VAT ?` ?-?! \/ J 'Ly r v OA M tMU M i' Q ?7 tp.M}M M h LO M M n WIA ,., ? n n n N n M t/ V J1 f0 y n St 4 s r N W u! O m '? n N V 1? Gi m fJJ M M O 1] ? - Q ? ,?'f ?? I Q In 1? n ?® M 1?[1 M tQ 19 L '2 Q S ti "j\"i N\m Q.r h rv?' t2 m w' R m M h ? nI? Mm ?'nq'? slr1J _ n to ?? R co, Aj7A I A ,4m Ln N' h? to" n Q h1Q?• u7? N'A ?yQ`?31? r4 m Q N N N .n ?n N N if) -S Q n N'q 1 Gt ' M ?t M N T° n ` m ? m ?o r%i R mR M N rom ??.umi `° 9 9 M N? m W) 10 t09 9 In -V in 9 In em, +n M C M n h S`N 1 M \ n M?Q P. L in N N ^ M tUl QED m R to in n Tio m n N It? NO ?. g7P? Q h n A?? U2 m f L; L 0 4M U, n M ?Oti 1? j n 4i - ' / 'a N G?1 9 t9 M 2, N m '7 h M R t'n. g 4/, ° 'It in U2 ?. cm LO m to co M M u7 m? O h 0 m 'C Q Ito 04 N t0 N m Na h to J Ln C? nLn.N (7 :In LqM R QIn` h, M n,2 W. VeV / N M to C4 Lq ID Le), 0 n `M.'n ?"?O n0 In? .QM h\?M? n cR„ 1m nQC' r<i?n?NN +?Q m?'^ h Oh 9c'yy???,m R .??m Rn NQQ ?to °+'n d!, No gyn. mom! ? oR -s R? to ??? >?SU? M ?m n M?, <A? ` CD 9-0 umi n 1° m h. in .n u?-.. n. tih h n ? caC r O ai Uo A o „ s S U v or- -o' r (w?A Lr '1 ? v? t„ o`° O H W 40. . > ? a 4 '? o r- +? "C7 V E O GO 3b 7 ob a * y r C a bq 40, p .fl N E-+ "Q NORTH CAROLINA MACON COUNTY L. STEPHEN FOSTER, BEING FIRST OULY SWORN SAYS THAT THIS PLAT IS IN ALL RESPECTS TRUE AND CORRECT TO THE BEST OF HIS KNOWLEDGE AND BELIEF AND WAS PREPARED FROM A SURVEY MADE BY HIM; THAT THE ERROR OF CLOSURE AS CALCULATED BY LATITUDES AND DEPARTURES IS 1, THAT THIS MAP IS PREPARED IN ACCORDANCE WITH 6-5-47 -30 AS AMENDED. THIS THE /6TH. DAY OF MARCH ,198E SUBSCRIBED AND SWORN BEFORE ME THIS THE DAY OF ,/9BB REGISTERED LAND SURVEYOR L - 1273 NOTARY PUBLIC MY COMMISSION EXPIRES STATE OF NORTH CAROLINA COUNTY OF THE FOREGOING CERTIFICATES OF L STEPHEN FOSTER, REGISTERED LAND SURVEYOR, AND NOTARY PUBLIC, ARE CERTIFIED TO BE CORRECT. THIS INSTRUMENT WAS PRESENTED FOR REGISTRATION AND RECORDED IN THIS OFFICE IN CABINET SLICE THIS THE DAY OF , AT O'CLOCK, . M., 1981. REGISTER OF DEEDS N O GLENVILLE LAKE ? E W Q 0 S P a L - -DATUM-- (3110) pNTP % S86916 1? OAK NB6?- 549-? 3//0 - --3115 CUCUMBER HEM • • OAK /• •M HEM _-... 3120 • • MAPLE CHERRY -------- _ CUCUMBER • • MAPLE -3125 3130 a GRADED % --_ -- _ MAPLE --- 3135 OAK • P ?-- ? SITE OLD ROAD 3140 NEM - / - / MAPLE p - - 3145 3150 w--- - ?--- - /? ,? -3155 - -- - - - _ v - ?' HEM _ 3760 38-53 O Ng6° 50, W / AROUND HEM o06W/??? V • Sg4 i HEM ? .---- ROAD N ?ARp'. 3165 .. . O : 'G\ST ER % % - RP?E? SEALS°. a a i' 56i' 10 srT???L-1273oer? ls? ti? SUK 10 HEN TOPOGRAPHIC SURVEY II OF PORTIONS OF LOTS 38 B 39 I L I 'L SWITZERLAND SUBDIVISION HAMBURG TOWNSHIP, JACKSON COUNTY, NORTH CAROLINA SCALE.- 1 = 20' MARCH 16, 1982 DWG. NO. F33-16 PLAT BY.' L.D.S. 20 0 20 40 111= 20' scale feet PREPARED BY L. STEPHEN FOSTER REGISTERED SURVEYOR P. 0. BOX 1063 HIGHLANDS, NORTH CAROLINA [A AV- 9?r _•°K? ? ??f }?. ?' s ? ¢p?. r ?Eg i 1'..' sir, F i Ft'vc Fj TM!R rT. {1 .r F { f so 4f x . Awe ? ',? ?' '" • . ? ? 7. ?' A ?. _ 1 . "'a Pd Duke Duke Energy Lake Semites PO Box 1006 / EC12Q Charlotte, NC 28201 December 15, 2009 Robert Fairbrother 2464 NW 64th Street Boca Raton, FL 33496 r_ RE: Application for FX? Private Facility E]Excavation FXJ Shoreline Stabilization F-] Miscellaneous Glenville - - 362 Guise Lane Reservoir Uses Dear Prospective Lake Use Permit Applicant: Enclosed you will find the current Duke Energy Lake Services Fee Schedule which became effective January 1, 2002, the applicable Shoreline Management Program Permit Application(s), the Duke Energy Nantahala Area (DENA) Shoreline Management Guidelines (SMG) which became effective July 1, 2003, and the DENA Private Facilities Users Agreement. The purpose of the program is to comply with Federal Energy Regulatory Commission (FERC) orders and requirements for authorizing facilities constructed inside the project boundary of Duke's licensed lakes. The Application(s) will be reviewed after being completed and returned to Duke Energy Lake Services - EC12Q, PO Box 1006, Charlotte, NC 28201-1006. PLEASE USE YOUR MAILING ADDRESS ON THE APPLICATION(S) and type or print information for legibility. No activity is allowed inside the project boundary until you receive written authorization from our office, and no approval will be given to anyone other than the property owner. A check made Payable to Duke Energy for the appropriate filing fee (see enclosed fee schedule) must accompany the following before the review process will be initiated. A completed DPNA Users Agreement must be signed by the adjacent property owner and included with each application. An application is not considered complete without the signed Users Agreement. PIER/DOCK/STABILIZATION: 1. The completed application(s) (for pier structures include both proposed and existing facilities). Include the Duke Energy permit number if one has been previously assigned to any existing structure on the property. 2. The form describing directions by road (including section and lot number if applicable), and the area of the planned construction/activity marked on the grid map (if enclosed). 3. Copy of a registered survey of the property, showing proposal's location from your property into the project boundary. 4. Copy of county building permit, if one is required by the county. (Applicable to pier structures only except for Burke County which requires a building/shoreline protection permit for stabilization.) 5. Other information, including mitigation plans or cultural resource consultation documentation, if applicable. 6. Latitude and Longitude coordinates must be supplied in order to process the application. Coordinates can be obtained from www..orbisinc.com/smp/. FOR NORTH CAROLINA STABILIZATION: 1. TWO (2) COPIES ofthe NC Division of Water Quality (DWQ) Pre-Construction Notification Application (can be found on internet site, http://h2o.enr.state.nc.us/ncwetlands/lake.html) and the DWQ application fee must be provided to the NC Division of Water Quality, Attention: John Dorney, Parkview Building, 2321 Crabtree Blvd., Raleigh, NC 27604 Thank you for your cooperation in working with us through the Private Facilities Permitting Program. Should you have any questions or need further assistance, please call the Lake Representative for the Nantahala Area (828-369- 4513), or you may call Toll Free 1-800-443-5193. Sincerely, Lake Services www.duke-energy.com DUKE ENERGY LAKE SERVICES EC12-Q P O BOX 1006 CHARLOTTE, NC 28201-1006 704-382-1567 or TOLL FREE 1-800-443-5193 APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. PLEASE SUBMIT APPLICATION AND APPROPRIATE DUKE ENERGY FILING FEE, PAYABLE TO DUKE ENERGY, TO ABOVE ADDRESS. I. Applicant Information A. Name Robert Fairbrother B. Mailing Address 2464 NW 64th Street Boca Raton, FL 33496 C. Telephone:_Home : (561)997-9291 Mobile: (9 4)868-6701 IT. Location of Proposed Project A. B. C. D. E. F. Lake Glenville Street Address 2 Quise Lane County Jackson Parcel ID : 7563-64-3414 City, town, communityor landmark Cashiers, NC 28717 (Hamburg Township) Section 1 Lot# 38b, 39 Subdivision LIL Switzerland Directions to property by road rom crossroads i n Cashi ers tak Hwy 107 N to No Blue Ridqe School). urn T?t on Norton Road an ao ahout 13m,Tes tG i i,rP III. Description of Project A. Length of wal I 180' + or - B. Material Dry Stack Stone Class B rip-rap combination C. Distance from property line/shoreline 20' + or - IV. V. Intended Use of Project Area A. Private X B. Commercial Applicant Signatu Date L PLEASE NOTE THE FOLLOWING: 3Witzerland).! To- last house: • 2 COPIES OF THE "DUKE ENERGY APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA", PHOTOGRAPHS OF THE SHORELINE TO BE STABILIZED, AND FIVE (5) COPIES OF THE COMPLETED "NC DIVISION OF WATER QUALITY PRE-CONSTRUCTION NOTIFICATION APPLICATION" MUST BE SUBMITTED WITH THE DIVISION OF WATER QUALITY APPLICATION FEE TO: NC DIVISION OF WATER QUALITY ATTENTION.• CYNDI KAROLY PARKVIEW BLDG., 2321 CRAB TREE BLVD. RALEIGH, NC 27604 919-733-1786 YALAKEMGM71Package InfoanationWC Shoreline Stabilization Application.doc 2-9-2010 G. Latitude and longitude for the project site 35.148218 -83.128545 H. Please submit a map showing the coordinates or a detailed map (USGS quad map, city map, etc.) showing the exact location of the project site. (NOTE: Latitude/ longitude coordinates can be found on internet site, www.maosonus.com. Directions: Don't register, click "Maps", enter address, draw map, select "Map Clicking Will...", select "Lat/Long",click map) DUKE ENERGY DIRECTIONS BY ROAD FORM Lake Use Permit Applicants and Contractors: Ease of locating the proposed project site can have a big impact on permit processing time. Please complete this form and return it along with your completed permit application to: DUKE ENERGY C/O LAKE SERVICES - EC 12 Q PO BOX 1006 CHARLOTTE, NC 28201-1006 1-800-443-5193 and select Option 5 Applicant's Name: Robert Fai rbrother Street Address (at lake): 362 Guise Lane Lake Name: G l e n v i l l e Subdivision Name: L I L Switzerland Tax Parcel ID (if known): 7563-64-3414 Lot # 38b & 39 City: Cashiers County: Jackson State: North Carolina Zip: 28717 Latitude: 35.148218 Longitude: -83.128545 Telephone:Home: (561)997-9291 Mobile: (954)868-6701 Directions (from major road or highway): From crossroads in Cashiers, take Hwy. 107 N. to Norton Road (Landmark - Blue Ridge School). Turn left on Norton Road and go about 1.3 miles to Guise Lane (LIL Switzerland). Take Guise Lane to last house (0.5 miles). Note: Where road forks bear left & continue to last house. Descriptive Structure(s) on Property (i.e. brick garage, white fence, mobile home, etc): Single Family Home. gpal/LAKEMGMT/Package Infortnation/Directions by Road Fortn.doc 8/26/09 Form 398578 (9-06) LAKE ?.. DUKE ENERGY LAKE SERVICES DUKE ENERGY PERMIT NO. COUNTY T PRIVATE FACILITIES PROGRAM PERMIT APPLICATION FORM RD6q_ r- tl ?b:T ? 4? 0 a First MI Last Signature (Required) Date 6? ? Z '.J g St Rte. _. FL '33 ti q Y U Nc a 9 71.7 nom, c City `1-19 rate Zip r JS •S' 3.- J 6'~-'rVP S W City State Zip Lit. 3 Phone Cell/ E-Mail / Other % j jSouf , evelopment Lot No. At?Y7 Company Name Phone / E-Mail / Etc. $ . eYiv' C a$ Address Check the appropriate box. Stationary Pier Slip Style Dock Platform Style FACILITY SQUARE (Fig. 1) (Fig. 3 & 4) Dock (Fig. 2 & 5) FOOTAGE 1lndividual Common 13 1 ? 2 1 ? 2 1 ? 2 Stationary Surface Area: FTZ Status- 1 Existin 2 Proposed 13 1 0 2 X1 132 1 13 2 Floating Surface' Area: FTZ Type of Faci ' • Total Surface Area: 1 Stationar 2 Floating Combination 13 1 1? 2133 X102133 FTZ '? ? _ ? -?I ??(? ? Imo- --?1 ?:?'"` t -»i ?- XCheck box ff uncovered dock. ? Check box if uncovered dock 0 S tt h d FIG. 1 . ee a ac e , FIG. FIG. 3 FIG. 4 FIG. 5 FIG. 6 (other) If application is for a common use facility, additional waterfront property owners using the facility appoint the individual(s). Listed in W the applicant information section of this form as the agent applying for permit. All parties using the facility for permanent mooring _ must be waterfront property owners (i.e., eligible for individual facilities) and must sign below: (use additional sheet if needed). cs W N Name Address Date 8 Name Address Date 0 E o , Condition of Pier: ? Good ? Fair ? Poor Permitted: ? Yes ? No ? Denied Final Inspection Completed: Date, Initial Comments: DP Duke Energy, Duke Energy Lake Services PO Box 1006 / EC12Q Charlotte, NC 28201 DUKE ENERGY NANTAHALA AREA (DENA) PRIVATE FACILITIES "USER AGREEMENT" LETTER (You may use this letter and fill in the requested information. Please Print) Date 2-9-2010 TO: Duke Energy c/o Lake Services- EC 12Q P. O. Box 1006 Charlotte, NC 28201-1006 RE: (Lake Name) Glenville (Street Address) 362 Guise Lane Cashiers, NC 28717 (Subdivision/ Lot #) LIL Switzerland / 38b and 39 (Applicant's full name) Robert Fa i rbrother hereby agrees to comply with all requirements and conditions set forth by Duke Energy's Lake Services' office, or any federal, state or local agencies pertaining to our Private Facilities application to construct a shorel i ne stabi 1 i zati on wal 1 and dock on Lake Gl envi 11 e . In addition, I/we have read and agree to comply with Duke Energy's Shoreline Management Guidelines (SMG) and understand that written authorization must be obtained from Duke's Lake Services' office prior to beginning any activity/construction within the Project boundary. The construction will be completed as described in the approved private facilities program application and within twelve (12) months from the date of approval by Lake Services. Failure to complete construction within the build-out period will require the applicant to file a new application within the then-current guidelines. The filing will include any applicable fees and security deposits. Uwe attest to be the owner or lease holder of the tract of land immediately adjoining the Project boundary where the proposed facility is to be constructed. Uwe understand the physical location on my/our lot in relation to the common property line with Duke Energy, the FERC Project boundary, and any deeded flood easements or required building setbacks. Uwe understand that this lake was constructed as a working hydropower reservoir for the primariy purpose of producing cost-effective electric energy and that this remains as the lake's primary purpose. Uwe understand that the lake and its associated hydropower station are operated by DENA under the terms of a license issued by the Federal Energy Regulatory Commission (FERC) and that there will be no change in hydro project operations as a result of the construction and/or use of any facilities that Uwe may be allowed to place within the FERC Project boundary or on DENA-owned property. Uwe understand that lake levels will rise and fall over time in response to weather events and hydro project operations. DP NA PRNATE FACILFFIES USERS AGREEMENT Page 1 of 5 Final Rev. 10/13/03 www.duke-energy.com Uwe acknowledge that DENA provides no guarantee of any specific quantities (except those identified in the Low Inflow or Hydro Project Maintenance and Emergency Protocols) or quality of water in the lake. Uwe acknowledge that DENA does not guarantee that an approved facility will always have sufficient water depth to be accessible by boat or for other water depth related recreation activities. Uwe understand that the structures to be installed are my/our property and Uwe therefore agree to be fully responsible for the permitted reservoir use including maintaining structures in good repair. If the facility is deemed unsafe by a Lake Services Representative, Uwe agree to repair or remove the facility at my/our own expense and within the specified timeframe. This responsibility is considered to transfer automatically along with ownership and leases of the adjoining tract. Uwe understand that as an owner or lease holder of property directly adjacent to DENA's Project boundary Uwe enjoy the same rights and privileges for general recreational use and enjoyment of the Project lands and waters as are afforded the general public. Uwe understand that as an adjoining property owner I/we may, with proper written approval, be considered for expanded privileges as specified in the DENA SMG. Uwe understand that certain activities specified in the SMG are prohibited because of the DENA lakes small size, environmental concerns, boating capacity limitations, safety considerations and other reasons. Uwe understand that ownership/interest in a Common Use Facility eliminates the option for me/us to also have a separate facility on any other lot within the affected subdivision that Uwe own or lease. Uwe understand that Lake Services' approval of the requested reservoir use in no way constitutes assignment of an interest in real property (i.e. land rights). The approval is granted and maintained solely at Duke's discretion. Uwe also understand that the permitted use may be revoked at any time by Duke Energy or its successors for any reason whatsoever. If the approval is revoked, Uwe agree to remove the facility at my/our own expense within the specified timeframe set by Lake Services. Uwe specifically waive any claim for consequential damages arising out of or relating to this application, Duke's approval or denial of it, or Duke's subsequent revocation of approval, and Uwe specifically understand and acknowledge that, because Duke Energy can revoke the permitted use at any time, I/we are not entitled to reliance damages. Uwe understand that there will be no change in hydro project operations as a result of construction and/or utilization of the permitted proposed structures. Uwe understand that the proposed structure will be used only for the purposes described in the information submitted to Lake Services and other appropriate governing bodies for approval. Uwe understand that this lake is open for use by the general public and that maintaining safe and lawful public use is one of the primary lake management objectives of DENA. Uwe understand that the use for which we are applying is a private use and it should not interfere with the general public's safe and lawful use of the lake. Uwe understand lake use permit holders have the authority to prevent others from trespassing on the structures they have built. Uwe also understand that Uwe, however, do not have any authority to impede anyone from DP NA PRIVATE FACILITIES USERS AGREEMENT Final Rev. 10/13/03 Page 2 of 5 pursuit of the lawful public recreation enjoyment of FERC Project lands and waters. Except as specified otherwise in the SMG or other DENA documents (e.g. Public Safety Plans), anyone may fish around/under structures built by others, may walk/wade/fish within the FERC Project boundary or any DENA-owned peripheral strip, boat in the lake's waters, etc. without having to get anyone's permission to do so. Boaters may not block ingress/egress to piers/docks. Uwe understand that every reasonable effort must be made to minimize any adverse impact on fish, wildlife, and other natural resources. Uwe understand that trees and vegetation growing within the Project boundary play an important role in the overall environmental condition of the lake. The ecological benefit the vegetation has on the fish and wildlife habitat supports a sound and healthy lake environment. Uwe also understand that unauthorized removal of shoreline vegetation (i.e. button bushes, willows, cattails, etc.) and/or disturbance of the shoreline buffer may result in suspension or denial of lake use permitting requests and require me/us to re-establish the vegetation, if the disturbance is found to be in violation of the state or county watershed buffer regulations or Duke Energy Nantahala Area Vegetation Management Requirements. Uwe agree to notify Lake Services when construction is completed. During the construction period, the weather-proof "Duke Energy Approved Lake Use Activity" sign (to be provided by Lake Services) must be posted at the job site, visible from the water's edge. Uwe agree to notify Lake Services if the property is sold and provide the name and address of the new owner. The new owner has 180 days following the date of closing on the property purchase to sign this agreement and its conditions. Uwe agree to fully disclose all information regarding the approved private facility to any prospective buyer/leaseholder of the property and any new owner/leaseholder. Uwe agree that Duke Energy Lake Services will be notified immediately of any sale/transfer of the property and the transfer of the permit to the new owner/leaseholder. Uwe agree that Duke Energy may enter into agreements with third parties permitting use of the Project property that promotes the overall recreational purposes of the Project. Uwe agree that this agreement confers no right to construct or maintain public and private beaches, marinas or campgrounds. Uwe agree that the adjacent Duke Energy Project property shall be used exclusively for non-commercial recreational purposes. Uwe agree not to rent, lease or otherwise allow third parties (except for temporary use by guests, family members, and renters of the residential property) to use any structures permitted to me/us by DENA. Uwe agree not to allow any use of the adjacent property and will exercise due care and diligence to prevent all other persons that are affiliated with my/our property (including invitees, family members, guests, etc.) to violate an applicable federal, state or local law or regulation. Examples include but are not limited to nudity, illegal discharge of firearms or fireworks, controlled substance abuse, public drunkenness, public urination or defecation, or other activities determined to be a nuisance by law enforcement officials. DP NA PRIVATE FACILMES USERS AGREEMENT Final Rev. 10/13/03 Page 3 of 5 Uwe agree to exercise all care and due diligence to preserve and maintain the character of the DENA's adjacent property. Uwe agree to comply with the DENA Vegetation Management Requirements. Uwe agree further to not allow sewage, including discharge from septic tanks (or similar facilities) or boat holding tanks, garbage, trash, or other waste material to be discharged or dumped into the reservoir, tributaries or adjacent property. Uwe understand that as an adjoining property owner Uwe can make no change in land form of land within the FERC Project boundary or land owned by DENA, such as grading, excavation or filling without prior written approval by Lake Services. Uwe agree that only floating piers/docks (unless otherwise authorized by DENA in writing) will be placed on the Project property and that no piers/docks or structures will be built on Project property without prior written authorization by DENA. I/we agree for myself/ourselves, members of my/our family, guests and invitees that Uwe assume all risks of personal injury or property damage incident to my/our occupancy and use of the premises; including but not limited to any personal injury or property damage which may be sustained as a result of flood waters or in connection with the rise and fall of water in the reservoir as a result of floods or of the operation of Duke Energy's hydro electric facilities. Uwe as the adjoining property owner further agree that I/we will indemnify, protect, defend, and save harmless Duke Energy from any and all loss, cost, claims damages, expenses, judgments and causes of action for all injuries and damages sustained by the members of my/our family, guests, and invitees arising or claimed to have arisen in connection with their occupancy or use of the DENA- permitted facility(s). Uwe agree to comply with all FERC orders (as modified or interpreted by FERC), with all other applicable FERC Rules and Regulations imposed by Duke Energy, and with all rules or regulations imposed on Duke Energy by any governmental agency. Uwe understand this user's agreement does not have an expiration date and is transferable to the next property owner provided the new owner signs a new agreement within 180 days following the date of closing on the property purchase. I/we have included a check for the applicable filing fees and security deposits and copies of all other necessary permits. Uwe acknowledge that DENA has the right to charge reasonable user's fees for private use of its property and that failure to pay any applicable user's fees in a timely manner can result in the suspension or cancellation of any previously approved lake use permit. Uwe agree to maintain any prescribed mitigation activities that are required in order to gain approval for facility construction, as long as the facility exists. Uwe agree that camping is only allowed in designated areas. Uwe recognize that Uwe have the continuing responsibility to ensure that the constructed structures are maintained in good repair, including, but not limited to maintenance of the dock and boat slips, and proper erosion control within the permit area and along the shoreline, and agree to take all reasonable steps necessary to meet this responsibility. Uwe agree to maintain all structures within the Project boundary on DENA-owned property in a sound condition and in a neat appearance and pay all costs for said maintenance. DP NA PRIVATE FACILITIES USERS AGREEMENT Final Rev. 10/13/03 Page 4 of 5 Uwe agree that if any action is taken by Duke Energy to enforce any provision, covenant or agreement contained in this user agreement or DENA SMG or if Duke Energy is required to retain an attorney to enforce any provision, covenant or agreement contained in this user agreement or SMG (including, without limitation, the payment of fees due hereunder or the removal of an encroachment constructed in violation of this user agreement or SMG), then Duke Energy shall be entitled to recover all of its reasonable costs associated with such an action, including but not limited to, attorneys' fees and court costs incurred in such action and/or enforcement; provided, however, that the undersigned shall be entitled to recover all of its reasonable costs associated with such an action, including but not limited to, attorneys' fees and court costs incurred in such action and/or enforcement if judged to not be in violation of any provision of the User Agreement or SMG. Uwe agree that Uwe have read and will abide by the DENA SMG published under separate cover. Uwe understand that Lake Services representatives may issue Stop Work Directives for any violations of the SMG or engagement in prohibited acts or activities on DENA property as specifically identified in the SMG. Uwe understand that persons found to be in violation will be subject to DENA sanctions which can include: 1) restoration of the impacted area at the person's expense; 2) loss of consideration of any future lake use permitting activities for up to five years for improper vegetation removal or until vegetation is satisfactorily re- established (even if there is a change in property ownership); 3) revocation of a previously issued permit and loss of consideration of any future lake use permitting activities and/or reinstatement of the revoked permit; 4) increases in fees; 5) modification or removal of non-complying structures; and/or 6) further legal action being taken by DENA. Sincerely, Robert Fairbrother (Applicant's Name) 362 Guise Lane Lake Street Address Cashiers, NC 28717 City/State/Zip Code (828) 743-2761 Lake Phone Number (Designated Duke Energy Agent) Applicant's Signature 2464 NW 64th Street Home Street Address Boca Raton, FL 33496 City/State/Zip Code Home: (561)997-9291 Mobile: (954)868-6701 Home Phone Number Date: 2-9-2010 Date: DP NA PRIVATE FACU ITIES USERS AGREEMENT Final Rev. 10/13/03 Page 5 of 5