Loading...
HomeMy WebLinkAboutNCC203767_ESC Approval Submitted_20200828T ro%vn tit;Mt� NORTH CAROLINA August 24, 2020 Mr. Chris Stanley 3715 Northside Parkway Northwest Atlanta, GA 30327 Email: cstanley@mdhpartners.com Re: Huntersville Distribution Park (9409249) Approval as noted of Erosion Control Plans Total Approved Disturbed Area: 34.2 acres Please be advised that the above referenced plan has been approved by the Town of Huntersville Planning and Engineering Departments. This approval is required prior to applying for the Construction Stormwater General Permit (NCG010000). Application for this permit can be made at https:Hdeg.nc.gov/NCGOI. Please contact the Town of Huntersville Erosion Control Inspector, Anne Loftin (704-579-1090), to set up a pre -construction meeting after obtaining your Certificate of Coverage (COC) from NCDEQ. Refer to the attached Fact Sheet for additional information. Approved and stamped plans are accessible through the "Approved Package" section in EPM for print. Please keep one set of stamped plans onsite at all times. If you have any questions, please contact me at 704-766-2239. Sincerely, Mike MacIntyre, PE Land Development Plan Reviewer, Town of Huntersville CC: Town of Huntersville Planning Department — Brad Priest Town of Huntersville Engineering— Ben Brill Design Firm - Kimley-Horn — Blake Day Town of Huntersville Erosion Control Inspector — Anne Loftin Town of Huntersville Land Development Inspector — Cecil Talbot Town of Huntersville Public Works Construction Engineer — Kevin Garton Mecklenburg County GIS — Angela Norward EPM Project File • 105 Gilead Road • Huntersville, North Carolina 28078 • www.huntersviBe.org