August 24, 2020
Mr. Chris Stanley
3715 Northside Parkway Northwest
Atlanta, GA 30327
Email: cstanley@mdhpartners.com
Re: Huntersville Distribution Park (9409249)
Approval as noted of Erosion Control Plans
Total Approved Disturbed Area: 34.2 acres
Please be advised that the above referenced plan has been approved by the Town of Huntersville Planning
and Engineering Departments. This approval is required prior to applying for the Construction
Stormwater General Permit (NCG010000). Application for this permit can be made at
https:Hdeg.nc.gov/NCGOI. Please contact the Town of Huntersville Erosion Control Inspector, Anne
Loftin (704-579-1090), to set up a pre -construction meeting after obtaining your Certificate of Coverage
(COC) from NCDEQ. Refer to the attached Fact Sheet for additional information.
Approved and stamped plans are accessible through the "Approved Package" section in EPM for
print. Please keep one set of stamped plans onsite at all times.
If you have any questions, please contact me at 704-766-2239.
Sincerely,
Mike MacIntyre, PE
Land Development Plan Reviewer, Town of Huntersville
CC: Town of Huntersville Planning Department — Brad Priest
Town of Huntersville Engineering— Ben Brill
Design Firm - Kimley-Horn — Blake Day
Town of Huntersville Erosion Control Inspector — Anne Loftin
Town of Huntersville Land Development Inspector — Cecil Talbot
Town of Huntersville Public Works Construction Engineer — Kevin Garton
Mecklenburg County GIS — Angela Norward
EPM Project File
• 105 Gilead Road • Huntersville, North Carolina 28078 •
www.huntersviBe.org