Loading...
HomeMy WebLinkAbout20201086 Ver 1_GMisc_U5026_R5720_permit_app_tables_08_21_2020_20200825 U-5026/R-5720 Permit Site Impact Tables 1 U-5026/R-5720 Wetland Impacts Permit Drawing Site Number NRTR Label Impact Type Wetland Type Permanent Impacts (ac.) Temporary Impacts (ac.) 4 WA Fill Riparian 0.13 4 WA Excavation Riparian <0.01 4 WA Mechanized Clearing Riparian 0.05 8 WBA Mechanized Clearing Riparian 0.03 9 WO Fill Non-riparian 0.24 9 WO Mechanized Clearing Non-riparian 0.07 9 WO Hand Clearing Non-riparian 0.18 10 WK Hand Clearing Non-riparian <0.01 11 WN Hand Clearing Non-riparian 0.05 12 WL Fill Non-riparian 0.06 12 WL Mechanized Clearing Non-riparian 0.05 12 WL Hand Clearing Non-riparian 0.06 14 WT Fill Riparian 0.12 14 WT Excavation Riparian 1.23 14 WT Mechanized Clearing Riparian 0.03 14 WT Hand Clearing Riparian 0.10 15 WB Excavation Non-riparian 1.01 15 WB Mechanized Clearing Non-riparian 0.18 15 WB Hand Clearing Non-riparian 0.06 16 WQ Mechanized Clearing Riparian <0.01 Total Riparian Impacts: 1.60 0.10 Total Non-riparian Impacts: 1.61 0.35 Total Fill Impacts: 0.55 N/A Total Excavation Impacts: 2.24 N/A Total Mechanized Clearing Impacts: 0.42 N/A Total Hand Clearing Impacts: N/A 0.45 Total Impacts: 3.21 0.45 U-5026/R-5720 Permit Site Impact Tables 2 U-5026/R-5720 Surface Waters Impacts Permit Drawing Site Number NRTR Label Impact Type Permanent Surface Water Impacts (Ponds) (ac) Permanent Surface Water Impacts (Stream) (lf) Temporary Surface Water Impacts (Stream) (lf) Stream Flow 1 SZ Bank/Scour Stabilization 47 10 Perennial 2 SA Fill 133 Perennial 2 SA Bank Stabilization 28 29 Perennial 3 SB-Per RCBC 140 Perennial 3 SB-Per Channel Relocation 90 9 Perennial 3 SB-Per Channel Relocation 18 21 Perennial 5 SB-Int RCP-IV 45 Intermittent 5 SB-Int Outlet Channel Protection 16 6 Intermittent 6 SF-Int Roadway Fill/Channel Relocation 738 49 Intermittent 6 SF Roadway Fill/Channel Relocation 454 Perennial 6 SF Bank Stabilization 72 10 Perennial 7 SD Fill 86 Intermittent 13 SE Ditch Tie-in 44 Intermittent 16 SC-Int RCP-IV 52 39 Intermittent 16 SC-Per Fill 82 Perennial 16 SC-Per RCP/Bank Stabilization 36 23 Perennial 17 SY Bank Stabilization 39 13 Intermittent Total Impacts: 0 2,120 209 Total Bank Stabilization: N/A 186 Total Channel Relocated *: N/A 990 Total Intermittent: N/A 1,020 Total Requiring Mitigation: N/A 953 *Site 6 – A channel relocation plan is attached to the permit application. Mitigation ratio for the perennial section was required at ½:1 and no mitigation required for the intermittent stream reach. U-5026/R-5720 Permit Site Impact Tables 3 U-5026/R-5720 Riparian Buffer Impacts Site No. Impact Type Per or Temp Stream Name Buffer Mitigation Required? Zone 1 impact (ft2) Zone 2 impact (ft2) 1 Bank and Scour Hole Stabilization P SZ No 2,534 645 2 48” RCP-III, Bank Stabilization P SA No 9,998 2,549 3 10’x7’ RCBC P SB-Per Yes 13,929 8,093 5 48”RCP-IV, Outlet Channel Protection P SB-Int No 3,886 2,253 6 Roadway Fill, Base Ditch and Bank Stabilization P SF Yes 78,691 37,698 7 Roadway Fill P SD Yes 1,707 1,232 13 Special Lateral Base Ditch P SE No 4,384 4,721 16 15” RCP-IV, 48” RCP- IV, Lateral Base Ditch P SC Yes 17,176 8,395 Total Allowable Buffer Impact 20,802 10,168 Total Mitigable Buffer Impact 111,503 55,418 TOTAL COMBINED BUFFER IMPACT 132,305 65,586 Wetlands in Buffers (Site 3 & 7) 3,254 2,057 Mitigable Buffer Impact after Wetland in Buffer Reduction 108,249 53,361 Buffer Replanting at Stream Relocation: 56,806 sq ft