Loading...
HomeMy WebLinkAbout20201086 Ver 1_GMisc_Permit_Mitigation Ratio Meeting Minutes 06042020_20200825Meeting Minutes Project: U-5026 / R-5720 Subject: Determination of Permit Type and Mitigation Ratios Date: Thursday, June 04, 2020 Location: Webex Meeting Attendees: Eric Alsmeyer (USACE) Rob Ridings (NCDWR) Chad Coggins (NCDOT) Vickie Miller (HDR) Jackson Garvey (HDR) The meeting was held via Webex to determine the appropriate permit being sought and mitigation ratios for the permitting of U-5026 and R-5720. An agenda and mapping was provided prior to the meeting. The following list details the discussion points of the meeting. • Permit Type – The D-B Team has reviewed the Regional General Permit (RGP) 201902350 – Bridges, Road Widenings, and Interchanges that was just authorized and would like to move forward in that direction. o Eric was in agreement if we meet the conditions. o Eric also asked Rob if there was a General Certification to accompany the RGP 50. Rob verified that GC 4135 would cover it. • Mitigation Ratios o Wetlands – no WAM forms were developed  Assume 2:1 for fill/excavation  Eric said a 1:1 would be appropriate for mechanized clearing. Chad shared that those areas would likely return back after construction. o Streams / Buffers  Stream relocations – request no mitigation required or a lower ratio – Eric said he would want to see an ecological benefit of the relocation and mimicking the existing channel. Vickie shared that the channel at Site 6 was very straight and the new channel should be similar. No riprap in the bed and we are proposing live stakes and planting where we can. Eric said to include the amount that was in riprap at the end of the culverts and identify the existing linear feet vs the relocated linear feet.  Streambank stabilization / channel improvements - no mitigation will be required  Intermittent channels – Eric stated these are tributaries with minimal aquatic function and no mitigation would be required. • Permit Schedule (Assumes RGP 50 below) o Draft to NCDOT 6/5 for DOT 10 day review – will be later due to changes made as a result of the meeting o Comments on Draft to HDR 6/19 o HDR corrects and sends final back by 6/26 o NCDOT verifies permit is corrected and submits to Corps July 1 o Eric stated that there isn’t a specific timeframe with the RGP 50; however, they try to meet the same as the Nationwide permits if possible. o Eric stated that when the draft is ready he would like to review it ahead of time in order to make certain everything needed is included. o Eric asked discussed the Developer’s project near the roundabout and Site 6. Vickie shared that NCDOT was not including the Developer’s plans at this time and the Developer would apply for his/her own permit. • Other topics o Rob mentioned to make certain we had our stormwater plan together and asked if we had any questions on that to contact them to discuss. o