Loading...
HomeMy WebLinkAboutSW5200701_Bojangles Stormwater Site Calcs 8-27-20_20200828Famous Chicken 'n Biscuits at Spring Hope, NC Owner/Developer: It's Farm Time, LLC Contact: Brad Mercer brad. mercer(-becaiun.com 252.208.2233 • _ ENGINEERING 801 EAST WASHINGTON STREET P.O. BOX 1108 NASHVILLE, N.C. 27856 PHONE: (252) 459-8196 WWW. S TOCKSENGINEERING.COM e r '�0�``J a °oo'+ne°°•• `�`/' •'ees 0 ' SEAL 1,03843 r • n 1 •0je V • MENGINEERING Wet Pond Design Project: Bojangles Spring Hope Location: Spring Hope, NC Date: 19-Aug-20 Basin ID: 1 Drainage Area (A) Impervious Area % Impervious (1) 7.87 Acres Acres 3.42 43.46% Water Quality Volume Calculate Rv: Rv = 0.05+.9 X I Rv = 0.44 WQV= 3630XRDXRvXA Ro = 1.00 Inch WQV = 12,602 ICF Surface Area Orifice Sizing Average Depth = 3.00 SA/DA Ratio = 1.60 (Choose SA/DA Ration from the NC BMP Maunual Table 1 or 2) Surface Area = (SA/DA Ratio / 100) X Area (AG.) / 43,560 (SF/Ac.) 5,485 SF Design Orifice Q= CDAo 2gHo CD = 0.6 g= 32.2 FT/S2 Ho = H/3= 0.67 FT H= 2 FT Ao = 0.01 FEET Design Pipe = 1.5 INCH Design Orifice Q =1 0.05 US Days to Drain =1 3.0 Wetland Plants - Vegetative Shelf Vegetative Shelf SurfaceArea = 1919 SF # of Wetland Plants = 480 FOREBAY/POND VOLUME COMPARISON 8/24/2020 WET DETENTION FOREBAY VOLUME COMPARISON FOREBAY VOLUME ELEVATION SURFACE AREA INCREMENTAL VOLUME 0.0 0.0 0.0 241 0 74.5 242 149 239.5 243.0 330.0 446.0 244.0 562.0 705.0 245.0 848.0 1,015.0 246.0 1,182.0 703.0 246.5 1,630.0 SUM = 3,183.0 Forebay is 117.27,of Pond. Pond Average Depth: 1 3.4 lFeet POND VOLUME ELEVATION SURFACE AREA INCREMENTAL VOLUME 0.0 0.0 0.0 238 0 0.0 239 0 593.0 2401 1186 1,327.5 241 1469 1,624.5 242 1780 1,949.5 243.0 2,119.0 2,301.0 244.0 2,483.0 2,679.0 245.0 2,875.0 3,083.5 246.0 3,292.0 1,797.8 246.5 3,899.0 SUM = 15,355.8 • W�O� ENGINEERIPJC3 Curve Numbers Project: Bojangles At Spring Hope Location: Spring Hope, NC Date: 17-Aug-20 Pre Development Curve Number Pre Dev. 1 49.66 Post Development Curve Number Post Dev. 1 64.34 Post Dev. Bypass 39.00 MNEENGIRING Curve Numbers Project: Bojangles At Spring Hope Location: Spring Hope, NC Date: 17-Aug-20 Basin ID: Pre Dev. Area 1 Drainage Area (A) 1 8.95 1 Acres Runoff Curve Numbers Cover Description Cover Type and Hydrologic Condition A Area (ac) I B I Area (ac)l C I Area (ac)i D Area (ac) Cultivated Land Without Conservation Treatment 72 81 88 91 With Conservation Treatment 62 71 78 81 Wood of Forest Land Poor Cover (Thin) 45 66 77 83 Good Cover 25 55 70 77 Open Spance (lawns, parks, cemeteries, etc) Poor Condition (grass cover <50%) 68 79 86 89 Fair Condition (grass cover 50%-75%) 49 8.83 69 79 84 Good Condition (grass cover >75%) 39 61 74 80 Impervious Area Parking Lots, Roofs, Drives, etc. 1 98 0.12 98 98 98 Soil Area per Hydrologic Group 1 8.95 0 0 0 Drainage Area = Area Total Weighted Curve Number CN = [(CNi*Ai)+ (CNn*An)]/Atot TRUE 1 8.95 = 8.95 Pre Development Area 1 Curve Number 49.66 • ENGINEERING Curve Numbers Project: Bojangles At Spring Hope Location: Spring Hope, NC Date: 17-Aug-20 Basin ID: Post Dev. To SCM Drainage Area (A) 1 7.87 1 Acres Runoff Curve Numbers Cover Description Cover Type and Hydrologic Condition I A I Area (ac)l B I Area (ac) I C I Area (ac)l D I Area (ac) Cultivated Land Without Conservation Treatment 72 81 88 91 With Conservation Treatment 62 71 78 81 Wood of Forest Land Poor Cover (Thin) 45 66 77 83 Good Cover 25 55 70 77 Open Spance (lawns, parks, cemeteries, etc) Poor Condition (grass cover <50%) 68 79 86 89 Fair Condition (grass cover 50%-75%) 49 69 79 84 Good Condition (grass cover >75%) 39 4.45 61 74 80 Impervious Area Parking Lots, Roofs, Drives, etc. 98 1 3.42 1 98 98 98 Soil Area per Hydrologic Group 1 7.87 1 1 0 0 1 0 Drainage Area = Area Total Weighted Curve Number CN = [(CNi*Ai)+ (CNn*An)]/Atot TRUE 7.87 Post Development Area 1 Curve Number 64.64 • ENGINEERING Curve Numbers Project: Bojangles At Spring Hope Location: Spring Hope, NC Date: 17-Aug-20 Basin ID: Post Dev. Bypass Drainage Area (A) 1.08 Acres Runoff Curve Numbers Cover Description Cover Type and Hydrologic Condition I A Area (ac)l B I Area (ac)J C I Area (ac)i D I Area (ac) Cultivated Land Without Conservation Treatment 72 1 81 1 1 88 1 1 91 With Conservation Treatment 62 1 71 1 78 1 1 81 Wood of Forest Land Poor Cover (Thin) 45 1 66 77 83 Good Cover 25 1 55 70 77 Open Spance (lawns, parks, cemeteries, etc) Poor Condition (grass cover <50%) 68 79 86 89 Fair Condition (grass cover 50%-75%) 49 69 79 84 Good Condition (grass cover >75%) 39 1.08 61 74 80 Impervious Area Parking Lots, Roofs, Drives, etc. 1 98 1 98 1 98 1 1 98 Soil Area per Hydrologic Group 1 1.08 1 1 0 1 0 1 1 0 Drainage Area = Area Total Weighted Curve Number CN = L(CNi*Ai)+ (CN,*A,)]/Atot TRUE 1.08 Post Development Area 2 Curve Number 39.00 Runoff Curve Numbers Cover Description Cover Type and Hydrologic Condition A B C D Cultivated Land Without Conservation Treatment 72 81 88 91 With Conservation Treatment 62 71 78 81 Wood of Forest Land Poor Cover (Thin) 45 66 77 83 Good Cover 25 55 70 77 Open Spance (lawns, parks, cemeteries, etc) Poor Condition (grass cover <50%) 68 79 86 89 Fair Condition (grass cover 50%-75%) 49 69 79 84 Good Condition (grass cover >75%) 39 61 74 80 Impervious Areas Parking Lots, Roofs, Driveways, etc. 98 98 98 98 Watershed Model Schematic Hydraflow Hydrographs by Intelisolve v9.22 1 - Pre Area 1 2 - Post to SCM 3 - Post Dev. Bypass 4 - Post into SCM �OA5 - Total Post Development Project: Wetland #1.gpw Monday, Aug 24, 2020 2 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Aug 24, 2020 Hyd. No. 1 Pre Area 1 Hydrograph type = SCS Runoff Peak discharge = 0.058 cfs Storm frequency = 1 yrs Time to peak = 902 min Time interval = 1 min Hyd. volume = 2,008 cuft Drainage area = 8.950 ac Curve number = 49.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 22.50 min Total precip. = 2.86 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Area 1 Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 00 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 3 Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 2 Post to SCM Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 7.870 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.86 in Storm duration = 24 hrs Q (cfs) 3.00 2.00 1.00 Post to SCM Hyd. No. 2 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 2 Monday, Aug 24, 2020 Peak discharge = 2.502 cfs Time to peak = 730 min Hyd. volume = 12,591 cuft Curve number = 64.7 Hydraulic length = 0 ft Time of conc. (Tc) = 22.10 min Distribution = Type II Shape factor = 484 Q (cfs) 3.00 2.00 1.00 ' 0.00 1080 1200 1320 1440 1560 Time (min) 4 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 3 Post Dev. Bypass Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 1.080 ac Basin Slope = 3.0 % Tc method = KIRPICH Total precip. = 2.86 in Storm duration = 24 hrs Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 00 Monday, Aug 24, 2020 Peak discharge = 0.000 cfs Time to peak = n/a Hyd. volume = 0 cuft Curve number = 39 Hydraulic length = 3050 ft Time of conc. (Tc) = 14.50 min Distribution = Type II Shape factor = 484 Post Dev. Bypass Hyd. No. 3 -- 1 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 000 0 20 40 60 80 100 120 Hyd No. 3 Time (min) Hydrograph Report 5 Hydraflow Hydrographs by Intelisolve v9.22 Monday, Aug 24, 2020 Hyd. No. 4 Post into SCM Hydrograph type = Reservoir Peak discharge = 0.054 cfs Storm frequency = 1 yrs Time to peak = 1456 min Time interval = 2 min Hyd. volume = 11,418 cuft Inflow hyd. No. = 2 - Post to SCM Max. Elevation = 248.03 ft Reservoir name = SCM #1 Max. Storage = 10,471 cuft Storage Indication method used Q (cfs) 3.00 2.00 H one] 0.00 0 600 Hyd No. 4 Post into SCM Hyd. No. 4 -- 1 Year 1200 1800 2400 3000 3600 4200 4800 5400 Hyd No. 2 Total storage used = 10,471 cuft Q (cfs) 3.00 WE 1.00 0.00 6000 Time (min) Pond Report s Hydraflow Hydrographs by Intelisolve v9.22 Monday, Aug 24, 2020 Pond No. 1 - SCM #1 Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 246.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 246.50 5,529 0 0 0.50 247.00 6,535 3,016 3,016 1.50 248.00 7,793 7,164 10,180 2.50 249.00 9,408 8,601 18,781 3.50 250.00 11,854 10,631 29,412 4.00 250.50 13,987 6,460 35,872 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 1.30 0.00 0.00 Crest Len (ft) = 10.00 15.00 0.00 0.00 Span (in) = 15.00 1.30 0.00 0.00 Crest El. (ft) = 249.25 250.10 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 246.30 246.50 0.00 0.00 Weir Type = Rect Broad --- --- Length (ft) = 46.00 0.50 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 7.17 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 4.00 3.00 2.00 1.00 0.00 ' 0.00 2.00 Total Q Note: CulverUOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 4.00 6.00 8.00 Stage / Discharge Elev (ft) 250.50 249.50 248.50 247.50 ' 246.50 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 Discharge (cfs) Hydrograph Report 7 Hydraflow Hydrographs by Intelisolve v9.22 Monday, Aug 24, 2020 Hyd. No. 5 Total Post Development Hydrograph type = Combine Peak discharge = 0.054 cfs Storm frequency = 1 yrs Time to peak = 1456 min Time interval = 2 min Hyd. volume = 11,418 cuft Inflow hyds. = 3, 4 Contrib. drain. area= 1.080 ac Total Post Development Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 00 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 5 Hyd No. 3 Hyd No. 4 8 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 1 Pre Area 1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 8.950 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.17 in Storm duration = 24 hrs Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 L I' 0 120 240 Hyd No. 1 Pre Area 1 Hyd. No. 1 -- 10 Year 360 480 600 720 840 Monday, Aug 24, 2020 Peak discharge = 4.657 cfs Time to peak = 730 min Hyd. volume = 23,834 cuft Curve number = 49.6 Hydraulic length = 0 ft Time of conc. (Tc) = 22.50 min Distribution = Type II Shape factor = 484 Q (cfs) 5.00 3.00 2.00 1.00 w ' 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 9 Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 2 Post to SCM Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 7.870 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.17 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 M 4.00 2.00 Post to SCM Hyd. No. 2 -- 10 Year Monday, Aug 24, 2020 Peak discharge = 13.97 cfs Time to peak = 728 min Hyd. volume = 50,737 cuft Curve number = 64.7 Hydraulic length = 0 ft Time of conc. (Tc) = 22.10 min Distribution = Type II Shape factor = 484 Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 e I I I I I I I t 1_ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Aug 24, 2020 Hyd. No. 3 Post Dev. Bypass Hydrograph type = SCS Runoff Peak discharge = 0.051 cfs Storm frequency = 10 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 900 cuft Drainage area = 1.080 ac Curve number = 39 Basin Slope = 3.0 % Hydraulic length = 3050 ft Tc method = KIRPICH Time of conc. (Tc) = 14.50 min Total precip. = 5.17 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev. Bypass Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 00 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 11 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Aug 24, 2020 Hyd. No. 4 Post into SCM Hydrograph type = Reservoir Peak discharge = 2.555 cfs Storm frequency = 10 yrs Time to peak = 760 min Time interval = 2 min Hyd. volume = 44,548 cuft Inflow hyd. No. = 2 - Post to SCM Max. Elevation = 249.43 ft Reservoir name = SCM #1 Max. Storage = 23,297 cuft Storage Indication method used. Q (cfs) 14.00 12.00 10.00 .m 4.00 2.00 0.00 0 600 Hyd No. 4 1200 Post into SCM Hyd. No. 4 -- 10 Year Q (cfs) 14.00 12.00 m 4.00 2.00 0.00 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 2 Total storage used = 23,297 cuft 12 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Aug 24, 2020 Hyd. No. 5 Total Post Development Hydrograph type = Combine Peak discharge = 2.597 cfs Storm frequency = 10 yrs Time to peak = 760 min Time interval = 2 min Hyd. volume = 45,448 cuft Inflow hyds. = 3, 4 Contrib. drain. area= 1.080 ac Q (cfs) 3.00 2.00 1.00 0.00 0 600 Hyd No. 5 Total Post Development Hyd. No. 5 -- 10 Year 1200 1800 2400 Hyd No. 3 3000 3600 Hyd No. 4 4200 4800 5400 Q (cfs) 3.00 2.00 1.00 1 0.00 6000 Time (min) Stocks Engineering, P.A. 801 East Washington Street PO Box 1108 Nashville, NC 27856 PROJECT: Bojangles' at Spring Hope, NC DATE : July 1, 2020 PAGE: 1 of 1 Post -Development Tc Area ID Area (Ac.) C 110 Q10 (cfs) 5 DI#3 0.74 0.75 6.64 3.69 5 CB#6 0.25 0.90 6.64 1.49 5 CB#4 0.06 0.50 6.64 0.20 5 CB#5 1.90 0.73 6.64 9.21 5 NC 581 0.24 0.52 6.64 0.83 Post -Development Tc Area ID Area'(Ac.) C 125 Q25 (cfs) 5 D1#3 0.74 0.75 7.45 4.13 5 CB#6 0.25 0.90 7.45 1.68 5 CB#4 0.06 0.50 7.45 0.22 5 CB#5 1 1.90 0.73 7.45 10.33 5 NC 581 1 0.24 0.52 7.45 0.93 10-Year Storm 25-Year Storm Runoff Computations 0 0 N a al 3 m E o` \ � 1� O CL � � � � E E m co � � � � cn E � O *a cn \m ° §ƒ \ \ \ \ / / @ j @ d a a coz / ƒ / �t \ \ ? j / \ j j \ k 2 — A �f e z , 2 2 « CO k§ $ M / \ j \ \ \ @ \ G G \ (N % % J j 0 0 0 2 a\04 04 _ a)/ w / o < / @f 9 w a \ omG G { ) G _ j \ Cl) \ j) _w_ p # c \ 7 m } \ \ \ \ \ E w— \ \ \ \ CD 0) / § m § § [ 2 og / f 2 2 @)£ -i mZ-- . / / # e § § \ j 3 yea ) E ( ] / @ / \ \ § 5 \ CD- G 0 0 0 3 / § / \ 0 0 0 o e » \ w 7 \ fe IL -jz r O rN C m _N ll� m O O M CD CD J Y -� u O T O m N N C N @ N (O N r Y W 0 c c c c U 00 N O O O O o 0 00 U >4 - m Q om` 0 0 0 0 p O O 00 O c W O O O O c') c O O O O J > OO Lq M O it a) It IT LO rl- ul N N N N N 'O m O0 00 M d M > O O O d' N N co cO (0 <t 7 M V N N @ 0) LO M V C � in O in M N D tr Lq M 9 Q N O O C C * z Z °L v rn v °r`° p 0 0 0 LO o 00 �n C9 a>i ^ Lo v 'n LO = d$ N N N N O O O a) > N M LO (O _ Cv' N N N N O O O O C O O O O N $ J (N M LO (D O C) O r- o O O O O O O O O (Y) W N tt J> M M V V WN$ N N N N Ox n O m OO 00 M V' M 7 I I j= o 00 0 M (0 II N m > M V 'v d N m $ o eo o co to Lq 00 II U 3 0 Q v o 0 p = m M Lo Lo n. C CL cry r-; r _ m - - O o T (Y) U') CF) m N J > to V' O O C N Cl) 't d �9 2 N N N N N U 0 O It V E N U N C t _N �t M M J a) > N M M T N N N N N M Q Q. w (co0 co C'1QOO (0 c6 U U co 00 co co N_ C � U *- U) U Ul O N C N M V d Z J �5R 0 0 0 0 0 0 0 0 0 0 0 0 ri 00 Cl) 00 m OD N N N N N N 0 ln0 TNT b :u 0 0 0 0 rn 0 0 o' r UI o M Z :U O LO 0 d� ul 0 m :ul J w 0 N J � o ul 0 -441 Iles}np 0 0 0 0 0 0 0 0 0 0 0 0 0 Cl) 5 N 00 N m N ao N vi N 00 N a) W l 00'99Z '13 'nUl 00'65Z '13 w!b - 00'96+6 �1S I N d' bE'E9Z '13 'nUl 4- 0 L Q� cn E L O '-W V+ O O O O O o O o O O O o ai ca ui co Za LO r ai Ln ai v N N N N N N O O O --- 0 co — — ----- - - — ----- O r-- -- - - - - - O co - - - cc cc cc ln0 ZO'99Z '13 'nul _ $ £6'69Z '13 WIN oc £ :ul - 00' 69+0 elS oO C) (D 0 ul b£'69Z '13 '^ul in0 b l'£NZ '13 'nul b£'99Z '13 WN Z :ul - 00'Z£+0 BlS o O J N Ur W �p O ul U'ZNZ '13 'nul 1n0 ZO'ZNZ '13 MI Z6'99Z'13 wl2i 00'00+0 u1S 0 o $ o O 0 o 0 0 0 0 0 0 0 N 7 N N N N N N W TEMPORARY Product DescriptionTyplEalSIOPe LongevltV Applications channel Agpilcation ,r ERONET Accelerated photodegradable, polypropylene top 45days 4:1-3.1 1.55psf/5.0fps net, 100% straw OS75 fibermatrix Accelerated photodegradable, polypropylene GO days 3:1.2:1 1.75psf/6.0fps top 6 bottom net, 100%straw fiber DSI50 matrix Photadegradable, polypropylene lop 12 months 4:1.3:1 1.55 psf / 5.0 fps net, 100% straw fiber matrix S75 Photadegradable, polypropylene top 6 bottom net, 12 months 3:1.2:1 1.75psf /6.Ofps 100% straw fiber matrix SISO UV -stable polypropylene top net, 70% straw/30% ok coconut 24months 2:1.1:1 2.0psf /8.0fps I flbermatrix. if,, f phatodegradable polypropylene SCISO bottom net UVstable polypropylene top 2.25 psf / 10.0 6bottom nets, 36months 1:1 and Greater fps 100%coconut flbermatrix C125 BIONET i Leno woven blodegradable j lute top net, 12 months 4:1-3:1 1.6psf /50fps 100%straw fiber 575BN matrix i Woven biodegradable 'jute top and 12monfhs 3:1.2:1 1,85psf/6'0fps bottom net,100% straw fiber matrix S150BN Woven t 1 biodegradable G lute top and bottom net, to months 2:1.1:1 2.10psf /8.Ofps ' 70%straw/30% coconut fiber SCISOBN matrix TEMPORARY SlopeTypical aascription Applications Agplicallon BIONET convo Woven biodegradable ev" lutetopand 24mo. 1:1andGreater 2.35psf /10.0 bottom net,1GO% fps coconut fiber matrix 025BN 7011 g woven biodegradable ' colrtopnet,1001,4 2.35psf/10,0 coconutllber 36ma. 1:1 and Greater fps matrix, woven blodegrdablelute C7001311 botlomnet PERMANENT ERONET UV -stable Unvegetated polypropylene 3.0 p5f/9.0 fps (PP)top and Permanent 1:1 bottom net,100°h Vegetated PP fiber matrix 10 psf / 16.0 fps P300 VMAX UV -stable PP top 6 bottom Unvegetated nets, UV -stable PPcrlmped ermanen:1anreaer Permanent 1dGt 3.0 psf/9.5 fps { centernet,70°A Vegetated I straw/30% coconut fiber SC250 matrix 1't- UV -stable PP top6bottom Unvegelated ta' nets. UV -stable 3.2psf/IO,Sfps PPcrlmped Permanent 10 and Greater center net,100% Vegetated coconut fiber 12 psf / 20 fps C350 matrix _ - I UV -stable PP top Unvegetated 6 bottom nets, 4.0 psf/12.5 fps UV -stable PP Permanent 1:landGreater crimped center Vegetated ^ _ net, 100%PIP fiber matrix 14psf /25fps) P550 i 100%UV-stable PPmonofilamenl Vegetated yarns, woven Into Permanent I:IandGreater 15 psf / 25 fps TMAX/ a3.0structure TMAX3k 100%UV-stable PPmonofflament Extreme High FlowClrannels Permanent Vegetated yarns,woveninto 1:1 and Greater 16 sf/25f s P P a3.0structure Slopes W3000 i Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3DO by Autodesk, Inc. NC 581 Ditch - Grassed Triangular Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 266.00 Slope (%) = 1.00 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 0.93 267.50 267.00 266.50 266.00 265.50 2 4 6 Section 8 Reach (ft) Monday, Aug 24 2020 Highlighted Depth (ft) = 0.41 Q (cfs) = 0.930 Area (sqft) = 0.67 Velocity (ft/s) = 1.38 Wetted Perim (ft) = 3.38 Crit Depth, Yc (ft) = 0.33 Top Width (ft) = 3.28 EGL (ft) = 0.44 10 12 14 16 Depth (ft) 2.00 1.50 1.00 0.50 10§ -n r;n Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. NC 581 Ditch - Bare Soil Triangular Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 266.00 Slope (%) = 1.00 N-Value = 0.020 Calculations Compute by: Known Q Known Q (cfs) = 0.93 Elev (ft) 268.00 267.50 267.00 266.50 266.00 265.50 2 4 6 Section 8 Reach (ft) Monday, Aug 24 2020 Highlighted Depth (ft) = 0.33 Q (cfs) = 0.930 Area (sqft) = 0.44 Velocity (ft/s) = 2.13 Wetted Perim (ft) = 2.72 Crit Depth, Yc (ft) = 0.33 Top Width (ft) = 2.64 EGL (ft) = 0.40 10 12 14 16 Depth (ft) 2.00 1.50 1.00 0.50 1 �� -n sn • ENGINEERING W W Rip -Rap Outlet Protection Pipe # FES #6 Known: 24" RCP Q25 = 16.36 cfs V25 = 10.91 ft/s Min. Required: (Use NCDEQ Table 8.06b) La = 10' W = 8' 3do = 6' d5o = 2.5" (Rip Rap Size) *Use Class B Rip Rap over Mirafi 140N 18" in depth. Rip -Rap Outlet Protection Pipe # FES #7 Known: 15" RCP Q25 = 3.096 cfs V25 = 3.01 ft/s Min. Required: (Use NCDEQ Table 8.06b) La = 6' W = 4' 3do = 3.75' d50 = 2.5" (Rip Rap Size) *Use Class B Rip Rap over Mirafi 140N 18" in depth. Channel Report Hydraflow Express Extension for AutodeskO AutoCADO Civil 3DO by Autodesk, Inc. Temporary Diversion #1 - Grassed Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 251.40 Slope (%) = 1.00 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 22.44 Thursday, Aug 20 2020 Highlighted Depth (ft) = 1.50 Q (cfs) = 22.44 Area (sqft) = 6.75 Velocity (ft/s) = 3.32 Wetted Perim (ft) = 9.49 Crit Depth, Yc (ft) = 1.29 Top Width (ft) = 9.00 EGL (ft) = 1.67 Elev (ft) Section Depth (ft) 2.60 254.00 2.10 253.50 1.60 253.00 1.10 252.50 0.60 252.00 251.50 Oor0.10 251.00 1r,n r,n -0.40 -0 90 2 4 6 8 Reach (ft) 10 12 14 16 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3DO by Autodesk, Inc. Temporary Diversion #1 - Bare Soil Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 251.40 Slope (%) = 1.00 N-Value = 0.020 Calculations Compute by: Known Q Known Q (cfs) = 22.44 Thursday, Aug 20 2020 Highlighted Depth (ft) = 1.21 Q (cfs) = 22.44 Area (sqft) = 4.39 Velocity (ft/s) = 5.11 Wetted Perim (ft) = 7.65 Crit Depth, Yc (ft) = 1.29 Top Width (ft) = 7.26 EGL (ft) = 1.62 Elev (ft) Section Depth (ft) 2.60 254.00 2.10 253.50 1.60 253.00 100 1.10 252.50 0.60 252.00 251.50 OOF0.10 251.00 -0.40 2 4 6 8 Reach (ft) 10 12 14 16 Channel Report Hydraflow Express Extension for Autodesk@ AutoCADO Civil 3D0 by Autodesk, Inc. Temporary Diversion #2 - Bare Soil Triangular Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 251.00 Slope (%) = 3.50 N-Value = 0.020 Calculations Compute by: Known Q Known Q (cfs) = 11.22 Tuesday, Jun 30 2020 Highlighted Depth (ft) = 0.88 Q (cfs) = 11.22 Area (sqft) = 1.55 Velocity (ft/s) = 7.24 Wetted Perim (ft) = 3.94 Crit Depth, Yc (ft) = 1.15 Top Width (ft) = 3.52 EGL (ft) = 1.70 Elev (ft) Depth (ft) Section 3.00 254.00 2.50 253.50 253.00 2.00 1.50 252.50 .......... . 1.00 252.00 0.50 251.50 0.00 251.00 qt;nFn -ni;n 1 2 3 4 5 6 Reach (ft) 7 8 9 10 Channel Report Hydraflow Express Extension for Autodesk(D AutoCADO Civil 3D@ by Autodesk, Inc. Temporary Diversion #2 - Grassed Triangular Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 251.00 Slope (%) = 3.50 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 11.22 Elev (ft) Section 254.00 253.50 253.00 252.50 252.00 251.50 251.00 OrIn Tuesday, Jun 30 2020 Highlighted Depth (ft) = 1.08 Q (Cfs) = 11.22 Area (sqft) = 2.33 Velocity (ft/s) = 4.81 Wetted Perim (ft) = 4.83 Crit Depth, Yc (ft) = 1.15 Top Width (ft) = 4.32 EGL (ft) = 1.44 1 2 3 4 5 6 7 Reach (ft) 8 9 1 Depth (ft) 3.00 2.50 2.00 1.50 1.00 0.50 0.00 -0.50