Loading...
HomeMy WebLinkAbout20061897 Ver 1_Application_20061211Office Use Only: Form Version March OS 2006 1897 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I. Processing t ~.,~ ._i~El 1. Check all of the approval(s) requested for this project: ~ ~ LE~V~a Section 404 Permit ^ Riparian or Watershed Buffer Rules ection 10 Permit ^ Isolated Wetland Permit from DWQ 401 Water Quality Certification ^ Express 401 Water Quality Certification ,~ 2. Nationwide, Regional or General Permit Number(s) Requested: /mow. `-~Z ~z~j'~F~ 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ^ 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ^ 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ^ II. Applicant Information 1. Owner/Applicant Information ,.T__ _ _ ,-~, i , o~c i x zoos Mailing Address: 'a ~ ,r~ ~°- ,~?:~~.~}~ A gRRA~,,,, Telephone Number: ` r' - E-mail Address: 1_? ~- ,_ . Fax Number: ~G~ ~ -_3 ~ -~ ~',~_3 _~~. 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Page S of 12 III. ' Project Information Attach a vicinity map cleazly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing properly boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is cleazly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans aze reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of proj 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN); ~) ~ .~~~ .~~ 4. Location ~ ~ County: /~~,~.~~, ;;~r.'z!6 Nearest Town:~~ Subdivision name (include phase/lot number): ;~ 1, S ,~; ~ ~ , Directions to site (include road numbers/names, landmarks, etc.):, gr- i ci~fLr ~u7- .[%~',£/; .4, //~'~ / /- ~ r^e ./`F'?~.i~r"~:~ i'/ G !): ' r lc ~/tC- ° /f ',- t- ~ l~-C' ~/~.'~'~U~7 / !"fzL.~l/fi /'.~ TJ~" ~ l.>` lf': G /~. G ~-~'tvr~ /.t~ <%,~ ~ s~~l.'.'~/,.St~ Can ..C. {~ ~J~. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): ~S ~ 5 ~.~ °N - ~ a Il ~ 9 °W 6. Property size (acres): ! c~ G2i_. 7. Name of nearest receiving body of water: .~~~;~.~ ,,~ ~ ~ ~ ~~ .- 8. River Basin: 1 ~ ~~~I ~~:-~~ ~ (Note -this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use ' the vicinity of the p ject at the time of this application: ~~~ ~/ ~sc~ ~ `> ~ ,;~~ '. ~,, ~~ .,t -dam' • `~ - a ~ ~~ ~. ,dJ~L- /-~ s~ ~; ;- GiliG Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: /~ ~4 ~, ~- .~.:~~~ ;~ 11. Explain the purpose of the proposed work: T 1~ ,~,.,.,,~;%~~,,' ~ ~.a.,~ , ~~, - CJl r~r~~-~ IV. Prior Project History If jurisdictional determinations andlor permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued or prior segments of the same T.I.P. project, along with construction schedules. ~~~; ~.~' V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. :~/~r VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's} responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Provide a written description of the proposed i Page 7 of 12 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flcx~din~_ Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplsin es/no Distance to Nearest Stream linear feet Area of Impact (acres) Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: c~ 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib wails, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acre e, multi I len X width, then divide b 43 560 Stream Impact Number indicate on m Stream Name Type of Impact Perennial or Intermittent? Average S~azn Width Before Im act Impact ~ Length Inear feet Area of Impact acres Total Stream Impact (by length and acreage) 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredain~, flooding, drainage. bulkheads_ etc_ Open Water Impact Site Number indicate on Name of Waterbody (if applicable) Type of Impact ~ Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. Area of Impact acres Total Open Water Impact (acres) ~, lac Page 8 of 12 6. LISt the cumulative ITI1Da.Ct to all Waters ~f the i T_C _ rPenitina~ fmm thn nrnir+rt• Stream Im act acres • ---- -- --- Wetland Im act acres): O n Water Im act (acres): ~, ~~` Total Im act to Waters ofthe U.S. (acres) Total Stream Im act (linear feet): 7. Isolated Waters Do any isolated waters exist on the property? ^ Yes [?~No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam/embanlanent, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts, It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts.,d Il w,, ~% ~ ~, /~ s~~ r<• P ~~ ti~ VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of 1`dationwi~le Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects t+o the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicdble include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same wa#ershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream 'Work in North Carolina, available at nttp://h2o.enr.state.nc.us/nc~vetlands/Strm~ide html. 1. Provide a brief description of the proposed mitigation plan. The description shoa~l~d Provide as much information as possible, including, but not limited to: site location {attach directions and/or map, if offsite), affected stream and river basin, type and amount {acreagellinear feet) of mitigation proposed (restoration, enhancement, creation, or preservation}, a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. ~~l 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhanceinen3 Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h?o.enr.state.nc.~FS1~,tirp/incfe~.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested {linear feet}: Amount of buffer mitigation requested (square feet}: Amount of Riparian wetland mitigation requested (acres}: Amount ofNon-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 14 of 32 IX. ' Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federaUstate/local) funds or the use of public (federaUstate) land? Yes ^ No [a'" 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ^ No ^ 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^ X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ} It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico}, 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ^ No 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. ~ ~ Re Zone* ~~,.,.aP f h. Multiplier gaited 3 (2 for Catawba) 1.5 f Total I " Zone 1 extends out 30 feet perpendicular from the top of the near hank of channel; Zone 2 extends an additional 20 feet from the edge ofZone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration 1 Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. ~Vh Page 11 of 12 XI. ' Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss Stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. C.~~(„ ;G Sy0 ~,*,tY?r~„^~.r< ,~F~ s r'te'{ oc~c~ ,____ s~ . ~E i ~~h~n..,. `~ ~~'~~.ota-~ , .~ ~ s r~ ,-t,~ t ~ ~ i ~l ~r- t~o~.c~ ~ ~.~r.r ~ ~ l1 ~u,,. ~ ~z~.~ ~ nn 1l s~~ rM XII. Sewage Disposal (required by DWQ) Cleazly detail the ultimate treatment methods and disposition (non-discharge or discharge} of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (required by DWQ) Is this site in violation of DWf1 Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No (~' Is this anafter-the-fact permit application? Yes ^ No [~ XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ^ No If yes, please submit a qualrtatrve or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). n,. e~ •---~-- r ~ _ ~ --___ ~` i~ ~~ Appli(~ant/Agent'seS`ignature `Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 t~aztnertorct ~.;o, te~~: -- t'rantabte tvtap Rutherford Co, NC rage 1 of z Tax PIN: 217536 :eae_ nn~narner_~nnnnnn i9 P'liY: UCi'+L !U~`tJJ UJUUUU Account No.: 2247620 Owners Name1: TUTEN DAVID E Owners Name2: TUTEN KATHLEEN M Addressl: 2305 DILIJVCRTFI Rv ~w Address2: City: CHARLOTTE State: NC ZID: 28203 Property Address: 215 PICNIC POINT RD ACAS: 0 AC_DEED:O CALC_ACRE: 0.5 No. of Bldgs: 6 Deed Bk/Pg: 386/91 Land Value: $184,000 Bldg. Value: $36,500 Defr. Value: $0 Total Value: $220,500 Sale Price: $0 Neighborhood Code: L306 Neighborhood Desc.: RESIDENTIAL LAKE Property Desc.: RES PICNIC PT ROAD Zoning: http://arcims.webgis.net/nc/rutherford/printable.asp?process=id 1 &x2=1049496.465&y2=6... 11/7/2006 Kuthertbrd Lo, N L -- YrYntable Map Nbr Land Seg.: 1 Stamps: Land Use: _ Exempt_pro: Exempt amt: 0 Flood Plain: N Sr ~a~~~: ~ s~ St dir: St_name: PICNIC POINT St_suffix: RD Apt nbr: Yage 2 of 2 DISCLAIMER: The information contained on this page is NOT to be construed or used as a "legal description". Map information is believed to be accurate but accuracy is not guaranteed. http://www.webgis.net Anderson & Associates, fnc. http:1lwww.andassoc.com http://arcims.webgis.net/nclrutherford/printable.asp?process=idl &~=1049496.465&y2=6... 11 /7/2006 CONSTRUCT TO PROPERTY LINE ON THIS END 6X6 DEADMAN TURNED BACK CORNER TO ~ CONNECTOR MEMBERS MATCH EXISTING ~-~ ~-~_ 6X6 DEADMAN 4 OR 5 REQUIRED FILL SIDE FRONT FACE OF WOOD RETAINING WALL TO MATCH EXISTING WALL LOCATION LAKE BOTTOM - WATER ELEVATION = 990' APPROXIMATE LENGTH OF WALL TO BE REPLACED IS 34 FEET PLAN VIEW NOMINAL 34' CONSTRUCT TO EXISTING WALL ON THIS END THIS DRAWING FOR GENERAL LAYOUT ONLY RETAINING WALL SHALL REPLACE EXISTING, LAKE SIDE DAMAGED WOOD WALL AND SHALL BE CONSTRUCTED 50 THAT THE LAKE SIDE FACE OF THE NEW WALL i5 FLUSH WITH THE REMAINS OF THE EXISTING WALL AND THE SHORELINE AS DEFINED BY THE TOWN OF LAKE LURE DOCUMENT "LAKE STRUCTURES REGULATIONS" RIP-RAP MATERIAL NOT SHOWN I I I I I I I I I I I I I I I I I I I I I I I I I I I L I I I I LJ I I I I LJ BOTTOM ROW OF HORIZONTAL 6X6'5 INSTALLED BELOW LAKE BOTTOM 6X6 TREATED WOOD WALL MEMBERS SECURED TO VERTICAL SUPPORT POSTS WITH 100 PENNY GALVANIZED NAILS 6X6 TREATED WOOD SUPPORT POST, DRIVEN TO REFUSAL, 3 FOOT MINIMUM COMPACTED FILL 6X6 DEADMAN CONNECTOR, BOLTED TO 6X6'5 WITH 2- I " DIA. H.D. GALVANIZED BOLTS OR EQUAL 6X6 TREATED DEADMAN POST, 3 TO 4 FEET LONG, AS DETERMINED BY SOIL CONDITIONS, ANCHORED IN 12 TO 18 INCH DIAMETER CONCRETE FILLED HOLE. EXTEND POST THRU BOTTOM OF CONCRETE AS SHOWN I I I I 1 1 I I I I I I I I I I I I I I I I I I I( I I I I I I I I I I LJ LJ lJ ELEVATION I I I I I t I I I I I I I I 11 I i I I I I 1 I I I I I I I I I I I I LJ LJ LJ 6X6 VERTICAL SUPPORT POSTS TABLE OF VALUES VERTICAL DRY WALL RIP-RAP WATER HEIGHT HEIGHT HEIGHT DEPTH A B C E ESTIMATED L}'_6" 30" 18" 24" VERTICAL HEIGHT NOTE EXACT WALL HEIGHT FIELD DETERMINED, MAY BE ONE 6X6 THICKNESS HIGHER THAN EXISTING RIP-PAP AS PER LAKE STRUCTURES REGULATIONS CEO-TEXTILE SOIL SEPARATING FILTER FABRIC INSTALLED AS SHOWN / ~ v~ Q I' WATER HEIGHT EL=990 FT. W ESTIMATED WATER HEIGHT URING WINTER DRAW-DOWN SECTION "A" DESIGN INFORMATION THE DESIGNS PRESENTED ON THIS DRAWING INCORPORATE THE FOLLOWING MINIMUM VALUES. VERIFICATION THAT THESE VALUES ARE MEf OR EXCEEDED IS NOT THE RESPONSIBILITY OF THE DESIGN ENGINEER. CONCRETE (IF REQUIRED) IMPORTANCE FACTORS (WHEN RELEVANT) MINIMUM 28 DAY COMPRE551VE STRENGTH WIND I .O FOOTINGS dWALLS/SLABS 3500 / 3000 PSF SNOW I .O DENSITY 150 PCF SEISMIC I .O PERFORMING SLUMP 4 INCHES DESIGN LOADS (WHEN RELEVANT) SOIL ROOF DL /SNOW 15/20 PSF MINIMUM SOIL BEARING PRESSURE 2000 PSF FLOOR DL / LL I O /40 PSF MINIMUM SOIL INTERNAL FRICTION ANGLE 30 DEG WIND 90 MPH COMPACTED BACKFILL DENSITY EXPOSURE CATEGORY C SLIDING COEFFICIENT 45u SEISMIC DESIGN (WHEN RELEVANT) REINFORCING (IF REQUIRED) SEISMIC USE GROUP I ALL REINFORCING STEEL IS TO BE ASTM A615 GRADE 60, SITE CLASSIFICATION D FABRICATED AND PLACED IN ACCORDANCE WITH ACI 3 18. SPECTRAL RESPONSE ALL LAPS SHALL BE A MINIMUM OF 36 BAR DIAMETERS. ACCELERATION SDS 39% g, SDI 2 I % g STRUCTURAL SYSTEM MOMENT FRAME SEISMIC BASE SHEAR Vx= I . I k, Vy= I . I k ANALYSIS PROCEDURE EQVLNT LTRL FRCS SEAWALL DESIGN SHOWN BY KIM B. WARNER, PE, LLC, BASED ON GENERAL LAYOUT FURNISHED BY NOAH ANDERSON SIGNIFICANT CARE HAS BEEN TAKEN TO ENSURE THAT THESE PLANS ARE CORRECT AND COMPLETE AND SATISFY THE DESIGN CRITERIA. HOWEVER, KIM B. WARNER, PE, LLC, WILL NOT ASSUME LIABILITY FOR ANY DAMAGES DUE TO UNFORESEEN DESIGN LOADS OR SOIL CONDITIONS. ALL FEDERAL, STATE, LOCAL CODES AND ORDINANCES AND REGULATIONS SHALL BE CONSIDERED AS PART OF THE PLANS AND SPECIFICATIONS FOR THIS RETAINING WALL AND SHALL TAKE PRECEDENCE OVER ANYTHING SHOWN, DESCRIBED, OR IMPLIED WHERE VARIANCES OCCUR. CONTRACTOR 15 RESPONSIBLE FOR CHECKING AND VERIFYING ALL DIMENSIONS AND EXISTING CONDITIONS. VARIATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER FOR RESOLUTION. TREATED TIMBER SEAWALL DESIGN FOR PLAN, ELEVATION ~ KIM 6. WARNER, PE, LLC DATE 12-6-06 sr-IFFY REPLACEMENT SEAWALL AT TI1E RESIDENCE OF 139 COUNTRYWOOD DRIVE, REV DAVID ~ KATHLEEN TUTEN TYPICAL SECTION FOREST CITY, NC 28043 REV I SCALE - AS NOTED PE NO 19856, PH 828.248. 1240 2 15 PICNIC POINT, LAKE LURE, NC 28746 NOAH ANDERSON -CONTRACTOR OF I EL=985 FT. CONSTRUCTION NOTE THE SEAWALL SHOWN ON THIS DESIGN DOCUMENT IS TO BE CONSTRUCTED DURING THE 2006-2007 LAKE LEVEL DRAW DOWN PERIOD. IF CONCRETE IS REQUIRED TO BE POURED IN THE LAKE BED AREA, POURING SHALL NOT BEGIN BEFORE THE MOISTURE CONTENT OF THE SOIL UNDER THE CONCRETE HAS DRIED SUFFICIENTLY TO PREVENT CONTAMINANTS FROM ENTERING THE LAKE BED. IN ADDITION, ALL CONCRETE PLACED BELOW THE 990 FOOT ELEVATION SHALL HAVE BEEN PLACED SOON ENOUGH TO ALLOW A 28 DAY CURE BEFORE CONTACTING RISING LAKE WATER AT THE END OF THE DRAW DOWN PERIOD.