HomeMy WebLinkAboutNCC203718_NOI Application_20200827Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 8/25/2020 2:55:59 PM (NCG01 NOI Submission)
Approve by Gwinn, Matt 8/26/2020 3:34:14 PM (Review- Construction NOI 30411)
• Clark, Paul reassigned the task to Gwinn, Matt 8/25/2020 3:44 PM
* thx
• The task was assigned to Clark, Paul by round robin distribution 8/25/2020 2:56 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: August 27, 2020 5:00
PM 8/25/2020 2:56 PM
Subnut by Selkane, Aziza 8/27/2020 3:45:36 PM (Payment Verification for NCC203718)
* Reader & Partners, LLC
• Selkane, Aziza assigned the task to Selkane, Aziza 8/27/2020 3:45 PM
• The task was assigned to DEMLR NCG01 Payment Team. The due date is: October 7, 2020 5:00 PM
8/26/2020 3:34 PM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting r No
an NOI that was r Yes
rejected before?
Previous Rejected 30169
NOI No.
Prior Reviewer Matt Gwinn
Name
1a. Project Name * Holding Village South Lake Subdivision - Phase 4
1 b. Specific Lot This field any be used to list specifc lot numbers.
Numbers Phase 4 Lots 1-25
2. County* Wake
3. Highway or Street 0 Friendship Chapel Road (PIN 1840643841)
Address * Street narre only is acceptable if no address number assigned yet
4. City or Township* Wake Forest
5. State * NC
6. Zip Code * 27587
7. Latitude * Enter the latitude in decimal degrees
35.9596
8. Longitude* Enter the longitude in decimal degrees (M. ST be negative)
-78.5059
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 09/03/2020
Estimated Construction Project Start Date
10. Date to End* 08/06/2025
Estimated Construction Project End Date
11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521)
Standard Industrial aassification for Developrrent
12. Acres to be 12.85
disturbed* (including off -site borrow and waste areas)
13. Total site area 14.65
(acres) *
14. Post- 5.75
construction (Estirrated)
impervious area
(acres) *
NCC Project NCC-WAKE-2020-Holding Village South Lake Subdivision - Phase 4
Tracking ID Assignedautonatically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Spring Branch
Wate rbody* %rre of waterbody into which stornwater runoff will discharge
15b. Waterbody 27-23-4-1
Index No.* NCWaterbody Index Ninber
Stormwater rJ No
discharges will flow r- Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
F2rnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization
Legally Pesponsible Entity
Name *
HR North Lake, LLC
IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
2. First Name *
Dean
IF Corporation, enter Faegistered Agent First %rre
3. Last Name*
Barberree
IF Corporation, enter F;bgistered Agent Last %ne
3b. Title
Registered Agent
4. Permitee E-mail dean@readercommunities.com
Address*
5. Permittee 407-402-5588
Telephone No.*
6. Permittee Mailing Street Address
Address* 5850 T G Lee Boulevard
Address Line 2
Suite 200
City State / Frovince / Pegion
Orlando FL
Fbstal / Zip Code Country
32822 us
Check box if the F Yes
street address the
same as mailing
address
7. Permittee Street
Street Address
Address*
5850 T G Lee Boulevard
Address Line 2
Suite 200
City
State / Frovince / Region
Orlando
FL
Fbstal / Zip Code
Country
32822
us
8. Type of
Non -Government
Ownership
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
Scott
Contact - First
Name *
2. Primary Site
Lay
Contact - Last
Name *
3. Title
Senior Vice President
4. Site Contact E-
scott@readercommunities.com
mail Address*
5. Site Contact
919-706-9397
Telephone No.
6. Organization
Reader Partners, LLC
Name
7. Site Contact
Street Address
Mailing Address*
8480 Honeycutt Road Suite 200
Address Line 2
city
Raleigh
Fbstal / Zip Code
27615
8. Consultant Name
(Optional)
Jeremy Finch
First and Last nacre
9. Consultant E-mail
jfinch@mcadamsco.com
This person will be copied on all correspondence.
10. Consultant
9193615000
Telephone No.
State / Rovince / Region
NC
Country
us
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 08/25/2020
Approved *
2. E&SC Plan Project 2020-00000127
Number/ID * Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by* r Local Program
4. Local Program* Town of Wake Forest
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project or
include the beginning point and end point coordinates in the "Notes" box below.
5. E&SC Plan Holding Village Ph 4 ESC Approval Rev.pdf 88.56KB
Approval letter or Mast beRDFfornat
Grading Permit
6. Site Location Map Helpful for linear project review
(Optional) South LakesPH4Vicin ity. pdf 41.9KB
Mast be RDFfornat. Rease do not upload entire set of E&SCplans.
7. Notes (Optional) Rovide any additional information that night help the reviewer better understand how uploaded docurrents support
the application. Include additional waterbodies for linear projects if necessary.
8. NOI Certification Holding Village South Lake Phase 4 NCG01.pdf 89.32KB
Form Wst be RDFforrret
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.66 (1) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the
Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit. I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* 17 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
ff�
r�i'a' ff f.I t. &-t t{2''
Type Name* Dean Barberree
Title Registered Agent
Organization Legally Ibsponsible Entity
HR Northlake, LLC
Date * 08/25/2020
F. Tracking and COC Info
NOI Tracking No. 30411
NC Reference No.
NCG01-2020-3718
Uses 'count_nurrber' variable (increrrented by SP)
Certificate of
NCC203718
Coverage (COC)
Uses 'count_nurrber' variable (increrrented by SP)
No.*
Count Number 3718
Sequential nurrber for subrrittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)
Initial Invoice No. NCC203718-2020
Invoice Due Date 9/25/2020
Initial Fee $ 100.00
Invoice Status OPEN