Loading...
HomeMy WebLinkAboutWQ0041899_Application (FTSE)_20200827CIVIL ENGINEERING DESIGN & LAND SURVEYING � 8720 RED OAK BOULEVARD, STE. 420 CHARLOTTE, N.C. 28217 PHONE (704) 527-3440 FAX (704) 527-8335 TO NCDEQ - Mooresville Regional Office 610 East Center Avenue, Ste 301 Mooresville, NC 28115 WE ARE SENDING YOUn Attached ❑ Shop drawings ❑ Prints ❑ Copy of letter ❑ Disk DATE: 06/10/20 JOB NUMBER: 19092 ATTENTION: Water Quality Section `:. RE: Torrence Ford Development E ❑ Under Separate cover via ❑ Plans MOO F [WSVILLE RED' DNAL OFFICE the following ite s: ❑ Applications ❑Specification COPIES DATE NO. DESCRIPTION 2 Original plus one copy of following documents -Cover letter -$480.00 check for review fees ?a -Completed FTA Application -Flow Tracking Form (FTSE) ' ORO -14 -USGS map .. v RESVILLF REGI`C)NAI, ` -Street level map -Developers operational agreement form THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved and submitted ❑ Resubmit ❑ For your use ❑ Approved as noted ❑ Submit n As requested ❑ Returned for corrections ❑ Return ❑ For review and comment ❑ REMARKS copies for approval copies for distribution corrected prints Enclosed find the items listed above necessary for your review and approval of a private sewer extension to serve the Torrence Ford Development in Huntersville, North Carolina. Please contact me at 704.227.9402 or bcowan@isaacsgrp.com should you have any questions or need any add'I information. COPY TO SIGNED Anthony Newsome EM W SC) , I-VQ CIVIL ENGINEERING DESIGN & LAND SURVEYING 8720 RED OAK BOULEVARD, STE. 420 CHARLOTTE, N.C. 28217 PHONE (704) 527-3440 FAX (704) 527-8335 Project Narrative NorthTorrence Ford Development Buildings I & 2 • kAKII OS AUG2Q�f WQ VII0 O RESVIL LE RFGIONAL. The project site is in the Town of Huntersville, Mecklenburg County, N.C. and is an approximate 28.37-acre parcel located at the dead-end of Torrence Ford Drive (10028 and 10036 Torrence Ford Drive) and bordered on the west by Interstate 77. The proposed development will be constructed in two phases and consists of two commercial buildings on two separate lots. Sewer flow to be generated by this project is 12,350 GPD (310 employees x 25 gpd + 46 loading dock bays x 100 gpd). The sewer collection system within the project site will be provided by a series of 8-inch gravity lines owned and maintained by Scannell Properties, LLC. The proposed sewer system will tie into existing downstream 18-inch sewer lines owned by Charlotte Water and will be treated at McDowell Creek WWTP (WWTP NC0036277), which is owned by City of Charlotte. Included with the application package is one original and one copy of the Fast Track Sewer System Extension Application form FTA 04-16 and supporting documents, $480 Application Fee payable to NCDEQ, Flow Tracking/Acceptance Form from Charlotte Water, USGS Topographic Site Map, and Developer's Operational Agreement. State of North Carolina Department of Environmental Quality DWI R Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: Q1U'y_ �I 4�, (to becompleted by l)WR) (.i R �. All items must be completed or the application will be returned J I. APPLICANT INFORMATION: , I. Applicant's name: Scannell Properties #410, LLC(company,municipality,HOA utilit etc.)s'' pp � Y� 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name: Amanda Henry per 15A NCAC 02T .0106(b) Title: Senior Development Assocaite Ft I V E FD iN(,D E iVR/D� WR 4. Applicant's mailing address: 1800 Diagonal Road, Suite 600 AUG 112020 City: Alexandria State: VA Zip: 22314- wr=`,sHi 5. Applicant's contact information: MOOV� r,"VII_% �: PF,_ j!0NAI 0FF1C Phone number: (571) 527-1644 Email Address: amandah a,scannellproperties.com II. PROJECT INFORMATION: 1. Project name: Torrence Ford Develoment 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing pen -nit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.395699' Longitude:-80.856182' 5. Parcel ID (if applicable): 01719102 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Anthony Brent Cowan, PE License Number: 026462 Firm: The Isaacs Group, PC Mailing address: 8720 Red Oak Blvd., Suite 420 City: Charlotte State: NC Zip: 28217- Phone number: (704) 887-6582 Email Address: bcowan Laisaacs-orp.coni IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMMATION: 1. Facility Name: McDowell Creek Permit Number: NCO036277 Owner Name: City of Charlotte V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): I. Permit Number(s): WQ Downstream (Receiving) Sewer Size: 18 inch Svstetn Wide Collection System Permit NumberUs f - able): WQCS Owner Name(s): Charlotte Water FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached'? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ® Yes ❑No ❑N/A 3. If the Applicant is a Homell'roperty Owners' Associationhas an Operational Agreement (FORM: IIOA) been attached? ❑ Yes ❑No ❑N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ® Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: % Domestic/Commercial 100 % Commercial % Industrial (See 15A NCAC 02T .0103(20)) "Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ®No If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.01140 Daily Design Flow No. of Units Flow Office (310 employees) 25 gal/day 310 7750 GPD Warehouse (46 loading bays) 100 gal/day 46 4600 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 12,350 GPD a See 15A NCAC 02T .0 1 14(b)_ (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 12350 GPD (per 15A NCAC 02T .0114) a Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Paae 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & IIDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 130 PVC ➢ Section 1I & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: ° Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(i 1): ❑ Standby power source or pump with automatic activation and telemetry -15A NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ® Yes ❑ No ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any buildin foundation 5 feet Any basement 10 feet Top sloe of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 021.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface `eater Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ®Yes ❑ No [:]N/A ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ❑ No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Pennitting_Branch 5. Does project comply with 15A NCAC 02T.0105 c 6) (additional pernits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stornwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. [:]Yes ® No ❑ N/A If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System-IvVide Collection permit. FORM: FTA 04-16 Pa.-e 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ►1 ■ If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: that this application for Engineer's name from Application Item III.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date:�"$'g b®� �a®®oo Q®® g Sz_ 03 D 026462 t R, ® ..... ........... ®��............. .e..�.......�� 3. Applicant's Certification per 15ANCACO2T.0106(b): ��titttt Amanda Henry, Senior Development Associate attest that this application for (Signature Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. ��_p1�2020 Signature: .��.�" d /f�' ` " , �%*= � Dates" FORM: FTA 04-16 Page 5 of 5 STATE OF NORTH CAROLINA A COUNTY OF Mecklenburg Permit No, lipW oo ll i m DEVELOPER'S OPERATIONAL AGREEMENT This AGREEMENT made pursuant to G.S. 143-215.1 (d1) and entered into this day of , by and between the North Carolina Environmental Management Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and Scannell Properties #410, LLC , a corporation/general partnership registered/licensed to do business in the State of North Carolina, hereinafter known as the DEVELOPER. WITNESSETH: 1. The DEVELOPER is the owner of the certain lands lying in Mecklenburg County, upon which it is erecting and will erect dwelling units and other improvements, said development to beknown as Torrence Ford Development (hereinafter the Development). 2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve the Development on said lands. 3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143- 215.1 to construct, maintain, and operate the Disposal System. 4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter 47C or 47F of the North Carolina General Statutes. 5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the Declaration, (hereinafter Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State of North Carolina, for the purpose, among others, of handling the property, affairs and business of the Development; of operating, maintaining, re -constructing and repairing the common elements of the lands and improvements subject to unit ownership, including the Disposal System; and of collecting dues and assessments to provide funds for such operation, maintenance, re -construction and repair. 6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance with law and permit provisions in order to protect the quality of the waters of the State and the public interest therein. NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows: 1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions andlaw. 2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association until construction has been completed in accordance with the permit and approved plans, and the staff of the Division of Water Resources has inspected and approved of the facilities. In order to change the name of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The request must include a copy of the Association Bylaws and Declaration. 3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's successor. FORM: DEV 03-19 Page 1 of 2 4. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and appurtenances thereto are part of the common elements and shall thereafter be properly maintained and operated in conformity with law and the provisions of the permit for construction, operation, repair, and maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater treatment, collection and disposal system as a common element which will receive the highest priority for expenditures by the Association except for Federal, State, and local taxes and insurance. 5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will be maintained out of the common expenses. In order to assure that there shall be funds readily available to repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses, the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses. Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part of the yearly budget. 6. In the event the common expense allocation and separate fund are not adequate for the construction, repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any time. 7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city, town, village, county, water and sewer authorities, or other unit of government shall hereinafter become available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the existing and future wastewater of the Development to be accepted and discharged into said governmental system, and shall convey or transfer as much of the Disposal System and such necessary easements as the governmental unit mayrequire as condition of accepting the Development's wastewater. 8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for the Association to enter into voluntary dissolution without having made adequate provision for the continued proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the Association Bylaws that the Association shall not enter into voluntary dissolution without first having transferred its said system and facilities to some person, corporation or other entity acceptable to and approved by the COMMISSION by the issuance of apermit. 9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and operation of the Disposal System. 10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the Association. IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized representative of the parties hereto on the day and year written as indicated by each of the parties named below: FOR THE ENVIRONMENTAL MANAGEMENT COMMISSION Linda Culpepper Director, Division of Water Resources (Date) Scannell Properties #410, LLC NameofDEVELOPER (Signature) Amanda Henry, Senior Development Associate Print Name and Title (Date) FORM: DEV 03-19 Page 2 of 2 State of North Carolina Department of Environmental Quality Division of Water Resources z z �, Flow Tracking for Sewer Extension Applications p (FTSE 10-18) Entity Requesting Allocation: Scannell Properties Project Name for which flow is being requested: Torrence Ford Development More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McDowell Creek WWTP b. WWTP Facility Permit #: N00036277 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 12.0 .384 5.125 0.01235 5.5 45.9 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / p f), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Torrence Creek Outfall Downstream Permit Number: Unknown Page 1 of 6 FTSE 10- 18 III. Certification Statement: certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Chief Engineer Title of Signing Official Date Page 2 of 6 FTSE 10-1 S State of North Carolina Department of Environmental Quality Division of Water Resources Flow 'Fracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Scannell Properties Project Name for which flow is being requested: Torrence Ford Development More than one FTSE may be required.for a single project if the owner of the WWTP is not responsible for rrll pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McDowell Creek WWTP b. WWTP Facility Permit If: Nco036277 Allflows are in MGD c. WWTP facility's permitted flow 12.0 d. Estimated obligated flow not yet tributary to the WWTP .384 e. WWTP facility's actual avg. flow 5.125 f. Total flow for this specific request 0.01235 g. Total actual and obligated flows to the facility 5.5 h. Percent of permitted flow used 45.9 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (I3) (C) (I))=(13-1-C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / po, Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum I)esign Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Torrence Creek Outfall Downstream Permit Number: Unknown Page 1 of 6 FTS 10-18 III. Certification Statement: I Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and 11 plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Chief Engineer Title of'Signing Official 5/4/2020 Date Page 2 of 6 J If 444 � ( } - ! £ it ; � = s 11 r. r i � $i # £ Y ""At 3 A .- '� a. 7�€FAY a r� t �' { {F i '`��``?;d' ,-`-d w�k„� ,��--"'�--_ r• "`z a ,1 ?- `` aok, Zit' . f � d � � �c 1� �2', S. � �£� •.; £� 4 £� £ f � �Y Y �``" a ^.f •� � �a 4i� - � � � � � - ! t fi % A 4 '_ MAN i� 4 1 b t ry 5� ,� � f f � - � ! ' � � x �_ •a "� a ,e �. a � # fj I z 1 ayTs het r `.t �1, J i i �LL _ •; }{ ., " # € t•" _j # AA ri ° #ix M Ell ANT 15 wd( If # . p f =s "y e £ 'r -� i ! s £ Y �'4..•r= 3 ORNE'bE rOR6J f y 1 �Fa DEVELOPMENT ft�ft 11 a Polaris 3G Map — MecklenburgCounty, North Carolina Torrence Ford Development Date Printed: 6/10/2020 8:54:09 AM its map or report is prepared for the inventory of real property within McMent)urg county ana is compiled from recoraea aeeas, plats, tax maps, surveys, animetric maps, and other public records and data. Users of this map or report are hereby notified that the aforementioned public primary information sources could be consulted for verification. Mecklenburg County and its mapping contractors assume no legal responsibility for the information contained herein. North Carolina Secretary of State Search Results Page 1 of 2 • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online Add Entity to My Email Notification List • View Filings • Print a Pre -Populated Annual Report form Legal Name Scannell Properties #410, LLC Sosld: 1909232 Status: Current -Active O Date Formed: 10/24/2019 Citizenship: Foreign State of Incorporation: IN Annual Report Due Date: April 15th CurrentAnnual Report Status: Registered Agent: COGENCY GLOBAL INC. Reg Office Reg Mailing 212 South Tryon Street Suite 1000 212 South Tryon Street Suite 1000 Charlotte, NC 28281 Charlotte, NC 28281 Mailing 8801 River Crossing Boulevard, Suite 300 Indianapolis, IN 46240 Principal Office 8801 River Crossing Boulevard, Suite 300 Indianapolis, IN 46240 All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Manager James C. Carlino 8801 River Crossing Boulevard, Suite 300 Indianapolis IN 46240 Manager Marc D. Pfleging 8801 River Crossing Boulevard, Suite 300 Indianapolis IN 46240 https://www.sosnc.gov/online_services/search/Business Registration _Results 8/13/2020 North Carolina Secretary of State Search Results Page 2 of 2 Manager Robert J Scannell 8801 River Crossing Blvd STE 300 Indianapolis IN 46240 Douglas L Snyder 8801 River Crossing Blvd STE 300 Indianapolis IN 46240 Manager Ralph I. Shiley 8801 River Crossing Boulevard, Suite 300 Indianapolis IN 46240 httpsJ/www.sosnc.gov/online__services/search/I3usiness_Registration _Results 8/13/2020