Loading...
HomeMy WebLinkAboutNC0062278_additional information received_20200827c STONETOWN MEMO: REGIONAL SEWER CONNECTION INVESTIGATION Stonetown Berkley Oaks, LLC Permit NC0062278 Stonetown Berkley Oaks, LLC Contact: Colin Sidey Analyst 303-407-3013 cs@stonetowncapital.com Two Rivers Utilities (Gastonia) Contact: Mike Bynum Water Sewer Engineer 704-886-6827 mikeb@tworiversutilities.com Two Rivers Utilities manages the water and sewer operations for the corridor along US Hwy 321 from Gastonia, NC to Clover, SC. The utility currently uses sewer lines to the west along Crowders Creek Rd. A sewer line near the property runs near the intersections of Chapel Grove School Rd and Crowders Creek Rd. it's possible to construct a 2,500' extension to tap into the Two Rivers Utilities System near that intersection (map included). There are no current plans by the utility to expand service in the basin. However, the utility communicated that the construction of a sewer line satisfying city requirements would enable them to take over service of the line. An effluent meter would be used for billing purposes. To this end, an engineer and contractors would need to be hired for the work; all provided by Stonetown Berkley Oaks, LLC. Presuming that easements could be obtained for the sewer line, we estimate this expense to be $603,888. Linear Feet 2500 Pipe Size 8 Cost per inch*foot $23 $460,000 Easements $100,000 Manholes $10,000 Tap Fee $13,888 Engineer $20,000 $143,888 720 S. Colorado Blvd, Suite 1150-N, Glendale, CO 80246 — 303-407-3000