Loading...
HomeMy WebLinkAboutSW3200701_Add Info Request2_20200731ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality August 12, 2020 Brian LaFranchi, PE Dewberry Engineers Inc. 9300 Harris Corners Parkway, Suite 220 Charlotte, NC 28269 Subject: Request for Additional Information Stormwater Permit No. SW3200701 Prescot Village — Phase I Union County Dear Mr. LaFranchi: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on July 2, 2020 and additional information on August 6, 2020. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The drawdown calculations appear to be incorrect. Using the calculation method in Part B of the Stormwater Design Manual, the average flow rate is larger than shown in the calculations (approximately 0.198 cfs vs. 0.167 cfs). This results in a drawdown time less than two days. Please revise the design to ensure that the wet pond drain time is between 2-5 days. 2. The easement shown on the submitted plat does not include the SCM. In accordance with General MDC 9, the SCM and associated maintenance access must be within the permanent easement. 3. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Please only submit those plan sheets which have been revised as a result of these comments. Pdfs must be uploaded using the form at: https:Hedocs.deq.nc.gov/Fonns/SW ProjectSubmittal Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to September 11, 2020, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW3200701 on all correspondence. D E Qbi�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 vOry rN Cx:40:.itiA � o .—Io E�.w��,�.���a�:r� /� 919.707.9200 If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Corey.Anen(ibncdenr.gov or (919) 707-3649. Please note that due to the ongoing Covid-19 pandemic, I will be teleworking and will be most easily reached by email. Sincerely, Steven C. Anen, PE Environmental Engineer Stormwater Program cc: Mooresville Regional Office