HomeMy WebLinkAboutNC0003573_tax certification request_20200527TCN:
This application is to be used only for waste treatment systems and equipment Rev.
under the authori of the NC Division of Water Resources (DWR) 01/29/2016
DIRECTIONS: Complete and mail signed copies of the application form and all supporting information to both: 1) the County Tax Administrator for the County in which the facility is located (one copy)
AND 2) to the NC Division of Water Resources, Surface Water Protection Section, 1617 Mail Service Center, Raleigh, NC 27699-1617 (two copies). Type or print in blue or black ink. A separate
application package is required for each facility where property proposed for tax certification is located.
THIS APPLICATION WILL NOT BE PROCESSED WITHOUT COMPLETE AND ACCURATE INFORMATION. If you have any questions regarding this application, please call the local tax office or the
NC Division of Water Resources at 919/807-6300 ortheir web site at htt s://ox.de rod.nc. ov/about/divisions/water-resources/water-resources- ermits/wastewater-branchin des-wastewaterftax-
certification for more specific contact information.
Please Note:
a) Tax Certifications will only be processed for facilities under the authority of the DWR and only if the DWR has found that the described property:
1. Has been or will be constructed or installed;
2. Complies with or that plans therefore which have been submitted to the DWR indicate that it will comply with the requirements of the Environmental Management Commission;
3. Is being effectively operated or will, when completed, be required to operate in accordance with the terms and conditions of the permit, certificate of approval, or other document of approval
issued by the DWR; and
4. Has or, when completed, will have as its PRIMARY rather than incidental purpose the reduction of water pollution;
5, is being used exclusively (100%) for waste treatment.
b) If approved, the Tax Certification issued will incorporate all requested assets at the facility that meet the criteria for Tax Certification by DWR. Therefore this application must include any new assets
for which Tax Certification is being requested, as well as any assets previously receiving Tax Certification from DWR for which Tax Certification is still nPMf-ri_
A. Applicant (Applicant is the owner of and taxpayer fo
Name of Applicant: The Chemours Company FC, LLC
Address of Applicant, if different from facility where property located:
Same
(address) (city)
Business Relationship of Applicant to facility where property located:
)Fayetteville Works Plant Manager
Does the Applicant hold any NC Division of Water Resources Permits?
® Yes / ❑ No
If yes, please list
described in this a lieation for tax certification.)
Name of Facility:
The Chemours Company — Fayetteville Works
Facility ID: 900009
If approved, will this be the first Tax Certification issued for this Facility?
❑ Yes /®No
B. Complete this Section only if the
Name of Operator/User.
Operator/User Address:
(address)
Opemtor/User Contact Name:
of the facility and
and
Physical Address of Facility where property located (no P.O. Box):
22828 NC Hwy 87 West Fayetteville 28308
(zip) I (street address)
where property located:
Name of Contact Person at Facility where property located:
Brian D. Long
Title: Plant
If no, attach any previously issued
tax certifications
lent is different from the Owner of the
(city)
(city) (zip)
cone Nmnber: 910.678.1.213
(zip)
***ATTACH A PROCESS SCHEMATIC TO YOUR APPLICATION The number of each item for which Tax Certification is being requested must be shown on the schematic' Application continues on
Next page
DIVISION OF WATER RESOURCES TAX CERTIFICATION & EXEMPTION APPLICATION
Waste Treatment Systems & Equipment: Waste treatment systems & equipment must be used exclusively for the abatement of water pollution
Description of Waste Treatment Systems or Equipment
Pump Upgrades-Praftastar pump Impellers andaeration for wasta
lab L Ji Let, Sump Systan Installation. nowsup and dralnegosystemfor environmental
Nation cooling Waier Chanel -The Cooling WatarChmral centainswls and
athat agl be temaved as part of this program. In addition the plan Is to dev2tar the
IZoroto reellnectwatar Low requiring cutting endewrawrd M(infitraffnIfrom the
the depth Was Increased reducing =fNe area and basin gningwas
Attach additional pages If necessary
Was asset listed in Asset Number,
the permit (yeslNo) Vehicle Identification
' Number (VIN)
PAGE 2
Rev. 09101=13
% of time item is
How is this equipment used for pollution abatement?
used for pollution
Year of
tall glnal Historical
Is this asset
abatement
Acquisition
Cost"
replacing a prior
asset?
The Aeratlon pump is imderstred D[sing peskpedode, ff one pump mallunctlon, waste
treatmemwergd be Ilmled Ic the capacity Crime pump• one of the two pre -Digester
pumplmpellers has been Increased in sbe to boastcapaelny, The sister pump hasthe
smaller ImpellersWch Ilmft tleablIty and capachyll the other pump farm ae she etthe
Impollerso both pumps macra h. The pacity and BeXIblydygaln wa aliowthe Proeoss to
I
az; rep[ec!ment And
6o run wipr one ndudn eak 'ods.
100%
20f
AO 19B
erparmon 10 aeasl
Thl.prelectwlil Install anew sump and drainage s"llorthe Cell tab, The system veil
c
Incur al appraprlate Plphg, them. moniredng, And materials to meet ar coned
c
envlronmemai ra ulatlens
to
2019
195,010
No
To removesolLs and sed[motrts that may wrrtaln elevated concentratlons of PFAS
corrsilfuenis and line tho dlkh so that waterne longer Infiltrates Into the Perched Zone
belevr.
Te gee the basins to tad og the iaRladon ofwabr INa the PamMtl Zone, welch wgapow
t00%
2019
667570
No
Rx a more et8cleni tlev2[emtg otthe PerchedZone and r1n o8 tiowin lower water -
hearing oohs and the rivet
100%
2018
1,340238
No
i
If the asset is listed in the DWQ permit, the description must be Identical as listed on the current permit If the asset is not specifically listed In the DWA permit, the applicant must attach detailed intonnation as to why the asset should quality, for Tax Certification.
— When certifying systems or equipment, DENR is not certifying the cost of the equipment or the year of acquisition.
Facilities: To qualify for tax certification, the building or section of building being applied for, must be used exclusively for water pollution prevention. A sketch of the building, square footage along with details
as to how the building is used for water pollution prevention, is required.
Land: To qualify for tax certification, the land must be used exclusively for water pollution prevention. A schematic diagram of the facility detailing the land being applied for is required. The amount of land
(acreage) is required and how this land is being used to prevent water pollution. For wastewater treatment and irrigation system list separately the acreage used for actual treatment from the acreage required by
the facilitys water quality permit for buffers and setbacks.
SIGNATURE:
I hereby certify that the bove equipment, facilities and/or , nd are used for the purpose stated, and that the information
equipment listed on th' application will be used explusiv ly in the state of North Carolina.
Applicant
presented in this application is accurate. Furthermore, I certify that any portable or mobile
Signature:_Title:/
_,,1//
NOTICE: They penalty for false statement represen 'on or ce ' cation (print name also) Of. t � ity e (iC /� s —
herein includes imprisonment and / orthe assessment of civil penalties. a,___
Date; S /
i
Tc.Wo
WQ - Line #1 - WWT Aeration Pump Upgrades
P-1524
Chemours — Fayetteville — Water Pollution Control Applications
Aeration Pump Upgrades
COD # 10394436
Project # P-1524
Purpose / Description:
Purpose: The Aeration pump is undersized. During peak periods, if one
pump malfunction, waste treatment would be limited to the capacity of one
pump. One of the two Pre -Digester pump impellers has been increased in
size to boost capacity. The sister pump has the smaller impeller which
limits flexibility and capacity if the other pump fails.
Description: Increase the size of the impeller so both pumps match. The
capacity and flexibility gain will allow the process to be run with one pump
during peak periods.
The following documents are en ig neered sketches used to complete prescribed
r
i
P:�t _
WQ - Line #2 - CSL Lab -Cell Sump System
P-2821
Chemours — Fayetteville — Water Quality Pollution Control Applications
Installation of Cell Lab Sump System
COD # 10779741
Project # P-2821
Purpose / Description:
Purpose: Previously, process water from the Cell Lab Area was sent to a sewer hub
outside the northwest corner of the building. From the sewer hub, the process water was
sent to the Waste Treatment Plant for disposal. Process Waste from the Cell Lab (Cell
Tables and Lab sinks) can no longer be processed through the WTP, and must be
captured for alternative disposal. This project will propose an alternate method and route
for handling process streams coming from the Cell Lab.
Description: This project will install a new sump and drainage system for the Cell Lab. The
system will include all appropriate piping, liners, monitoring, and materials to meet or
exceed environmental regulations.
Mechanical Scope:
-Complete ground survey of excavation areas, needs to be done before project work can
be completed
-Excavate for new pit, trenching, new piping, and any new supports for piping run to the
waste tank farm.
-Install all new trench with internal pipe to all drain locations.
-Pour new concrete pit
-Pour Base for Pumps
-Install new HDPE tank
-Install Piping to new tank
-Install primary and spare pump
-Install pipe supports for piping run to waste tank farm
-Install new nozzle on Alkaline Waste Tank
-install piping run from the tank to the waste tank farm
-Insulate exposed piping
-Install grating over tank/pit
-Install roof over salt tote area dike
-Backfill any underground piping (structural fill)
-Pour concrete for piping and building
-Retile lab (epoxy welded flooring, talk to K. Smith)
-Abandon or remove all old piping and equipment as appropriate per regulations.
Aerial View with Callouts:
I
WQ - Line #3 - Mon - Ln Nafion Cooling Water Chanel
P-2879
Chemours — Fayetteville — Water Quality Pollution Control Applications
10802566-Mon-Ln Nafion Cooling Water Channel; P-2879
Purpose / Description:
Purpose: Approximately S to 10 million gallons of cooling water is run through the
Cooling Water Channel each day. This water ultimately makes its way through the 002
Outfall. This water is non -contact cooling water that is extracted from the Cape Fear
River upstream of the site, then run through cooling systems in the process plant before
being discharged into the ditch. Currently, all pipes and discharges of anything other
than non -contact cooling water and stormwater are permanently cut off from the
channel.
The Cooling Water Channel contains soils and sediments that will be removed as part of
this program. Additionally, because the bottom and sidewalls of the ditch are earthen
(and based on piezometric mapping), water flow in the ditch infiltrates into the lower
Perched Zone, causing water to build up and flow toward lower water -bearing zones. It
is our goal to dewater the Perched Zone of water to the point where it can no longer
flow toward lower water zones. This requires cutting off downward flow (infiltration)
from the Cooling Water Channel. Therefore, the purpose of this project is to remove
soils and sediments that may contain elevated concentrations of PFAS constituents and
line the ditch so that water no longer infiltrates into the Perched Zone below.
Description: To properly address the infiltration issues the channel was broken down
into two sections (1. North / West & East /South Channels). I've provided specifics
related to each section
North / West Channels:
Using an engineered approach, a system of excavation and a series of engineered linings
was utilized. To begin this process the bottom and sidewalls of the channel were
excavated to a predetermined depth and width. Once the proper dimensions and
elevation/slope was achieved a sequence of linings was applied. Lining material utilized
in order were, Geosynthetic Clay Liner, Compacted Soil, Geotextile and Grout filled
Revetment Mat.
East / South Channels:
Just as for the north and west channels an engineered approached was used for
determining the best method to address the issue at hand. Channel bottom and
sidewalls were excavated to a predetermined depth and slope. Once this was achieved
preparation begin for so that a series of linings could be applied, The following lining
sequence was executed with pre -cast concrete sections of channel added. These
concrete sections are configured in a way that accepts non -contact cooling water from
process unit and rain water runoff.
The following documents are engineered sketches used to complete prescribed work.
Aerial Veiw of Nafion North-West Lining East -South Lining
with Callouts.pptx Details.pdf Details.pdf
Aerial View of Nafion with Callouts
Mk-
r-
f.r
R
17;�jjjjijjjjRP"!'j
�J I
1 -7—
�1.
�' - "ZcY�,. ma's° : •- - '_
Manila r�> 'y#
Ir AL6k-,
.�S
1�
f
�
Jw-
T
1
is
. . . . . . . . . . . . . .
•21�,
u =.
i)w t
eW
ICP
Fine, - ra1
11i� rta•.. 1 �v!'"
}
i�
}h
k
a
i
Ii a
�,�\ � �'y'` �:,����� �.. '�:a����'•� _;:_��.��'� tide
;41i
WQ - Line #4 - PWT-Ln Sediment Basins
P-3071
Chemours — Fayetteville — Water Quality Pollution Control Applications
10853891-PWT-Ln Sediment Basins - P3071 - Sediment Basin Lining:
Purpose: The sediment basins contain sediments dropped out of the river water that is
brought into the site as a cooling water and process water source. The river intake
pumps bring in sediment along with water. The sediment is allowed to settle out and is
deposited as a slurry into the basin impoundments. Water content in the sediments
remains elevated and is allowed to infiltrate into the Perched Zone because the basins
are unlined, earthen impoundments.
Because our conceptual model shows that the Perched Zone is artificially filled with
water infiltrating from the Cooling Water Channel and the sediment basin
impoundments, the goal of this program is to line the basins to cut off the infiltration of
water into the Perched Zone, which will allow for a more efficient dewatering of the
Perched Zone and cut off flow to lower water -bearing units and the river.
Description: To properly address the infiltration issues the overall basin design was re-
evaluated. While maintaining basin capacity the overall footprint was reduced. This was
accomplished by increasing depth while reducing the amount of surface area. Basin
lining was executed in two phases starting with the south basin. Once complete, south
basin was placed in service then the north basin was shut down and lining activities
executed. Basins were engineered to accept a series of linings along with a re-
configuration of the over flow discharge box. Engineered sketches are attached.
Basin Design: Using an engineered approach, a system of excavation and a series of
engineered linings was utilized. To begin this process the bottom and sidewalls of the
basins were excavated to a predetermined depth and width. Once the proper
dimensions and elevation/slope was achieved a sequence of linings was applied. Lining
material utilized in order were, Geocomposite Vent Layer, Geosynthetic Clay Liner,
Geomembrane Layer, Non -Woven Geotextile Layer, 12" of compacted soil, Non -Woven
Geotextile Layer, 6" layer of Concrete (Bottom) or Grout filled Revetment Mat (Sloped
Sides).
The following documents are engineered sketches used to complete prescribed work
and pics as the work was being performed.
El H
Aerial Veiw of Nafion Basin Lining
with Callouts.pptx Details.pdf
Aerial View of Nafion with Callouts:
S�l��t�crit Basins
vY:�r!_{f a.aXr•�•l/ �.`►�i ...�i L. 1 � !: �v. r
c`11_I_ w •
•sir �-:'�,�r�_ _'��`�{"� _ r�s�- �-�, - -
_ a •4 *—:�� � arm' � �` _ . _
_ w•;�` - "� r. _ ^�,iF .�-� .. - - - � - _ _, - Jv� � dam.-'��. �✓��;.,
M
r _ f
. r
i
r, � I
a:=..-
� M
r ,i„ ` ��
'r.
lilm
y