Loading...
HomeMy WebLinkAboutNC0021873_Pretreatment Compliance Inspection Report - NOD-2020-PC-0435_20200826ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality August 26, 2020 Nadine Blackwell, Pretreatment Coordinator P.O. Box 1279 Clemmons, NC 2012 SUBJECT: Pretreatment Compliance Inspection Report and Notice of Deficiency NOD Tracking #NOD-2020-PC-0435 Town of Mayodan NPDES# NCO021873 Rockingham County Dear Ms. Blackwell: On August 18, 2020, Paul DiMatteo of the Division of Water Resources Winston-Salem Regional Office conducted a Pretreatment Compliance Inspection at the above referenced wastewater treatment system. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which included: reviewing the files, POTW plant performance, sampling and compliance judgement program, and adherence to the enforcement response plan (ERP). Background The Town operates one 2.5 MGD facility and has 3 significant industrial users (SIUs), of which is categorical. POTW Interview The WWTP has not had any recent NPDES limits violations. Ms. Blackwell reported difficulty with Strum Ruger (IUP#109) properly submitting reports and conducting required sampling, leading to Significant Noncompliance. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted on September 25, 2015 and approved on December 7, 2015. The next HWA is due on September 30, 2020. The Town's last Industrial Waste Survey (IWS) was submitted on September 28, 2018 and was approved on January 8, 2019. The next IWS is due October 1, 2023. The last Long Term Monitoring Plan (LTMP) for was submitted on March 22, 2017 and approved on June 14, 2017. D � North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office [ 450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 NOh �HCARO UHA ^^ •^ �ku^m I u�•i` r 336.776.9800 The Sewer Use Ordinance (SUO) was approved on December 14, 2012. The ERP was approved on December 27, 2012. LTMP Review The LTMP is being conducted at the proper locations and frequencies. Industrial User Permit (IUP) File Review A review of the files for Sans Technical (4108), Unifi (4105) and Strum, Ruger & Co (#109) revealed that monitoring data was well organized and the slug control plans were in good order. However, it was noted that the POTW failed to independently measure flow when conducting its routine sampling as required in the IUPs. The inspector discussed options for measuring flow with the operators during the inspection. The inspector also noted that, while Strum, Ruger & Co was in significant noncompliance for the first semiannual period in 2019 for failure to adequately conduct required monitoring and submit reports, the POTW did not take action on this violation until nearly 8 months after the end of that period in February, 2020. POTW should ensure that the time frames specified in the ERP are followed when taking action on violations. Conclusion The issues noted above have collectively resulted in the issuance of this Notice of Deficiency. Proper procedures were discussed with operators during the inspection. A formal response to this letter is not required. If you should have any questions, please do not hesitate to contact Paul DiMatteo at (336) 776-9691 or our office at (336) 776-9800. Sincerely, Docu Siiggned by: L0� l t�Hl�tl 145B49E225C94EA... Lon T. Snider., Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office Division of Water Resources, NCDEQ Enclosures — PCI Report CC: DWR Laserfiche Files NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Water Resources ENVIRONMENTAL QUALITY BACKGROUND INFORMATION 1ComDlete Prior To PCI: Review ProLyram Info Database Sheets 1. Control Authority (POTW) Name: _Maw 2. Control Authority Representative(s): Nadine Blackwell 3. Title(s): Pretreatment Coordinator 4. Last Inspection Date: 06/11/2018 Inspection Type (Check One): ® PCI ❑ Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO Order Type, Number, Parameters: ICIS CODING Main Program Permit Number I N I C 1 0 10 121 1181713 MM/DD/YY Are Milestone Dates Being Met? ❑ YES ❑ NO 7. Current Number Of Significant Industrial Users (SIUs)? 3 8. Number of SIUs With No IUP, or With an Expired IUP? 0 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 1 13. Number of SIUs in SNC with Pretreatment Schedule? 0 14. Number of SIUs on Schedules? 0 15. Current Number Of Categorical Industrial Users CIUs ? 1 16. Number of CIUs in SNC? 1 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during SNC for either of the Last 2 Semi -Annual Periods? Not Been Published for SNC for Public Notice?(May refer to PAR if Excessive SIUs in SNC) Not Pul PAR) 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? []YES ® NO ❑ YES ❑ NO Limits: 0 Reporting: 1 Ilished: I (to be published by next None ❑ YES ® NO LTMP/STMP FILE REVIEW: NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO Division Inspector, please verify yourself! Checked 6/2020 DMR 26. IfNO to 23 - 26, list violations 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO If yes, which ones? Eliminated: Added: 8. PRETREATMENT PROGRAM ELEMENTS REVIEW- Please review POTW files, verify POTW has copy of Program Element in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 9/25/2015 ® Yes ❑ No 12/17/2015 ® Yes ❑ No 9/30/2020 Industrial Waste Survey IWS 9/28/2018 ® Yes ❑ No 1/8/2019 ® Yes ❑ No 10/1/2023 Sewer Use Ordinance SUO 12/4/2012 ® Yes ❑ No 12/14/2012 ® Yes ❑ No Enforcement Response Plan (ERP) 12/20/2012 ® Yes ❑ No 12/27/2012 ® Yes ❑ No Long Term Monitoring Plan (LTMP) 3/22/2017 ® Yes ❑ No 6/14/2017 ® Yes ❑ No NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2 INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 29. User Name 1. Sans Technical 2. Unifi 3. Strum, Ruger & Co 30. IUP Number 108 105 109 31. Does File Contain Current Permit? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 32. Permit Expiration Date 6/30/2021 6/30/2021 6/30/2021 33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A N/A N/A 433 34. Does File Contain Permit Application Completed Within One Year Prior ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No to Permit Issue Date? 35. Does File Contain an Inspection Completed Within Last Calendar Year? I ® Yes ❑ NoI ® Yes ❑ NoI ® Yes ❑ No 36. a. Does the File Contain a Slug/Spill Control Plan? a. ®Yes ❑No a. ®Yes ❑No a. ®Yes ❑No b. If No, is One Needed? (See Inspection Form from POTW) I b. [I es ❑No b. ❑Yes ❑No b. ❑Yes ❑No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ❑Yes❑NoNN/A ❑Yes❑NoNN/A ❑Yes❑NoNN/A Organic Management Plan (TOMP)? I I Sample for TTO 38. a. Does File Contain Original Permit Review Letter from the Division? a. ®Yes ❑No a. ®Yes []No a. ®Yes ❑No b. All Issues Resolved? b.❑Yes❑No®N/A b.❑Yes❑NoNN/A b.❑Yes❑No®N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete FT��7'91 ❑ Yes ®No ElYes ® No its Sampling as Required b IUP, includingflow? 1 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? ® Yes ❑ No ® Yes ❑ No 11 ® Yes ❑ No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its ®Yes❑No❑N/A ®Yes❑No❑N/A ®Yes❑No❑N/A Sampling as Required b IUP, includingflow? 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports ®Yes❑No❑N/A ®Yes❑No❑N/A ®Yes❑No❑N/A on time? 42a. For categorical IUs with Combined Wastestream Formula (CWF), does ❑Yes❑NoNN/A ❑Yes❑NoNN/A ❑Yes❑NoNN/A file include process/dilution flows as Required b IUP? 42b. For categorical IUs with Production based limits, does file include ❑Yes❑NoNN/A ❑Yes❑NoNN/A ❑Yes❑NoNN/A production rates and/or flows as Required by IUP? 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No All Limits Non -Compliance from Both POTW and SIU Sampling? 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑Yes❑NoNN/A ❑Yes❑NoNN/A ❑Yes❑NoNN/A All Reporting_Non-Compliance from SIU Sampling? 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- a.❑Yes❑NoNN/A a.❑Yes❑No®N/A a.❑Yes❑NoNN/A Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes❑No®N/A c. If applicable, Did POTW resample within 30 days of becoming aware c.❑Yes❑NoON/A c.❑Yes❑No®N/A c.❑Yes❑NoNN/A of SIU limit violations in the POTW's sampling of the SIU? 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes ® No 11 ❑ Yes ® No ❑ Yes ® No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken ❑Yes❑NoNN/A ❑Yes❑NoNN/A ❑Yes❑NoNN/A as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? 48. Does the File Contain Penalty Assessment Notices? ❑Yes❑NoNN/A ❑Yes❑NoNN/A ❑Yes❑NoNN/A 49. Does The File Contain Proof Of Penalty Collection? ❑Yes❑NoNN/A ❑Yes❑NoNN/A ❑Yes❑NoNN/A 50. a. Does the File Contain Any Current Enforcement Orders? a.❑Yes❑NoNN/A a.❑Yes❑No®N/A a.❑Yes❑NoNN/A b. Is SIU in Compliance with Order? b.❑Yes❑No®N/A b.❑Yes❑NoNN/A b.❑Yes❑No®N/A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This ❑ Yes ®No ❑ Yes ®No ElYes ® No Requested Information For You? FILE REVIEW COMMENTS: Strum, Ruger & Co was in SNC for reporting for the 1It semiannual period of 2019. However, it was noted that the violation letter was not sent until 2/2020. POTW should ensure that the timeframes specified in the approved enforcement response plan are followed when taking action on violations. During review of POTW's sampling it was noted that flow was not recorded by the POTW personnel. NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3 INDUSTRY INSPECTION ICIS CODING: Main Program Permit Number MM/DD/YY l 1. Industry Inspected: 2. Industry Address: 3. Type of Industry/Product: 4. Industry Contact: Title: Phone: Fax: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: Requirements: _Please ensure that flow is measured during regular POTW sampling, and that violations are addressed in the time frames specified in the annroved ERP. Recommendations: NOD: ® YES ❑ NO NOV: ❑ YES ❑ NO QNCR: ❑ YES ❑ NO POTW Rating: Satisfactory Marginal XXX UnSatisfactory Docu Signed by: PCI COMPLETED BY: � � � Paul DiMatteo DATE: F10=2F5BB34D4_. 8/18/2020 NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 4