Loading...
HomeMy WebLinkAboutNCC203547_NOI Application_20200826Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 8/13/2020 6:39:05 PM (NCG01 NOI Submission) Approve by Clark, Paul 8/14/2020 1:38:09 PM (Review- Construction NOI 29903) • The task was assigned to Clark, Paul by round robin distribution 8/13/2020 6:39 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: August 17, 2020 5:00 PM 8/13/2020 6:39 PM Submit by Selkane, Aziza 8/26/2020 10:31:58 AM (Payment Verification for NCC203547) * Oak Grove Baptist Church • Selkane, Aziza assigned the task to Selkane, Aziza 8/26/2020 10:31 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: September 25, 2020 5:00 PM 8/14/2020 1:38 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Oak Grove Baptist Church 1 b. Specific Lot This field rray be used to list specifc lot nunbers. Numbers 2. County* Mecklenburg 3. Highway or Street 308 Johnston Drive Address* Street narre only is acceptable if no address number assigned yet 4.City orTownship* Pineville 5. State * NC 6. Zip Code * 28134 7. Latitude* Enter the latitude in decinal degrees 35.0836 8. Longitude* Enter the longitude in decir al degrees (KUST be negative) -80.8914 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 08/17/2020 Estinated Construction Project Start Date 10. Date to End* 12/31/2021 Estimated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial Classification for Developrrent 12. Acres to be 1.46 disturbed* (including off -site borrow and waste areas) 13. Total site area 1.16 (acres) * 14. Post- 0.75 construction (Estirrated) impervious area (acres) * NCC Project NCC-MECKL-2020-Oak Grove Baptist Church Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Sugar Creek Waterbody* %rre of waterbody into which stornwater runoff will discharge 15b. Waterbody 11-137 Index No.* NCWaterbody Index Nunber Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * The Trustees of the Oak Grove Baptist Church It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name * Larry IF Corporation, enter Faegistered Agent First %rre 3. Last Name* Ray It Corporation, enter F;bgistered Agent Last %ne 3b. Title Treasurer/Trustee 4. Permitee E-mail macklmcrae@pinevilledsl.net Address* 5. Permittee 7042311628 Telephone No.* 6. Permittee Mailing Street Address Address* 308 Johnston Drive Address Line 2 C7ty State / Rovince / F;bgion Pineville NC Fbstal / Zip Code Country 28134-9601 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 308 Johnston Drive Address Line 2 Oty State / Frovince / Faegion Pineville NC Fbstal / Zip Code Country 28134-9601 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Mack Contact - First Name * 2. Primary Site Mcrae Contact - Last Name * 3. Title Pastor 4. Site Contact E- macklmcrae@pinevilledsl.net mail Address* 5. Site Contact 7042311628 Telephone No. 6. Organization Oak Grove Baptist Church Name 7. Site Contact Street Address Mailing Address* 308 Johnston Drive Address Line 2 Suite 400 city Charlotte Postal / Zip Code 28262 8. Consultant Name (Optional) Jeff Mccluskey First and Last narre 9. Consultant E-mail Jeff@mc2eng.com This person will be copied on all correspondence. 10. Consultant 7045109797 Telephone No. State / Rovince / Region NC Country United States D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 11/26/2019 Approved * 2. E&SC Plan Project 395795 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Mecklenburg County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan PCO5_Approval_#_395795.pdf 170.9KB Approval letter or Mist beRDFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) Mast be FCFfornat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification NCG01-eNOI-signed.pdf 194.08KB Form Mist be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Larry Ray Title Treasurer/Trustee Organization Legally Ibsponsible Entity The Trustees of the Oak Grove Baptist Church Date * 08/13/2020 F. Tracking and COC Info NOI Tracking No. 29903 NC Reference No. NCG01-2020-3547 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC203547 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 3547 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC203547-2020 Invoice Due Date 9/13/2020 Initial Fee $ 100.00 Invoice Status OPEN