HomeMy WebLinkAboutNCC203638_ESC Approval Submitted_20200826PITT COUNTY
a4 coU��� PLANNING & DEVELOPMENT DEPARTMENT
DEVELOPMENT SERVICES BUILDING
1717 W. 5`h STREET
O GREENVILLE, NORTH CAROLINA 27834-1696
cpgOti TELEPHONE: (252) 902-3250
FAX: (252) 830-2576
August 12, 2020
Re: The Cottages at Swift Creek
Project Tracking #/ID: PC SESC 2020-11
Disturbed Acres: 12
Kenneth Smith
1588 NC HWY 102 E
Ayden, NC 28513
Dear Sir:
JAMES F. RHODES, AICP
DIRECTOR
This is to advise you that the Pitt County Technical Review Committee conditionally approved
the soil erosion and sedimentation control plan and stormwater plan for THE COTTAGES AT
SWIFT CREEK on August 12, 2020. Conditions and requirements as a part of this approval are
attached below. Copies of the draft minutes from the meeting will be available upon request
prior to the next Technical Review Committee meeting.
As stipulated on the financial responsibility form, you are responsible for ensuring compliance
with all aspects of the approved plan and the Pitt County Soil Erosion and Sedimentation Control
Ordinance. Your primary objectives include, but are not limited to, preventing offsite
sedimentation, preventing sediment from entering watercourses, and establishing vegetation on
all disturbed areas within 7-14 calendar days, following any completion of a phase of grading.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to
the commencement of any land disturbing activity on the above named project. The NOI form
may be accessed at deq.nc.gov/NCG0L Please direct questions about the NOI form to Annette
Lucas at Annette.lucas�a�ncdenr.gov or Paul Clark at Paul. clark6j)ncdenr.gov. After you submit a
complete and correct NOI Form, a COC will be emailed to you within three business days.
Please be aware that your project will be covered by requirements of the NPDES
Construction Stormwater General Permit NCG010000. Please become familiar with all the
requirements and conditions of this permit in order to achieve compliance.
Upon discovery of noncompliance by our office, the following actions may be taken:
1. No further permits for building or other construction will be issued.
2. The authority to continue construction, other than for erosion control measures,
will be terminated.
3. Penalties of up to $5000 per day may begin to accrue. Failure to immediately
comply upon notice of noncompliance will result in injunctive and/or criminal
action.
Other Comments:
4. This erosion control plan shall expire three years following the date of approval if
no land disturbing activity has been undertaken.
5. The Division of Water Quality may pursue legal action against you in order to
enforce requirements of the NPDES, Phase II permit.
6. The Pitt County Soil Erosion and Sedimentation Control Ordinance authorizes
County officials to inspect sites to ensure compliance with the Sedimentation
Pollution Control Act.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file
at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to meet
the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to insure compliance with the Act. Acceptance and approval of this plan is
conditioned upon your compliance with Federal and State water quality laws, regulations, and
rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. Land disturbance shall not
begin until a preconstruction meeting has taken place.
Please provide a copy of the certificate of coverage prior to beginning any land disturbance.
If you need further information or assistance, please contact me at (252) 902-3250.
Sincerely,qAW464a' /
C/
Thomas Shrader
Planner III
cc: Malpass & Associates
CONDITIONS AND REQUIREMENTS
[Planning]
1. Show Limits of Disturbance and total amount of disturbed acreage on Sheet 6.
2. A Financial Responsibility/Ownership Form will be required for all parcels involved
with this plan.
3. Documentation of the land ownership change that is occurring is needed.
4. Rip rap will be required at FES 101, 102, and/or 104 if signs of erosion appear during
construction.
5. List receiving watercourse on plans.
6. Show concrete washout location on plans.
[General Comments]
Soils located on site include Pg, Os, OcB and WaB, and possess the following
characteristics:
■ Seasonal high water table (Pg, Os, OcB)
■ Flooding or Ponding (Os, Pg)
■ Unstable for trenching 4 feet or more (Os)
■ Swift Creek Watershed
■ Soils are prime farmland or have statewide importance for farming.
Development will remove the site from agricultural production.
■ There is no record of sub surface drain tile, but it is possible for some to
be on site.
■ The ditches adjacent to the property should be cleaned out to the original
bottom for better drainage.