Loading...
HomeMy WebLinkAboutNCC203620_ESC Approval Submitted_20200826PITT COUNTY co��� PLANNING & DEVELOPMENT DEPARTMENT DEVELOPMENT SERVICES BUILDING 1717 W. 5`h STREET GREENVILLE, NORTH CAROLINA 27834-1696 G*g TELEPHONE: (252) 902-3250 FAX: (252) 830-2576 August 12, 2020 Re: Stor-All Mini Storage Project Tracking #/ID: PC SESC 2020-10 Disturbed Acres: 5 Kenneth Smith 1588 NC HWY 102 E Ayden, NC 28513 Dear Sir: JAMES F. RHODES, AICP DIRECTOR This is to advise you that the Pitt County Technical Review Committee conditionally approved the soil erosion and sedimentation control plan and stormwater plan for STOR-ALL MINI STORAGE on August 12, 2020. Conditions and requirements as a part of this approval are attached below. Copies of the draft minutes from the meeting will be available upon request prior to the next Technical Review Committee meeting. As stipulated on the financial responsibility form, you are responsible for ensuring compliance with all aspects of the approved plan and the Pitt County Soil Erosion and Sedimentation Control Ordinance. Your primary objectives include, but are not limited to, preventing offsite sedimentation, preventing sediment from entering watercourses, and establishing vegetation on all disturbed areas within 7-14 calendar days, following any completion of a phase of grading. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas0uncdenr.-og_v or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Please be aware that your project will be covered by requirements of the NPDES Construction Stormwater General Permit NCGO10000. Please become familiar with all the requirements and conditions of this permit in order to achieve compliance. Upon discovery of noncompliance by our office, the following actions may be taken: 1. No further permits for building or other construction will be issued. 2. The authority to continue construction, other than for erosion control measures, will be terminated. 3. Penalties of up to $5000 per day may begin to accrue. Failure to immediately comply upon notice of noncompliance will result in injunctive and/or criminal action. Other Comments: 4. This erosion control plan shall expire three years following the date of approval if no land disturbing activity has been undertaken. 5. The Division of Water Quality may pursue legal action against you in order to enforce requirements of the NPDES, Phase II permit. 6. The Pitt County Soil Erosion and Sedimentation Control Ordinance authorizes County officials to inspect sites to ensure compliance with the Sedimentation Pollution Control Act. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Land disturbance shall not begin until a preconstruction meeting has taken place. Please provide a copy of the certificate of coverage prior to beginning any land disturbance. If you need further information or assistance, please contact me at (252) 902-3250. Sincerely, Thomas Shrader Planner III cc: Malpass & Associates CONDITIONS AND REQUIREMENTS [Planning] 1. An Easement/Agreement and a Financial Responsibility/Ownership Form will be required for the neighboring parcel where the clearing of woods and ditch will occur. 2. Rip rap will be required at FES 02 if signs of erosion appear during construction. 3. Show concrete washout location on plans. 4. List receiving watercourse on plans. [General Comments] • Soils located on site include Pg, Os, OcB and WaB, and possess the following characteristics: ■ Seasonal high water table (Pg, Os, OcB) ■ Flooding or Ponding (Os, Pg) ■ Unstable for trenching 4 feet or more (Os) ■ Swift Creek Watershed ■ Soils are prime farmland or have statewide importance for farming. Development will remove the site from agricultural production. ■ There is no record of sub surface drain tile, but it is possible for some to be on site. ■ The ditches adjacent to the property should be cleaned out to the original bottom for better drainage. • The following agencies have reviewed the Erosion Control Plan for STOR-ALL MINI STORAGE and have no comments: ■ NCDOT