Loading...
HomeMy WebLinkAboutNCC203592_Certificate of Coverage_20200825Certificate of Coverage STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG010000 NC Reference No. NCG01-2020-3592 Certificate of Coverage No. NCC203592 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Strata Solar Development, LLC is hereby authorized to discharge stormwater associated with CONSTRUCTION ACTIVITIES to surface waters of North Carolina from a site located at: Overhill Farm Solar Power Plant Glenn Road Clinton Sampson County in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in N.C. General Permit No. NCG010000. This Certificate of Coverage is affiliated with E&SC Plan Project No. SAMPS-2021-001 This Certificate of Coverage shall become effective 8/25/2020. This Certificate of Coverage shall remain in effect until rescinded or expired. This Certificate of Coverage will expire on the anniversary of its effective date unless it is renewed by payment of the annual administration and compliance fee. for Brian Wrenn Director, Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission