Loading...
HomeMy WebLinkAbout20200980 Ver 1_More Info Received_20200825Strickland, Bev From: Michael Brame <mbrame@pilotenviro.com> Sent: Tuesday, August 25, 2020 10:16 AM To: David.E.Bailey2@usace.army.mil; Homewood, Sue Cc: Tom Flanagan; David Brame Subject: [External] RE: Request for Additional Information - The Landing at Sycamore Creek, Corvair Drive, High Point, Guilford County; SAW-2020-01321 Attachments: Sycamore- rev-401 -404exh.pdf Follow Up Flag: Follow up Flag Status: Completed External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to gam@nc.gov Good Morning David and Sue, The drawing has been updated and changed to reflect the revisions in the field. The impact is still 0.008 acres in area and did not change. Please let me know if you need anything else in order to issue the PCN. Thank -you. Sincerely, Michael T. Brame 336.708-4620 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.r)ilotenvire.com mbrame(@r)ilotenviro.com From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent: Wednesday, August 19, 2020 11:13 AM To: Michael Brame <mbrame@pilotenviro.com> Cc: Homewood, Sue <sue.homewood@ncdenr.gov>; Tom Flanagan <tflanagan@NAipT.com> Subject: Request for Additional Information - The Landing at Sycamore Creek, Corvair Drive, High Point, Guilford County; SAW-2020-01321 WH Thank you for your PCN and attached information, dated 7/28/2020 for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permit (NWP) 12 (http://saw-reg.usace.army.mil/NWP2017/2017NWP12.pdf). Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your application withdrawn and close the file: 1) The Corps completed a field verification of the delineation of wetlands and other potential waters of the US yesterday with Pilot Environmental, Inc., including the minor expansion of wetland areas in the northeast and southwest quadrants of the originally delineated wetland. Please update all project plans with the overlay of the Corps -verified wetlands, and update the PCN as required. Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. DAVID ASTOR DOWDY DO 2995 PO 917 U.- ZONED.- RS-12 IMPACT MAP FOR DEVELOPER: THE LANDING AT PAC HOLDINGS, L.L.C. SYC"ORE CREEK 348 N. ELM ST. 150' 75' 0 150' 300' CITY OF HIGH POINT GREENSBORO, N.C. 27401 GUILFORD COUNTY, NORTH CAROLINA SCALE: 1 150' JULY, 2020 JOB No. 2019-084 ............. IMPACTS S- I & CORVAM DIM W- I 4j IL 10 u THE CONTRACTOR SMALL LIMIT THE W107H OF DISTURBED AREA UTILITY NOTES aa' ao' f AT THE STREAM CROSSING TO 30'. ALL REMAINING DISTURBED - 1. UNLESS INDICATED OTHERWISE, ALL WATER AND SEWER LINES SHALL BE INSTALLED WITH A MINIMUM COVER OF TO THE TOP OF THE PIPE. Li c LOCATION OF UNDERGROUND AREAS WITHIN THE SIREAM BUFFER WILL BE LIMITED TO A UTOP UTILITIES ARE APPROXIMATE AND SHALL BE VERIFIED BY THE CONTRACTOR y y MAXIMUM WU)TH 2: LOCAT 4Q'. ALL AREAS OF DISTURBANCE WITHIN PRIOR TO CONSTRUCTION THE STREAM BUFFER Mc SPECIAL FLOOD HAZARD AREAS WILL BE - 3. ALL ON -SITE WATER & SEWER UTILI nES. SHALL BE CONSTRUCTED TO THE CITY OF HIGH POINT STANDARDS. I_ RETURNED TO ORIGINAL GRADES. NO FILL WILL BE ALLOWED - HOWEVER, ALL UTILITIES NOT LOCATED WITHIN A PUBLIC EASEMENT OR PUBLIC RIGHT-OF-WAY SHALL BE '��"y WITHIN THE FUMWAY - / ® .PRIVATE WITH MAINTENANCE OF THE STORM SYSTEMS PROVIDED BY THE HOA. g^` 4. CONTACT 'ME ENGINEERING SERVICES DEPARTMENT --CONSTRUCTION INSPECTIONS DIVISION AT (336) 883-3194 PRIOR TO ANY CONSTRUCTION ACTIVITIES. - ='� 6. THE OWNER/ENGINEER SHALL SUBMIT OF THE SEWER, STORM SIR AM BUFFERS LION D TAIL _..-- .--' ✓ �, ^" --- AS -BUILT DRAWINGS WATER, AND DRAIN SYSTEMS ` TO THE ENGINEERING SERVICES DEPARTMENT UPON PROJECT COMPLETION INCLUDING WATER METER AND SEE NIGH PoNT DEYELOPMENi �ipNAHCE I -."` - / As AMENDED alxE.^^` �`� SEWER CLEAN -OUT LOCATIONS. U FOR PRACTICES m ACTiVTlIES NOT ALLOWED / N ZONES i AND 2 - / "'r ; ^ ,yA�.�,,..` �.�.� '.• / OF —CIATION ZONE t - AREA E DiNB A NfNiNUM Of 30 FEET FROM OF BANK SEC. 4Z-6f!Q� _2(M'E 2 - .. O to i/^•�" _..--. 00 APFA OF ATOMGtt&lP1G m ATAT TIE�2 EDGE OF 2ME f AND E7t1ENDNG mRPf �' ,%/ - '1jr� pN ,q 1 "'� FLAT -TOP MH OF 0 (� N LANW1 A MND t 2D FEET. ExcEPnau �--' Mll4T W APPROVED BY PqE WATERSHED REVIEW J �P' �N .� „I1�� T- �.`/' m m 1 / STA 6+77.57 00 CGMMITIEI (WAC) PER SEG 9-7-6(tl)(A* F- / / �j-m Z cn rf (j fp W #0A-1 STA TA 11+1 - 20 WETLANDS. + {= STA it+T7.3T O W zxz,G 114 ¢ 0 0 (7 U �ir"f" T m m T m m �.- a WILLOWCREST ST.) w ., (6.5' RT.) - 0 US + MOO (,- m N W '1��- '- t'� �„• 1 STA 0+<x•�� I.g.i.�NyA. too ,\ TIE-IN TO X. MH cy ��■ �+.., �o _ ...-- """- Fy v m z O OFFgtE -LIMIT DISHjCE DURING/ _ / y ^ '�' '� �., P� py% \ cALL"eftD�-' / U T030' f% ,�, Q� m > .� _ 0� n a-Dut cfllTet :-iCCn7rr ENT .'_ TPB niE um / MAINTAINANCE CORRIDO TO 10' m FLAT -TOP MIN OF-2op STA 3+1A47 • ~i z ownIsm \ �- — z /� ma mmt®T y ='Iy, N f c �z / ®ramso m } m m e% FLAT -TOP MH OF-i 18 STA 1+0"1 t APPROXIMATE 100YEAR I COFFER DAMS FOR FLOOD PLAIN ✓f BY-PASS PUMP i o N rn a m 6$ (SEE DETAIL) t ( ( IAH 1 0.3 J! " TOP=853.87 N G O g F w Aw 2w Id D 40' w INV IN=844.93 . B INV OUT=842.93 SCALE: t "=40' � w in � � o FINAL GRADE f z o¢w=� cD J 6 U of NDEPKP9w M W AREA - --- - — - — - - -- - - - IN 2. 1 - -- - -- - -- It 4-- . FUND MAKE sm__E.wT It - _ _ _ _ _ 840 1�j ,.--__...... ... _ ... _.,_ A� F WHH N I ;62. -�- IT - _ -- - -- - lit v 82 0 4. _ - _ - - -- PLAN GtA?ai RW-RAP (liP.j sAN09Am tTm.) Y 9 87 { 830 swEnM 90TfW1(ROUD oGxfE Fw. ¢ Z -- - -- — P3V OSD PTPEL&E SEC ITON A - A oo' -- - -- -- - - — i. —TEN CCFFER DAW ANO uTIL¢E DEWAIEANG BA91N ro DRAW WYRK AREA 2 AMP SBYAY ARDUND WWtK AREA o W � r_l V }w � �682 _ _ _ - -- ..-� _ _- _ _ j � iFTI. — �. x � `A<RT b^%F n Ew a✓ffR rEmm. a. cua MusT � Taw rn Arom > � �T+ t-�. i I mxrww4nw m Tla sTREAM F1Ki1 COFFER DAM tE. E F-1 az O.Z "E0 A W - - - - - - - +. _ _ _ - 4 FOR BY-PASS PUMPING PIPELINE STREAM CROSSINGS i x - - - - CONSTRUCTION SEQUENCE FOR ALL STREAM CROSSINGS (EEE NOTE ABOVE O)NCFFHNO NPDES PFl&m Z- A� J� 4/ tip � �"�'i+ dz - -- _- -- -- - 820 _ T. CIXiTRADTIXt Sul. wsTa.L TEMPIXtARr CREEK cxasswG as �STA TMONE T�YIE U AM PORi�RM pN' NEE EA46 IN1. AN .,� HO E I -- _ A�WAIE DIS(ANCE TO ALLOW SEWER LUTE NS1ANAnON. - _ _ __ - z PRIOR T(T 05TAWxC THE 9EW£Ft UNE AUNY55 1HE CREDS. R1E CONTRACTOR SHALL PSTALL A TEMPCttAVY DAM UPSIREAN OF THE D lfllP ACRIXI ACTMTIEG. AND PUMP THE SIREPL FLOW A A THE AMAOF DLSNRRANOE. 1NE DIVRY AM SHALL N CF A r^ c" VL C) - — - I NOH-FAODi9ti AfATEAiAI 9UCN AS SANp BAGS OR PLA9RO SiFEiiN6 OVER SRwE. 3, UPON —R£RON OF THE SEWER UK NSTAUATION piO O WIIHPN KRM (SEE � 'T1K1. STABILIZE ALL O15RIRDED A9E0.5 � (� - SHEET NO.,--, WHICH TIME THE SEWER LNE N9TAL19,TION HA$ PASSER ALL iESTWG, AND TiE.AREA SEEDED, THE CDx1RACfOR SMALL FDeOVE lE1R�gtARY LKEIX CRWSING, Mq RE-ESTAE416H ORtONAL gifDS BANK IATII4 . RIP RAP SHA31 BE K= IH TD THE IXISFWG BN4C AND HOTRHI WIIHN THE le MANTENANOE COR R. ,M R' '. - — 11O . L.. .I. _ - _ 1 .9 L, . N � ( R ) 0+00 1+00 2+00 3+00 4+00 5+00 8+00 7+00 8+00 - IMPACTS S- I & W- I FOR THE LANDING AT SYCAMORE CREEK CITY OF HIGH POINT GUILFORD COUNTY, NORTH CAROLINA JULY, 2020 JOB No. 2019-084 30' 20' 10' 0 30' 60' DEVELOPER: L.L.C. SCALE: 1 30' 348 N,HOLDINGSELM ST. GREENSBORO, N.C. 27401 77- 7- W-l': 54 SF Q �3G!- 00, 1'STNUCTION CORRLOOP T EAS�MEtg 15' PEkMANE-N' Z:7 0 # Z-1- l< NOTE: PUMP STREAM AROUND WORK AREA PUMP STREAM P DISCHARGE HOSE POLYETHYLENE FABRIC 8 MIL. THICK (TYP.) z WATER SURFACE STREAM BOTTOM(ROCK) SECTION A - A RAP APRON ECK DAM WITH STONE FACE :ING BASIN PLAN rCLASS I RIP -RAP (TYP.) SANDBAGS (TYP.) a CONCRETE FILL PROPOSED PIPELINE NOTES: 1. CONSTRUCT COFFER DAM AND UTILIZE DEWATERING BASIN TO DRAIN WORK AREA. 2. PUMP STREAM AROUND WORK AREA. 3. CONVERT COFFER DAM TO STREAM CROSSING WHEN NO LONGER NEEDED. 4. CARE MUST BE TAKEN TO AVOID CONTAMINATION TO THE STREAM FROM POURED CONCRETE SEALANT. COFFER DAM FOR BY-PASS PUMPING PIPELINE STREAM CROSSINGS CONSTRUCTION SEQUENCE FOR ALL STREAM CROSSINGS (SEE NOTE ABOVE CONCERNING NPDES PERMIT) 1. CONTRACTOR SHALL INSTALL TEMPORARY CREEK CROSSING AS DETAILED. THE TEMPORARY CREEK CROSSING SHALL BE INSTALLED ON THE UPSTREAM PORTION OF THE EASEMENT, AN ADEQUATE DISTANCE TO ALLOW SEWER LINE INSTALLATION. 2. PRIOR TO INSTALLING THE SEWER LINE ACROSS THE CREEK, THE CONTRACTOR SHALL INSTALL A TEMPORARY DAM UPSTREAM OF THE CONSTRUCTION ACTIVITIES, AND PUMP THE STREAM FLOW AROUND THE AREA OF DISTURBANCE. THE TEMPORARY DAM SHALL BE OF A NON -ERODIBLE MATERIAL SUCH AS SAND BAGS OR PLASTIC SHEETING OVER STONE. 3. UPON COMPLETION OF THE SEWER LINE INSTALLATION CROSSING THE CREEK, THE CONTRACTOR SHALL STABILIZE ALL DISTURBED AREAS WITH RIP -RAP (SEE DETAIL). 4. UPON COMPLETION OF RIP -RAP, THE CONTRACTOR SHALL REMOVE THE TEMPORARY DAM, AND TERMINATE BYPASS PUMPING. 5. AT WHICH TIME THE SEWER LINE INSTALLATION HAS PASSED ALL TESTING, AND THE AREA SEEDED, THE CONTRACTOR SHALL REMOVE THE TEMPORARY CREEK CROSSING, AND RE-ESTABLISH ORIGINAL CREEK BANK ELEVATIONS. RIP RAP SHALL BE KEYED IN TO THE EXISTING BANK AND BOTTOM WITHIN THE 10' MAINTENANCE CORRIDOR. SKEEj CLU9 RO w o z � o � z J � U � N W y� Yn OLD MILL ROAD Y @YA 3j7 t Y 3Tr 9,pO� NORTy VICINITY MAP NOT TO SCALE