HomeMy WebLinkAbout20091321 Ver 2_Correspondence_20200629Strickland, Bev
From: Elliott, Jason C
Sent: Monday, June 29, 2020 8:29 AM
To: Liz Hair (sarah.e.hair@usace.army.mil); Steenhuis, Joanne
Subject: B-4138 UT to Cape Fear River
Good morning Liz/Joanne,
Hope you've both been doing well. I had a quick question for you both, I've completed the as -built plans for the stream
remediation that was recently done on the UT to Cape Fear River site in Lillington. However due to the seasonal
limitations we were not able to complete the reforestation at the site. The reforestation is scheduled to be completed
this upcoming winter but I wanted to see if it was ok with you both if I go ahead and submit the construction as -built
now with the reforestation as -built to follow once its completed. We've done this in the past on projects but I wanted
to make sure that was ok before I sent those plans to you. Thanks and I hope you both have a good day.
Jason C. Elliott
Environmental Analysis Unit
Environment Analysis Engineering Group
NC Department of Transportation
1598 Mail Service Center
Raleigh, NC 27699-1598
Phone: 919-707-6114
Fax: 919-212-5785
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Facebook Twitter YouTube
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
1