Loading...
HomeMy WebLinkAbout20091321 Ver 2_Correspondence_20200629Strickland, Bev From: Elliott, Jason C Sent: Monday, June 29, 2020 8:29 AM To: Liz Hair (sarah.e.hair@usace.army.mil); Steenhuis, Joanne Subject: B-4138 UT to Cape Fear River Good morning Liz/Joanne, Hope you've both been doing well. I had a quick question for you both, I've completed the as -built plans for the stream remediation that was recently done on the UT to Cape Fear River site in Lillington. However due to the seasonal limitations we were not able to complete the reforestation at the site. The reforestation is scheduled to be completed this upcoming winter but I wanted to see if it was ok with you both if I go ahead and submit the construction as -built now with the reforestation as -built to follow once its completed. We've done this in the past on projects but I wanted to make sure that was ok before I sent those plans to you. Thanks and I hope you both have a good day. Jason C. Elliott Environmental Analysis Unit Environment Analysis Engineering Group NC Department of Transportation 1598 Mail Service Center Raleigh, NC 27699-1598 Phone: 919-707-6114 Fax: 919-212-5785 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Facebook Twitter YouTube Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1