Loading...
HomeMy WebLinkAbout310685_Compliance Evaluation Inspection_20200730(0 Division of Water- Resources Facility Nurnbex r�� - $ `O Division of Soil and Water. Conservation '- O Other Agency Type of Visit: 7Routine pliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit:-3o-oto Arrival Time: Departure Time: °0 County: (Ouplln Region: IN I P? 0 Farm Name: A y� e- rr, n!) fa r M Owner Email: Owner Name: :Aryl ti We rn m Phone: Mailing Address: Physical Address: Facility Contact: n v%- in WIP- r", Title: Phone: Onsite Representative: Certified Operator: �a-4r-�/a� ��rP�e•� Back-up Operator: Location of Farm: Design► "Current Swine Capacity Pop. Wean to Finish Wean to Feeder ;200 9 Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other- " Other Latitude: Integrator: p Certification Number: 100 36 / Certification Number: Design Current " Wet Poultry Capacity" Pop. Layer Non -Layer Design` ' Current Dry Poultry" Canacity Pon: Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? Longitude: .Design, ° Current Cattle. Capacity Pop. ` Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes RNo ❑ NA ❑ NE ❑ Yes [2/No ❑ NA ❑ NE ❑ Yes [�To ❑ NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes El No ❑ NA ❑ NE 2. Is there evidence of a past. discharge from any part of the operation? ❑ - Yes F5ZNc ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: - Date of Inspection: -30 _a a 95 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes �/No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier:_ Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3a 5. Are there any immediate threats to the integrity of any of the structures observed? El Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes MNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [ o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [ xo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 02"No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes U No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [:]Yes P No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): , S B I W 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes VNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes fo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes E2/No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [2/No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design [:]Maps [:]Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes EdNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? El Yes WNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: 11 - f E 5 I jDate of Ins ection:7- 3 p-aoa 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes El No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [!] No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ZNA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes MNo ❑ NA ❑ NE ❑ Yes al/No ❑ NA ❑ NE ❑ Yes [D/�o ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ]d�E ❑ Yes [2/No ❑ NA ❑ NE ❑ Yes NO / ❑ NA ❑ NE [:]Yes ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. I Use drawings of facility to better explain situations (use additional pages as necessary). — P1 o` 4, b m -r� Reviewer/Inspector Name: CS hi - Phone: 010 ) Reviewer/Inspector Signature: Page 3 of 3 Date: 21412015