HomeMy WebLinkAboutNCC203682_ESC Approval Submitted_20200825■
ROY COOPER
Governor
MICHAEL S..REGAN
Secretary
S. DANIEL SMITH
D(reclor
NORTH CAROLINA
Environmental Quality
January 27, 2020
LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS
C & B Toothland of Marion, LLC
ATTN: Mr. William L. Chambers
10-B Yorkshire Street
Asheville, N.C. 28803
RE: Project Name: Erosion Control Plan for C&B Toothland of Marion, LLC
Acres Approved: 2.98
Project ID: MCDOW-2020-005
County: McDowell
City: Marion
Address: 1549 Sugar Hill Road
River Basin: Catawba
Stream Classification: Unnamed Tributary of Nix Creek, `C'.
Submitted By: Mr. Gary D. Davis, P.E.
Date Received by LQS: January 10, 2020
Plan Type: Commercial
Dear Mr. Chambers,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications and Performance Reservation. The Modifications Required for Approval and
the Performance Reservation are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and
CDC issued prior to the commencement of any landdisturbing activity on the above -named
project. The NOl form may be accessed at deq.nc.MJ. CG01. Please direct questions about
the NOI form to Annette Lucas at Annette.lucasancderingov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be
emailed to you within three business days. Initially, DEMLR will not charge a fee for
coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This
fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
North Cmroilita Department of Environmental Quality I Division of Energy, M€neral and land Resources
.�. 1E Q20
Asheville Regional office 12090 U S. Highway 70 1 &mnanoa, North GaroUrta 26778
u�wmemmrmwmm a�waar� ,�'"� 828.296.4SOD
Letter of Approval with Modifications and Performance Reservation
Mr. William L. Chambers
January 27, 2020
Page 2 of 4
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site;
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following
the commencement of this project, it is determined that the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land -disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is
any change in the information included on the form. In addition, it would be Helpful if you
notify this office of the proposed starting date for this project. Please notify us if you plan
to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Michael Smith
Assistant Regional Engineer
Land Quality Section
I