Loading...
HomeMy WebLinkAboutWQCS00249_Compliance Evaluation Inspection_20200819DocuSign Envelope ID: 5AECF6DA-339A-49AD-9CEC-EB530F2199EE ROY COOPER Covemor MICHAEL S. REGAN secretary S. DANIEL SMITH Dlreetor David M Mohr Onslow Water and Sewer Authority 228 Georgetown Rd Jacksonville, NC 28540 NORTH CAROLINA Envitanmental Quality August 24, 2020 SUBJECT: Compliance Inspection Report ONWASA Collection System Collection System Permit No. WQCS00249 Onslow County Dear Permittee: The North Carolina Division of Water Resources conducted an inspection of the ONWASA Collection System on 8/19/2020. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in Collection System Permit No. WQCS00249. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". There were no significant issues or findings noted during the inspection and therefore, a response to this inspection report is not required. If you should have any questions, please do not hesitate to contact Helen Perez with the Water Quality Regional Operations Section in the Wilmington Regional Office at 910-796-7215 or via email at helen.perez@ncdenr.gov. Sincerely, DocuSigned by: Toµ _N4-ml� �cOA, for 7F141E73B6F3456... Morella Sanchez -King, Regional Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ ATTACHMENTS Cc: Justin Sanderson — electronic copy Upload to Laserfiche NorthCaroLnsDepartmentoffnvironmeata3Quality I DWsionofWater ResoiEroes r, Wilmington Reg •3oaI Office I L27 CArd'1na1Drive Extension I WINmington, North Caro -ms23405 _:r"• " a"• 910-796-7215 Compliance Inspection Report Permit: WQCS00249 Effective: 03/15/17 Expiration: 12/31/25 Owner: Onslow Water and Sewer Authority SOC: Effective: Expiration: Facility: ONWASA Collection System County: Onslow Region: Wilmington Contact Person: David M Mohr Title: Engineering Dir Phone: 910-937-7521 Directions to Facility: System Classifications: CS2, Primary ORC: Donald J Sanderson Certification: 1003895 Phone: 910-455-0722 Secondary ORC(s): On -Site Representative(s): On -site representative Donald J Sanderson 910-455-0722 Related Permits: WQ0034367 Onslow Water and Sewer Authority - Northwest Regional WRF WQ0009267 City of Jacksonville - City of Jacksonville WWTF WQ0029945 Onslow Water and Sewer Authority - Summerhouse WWTF WQ0023261 Onslow Water and Sewer Authority - Swansboro WWTF NC0063029 Commanding Officer Marine Corps Base Camp Lejeune - Frenchs Creek Advanced WWTP WQ0019907 Onslow Water and Sewer Authority - Holly Ridge WWTF Inspection Date: 08/19/2020 Entry Time 09:OOAM Exit Time: 11:15AM Primary Inspector: Helen I Perez Phone: 910-796-7387 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type: Collection system management and operation Facility Status: 0 Compliant ❑ Not Compliant Question Areas: Miscellaneous Questions Map Spill Response Plan (See attachment summary) General Sewer & FOG Ordinances Reporting Requirements Inspections Spills Pump Stations Page 1 of 6 Permit: WQCS00249 Owner - Facility:Onslow Water and Sewer Authority Inspection Date: 08/19/2020 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary: A routine compliance inspection of the ONWASA Collection System was conducted on August 19, 2020. The purpose of the evaluation was to verify that the facility is operating in compliance with the conditions and limitations specified in Permit WQCS00249. Justin Sanderson, ORC, was present during the inspection. This inspection covered the Holly Ridge area of the collection system and did not cover all the required documentation. ONWASA operates 13 pump stations in Holly Ridge. The Green Street PS has not received any flow to date, and a new pump station is currently being constructed at the future Homestead Place Subdivision. Nine pump stations were inspected and all were well maintained. Inspection and maintenance log books were complete and stored at each pump station. ONWASA plans on using the Survey 123 program on tablets to replace the paper logs soon. This will allow them to issue work orders faster and more efficiently. ONWASA is also working towards using their GIS mapping system to map work orders, lines cleaned, CCTV inspections etc. ONWASA is compliant with collection system permit WQCS00249. Please review the comment sections of the inspection report for more details. Page 2 of 6 Permit: WQCS00249 Owner - Facility:Onslow Water and Sewer Authority Inspection Date: 08/19/2020 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine General Yes No NA NE Is there a properly designated primary ORC and at least one back-up of proper grade? 0 ❑ ❑ ❑ Are logs being reviewed by the system management or owner on a regular basis? 0 ❑ ❑ ❑ # What is that frequency? Approximately once a week. # Are there any issues being addressed currently or any in the planning stages? 0 ❑ ❑ ❑ Is there a specific pump failure plan available for all pump stations? 0 ❑ ❑ ❑ Does plan indicate if pump parts/new pumps are in spare parts/equipment inventory? ❑ ❑ ❑ Are new/significantly upgraded pump stations equipped with anti -corrosion materials? 0 ❑ ❑ ❑ Does the permittee have a copy of their permit? 0 ❑ ❑ ❑ # Is permit expiring within the next 6 months? ❑ 0 ❑ ❑ If Yes, has the Permittee applied for renewal? ❑ ❑ 0 ❑ Comment: No comment. Sewer and FOG Ordinances Yes No NA NE Is Sewer Use Ordinance (SUO) or other Legal Authority available? ❑ ❑ ❑ Does it appear that the Sewer Use Ordinance is enforced? ❑ ❑ ❑ Is there a Grease Control Program that legally requires grease control devices? ❑ ❑ ❑ What is the standard grease trap cleaning requirement in the FOG ordinance? 30 days Is Grease Control Program enforced via periodic inspections/records review? ❑ ❑ ❑ Is action taken against violators? ❑ ❑ ❑ # Have satellite systems adopted an equivalent or more stringent ordinance? ❑ ❑ ❑ Is grease/sewer education program documented with req'd customer distribution? ❑ ❑ ❑ # Are other types of education tools used like websites, booths, special meetings, etc? ❑ ❑ ❑ If Yes, what are they? (This can reduce mailing to annual.) O N WASA website Comment: No comment. Map Yes No NA NE Is there a overall sewer system map? ❑ ❑ ❑ Does the map include: Pipe Type (GS/FM) ❑ ❑ ❑ Pipe sizes ❑ ❑ ❑ Pipe materials (PVC, DIP, etc) ❑ ❑ ❑ Pipe location ❑ ❑ ❑ Flow direction ❑ ❑ ❑ Approximate pipe age ❑ ❑ ❑ Page 3 of 6 Permit: WQCS00249 Owner - Facility:Onslow Water and Sewer Authority Inspection Date: 08/19/2020 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Pump station ID, location and capacity ❑ ❑ ❑ # Force main air release valve location & type ❑ ❑ ❑ # Location of satellite connections ❑ ❑ ❑ Is the map being updated for changes/additions within 1 year of activation? ❑ ❑ ❑ Comment: ONWASA uses a GIS mapping system and is working towards using the system to map workorders, lines cleaned, CCTV inspections, etc. Reporting Requirements Yes No NA NE # Have there been any sewer spills in the past 3 years? 0 ❑ ❑ ❑ If Yes, were they reported to the Division if meeting the reportable criteria? ❑ ❑ ❑ If applicable, is there documentation of press releases and public notices issued? ❑ ❑ ❑ Is an Annual Wastewater Performance Report being filed with the Division, if required? ❑ ❑ ❑ Is the report being made available to all its sewer customers? ❑ ❑ ❑ # How is it being made available? website Comment: ONWASA's Public Information Officer issues and documents the reauired Dress releases and public notices. The Annual Wastewater Performance Report is currently being completed and will be made available on the ONWASA website. Inspections Yes No NA NE Are adequate maintenance records maintained? 0 ❑ ❑ ❑ Are pump stations being inspected at the required frequency? ❑ ❑ ❑ # Is at least one complete functionality test conducted weekly per pump station? ❑ ❑ ❑ Is there a system or plan in place to observe the entire system annually? ❑ ❑ ❑ Is the annual inspection documented? ❑ ❑ ❑ # Does the system have any high -priority lines/locations? ❑ ❑ ❑ Are inspections of HPL documented at least every 6 months? ❑ ❑ ❑ Are new lines being added to the HPL list when found or created? 0 ❑ ❑ ❑ Comment: Currently, the entire collection system is observed through line cleaning, repairs, CCTV inspections, ROW maintenance and HPL inspections. Documentation is available on all these activities. Suggestion was made to staff to record these activities on the collection system map to ensure the entire system is observed every year. High priority lines are inspected through work orders from ORC. One HPL, an iron ductile pipe located across a ditch near the intersection of Jenkins Street and Hudiburg Street was observed during the inspection. Vegetation will need to be cleared for better access. Spill Response Action Plan Yes No NA NE Is a Spill Response Action Plan available? 0 ❑ ❑ ❑ Is a Spill Response Action Plan available for all personnel? 0 ❑ ❑ ❑ Does the plan include: 24-hour contact numbers 0 ❑ ❑ ❑ Response time 0 ❑ ❑ ❑ Page 4 of 6 Permit: WQCS00249 Owner - Facility:Onslow Water and Sewer Authority Inspection Date: 08/19/2020 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Equipment list and spare parts inventory 0 ❑ ❑ ❑ Access to cleaning equipment 0 ❑ ❑ ❑ Access to construction crews, contractors, and/or engineers 0 ❑ ❑ ❑ Source of emergency funds ❑ 0 ❑ ❑ Site sanitation and cleanup materials 0 ❑ ❑ ❑ Post-overflow/spill assessment 0 ❑ ❑ ❑ Does the Permittee appear to respond within 2 hours of first knowledge of a spill? 0 ❑ ❑ ❑ Comment: No comment. aRlL Yes No NA NE Is system free of known points of bypass? ❑ ❑ ❑ If No, describe type of bypass and location Are all spills or sewer related issues/complaints documented? ❑ ❑ ❑ # Are there repeated overflows/problems (2 or more in 12 months) at same location? ❑ ❑ ❑ # If Yes, is there a corrective action plan? ❑ ❑ ❑ Comment: Any spills, sewer issues or complaints are directed to the ORC and a work order is issued. Pump Stations Yes No NA NE Please list the Pump Stations Inspected: Jenkins St PS-200 Jenkins Street Belvedere Drive PS-157 Belvedere Drive Cypress St PS-159 Cypress Street Sage's Ridge Subdivision PS-504 Hazelwood Summerhouse #1 PS-344 Kings Creek Crossing Summerhouse #2 PS-319 Summerhouse Drive Summerhouse #3 PS-608 Martin House Loop Summerhouse #4 PS-523 White Picket Way Summerhouse #5 PS-100 Night Heron Trace # Number of duplex or larger pump stations in system 70 # Number of vacuum stations in system 0 # Number of simplex pump stations in system 8 # Number of simplex pump stations in system serving more than one building 0 How many pump/vacuum stations have: # A two-way "auto polling" communication system (SCADA) installed? # A simple one-way telemetry/communication system (auto -dialer) installed? For pump stations inspected: Are they secure with restricted access? 0 ❑ ❑ ❑ Were they free of by-pass structures/pipes? 0 ❑ ❑ ❑ Were wet wells free of excessive grease/debris? 0 ❑ ❑ ❑ # Do they all have telemetry installed? 0 ❑ ❑ ❑ Is the communication system functional? 0 ❑ ❑ ❑ Page 5 of 6 Permit: WQCS00249 Owner - Facility:Onslow Water and Sewer Authority Inspection Date: 08/19/2020 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Is a 24-hour notification sign posted ? 0 ❑ ❑ ❑ Does the sign include: Owner Name? 0 ❑ ❑ ❑ Pump station identifier? 0 ❑ ❑ ❑ # Address? 0 ❑ ❑ ❑ Instructions for notification? 0 ❑ ❑ ❑ 24-hour emergency contact numbers? 0 ❑ ❑ ❑ Are audio and visual alarms present? 0 ❑ ❑ ❑ Are audio and visual alarms operable? 0 ❑ ❑ ❑ # Is there a backup generator or bypass pump connected? 0 ❑ ❑ ❑ If tested during inspection, did it function properly? 0 ❑ ❑ ❑ Is the back-up system tested at least bi-annually under normal operating conditions? 0 ❑ ❑ ❑ # Does it have a dedicated connection for a portable generator? 0 ❑ ❑ ❑ # Is the owner relying on portable units in the event of a power outage? 0 ❑ ❑ ❑ # If Yes, is there a distribution plan? 0 ❑ ❑ ❑ If Yes, what resources (Units/Staff/Vehicles/etc) are included in Plan? Two small pump stations in Holly Ridge, Trout Street PS and Bream Street PS, rely on one portable generator for both. They are located close to each other and staff has a distribution plan in place for them during a power outage. # Does Permittee have the approved percentage of replacement simplex pumps? ❑ ❑ ❑ Is recordkeeping of pump station inspection and maintenance program adequate? 0 ❑ ❑ ❑ Do pump station logs include at a minimum: Inside and outside cleaning and debris removal? 0 ❑ ❑ ❑ Inspecting and exercising all valves? 0 ❑ ❑ ❑ Inspecting and lubricating pumps and other equipment? 0 ❑ ❑ ❑ Inspecting alarms, telemetry and auxiliary equipment? 0 ❑ ❑ ❑ Comment: All of the Hollv Ridae DumD stations are connected to a Mlssions SCADA system. By the end of the year, ONWASA plans on connecting the small number of pump stations throughout the entirE system that still have a chatterbox with the Missions system. Generators are auto tested and manually tested weekly. Generator preventative maintainence is performed once a month by staff and once a year by a contracted company. Pump station inspection and maintainence logs are complete and stored at each pump station. Staff removes grease and cleans the pump stations monthly. The audio alarm at Summerhouse PS #4 was not operable and needs to be repaired. Page 6 of 6