HomeMy WebLinkAboutNCC203652_ESC Approval Submitted_20200824ROY COOPER
Goverrtat
MICH 4EL &IREGAN
3acre ary
BRIAN WRENN
F1ire�tor
NORTH CAROLINA
,5h,&nnM,nt&
August 5, 2020
LETTER OF APPROVAL
Jerry Hall, Owner
2344 Park Garden Court
Fayetteville, NC 28306
RE i Project Name Dirty Whiskey
Acres Approved: 1.2
Project ID: CUMBE-2021-003
County: Cumberland, City: Hope Mills
Address: Corporation Drive
River Basin: Cape Fear
Stream Classification: Other
Submitted by: Scott Brown'
Date Received by LQS: July 13, 2020
Plan Type: Commercial
Dear Mr. Hall:
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable: and hereby issue this Letter of Approval. The enclosed Certificate of
Approval must be posted at the job site. This plan shall expire three (3) years following the
date of approval, if no land disturbing activity has been undertaken, as is required by Title
1.5A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form.requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and
COC issued prior to the commencement of any land disturbing activity on the above -named
project. The NOI form may be accessed at de .nc. ov/N.CG0.1. Please direct questions about
the NOI form to. Annette Lucas at. Ai'ne'tte' Aucas ncdenr. ov or Paul Clark at
Paul. clarkkncd_enr Gov.. After you submit a complete and correct NOI Form, a COC will be
emailed to you within three business days. Initially; DEMLR will not charge a fee for
coverage under the NCGO 1 permit. However, on or after June 1, 2019, a $100 fee:: will be "
charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh:
offl? Oft -OR North Carolina Department ofEnvironmental Duality I ulviSitsn of Energy, Mineral,and Lc!nd Resources
Fayetteville Re9t*na[ 0fhce. l 225 Csreen'Str'eek:5ulte 7141 %ayeEtevllle; North Garollna.2=t
:OmpaHmmtwemkor Mup 9104331B0.0
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the.
commencement of this project, the erosion and sedimentation control plan is inadequate to
meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information
provided in the Financial Responsibility Form, which you provided. You are requested to
file an amended form if there is any change in the information included on the form. This
permit allows for a land -disturbance, as called for on the application plan, not to
exceed the approved acres. Exceeding the acreage will be a violation of this permit and
would require a revised plan and additional application fee. Any addition in impervious
surface, over that already noted on the approved plan, would also require a revised plan
to verify the appropriateness of the erosion control measures and the stormwater retention
measures. (GS 11 3A-54. I (b)). In addition, it would be helpful if you notify this office of
the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Chris Baker
Assistant Regional Engineer
DEMLR - Fayetteville Regional Office
Enclosures: Certificate of Approval
cc: Scott Brown, P. E., 4D Site Solutions, Inc. — electronic copy
Michael Naylor, Cumberland County Inspections Office — electronic copy
Fayetteville Regional Office