Loading...
HomeMy WebLinkAbout20200469 Ver 1_permit drawings_20200423 Revised 4/20/20 co See Sheet I A For Index of Sheets S T �i TIE OF NORTH C A ROT 1T N ,�i STATE STATE PROJECT REFERENCE "RR TOTAL See Sheet 18 For Conventional Symbols ISI del Il' NORTH del �e 1L del NO.. 6RRRT6 /1921 11 1958 aQ�ea• ` DIVISIONOF HIGH VV Jl N C. B-5639 T'L+PROl.N0. A.PROl.NO. E9CRIPT[ON 1957 cS r 45594.1.1 P.E. 1737 a° Toe: 1141 45594.2.1 RAN & UTL a 1957 eG,,a •grown Town Rd. Bridge Rd. ON 1912 DUPLIN COUNTY c?, B-5639 I 1141 ai PROJECT? 11ss y) LIMITS LOCATION: BRIDGE NO. 36 OVER MAXWELL CREEK PERMIT DRAWING 0°: 7 1141 dead Rd. ON NC 11 (CLODFELTER ROAD) SHEET 1 OF 17 � 1918 (� y, a' Rd. TYPE OF WORK: GRADING, PAVING,DRAINAGE AND STRUCTURE V1141 '_` 1911141 e C'a. Register W NA = 8 199G 4111 T-- O 1932 Brothers Rd. 1996 11 ei4 VICINITY MAP(NOT TO SCALE) WETLAND AND SURFACE WATER IMPACTS PERMIT pis 4 & SITE 2 SITE 3 5 & SITE 4 2 BEGIN B IDGE Lu 2B-2 B—i —L— POT TA. 22+68.75 END BRIDGE END TIP PROJECT B-5639 1 r . . . . A A A A A _� J -L- POT STA. 24+41.25 -L- POT STA. 32 +25.00 BEGIN TIP PROJECT B-5639 . * . _ - - - i . " _ _ - _ _ - - - - - , - ° - - . * . * -L- POT STA. 14+90.00 _ , . ' . . . _ . . . . _ _ * NC 1�1'--`- --=t= - ` -- -- TO REGISTER _ Re _ '` TO SR 1912_ BEGIN DETOUR B-5639 BEGIN BRIDGE END BRIDG' END DETOUR B-5639 -L DET- POC STA. 10+26.46 -L_DET— POT STA. 17+91.04 +/— —L_DET— PO STA. 19+61.04 +/—L DET- POC STA. 26+54.80 -L- STA. 15 +06.95 / -L- STA. 31 +32.22 SITE 1 / SITE 5 S IMPSON 5640 Dillard Drive NGINEERS Suite C 00 (A DOCUMENT NOT CONSIDERED FINAL Cary,NC 27518 $SOCIATES 21T 852-0468 ff, UNLESS ALL SIGNATURES COMPLETED 4\ 19191 8520598 IFaxl ,J? www.slmpsonengr.com LICENSE NO.C-2521 J PLANS PREPARED FOR NCDOT BY: HYDRAULICS ENGINEER f J GRAPHIC SCALES DESIGN DATA PROJECT LENGTH A PO Boa 100 SUNGATE DESIGN GROUP,P.A. rari-VOrino,NC 27526 �9191552-2253 ADT 2020 = 2,617 Mon M (919)S52-225 olTs.) oz ,I� RALEIOH NORTH CINROLINA 0606 50 JJ 0 50 100 ADT 2040 = 3,200 MnCDDNALD LICENSE NO.F-0669 ENGFIR' CENSENO.CES0 ®� ®PIT eg 1 LENGTH ROADWAY TIP B-5639 PROJECT = 0.296 MILES 2018 STANDARD SPECIFICATIONS �� ��® a �o PLANS K = 9 0° MICHAEL PEKAREK, PE P.E. � o D = 55 /0 PROJECT ENGINEER SIGNATURE: u® �n 50 0 50 100 T = 5 %* LENGTH STRUCTURE TIP B-5639 PROJECT = 0.033 MILES RIGHT OF WAY DATE: v 1 ROADWAY DESIGN NOVEMBER 27, 2019 JOSH DALTON, PE I�'�w V = 60 MPH e HYDRAULIC ENGINEER z PROFILE (HORIZONTAL) * =2% 3% TOTAL LENGTH TIP B-5639 PROJECT = 0.329 MILES ENGINEER 7°o ® 8����OI N4>z O 10 0 10 20 TTST DUAL a LETTING DATE: I ' I .. SUB-REGIONAL TIER JULY 21,2020 DAVID STUTTS, PE ::`��J PROFILE (VERTICAL) MAJOR COLLECTOR NCDOT BRIDGE PROGRAM MANAGER P.E. f\ SIGNATURE, f\ Revised 4/20/20 PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING • 8-5639 2B-/ SHEET 2 OF 17 I7 tO ROADWAY rESIGSNHEET NO. HYDRAULICS ENGINEER ENGINEER 50' 25' 0 50' 100' `1I11� NAB. /_8� SCALE: 1"=50' 1071 qq�� r„..., / \ DOCUMENT NOT CONSIDERED FINAL I" -- \ UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of. M / ---,..............„ / t�/,I Fu Box 700 \p.N., �V�NID quoy-Von ina,NC 37516 _ _ WCDON www.mon <.wmbmvncoa — g SUNGATE DESIGN GROUP,P.A. � - m7 r-g / O KILPATRICK FARMS,INC. A.M.E.ZION CHURCH t....----..---'''' -------------------/ I CO A.M.E.ZION CHURCH \ I I- we W ANTHONY K.DEVANE A.M.E.ZION CHURCH \\ Ac ± (L EVELYN J.DEVANE WOODS ' oa Ivy POSSIBLE W i . . . el OVERLAP AREA gm W EXISTING N/W \ ��—\ ——T—_T—T—— —r__ v' —TO SR 1916(LANDFILL 00) I I I O I I T O EIP NC HWY IIS 27 BS7 O _-_c • T' T - FO T FO——— % EXISTING R/0/7/ E� E m �- � O ��.CGI EIP 0 - Ai LO WOODS _ - � WOODS I --Wt1/, �— ± ± o I. / 4 \ /j ± —± HC / ± SITE 1 I F I -L_DET- PC Sta.10+00.00 = iC t ± ± ± W -L- Sta.14+80.49 C) 1 WETLAND WC JI AN I HUN" K.DEVANE EVELYN J.DEVANE W Z J U // FILL IDENON TES WETLA TEMPORARY z DENOTES HAND +0+0" ::t CLEARING }�� FOR -L_DET- PROFILE, SEE SHEET 7 ... FOR -L- DESIGN, SEE SHEETS 69E90 Revised 4/20/20 0' PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING • 8-5639 2B-/ m SHEET 3 OF r •7 ROADWAY rESIGSNHEET NO. HYDRAULICS ENGINEER ENGINEER 50' 25' 0 50' 100' `iIii- NqD- /_8� SCALE: 1"=50' ss......, 7--------,-, m \ DOCUMENT NOT CONSIDERED FINAL —— \ UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M // /,I t� PO Box 700 ..A., .V. Fuquoy-Vonna,NO 3J526NID_ _ WCDON www.monma w<. m oabmvnc — g SUNGATE DESIGN GROUP,P.A. az)=E °. __________ 17' in - m O --_--i KILPATRICK FARMS,INC. 7— A.M.E.ZION CHURCH -75t---------,_-----____________ -----„,,,,,.... / I CO N A.M.E.ZION CHURCH / —J= ,,_, ± ,'7 ± I,.� — �� \\its ± (jJ ANTHONY K.DEVANE A.M.E.ZION l� s/ s \ \\\ EVELYN J.DEVANE Jl \ _ C 6 NLB� \ \8g l\C WOODS 9�� ' POSSIBLE �0�� o. �� 7 \ ,+I liti El OVERLAP AREA \r., / 1 - EXISTING F/W �J�n�� _ —__ r/) T —TO SR 1916(LANDFILL RD) I = I� \ I I I O EIP NC'WY llS 22':. INII __ -- Imo_ — 68 O yy, — X —� :. 65— w O ...— EXISTING FUN/ j E �� -' -�a7 ,• /' �y y W0005 / / //-� EIP /. �.Y4I r jWOODS/ / J� ./ j' ±- -± I- zic tie ± ± y 1 / ± SITE 1 , I C 1 + / ± ± -L_DET- PC Sta.10+00.00 = ± W -L- Sta.14+80.49 C) 1 WETLAND WCO JI AN I HUN" K.DEVANE EVELYN J.DEVANE W Z —J U / FILL DENION TES WETLA TEMPORARY DENOTES HAND EONA" ::t CLEARING >E9Z FOR -L_DET- PROFILE, SEE SHEET 7 ENEO— ..4 FOR -L- DESIGN, SEE SHEETS Revised 4/20/20 v.N. \ PROJECT REFERENCE NO. SHEET NO. 8-5639 28-2 RW SHEET NO. 50' 25' 0 50' 100' ROADWAY DESIGN HYDRAULICS I I 'I" ENGINEER ENGINEER SCALE: 1"=50' NAD ,gam 011 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M \piT M ,%quoy-Varina,NC 37516 \in WCDONALD www.monmac.wmkmenon I SUNGATE DESIGN GROUP,P.A. Ln 0 N into JOGENFORRATNIa,IROADN CAROLINA,sos olrl'a 1,1ZENO ceee R.J.& CARRIE ROBINSON HEIRS N C/O NATHANEL BONY PERMIT DRAWING 0 SHEET 4 OF 17 cc) KILPATRICK FARMS,INC. N I— \ \ W I V) CL A RIPRAP a EST 1 TON SHOULDER BERM GUTTER W Yn EST 4 SY GFD APPR.SLAB TO STA.19+78-L DET-LT W ± ± ± ± + ± + + + + + + + + + + + + + + + + + N + ± + + + + ± ± + + + ± + + + + + + + + + + \±± + + •Of — .�—. '. �,� WLB���I. EXISTING R/W MML T —T— /e 24'GONC� a T-- �� — _ __— __ T——T d- 424'CONC. s- T BRIDGE°36 -- 1— ICONC) iv• NC WY II 22'EST -- o -- — - F 8 Q --- F— W---- _F \�cp Fib Tro _F-- - — =r-------�TFO rEo--- �` F -- -- �JNK TFo - i AmommIII ., WLB - v J � rAil A! '. T T - •��;; _ � �I%�--�°®I' �� •ITS"I�IR7.AY.� -E.WI. .-.. �N: -$�� + + + + —yr.al/ w E—� + + E. E 000siii, •1 Ir,�.►7Y:�i74s�7Y> I IrI7 a� E+ + + + + + + + + + + + + + + + + + + + F 9 F I " LU — W ` W �3; E a E E • 0 \ \ ± + ± ± + ± + + + ± + + + ± + ± ± TS ± ± ± + ± ± + + + + + SITE 1 + + + + + + WLB C S II RIP RAP 6. + + + + SITE 5 + + + + + + + + + + + + + + + LU Z ± ± ± ± + ± + +\, EIP _ + + + + + + + + + + + + + + + + + + + + + + \ SIT: Is II RIP RAP— 't\ + ± + ± ± + —1 J ± ± ± ± + ± + + ± ± + + + ± -L-DET- PC Ste.21+68.02 -L_DET- PT Ste.27+54.95 = HC -L- Ste.32+32.36 U -L_DET- PT Sto.15+86.93 WETLAND 'IC -L_DET- PC Ste.19+88.37 WETLAND WA Q -L_DET- PC Ste.16+74.93 -L_DET- PT Ste./7+66.58 O / -L_DET- PT Ste.20+80.02 ANTHONY J. DEVANE DENOTES HAND EVELYN J.DEVANE / 0 / CLEARING 0 KILPATRICK FARMS,INC. 4 / GARNETT CHASTEN, j�//i/� '/ DENOTES TEMPORARY & LOIS CHASTEN,HEIRS /�° IMPACTS IN SURFACE WATER / FILL IN DENOTES WETLA ODRARY " // DENOTES WETLANDTION Z 0 >�� FOR -L_DET- PROFILE, SEE SHEET 7 ��� FOR -L- DESIGN, SEE SHEETS 4 & 5 Revised 4/20/20 v. \ PROJECT REFERENCE NO. SHEET NO. 8-5639 28-2 . RW SHEET NO. 50' 25' 0 50' 100' ROADWAY DESIGN HYDRAULICS I I 'I" ENGINEER ENGINEER SCALE: 1"=50' NAD "gam 011 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M LK PO 13o,700 \piT ... Fuquoy-Vonna NC 27526 MCDONALD www.monmac.cam/ammo's I in SUNGATE DESIGN GROUP,P.A. 0 N •• ,oGENFonwMA OMAnces olri'°'"'se No ceeo R.J.& CARRIE ROBINSON HEIRS 1 0 \ N C/O NATHANEL BONY PERMIT DRAWING m KILPATRICK FARMS,INC. SHEET 5 OF 17 i \ \ '' ^ ( I F CL A RIPRAP EST 1 TON SHOULDER BERM GUTTER \ \ g W N— k I + + �—I �,� EST 4 SY GFD APPR.SLAB TO STA.19+78-L DET-LT W ± ± ± ± ± ± i i / I i i ± ± ± + ± ± 1 ± ± + ± ± i + i i + • �— te._ �� y r. •5) * A/ i 1 ± ± , is J ae \ �, / ±r± * A, ± A, i\ ± , __________—___ ..7/ ± ± ± ± \( r ± ± ± A, ± ± ± - / \ ;c)12 .,- 1 9S4 ± L + + ± + ± O \ 8,1_ i k —�i� i ,� \.: L/� i _ i --i i\/ i i i- i- i - _+____, i i i i i \,..± n 4 `yy_ �\•2 'I ��x J' _--�- __ _N—- - —:M -__/�� 85_ — _ — T-�-- _�.� __ — TIN''' - _ T —R__. `cam C:G v. _ w_ _ i�x 1• — :RInGE o� —Sy_ Sy-- 1 _ ,- i i LO \ / 1 ONC) ,/i iv M1 NC bWY II 22'BST I J \ 1 0 1 I',I L v alliu,c nLi e �� 6Z - 999 I„ —_ —— j — - r �" _ �1aala WIN '`� _ iii Ei wee - llists.� - i i i . s"i ' �i� �`�7 � iii I - —� wrf7® Y W �7 - � �: _ a � 4eredGV � rr i + i ± 1 i ± I'— E ►!7Iri:•L 7Y7 000s — i i i i i W i wr \ imam v Wx- � 7 ..L : ir - rr + ± i \* i ± + ± \ i 4• + �/ ± ± ± I i i i i + + 111 +1 0,7;m � C--85 Nig I \\ i i ± i i i�\ i \\ i ± ± i ± i1 , \ ± i ± ± ± ± ± i i ± �\i i i ± ± + i / SITE 1 1 — C\. I RI RAP \ + + ± i + ± + ± Ae ± i i SITE 5 + LU P ± ± ± ± ± ± + ± ± + i + ± i ± + + ± + + i Z ± ± ± ± + ± ± i _ SIT 65IIRIP RAP— + i ± + + ± ± ± ± ± ± ± + ± ± + + ± —I -L_DET- PC Ste.21+68.02 -L_DET- PT Ste.27+54.95 = r HC -L- Sto•32+32.36 U -L_DET- PT Ste.15+86.93 WETLAND C -L_DET- PC Ste.19+88.37 I— WETLAND WA Q -L_DET- PC Ste.16+74.93 -L_DET- PT Ste./7+66.58 O -L_DET- PT Ste.20+80.02 ANTHONY K.DEVANE DENOTES HAND — EVELYN J.DEVANE / / CLEARING KILPATRICK FARMS,INC. 0 / GARNETT McCALOP j//i/� '/ DENOTES TEMPORARY & LOIS CHASTEN,HEIRS /�° oy IMPACTS IN SURFACE WATER //// FRILL IN ENOTE WETLAND TEMPORARYS it // DENOETION j` >E•Z FOR —L_DET— PROFILE, SEE SHEET 7 .01 FOR —L— DESIGN, SEE SHEETS 4 & 5 rr Revised 4/ 0/20 PROJECT REFERENCE NO SHEET NO. 03 PERMIT DRAWING e 5639 Lo SHEET 6 OF 17 ROADWAYENGINEER ENGINEER ENGINE RS -L D ET- --LD ET- DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BEGIN GRADE B:NCH MARK "2 Prepared in the -L_DET- STA 13+71.67 B : TIE IN 10°04K Office of: 'pow Ud F a°arvata,NC 27526 EL.= 67.65' -L_DET- STA 17+91.57 OFF 53.65' A1=408406 E=231002' SUNGATE DESIGN GROUP,P.A. L.= 59.55' arvEs ry '—BRIDGE 4 STA.18+76.04-L_DET— `1/i,' 'cFsnaocec,z.za ziaoa I 4'G RDER Ery ucery euo.c�m 90 1 SPAN:1@170',SKEW 90 END GRADE 90 :EGIA BRIDGE WENVD. JCAS END BRIDGE -L_Ut l- SI A 23+9/.SS L_DET- STA 17+91.04 -L_DET- STA 19+61.04 EL.= 65.68' 80 PI= 14+50.00 _ I PI= 20+ 00 1 PI= 22+00.00 PI= 23+50.3Q. 0 80 EL = 67.92' EL = 65.02' EL = 66.52' EL = 65.53' VC = 150' VC = 130' VC = 200' VC = 90' K = 178 K = 54 K= 130 K = 92 70 _ _ I 70 _ — c� (+)0,344T% b X)5000% ( )0�5000% (+) 824% —(-) .660% ti e '-)O.E000% (+)0 1 69. 60 � -- _ _ _ _ � " 60 BENCH MARK "1 )\_ / BM: TIE IN IT PINE - 7 -L_DET- STA 10+5383 OFF 83.20' \ \ ') 50 N=407712 E=23101 4 - 50 EL.= 68.71' TO TOP OF BERM CLASS II R P RAP CLASS II RIP RAP 1.5:1 SLOPE TO TOP OF BERM 1.5:1 SLOPE OBS.ON 3-18-16 NWS=56.3 40 40 10 11 12 13 14 15 BRIDGE HYDRAULIC DATA DESIGN DISCHARGE = 1500 CFS DESIGN FREQUENCY = 10 YRS DESIGN HW ELEVATION = 58.8 FT • BASE DISCHARGE = 4560 CFS BASE FREQUENCY = 100 (FEMA)YRS BASE HW ELEVATION = 61.5 FT 90 OVERTOPPING DISCHARGE= 16800 CFS 90 OVERTOPPING FREQUENCY= )500 YRS OVERTOPPING ELEVATION = 65.3 FT 80 80 DATE OF SURVEY = 3/18/2016 W.S.ELEVATION AT DATE OF SURVEY = 56.3 FT 70 70 z 60 - - II 60 S z Z o :: 50 50_ zzz wow H-SF ze>a >z. FOR -L_DET- PLAN VIEW SEE SHEETS 2B-I& 28-2 4w 40 40 zz� 15 16 17 18 19 20 21 22 23 24 25 26 27 Revised 4/20/20 — 0 5 10 PROJ.REFERENCE NO. SHEET NO. N �i B-5639 X-3 CO 150 140 150 1:0 110 100 90 80 70 60 50 40 30 20 1D 0 1D 20 30 40 50 60 70 80 90 100 1'0 120 1"0 140 150 an 80 ct a 9 ° PERMIT DRAWING SHEET 7 OF 17 k W w W 0.020 0.020 E 3 70 ,\ / T- 67.96 � � — 0.023 0.024 60 — — _ _I� / � \ \ � _ _ — 60 FINAL GRADING- - - 21+50.00 . .50 •• W 89 p � 9 g� VI V W SITE 1 3 m `" 0.020 0.020 �Q OOO I O.00T—� M1�OR WE — T— — 67,96 — - LL IN WETLAND \ � ) 60 / - - - FINAL GRADING - - - - - - - - - _ ___ 21 +00.00 50 W Rn a p J R z ti L] 0.020 0.020 0.02O_\ W0.020 3 ,F TEMPORARY 7n T 68,09 -__Q+ IN WETLAND / / \ / W W \ 2.1 ?I 60 - - ��� FINAL GRADING �� - - - \ _ _ - - - 20 +50.00 50 80 p c 1 z1. • W 0.020 0,020 0.02I�� 0 020W 7� 1 ' \ FILL WETLAND '0 / h 8 \ -.1 -?..7 199 1 20 1 00.00 -FIIJAl CZRenwr, - - - - _ 50 Rn p C w W 0.020 0.020 0.020 W 3 TEMPO RARY 70 TA � 8 6L11 \� \ ~FILL IIN WETLAND SITE 1 \El \\ 60 Z _ _ _ -- CD — _ _ " T -FINAL GRADING\ — — — — 19 +50.00 L.,„. 5n '--C ,-,.a C--z rust / — ��w L 5a ** 150 140 170 1:0 1.0 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 1.0 120 1;0 14-0 150 Revised 4/20/20 0 5 10 PROJ.REFERENCE NO. SHEET NO. N �i — B-5639 X-4 CO Rn 150 140 130 120 1"0 100 90 8070 60 50 40 30 20 1D 0 1D 20 30 40 50 •8 8 :8 90 110 1"0 1:0 1i0 140 1'0 80 PERMIT DRAWING SHEET 8 OF 17 70 0.020 0.020 70 eeleeleeleeleeIIeelIee eeleeleelee s 0.020 0.020 60 `" 60 50 ` � /-- 53.09 / 50 24 +00.00 80 Rn 7n 0.020 0.020 7n eeleeleeleeIeelleelleeIeeleeleelee 'l ,. 0.020 0.020 N. Rn cc g Rn W 5n - - � — - - - - - - - - - - - — — _ 50 - 50.35 -J Rn 23 +50.00 80 7n 0.020 0.020 7n es, lEraleeleeleef CU: ice--M�"t-iuM-- 0.020 0.020 J � W W AY) v~ I f� V III SITE 1 hn " 'RARY IMI ACTS W - -- RFACE WATER / / — — _— ` ' U. , , 50 3 W ` BEGIN RIDGE —L— 22 + 68.7 .' BEGIN BRIDGE —L it 9 .04 5n Rn 80 ct t Lt.. 0 a z z z z J a � �g h k W u {j W 7n W 0.020 0.020 W 3 3 3 3 7� ? 0.024 0.024 /— — 8 67.99 2 A. 1'1 / W W \ nn / _ fY — — — _ _ — I FINAL G DING — — _ 22 +50.00 5,0 50 Rn 80 N. C I � � CD LU x 7n u 0.020 0.020 W 70 67.92 0.040 8.04 �� — — — * / \ ?7 60 _ _ \ — _ Rn Z _ _ FINAL GRADING- .0 22 +00.00 L.JM. 50 50 '--a C--Z rust / - C-S.w L . » CC ** 150 140 170 120 1"0 100 90 8070 60 50 40 30 20 10 0 10 20 30 40 50 •I I :11 90 110 1"0 11.0 1;0 1 0 1'0 Revised 4/20/20 — 0 5 10 PROJ.REFERENCE NO. SHEET NO. N 171717171i 6-5639 X-5 co 150 140 150 1:0 110 100 90 80 70 60 50 40 30 20 1D 0 1D 20 30 40 50 60 JO 80 90 100 1-10 120 1i0 140 150 PERMIT DRAWING SHEET 9 OF 17 •• :,9 Cu' : 9 z� ww3 SITE 5 0.020 0.020 " TEMPORARY ,�0�'` �I 67,36 _ 0.006 0.007 FILL IN WETLAND \0 26 +00.00 FINAL GRADING- II 50 Ai 80 w � a a g w 3 4 _ 70 0.020 0.020 r w TEMPORARY FILL IN WETLAND 1,•? �1 67,58 1� 0.029 0.030 /// ➢ �\ 2) 2.7 60 — _ _ — — — — FINAL GRADING- — 25 +50.00 50 cr cr W 80 o kI- w 163. 0.020 67$' 0.020 W 0.040 �3 j TEMPORARY 70 0,040 FILL IN WETLAND //// h . _ 37 ?,) ®O_ T 25+ 00.00 -FINAL GRADIRIG --- - - - - �__ ___ - - - 80 3 Cu- 0 Z • CD 1 ' SITE 5 W W 0.020 0.02o L 7n �, 68.02 0.020 0.020 I RARY / 7 3, r WETLAND FO *o — _ — / -FINAL GRADING— — — — — — _ I _ — W�� - - - - - - - - - - - 24 +50.00 NSW.�w END BRIDGE -L- 24 +41.25 END BRIDGE -L_DET- 19 + 61.04 50*0 _L *� 55= 55: ** 150 140 170 1:0 1"0 100 90 80 70 60 50 40 30 20 1D 0 1D 20 30 40 50 60 710 80 90 100 1"0 1:0 1y0 100 150 Revised 4/20/20 o, PROJECT REFERENCE NO. SHEET NO. 0- 50' 25' 0 50' 100' 8-5639 4 '' `'I" RNJ SHEET NO. SCALE: 1"=100' ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER NAD /8 = 017 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M t�/� F, Bor J00 \pCD ALD xnew monrna a,NC men275co 6 \IwLTONNID www.monma<.wmbmvncoa 5Ar------ — O3.g20 SUNGATE DESIGN GROUP,P.A.6� — 2/2.62\ RPLJ IGN NOgrn c R� _ I `! N`O FIRIMLLE SE N0..0 �"°. PERMIT DRAWING - _ SHEET 10 OF 17 3 T__ SO'£1� - ,IZ.91 S v PrAR KILPATRMS,INC. V) z A.M.E.ZION CHURCH t W - W ---------J -L- POT Sta.10+00.00 z V) "03.3g,g1 END OVERLAY W 2"73� LL_ POT 18+00.00W A.M.E.ZION CHURCH z f J: v± * I V) 0 A ± ± J A.M.E.ZION CHURCH \ ANTHONY K.DEVANE \ ± 0 EVELYN J.DEVANE ` __w,a——— WOODS O F POSSIBLE oG El OVERLAP AREA sN 0 F - W O EIP EXISTING R/W k ---- - B5639-2. —T—--— _ — — 1——r O —TO SR reie(LANDFILL Rm N l2'09'40.3°W I I I -Te Q EIP NC(INC IIS 22'6ST N 7O6D X EXISTING R/w �E—,E � —.. .. .. .. .. .. .. .. .. .. .. .. .. .. -. .- .. - _ �,VI �,. _ Fo F T I a W J WOODS \ EIP /-'Y WOODS / ——— E— LLJ Z / ± A, A, ± A & A J I / ± AX ASITE Al AX 5 V ± /1 ± ± ± -L_DET- PC Sta./0+00.00 = ± -L- Sta.14+80.49 Q WETLAND WC0 AN I HONY K.DEVANE z EVELYN J.DEVANE 0, z cp /// DETES WETLANDL IN 0 LPE �44� He,a vtE»z �� FOR —L— PROFILE, SEE SHEET 6 ENE ** FOR DETOUR DESIGN, SEE SHEETS 2B-1 & 2B-2 Revised 4/20/20 o, PROJECT REFERENCE NO. SHEET NO. D, 50' 25' 0 50' 100' 8-5639 4 tO 'I" RAM SHEET NO. SCALE: 1"=100' ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER °3/2oli DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M M PO Box 700 .N., 0V0 Fuquoy-Vonna,NC 27526 MCDONALD www.monmoc.coMmencos 03.g2,D, SUNGATE DESIGN GROUP,P.A. 6� — 2/2'62\ RUJIGH NORTH cR� ....... L `! N�OFlRIMLLENSENOL8B0 ��"°.3q --7 PERMIT DRAWING 3 - _ SHEET 11 OFN17 liv 7 SO'£1� - 1,IZ.91 S O KILPATRICK FARMS,INC. Ln co z A.M.E.ZION CHURCH W£, W - W ---------_i -L- POT Sta.10+00,00 = z a V) E'g "°3.38 4/ END OVERLAY W 2"73 -L- POT 18+00.00 W A.M.E.ZION CHURCH z � _ S N A.M.E.ZION -��- ANTHONY K.DEVANE �� °'m 6/ s� \\ ✓_ _9 O EVELYN J.DEVANE � �89 '� WOODS e9 _w�e—_ POSSIBLE /� \ 0 E1 OVERLAP AREA / 65 -1 fi q 11 F _ F EXISTING Riw �: - _ __ _ _ _-.iz� O O EIP X - f • —`- S9 B5639-2 — - � , - _ ,-I -TO • SR l9/6(LANDFILL RO1 `wee \6Z '/2°09'-0,3'W 9�`'• a ` N^ - • [�—— _ N EIP NC (IS 22'0 AKEW— _.AIMMEMNIIMMMM— _ -68 � �6; -- _65 =37 --- _ �, ..��FaL _ ,,y= _ Ain E +,9 i �d1� J�c = V'711.48' EXISTING Riw — —. WOODS / / ODS / EIP a '-.V, I / WoODS /� T E— LLJ I 1:V--,/ 4;•_771 ± _________56.-k-N ., SITE Al A i V c ± /1 ± ± ± ± -L_DET- PC Sta./0+00.00 = -L- Sta.14+80.49 Q WETLAND WC0 AN I HONY K.DEVANE EVELYN J.DEVANE i z /// DE WETES TLANDL IN 0 ... vtE»Z �� FOR -L- PROFILE, SEE SHEET 6 .01 �� FOR DETOUR DESIGN, SEE SHEETS 2B-1 & 2B-2 +9+9+9 Revised 4/20/20 cr \ I U• PROJECT REFERENCE NO. SHEET NO. 50' 25' 0 50' 100' B 5639 5 m `' " RAM SHEET NO. SCALE: 1"=100' ROADWAY DESIGN HYDRAULICS Alli1116......._. \ ENGINEER ENGINEER 0)7 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M rAg PO Box 700 wMM rV. Fogooy-Varina,NC 27526 WCDONNID www.monma<.wmbmvncoa I SUNGATE DESIGN GROUP,P.A. N M OAD ` 11, �� P"r:oLInA:76oB 0 PERMIT DRAWING R.J.L/0 NA THANELNBON�YEIRS O SHEET 12 OF 17 2 KILPATRICK FARMS.INC. I- WETLAND WD w LJJ P RAP T SH SHOULDER CLASS II IPA POINT CLASS II IP RAP WETLAND WB STA.19+75 TO TO SH ULDER POINT ROCK PLATING=1,470 SY BE IN BRIDGE LT& RT s END IDLE TO STA.25+00 LT —L— POT SIG.33+00.00 Cl) FROM STA 19+75 TO 22+70 LT& RT IS RUCTURAL PAY ITEM) END RIDGE TO STA.24+50 RT CARRY ROCK PLATING TO 2.5:1(HA)SLOPE P (STR CTURAL PAY ITEM) W USE ROCK PLATING DETAIL NO.1 OF \--- CL B RIPRAP BEGIN OVERLAY �W/ N 1 ROADWAY STANDARD DRAWING NO.275.01 )( EST 1 TON —L— POT 27+00.00 v I i ± SITE 2 IA A ± i A 'A A A A EST 5,SY GFDA 'A i i i i 'A A A A i i i A i A A A A A ± i ± i i i i i i SITE 3 T '. i A i i SITE 4 A A A A A A A A A A A A i A A i A A i 0 A A A A i A A A i A A ± A A A A A A A A A A A A A A A A A A A A A A A O \i A A A A A A A A A i \ F 15"WzELBOWS ± A i i i UTTE i A A A A A A A A A i A A A A A A O' I SHOULtERSLAB BERM .24+ O. 1 &�APfR.SLAB,TO STA.�4+65.5,,, i i A A A A A A A A i A A A i i i i O F *�— O _If� i � T *L �� i i i `.- -- i i i A A A A A A �I�,�II'/�i • ' — ly^ r . - B- y EXISTING Riw E� O -,,,...:4 rfar, I i, 4 Cp, _ - — _ . —r—i T—— —r N N /2°09'40.3"W " �, I f771, ' w TB 2GI r� NC ' Aa —.._�_..,,• k,..,* 94 TB 2GI1�Q —_ a - -- - --o - T E�' r Eo � N4C r Sow-- r ,��*n y 'Oa '1•r - ————esrs�e-FriW-—— 100------- — _— Ol�I� — 6 unK _ 2i , �t — FAY �� �i�/ B w s——— =E V. Y o F Saa�'±ii —A .i1,rj av .. .. - i i i i�E i A A A A A A A A / �•" -- YI ro � ..�SHOULD R BERM UTTER _ _AS E -� J i- A A A A A A A A APIp SLAB T STA.2dd+65.5 C A -= WOODS wLs\ i i Y 4 A E i A A A A A A A A A A A A A A A A W A lt,6 i E i - E I E /A, i E A A A A A A A A A A A A A A A A A A A A A Zi i 'Y A 4� 'Y i 'x ` 't \ A A AN SITE 5 A A A A A A A A A A A A A A A A A A J A A SITE 1 A i 15"WfLBOWS © CL B RIPRAP \ i i i A A A A A A A A A A A A A A A A A A A A A EST 1 TON \ = A A A A A A A A -w EST 5 SY GFD N A A A A A A A A A A A A A A A A A A A A A A A V \ EIP EXCAVATE TO APPROX. A A A A A A i A A i A A A A A A A A A A A A A A A A A i A A A A A NG EL.AT CL=57.3' ag - EXCAVATE TO APPROX. A i A A A A A A A A A A A A A A A A A A A NG EL AT CL=57.3' ROCK P G=230 SY WETLANDFRW,OzA +L TO 26+25 RT CAegv ROCK n.enu^ TO 2.5:1(FIN)SLOPE WETLAND WC ROADWAYS STANDARD PLATINGcK DETAIL NO.27 O1 //// DETES FILL WETLAND IN ANTHONY K.DEVANE * * * * DENOTES MECHANIZED EVELYN J.DEVANE **** * * *_1CLEARING © KILPATRICK FARMS,INC. 0 &LOISECHASTEN HEIRS j DENOTES IMPACTS IN / �!`�'//�j SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER .E � �� STRUCTURE EXCAVATION w�� y\ \\\\\\\\ ::� APPROACH SLAB Af i N., FOR -L- PROFILE, SEE SHEET 6 .01 FA4.4 I FOR DETOUR DESIGN, SEE SHEETS 2B-1 & 2B-2 Revised 4/20/20 v. G. \ I PROJECT REFERENCE NO. SHEET NO. 50' 25' 0 50' 100' B 5639 5 co `' " RNJ SHEET NO. SCALE: 1"=100' ROADWAY DESIGN HYDRAULICS Illikab......_. \ ENGINEER ENGINEER -YzOi DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared or the Office of: M IM PO Box 700 \piT �V� Foquoy-Varina,NC 37516 WCDONNID www.monma<.wmbmvncoa I SUNGATE DESIGN GROUP,P.A. CV M ` • �� P"r:oL�NA:TsoB in \ PERMIT DRAWING SHEET 13 OF 17 R.J.& NATHANELN ON�YEIRS O2 KILPATRICK FARMS.INC. I- WETLAND WD \ \ w W P RAP T SH SHOULDER CLASS II IPA POINT CLASS II IP RAP WETLAND WB = STA.19+75 TO— TO SH ULDER POINT —L— POT 510.33+0000 ROCK PLATING=1,470 SY BE IN BRIDGE LT& RT s END IDGE TO STA.25+00 LT Cl) FROM STA 19+75 TO 22+70 LT& RT (S RUCTURAL PAY ITEM) E f END RIDGE TO STA.24+50 RT CARRY ROCK PLATING TO 2.5:1(HA)SLOPE (STR CTURAL PAY ITEM) W USE ROCK PLATING DETAIL NO.1 OF r CL B RIPRAP BEGIN OVERLAY ROADWAY STANDARD DRAWING NO.275.01 N �, m-`- EST 1 TON —L— POT 27+00.00 \ \ g NA AEST 5 SY GFDAA AA5? A A A- ±-_77-A A A A ± W SITE 2 e5 I I'� A SITE 3 l h' ± ± SITE 4 �_� 6 `2 : : A 'x 'A\s ± 2'Ift) = **k**1E iE#. l .� ili - \----.- . /ZU`l \ Ll ,42 �eMlt--_.\\ «t 3!..,1�gi 1 F''� S A A A -A 5 A 1 l_ A A A ± + �_ r I �,4 S� 8\ _ • TING R 90 ,,�. +r � :xs� `tl_L/� ' S in L _ E-_ - x ,r- — ,_ O �...... —— T WLB MI .. L7C Sx�GO.?J rig '1 �9L —59— —Sy— 1 N /2'09'40.3"W I i r 2 YSTI ��� I � TB 2GI o Q TB 2GI eI� -1Fliklomi �_. — =.---�.— 'sue-- T r1'� o�_�_ I . ..tea^ o - �LJO— n iFIT� - y J ._ 1 ! I 1111 B5a EE±IF w. i-/:__ A ± A 1"‘,''''''':\*\\ I:)4j, ± A ± ± A SITE 5 \ \\ \ ±/ " ,,_ 15"WiELBOWs \ J T, _ SITE 1 c \ �!� \, �s CL B RIPRAP \ 3: A t 1\\ \�� EST 1 TON \ /) I A A A A A A A A —WL EST 5 SY GFD A 3 A 6 � U A A A A 7< A A A A A EP EXCAVATE TO APPROX. A A A A 'A A A A A A A A A A A A A A A A A A A NG EL.AT CL=57.3' eg - A 17 EXCAVATE TO APPROX. A A A A A A A A 'A A A A A A A A A A A A NG EL AT CL=57.3' ROCK P G=230 SY WETLANDFRWATA +L TO 26+25 RT CARRv ROCK R.e" TO 2.5:1(H:V)SLOPE— NO.1 OF WETLAND WC ROADWAYS STANDARD DRAWING NO.27 O1 / /// DE WETLAND IN ANTHONY K.DEVANE * * * * DENOTES MECHANIZED EVELYN J.DEVANE / **** * * *_1CLEARING KILPATRICK FARMS,INC. O © &LOISECHASTEN HEIRS j DENOTES IMPACTS IN / �!`�'//�j SURFACE WATER . ///iir t» DENOTES TEMPORARY IMPACTS IN SURFACE WATER .E � �� STRUCTURE EXCAVATION w�� y\ \\\\\\\\ ::� APPROACH SLAB �f N4,Cc FOR -L- PROFILE, SEE SHEET 6 FA4.4 .01 I FOR DETOUR DESIGN, SEE SHEETS 2B-1 & 2B-2 R v i s e d 4/20/20 PROJECT REFERENCE NO. SHEET NO. ROADWAY DESIGN HYDRAULICS S ENGINEER -L- END OVERLAY BEGIN GRADE -L- STA 18+00.00 BEGIN PROJECT EL.= 68A3' DOCUMENT NOT CONSIDERED FINAL BEGIN OVERLAY UNLESS ALL SIGNATURES COMPLETED -L- STA 14+90.00 Prepared in the I A PO Box 700 MOT7 IVY Fupuay-VeS,,NC 27526 90 SUNGATE DESIGN GROUP,P.A. P1= 18+80.00 `II E��s sM'°s�nO Cno,�s 80 - - - - - - - - - - - EL = so3' PERMIT DRAWING 80 - - - ___ --- - - - - K = 135 SHEET 14 OF 17 BRIDGE HYDRAULIC DATA 70 DESIGN DISCHARGE = 2500 CFS 70 DESIGN FREQUENCY = 50 YRS (-10.5000% (+10.6880% DESIGN HW ELEVATION = 60.0 FT BASE DISCHARGE = 3000 CFS 60 BASE FREQUENCY = 100 YRS 60 BASE HW ELEVATION = 60.5 FT OVERTOPPING DISCHARGE= 16800 CFS I I OVERTOPPING FREQUENCY= )500 YRS 50 OVERTOPPING ELEVATION = 65.6 FT RFNCH MARK °I 50 BM/: TIE IN 13"PINE -L- STA I5+63J4 OFF 83.78' DATE OF SURVEY = 3/18/2016 N=407712 E=2310164 40 WS.ELEVATION _ EL= 68.71' 40 AT DATE OF SURVEY = 56-3 FT 30 30 10 11 12 13 14 15 16 17 18 19 20 I-L- I BEGIN OVERLAY END PROJECT END GRADE END OVERLAY -L- STA 27+00.00 -L- STA 32+25.00 r--BRIDGE I) STA.23 55.00-L- Fl = FiFi Of)' 24"COREC SLAB 3 SPANS:W56.19,1@60.3',1@56.19',SKEW 90 W/4'END BENT C PS GP ELEV.=68.63' 90 BEGIN BRIDGE END BRIDGE -L- STA 22468.75 -L- STA 2444/.25 RFNCH M"PK .2 90 5 2: TIE IN 10"OAK -L- STA 22+70.53 OFF 95.90' PI= 21+30.00 I N=408406 E=23/0027 80 EL = 59.75' EL.= 59.55' 80 VL = aO' K = 227 PROPS ®GE E _EXIS E7��J C, B6P,,IDGE T EE R M.�f5`'"'-VED 70 r+In6R8ox ( )oSoonL 70 • *=`, SO `�V®` 60 EXCAVATE EE TOT APPRO=57.3' EX VATE TO APPROX. 50 NG EL.AT CL 840 C' -' EST.840 CY 1 _...\...' V I s—NG EL.AT CL=57.3' EST 700 CYf» 50CL II RIP RAP :L II RI RAP : TO TOP OF BERM 10 TO OF BERM 5 1.5:1 NORMAL .5:1 N RMAL z CUT EXISTING CUT EXIST �E VERTICAL ABUTMENT VERTCAL UTMENT 40 TO EL.=57.3' TO EL.=573' 40 er�w vry -a-16 *�t9 NWS=56.3 eL >�z FOR —L— PLAN VIEW SEE SHEETS 4 & 5 ,A.w 30 30 ... 20 21 22 23 24 25 26 27 28 29 30 31 32 33 '00 Revised 4/20/20 — 0 5 10 PROJ.REFERENCE NO. SHEET NO. N �i B-5639 X-3 CO 150 140 130 1:0 110 100 90 80 70 60 50 40 30 20 1D 0 1D 20 30 40 50 60 70 80 90 100 1"0 120 1�0 140 150 Rn Ro � ct a 9 PERMIT DRAWING SHEET 15 OF 17 w 0.020 0.020 L., 70 ,\ / � � 67.96 � � L 0.023 0.024 1 / El \`\ 2:7 2;7 Fin —G- / / \ 60 _ _ — FINAL GRADING — - - 0 21+50.00 I . .50 W 89 a CC C9 z v W 7n SITE 1 3 `" 0.020 0.020 -Q000 0 ►3 ILL IN WETLAND FILL IN WETLAND ► �A � - 67,9. - / \, - 2.7 --, Fin , FINAL GRADING — — — — — — — — _ — — - 21 +00.00 50 CI — 80 z a 3 z SITE 2 g t 7 3 - v L., o.ozo 0.020 0.02 W % 7n 0.020� ��FILL IN WETLAND FILL IN WETLAND .° / W T — 68,09 — \ \ � 60 SITE 1 W 2'7 ?'I — 1� _ _ _ _ FINAL GRAD ING_ �� - - - - - - - - - - - - — 20 +50.00 50 80 0 c 1 z v) it. L., 0 020 w 79 0.020 _ _ 00 2yz�020 6810 1 1 j / 8 27 27 199 I 20 1 00.00 FWM rRenwr - - - _ 50 Rn t i a• r C ;c W k 0.020 0.020 0.020� 70 � — all I----- / lb °'7 ?•7 — / \\ nn `"� — — — — T FINAL GRADING \ 19 +50.00 L.,„. 5n '-Sc '-Sc '-4AZ cc 55 -L - .** 150 140 170 1:0 1"0 100 910 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 1/0 1.0 140 150 Revised 4/20/20 0 5 10 PROJ.REFERENCE NO. SHEET NO. N �i — B-5639 X-5 co 150 140 150 1:0 110 100 90 80 70 60 50 40 30 20 1D 0 1D 20 30 40 50 60 70 80 90 1 0 1'10 120 1i0 140 150 PERMIT DRAWING SHEET 16 OF 17 •• :,O Cl g : z� SITE 4 1 3 w - SITE 5 0.020 0.020 W 3w FIB IN WETLAND FILL IN WETLAND 1..• ` �I 67,36 _ 0.006 0.007 21 — �/ \\ - - - - - - - - - - - - 0 26 +00.00 50 • — 80 o L —....- z o g ct J 3 W - 70 0.020 0.020 E w FILL IN WETLAND 01'1 ➢� �� 67,58 ��� 0.029 O. 30 60 — / FINAL GRADING- — 25 +50.00 50 80 ❑ w ❑ a zz 1 L.; 3 7l7 0.020 0.020 441 ?-• 67.81 0,040 0.040 /// h \ 3.7 _ - - - � -FINALGRADIRIG --- - - - - �_____ --- — _ ___ 25+ 00.00 90 80 3 W ❑ g i Z� z SITE 4 w ti g I w x 3 70 0.020 0.020 r W 3 FILL IN WETLAND� �, 6s.os — —\ 0.020 0.020 Z 1 /// _-,,, it -?� 60 �o - - - - - - - � -FINAL GRADING- - - - - � - - - - - - - - - - - - 24 +50.00 ... N END BRIDGE -L- 24 +41.25 END BRIDGE -L_DET- 19 + 61.04 50 .�w _L SS� ... 55: ** 150 140 1-0 1:0 10 100 90 80 70 60 50 40 30 20 1D 0 1D 20 30 40 50 60 7�0 80 90 100 1"0 1:0 1.'0 1.10 150 Revised 4/20/20 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 19+50 to 19+86-L-RT ROADWAY FILL < 0.01 20+11 to 21+09-L-RT ROADWAY FILL < 0.01 14+62 to 16+65-LDET-RT ROADWAY FILL 0.08 0.02 17+22 to 17+38-LDET-RT ROADWAY FILL < 0.01 2 20+21 to 22+85-L-LT ROADWAY FILL 0.02 0.06 3 22+85 to 24+25-L- 170' BRIDGE * <0.01 < 0.01 0.09 99 17+46 to 19+61-LDET- 170' DETOUR BRIDGE < 0.01 < 0.01 < 0.01 27 4 24+22 to 25+34-L-LT ROADWAY FILL <0.01 0.02 26+01 to 27+49-L-LT ROADWAY FILL 0.03 0.03 5 25+81 to 27+17-L-RT ROADWAY FILL 0.02 19+61 to 26+42-LDET-RT ROADWAY FILL 0.19 < 0.01 0.08 TOTALS*: 0.07 0.27 < 0.01 0.11 0.10 I 0.10 0 126 0 *Rounded totals are sum of actual impacts NOTES: Site 3 Interior Piers are 2(8- 14x73 (14.6in x13.6in))= 2(8 (198.6 sq in)) = 2(1588.8 sq in) =22 sq ft(0.0005 ac) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 04-15-2020 There will be 0.03 Ac of temporary fill will be needed in the hand clearing areas for erosion control measures. DUPLIN COUNTY B-5639 45594.1.1 Revised 2018 Feb SHEET 17 OF 17