Loading...
HomeMy WebLinkAbout20200969 Ver 1_No Written Concurrence_20200821 Carpenter,Kristi From: Ward, Garcy Sent: Friday, August 21, 2020 2:55 PM To: Lane, Heather C; Steffens, Thomas A CIV USARMY CESAW (USA) Cc: Johnson, Jay B; Capehart, Cadmus; Gerrald, Rhett Subject: RE: R-5812 (C204358) Bank Repair Heather and Jay, I've reviewed the Buffer Authorization request that was submitted for this work(DWR project# 20200969). All the impacts are kept at or below the top of bank and no riparian buffers are impacted, therefore a Buffer Authorization is not required. The Corps is not requiring a 404 so a 401 is not required from DWR. Any buffers temporarily impacted by construction activities need to be restored to natural grade and revegetated. Should the scope of the project change, please notify me as a 401 or BA may be required. Thanks, Garcy Ward Environmental Specialist NC Divison of Water Resources (252)948-3917 Email correspondence to and from this address gs subject to the North Carolina Riblic Records Law and may be disclosed to third parties, Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts.To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Lane, Heather C Sent:Wednesday,July 22, 2020 4:01 PM To: Steffens, Thomas A CIV USARMY CESAW(USA) <Thomas.A.Steffens@usace.army.mil>;Ward, Garcy <ga rcy.wa rd @ n cd e n r.gov> Cc:Johnson,Jay B<jbjohnson@ncdot.gov>; Capehart, Cadmus<ccapehart@ncdot.gov>; Gerrald, Rhett <rgerrald@ncdot.gov> Subject: R-5812 (C204358) Bank Repair Tom/Garcy, As you know from our previous field meeting on R-5812 in Snow Hill, we have been working on a solution to address the bank erosion on private property. Please see the attached sketch which shows our repair recommendation which utilizes rip rap class II and class B. We have reviewed this tentative plan with the property owners and this satisfies them. Going forward, what do we need to do for agency approval since this is repair work(and off site)? Once we get approval, we can proceed very quickly with this repair. Please let me or Rhett know if you have any questions regarding the repair methodology. Thank you, HeatherC. Lane, P.E. Assistant Division Construction Engineer Division of Highways - Division 2 North Carolina Department ofTransportation (252)430-2847 Greenville Office (252) 640-6506 New Bern Office 1.h..c I a modVt.,qVv 1OSPooto|us Highway NC33 PO Box 1SD7 Greenville, NC27D3S smmll correspondence mmnarmmmlmmwnaw,immuNwoïż½mmwwopuuIonwoo,umI mwmna ray uw disclosed mml,unmmwm z