Little Tennessee Umbrella Mitigation Bank
East Buffalo Mitigation Site
Little Tennessee River Basin 06010204
Graham County, North Carolina
Title Sheet 0.1
Project Overview 0.2
Project Valley Overview 0.2.1
Wetland Crediting 0.2.2
General Notes and Symbols 0.3
Construction Sequence 0.3.1
Typical Sections 1.1-1.8
Stream Plan and Profile Sheets
East Buffalo 2.1.1-2.1.4
UT1 2.2.1
UT2 2.3.1-2.3.2
UT3 2.4.1-2.4.4
UT4 2.5.1
UT5 2.6.1
Planting Plan 3.0-3.3
Invasives Treatment Plan 3.4
Erosion and Sediment Control 4.0-4.2
Additional Grading 5.0-5.3
Details 6.1-6.10
Vicinity Map
Not to Scale
BEFORE YOU DIG!
IT'S THE LAW!
CALL 1-800-632-4949N.C. ONE-CALL CENTER
Sheet Index
Project Directory
Engineering:
Wildlands Engineering, Inc
License No. F-0831
167-B Haywood Rd.
Asheville, NC 28806
Jake McLean, PE
828-774-5547
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO NOT USE FORCONSTRUCTIONPRELIMINARY PLANS
ISSUED AUGUST 4, 2020
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Cover Notes.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaTitle Sheet005-45020HBERJM0.1August 4, 2020Surveying:
Brad Kee
Kee Mapping and Surveying, PA
P.O. Box 2566
Asheville, NC 28801
828-575-9021
Bank Sponsor:
Wildlands Holdings VI, LLC
USACE Project Manager
Steve Kichefski
U.S. Army Corps of Engineers
Wilmington District, Asheville Field Office
151 Patton Avenue, Suite 208
Asheville, NC 28801
(828) 271- 7980
USACE Action ID No. SAW-2019-01296
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NOT USE FORCONSTRUCTION0'250'500'750'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Overview.dwg August 4, 2020
005-45020
HB
ER
JM
0.2
August 4, 2020 East Buffalo Mitigation Site
Graham County, North Carolina
Project Overview CECECECECECECECECECECECECECECECECECE CE CE CE CECECECECECECECECECECECECECECE
CECECECECECECECECECECECECEC
E
C
E
CE
CECECE
CE
CE
CE
CEC
E
C
E
C
E
C
E
C
E CECE
CE
CE
CE
CE
CE
CE CECECECECECECECECECECECECECECECE CE CE CE CECECECECECE CE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECEOUOUOUOUOUOUOUOUEOUERAMLONGHORN, LLCPORTION OF PIN: 5662-00-09-0043DB: 374 PG: 420PC: DB PG: 1000RAMLONGHORN, LLCPORTION OF PIN: 5662-00-09-0043DB: 374 PG: 420PC: DB PG: 1001RICHARD WAYNE PENNINGTON, JR.& WIFE, CYNTHIA PENNINGTONPOTION OF PIN: 5662-00-09-0042DB: 240 PG: 770CARL D. LEE &WIFE, JOAN, B. LEEPIN: 5662-00-09-0024DB: 260 PG: 609PG: 5 PG: 980RICHARD PENNINGTON AND WIFE,MARGARET PENNINGTONPORTION OF PIN: 5662-00-09-0042DB: 128 PG: 799REF: DB: 126 PG: 713REF: DB: 117 PG: 746HUGH DARRELL ORR ANDWIFE, PATRICIA ORRPIN:5662-00-09-0028DB:72 PG: 553JESSE LOVELACE ANDWIFE, KRISTAN LOVELACEPORTION OF PIN: 5671-01-00-0022DB:348 PG: 844(TRACT 2 MYERS INDIVIDUAL DEED)U.S.F.S. TRACT N 723cPB: 4 PG: 608U.S.F.S. TRACT 1091aPB: 4 PG: 608JESSE LOVELACE ANDWIFE, KRISTAN LOVELACE PORTION OF PIN: 5671-01-00-0022DB: 348 PG: 844(TRACT 2 MYERS TRUST DEED)U.S.F.S. TRACT N 1091aDB: 42 PG: 247REF: DB: 83 PG: 94U.S.F.S. TRACT N 752oJAMES DARRELL COLLINS, SR.AND WIFE, ROMA GAIL COLLINSPIN: 5662-00-09-0033 PORTION OF DB: 214 PG: 363BO COLLINS AND WIFE,HELEN M. COLLINSPIN: 5662-00-09-0033DB: 367 PG: 550RICHARD PENNINGTON ANDWIFE, MARGARET PENNINGTONPORTION OF PIN: 5662-00-09-0042DB: 128 PG: 799REF: DB: 126 PG: 713BONNIE GERRYRICHARD SCHLEYROBERT G. CUSHMAN (LE)HARRIETTE C. CUSHMAN (LE)PIN: 5662-00-04-0006DB: 352 PG: 603PB: 5 PG: 980BRITTANY DANIELLECARPENTERPIN: 5662-00-07-0020DB: 345 PG: 163WILLIAM L. PRITCHETT JR.VALERIE N.PRITCHETTPIN: 5662-00-07-0011DB: 141 PG: 579PB: 4 PG: 29LOTS 11 & 18SUSAN INMANWILLIAM H. HOUNSHELLAND WIFE, CAROLYNHOUNSHELLPIN: 5662-00-07-004ADB: 330 PG: 487PB: DB PG: 2023PB: 4 PG: 29LOTS 4 & 19ARTHUR GREER ANDWIFE, SUSAN GREERPIN: 5662-00-07-0001DB: 315 PG: 588PB: 4 PG: 29LOT 1KLAUS HANNU MELARTI ANDWIFE, MARITA ULRIKA MELARTIPIN: 5662-00-04-0001DB: 246 PG: 605PB: 4 PG: 241REF: DB:83 PG: 640EASEMENT EXCLUSIONAREA14.9 ACRESLOT 2SEE TABLE 1LOT 3SEE TABLE 1TABLE 1. ADDITIONAL LANDOWNER INFORMATIONLOT 2LARRY D. MURRELL ANDWIFE, JEANEEN R. MURRELLPIN: 5662-00-07-0002DB: 259 PG: 157PB: 4 PG: 29LOT 2LOT 3STEPHEN D. POLACHEK ANDWIFE, DEBORAH L. POLACHEKPIN: 5662-00-07-0003DB: 328 PG: 687PB: 5 PG: 351 LOT 3REF: PB: 4 PG: 29EXISTING LOWER DIRTROAD TO BE ABANDONEDAND CROSSINGS REMOVEDEXISTING UPPER DIRT ROADTO BE NATURALIZEDEXISTING LOWERDIRT ROADUT3UT1UT2UT4UT4AUT4UT6UT7UT5EAST BUFFALO CREEKUT3UT2EAST BUFFALO ROADUT4BHISTORIC FIELD/ROADOVERBURDENTO BEREMOVEDBURIEDHYDRICSOILSEXISTING PORTION OF PIN: 566200090043TO BE SUBDIVIDED OR RECOMBINED WITHADJACENT MELARTI PARCELRE-ESTABLISHMENTEXISTING CLAYDRAIN TILEB6BURIEDHYDRICSOILS14"
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION0'80'120'200'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Overview.dwg August 4, 2020
005-45020
HB
ER
JM
0.2.1
August 4, 2020 East Buffalo Mitigation Site
Graham County, North Carolina
Project Valley OverviewOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOHEOHE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECE
CE
CE
CE
CE
CE
CE
CE CECECECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECEOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUUT3UT1UT4AUT4UT6UT7
UT
5
UT3UT2EASEMENT EXCLUSION AREA14.9 ACRESEAST BUFFALO ROADSHEET 5.2SHEET 5.1SHEET 2.2.1SHEET 2.4.1SHEET 2.3.1SHEET 2.4.2SHEET 2.4.3SHEET 2.4.4SHEET 2.1.4SHEET 2.1.3SHEET 2.3.2SHEET 2.1.1SHEET 2.1.2SHEET 2.6.1SHEET 2.5.1STATION 3000+95END UT2 REACH 1 - PRESERVATIONBEGIN WORK UT2 REACH 2STA. 4000+52END UT3 REACH 1 - PRESERVATIONBEGIN WORK UT3 REACH 2NO STREAMWORK ON UT4ASTA. 1003+66EAST BUFFALO CREEK REACH 1 - ENHANCEMENT IISTA. 3+96 END UT1 - ENHANCEMENT IISTA 1000+00BEGIN EAST BUFFALO CREEK REACH 1 -ENHANCEMENT IISTA 1005+74END EAST BUFFALO CREEK REACH 1BEGIN EAST BUFFALO CREEK REACH 2 - RESTORATIONSTA. 1013+57CONTINUE EAST BUFFALO CREEKREACH 2STA 6002+48END UT5 REACH 2STA 1017+06END EAST BUFFALO CREEKREACH 3 - ENHANCEMENT IISTA. 4010+46END UT3 REACH 2BEGIN UT3 REACH 3 - ENHANCEMENT ISTA. 5002+29END UT4 REACH 2STA 1014+30END EAST BUFFALO CREEK REACH 2BEGIN EAST BUFFALO REEK REACH 3 -ENHANCEMENT IISTA 1008+37 CONTINUE EAST BUFFALO CREEK REACH 2STA 3025+33END UT2 REACH 25000+65END UT4 REACH 1 -PRESERVATIONBEGIN UT4 REACH 2 -ENHANCEMENT ISTA 6000+00END UT5 REACH 1 - PRESERVATIONBEGIN UT5 REACH 2 - ENHANCEMENT IIPROPOSED POWERLINE RELOCATION,ABANDON OLD LINEAND EASEMENTEXISTING POWERLINE ANDEASEMENT TO BERELOCATED AS SHOWNFALL 2020EAST BU
F
FA
LO
CREEKSTA 0+00BEGIN UT1 - ENHANCEMENT IISTA 4014+26END UT3 REACH 3STATION 3001+46BEGIN UT2 - ENHANCEMENT I CREDITSTA. 4000+52BEGIN UT3 REACH 2 -RESTORATION CREDIT
OUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOHE OHE
CECECECECECECECECECECECECECECECECE
CECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECEOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUE0+001+00
1+69
0+001+002+002+540+001+002+002+54G!G2G3G4206520702075208020702085208020752060205520502065206020502055EAST BUFFALO ROADUT3UT2EAST BUFFALO CREEKUT
5UT4
ABCDDDEFHGIJUT4AKXS 2XS 1EXCLUSION PARCEL VIA SUBDIVISIONDGWG 1GWG 2GWG 3GWG 4B1B2B3B4B5B6B7B8B9B10B11B12HARVEST BIOTA,HARVEST BED MATERIALFOR REUSE (REFER TO 0.3.1),THEN FILL PER GRADINGPLAN OR APPLY FLOODPLAINPOOL AND DEPRESSIONDETAIL AS DIRECTEDPROPOSED STREAMALIGNMENTDISTURBANCE TO BE MINIMIZEDDURING CONSTRUCTION OF UT3GRADE OUT HISTORIC ROAD BED ANDCROWNED FIELD TO RELIC HYDRIC SOILSPLUG AND REMOVEFIELD LOCATEDDRAIN TILE OUTLETPLANT EXISTING WETLANDS PERPLANTING PLAN SHEETS ASPRIMARY ENHANCEMENT ACTIVITY(TYP)PROPOSED LOCATION OFRELOCATED UTILITY LINEREMOVE CLAYDRAIN TILE TOUPGRADIENTPROPERTY LIMITSGWG 520702075208020852090207020752080208520900+000+501+001+502+002+50HISTORIC FIELD/ROAD20552060206520702075205520602065207020750+000+501+001+501+70HISTORIC FIELD/ROADRE-ESTABLISHMENTRE-ESTABLISHMENTB614"0'50'100'150'(HORIZONTAL)NX:\shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Overview.dwg August 13, 2020
005-45020
HB
ER
JM
0.2.2
August 14, 2020 East Buffalo Mitigation Site
Graham County, North Carolina
Wetland Crediting
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION WETLAND RESOURCESNAMEEXISTING WETLAND ACREAGERESTORED ACREAGEAPPROACHWetland A0.07N/AN/A1Wetland B0.03N/AN/A1Wetland C0.01N/AN/A1Wetland D1.28 (TOTAL)0.41EnhancementWetland D1.28 (TOTAL)0.66RehabilitationWetland E0.230.23EnhancementWetland F0.040.04EnhancementWetland G0.01N/AN/AWetland H0.01N/AN/AWetland I0.020.01EnhancementWetland J0.050.05EnhancementRelic Wetland K0.001.02ReestablishmentTotal1.752.47Wetland K Re-establishment Cross SectionsRE-ESTABLISHMENT (1:1)REHABILITATION (1.5:1)ENHANCEMENT (3:1)XS 2XS 1WETLANDS A, B, C ARE CONSISTENT WITH OLD STREAMBED AND ARE NOT BEING SOUGHT FOR WETLAND CREDIT1GROUNDWATER GAUGE (GWG #)CREDITSPROPOSED RATION/A3:11.5:13:13:13:13:11:10.000.000.000.1350.4420.0780.015N/AN/A0.0050.0171.0171.708N/AN/AN/AN/A1.GAGES 1-4 WERE INSTALLED AT INDICATED LOCATIONS IN MARCH2020 TO RECORD WETLAND HYDROLOGY DURING GROWINGSEASON.2.GAGE 5 WILL BE INSTALLED FOR POST CONSTRUCTION MONITORING.3.GAGE 4 WILL BE MOVED FURTHER NORTH TO THE CENTER OF THEPROPOSED WETLAND AREA FOR POST CONSTRUCTION MONITORING.MITIGATION PLAN NOTE:SOILINVESTIGATIONBORINGDEPTH TOHYDRICINDICATORB1NON-HYDRICB26" - F3B3NON-HYDRIC16" - F3B40" - F3B54" - F3B6NON-HYDRIC18" - F3B7NON-HYDRICB82" - F3B9NON-HYDRICB107" - F3B112" - F3B126" - F3SOIL BORING LOCATION (B#)REV. 5/11/205/11/20 Updated wetland K
grading per soil scientist report
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTIONX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Cover Notes.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaGeneral Notes and Symbols005-45020HBERJM0.3August 4, 2020Existing Thalweg
Existing Property Line
Existing Major Contour
Existing Minor Contour
Existing Overhead Utility
Existing Overhead Utility Easement
Existing Power Pole
Existing Fence
Existing Storm Pipe
Existing Soil Road
Existing Wetland
Existing Tree
Existing Bedrock
Existing Building
Existing Treeline
Survey Control Point
Existing NCDOT Right of Way
Existing Top Of Bank
Proposed Conservation Easement
Proposed Thalweg Alignment
Proposed Bankfull
Proposed Major Contour
Proposed Minor Contour
Proposed Safety Fence
Proposed Silt Fence
Proposed Limits of Disturbance
Proposed LOD Exclusion
Easement Exclusion Area
Mapped FEMA Cross Section
Proposed Overhead Utility
Proposed Overhead Utility Easement
Proposed Power Pole
Proposed Fence
Proposed Log J-Hook
See Detail 4, Sheet 6.4
Proposed Log Vane
See Detail 2, Sheet 6.4
10+00
OUE OUE
100
100
PROJECT NOTES:
Topographic survey was completed by Kee Mapping and Surveying, PA in July 2019.
Parcel boundary survey completed by Kee Mapping and Surveying, PA in October 2019.
Topographic data supplemented with Lidar data from Feb - April 2017.
Riffle selection will be varied based on available materials at the Engineers' discretion. Field
coordination will be required.XXExisting Features Proposed Features Erosion Control Features
Proposed Various Constructed
Riffles Per Plans
See Sheet 6.4
Proposed Brush Toe
See Sheet 6.3, Detail 1
Proposed Bank Grading and
Invasive Treatment
See Plans for Additional Notes
Proposed Floodplain Roughening
Proposed Vegetated Stone Toe
Protection
See Sheet 6.3, Detail 4
Proposed Structures
SAF SAF
[x][x]
CE CE CE Proposed Haul Road
See Detail 2, Sheet 6.11
Proposed Temporary Rock Sediment Dam
See Detail 3, Sheet 6.8
Proposed Temporary Crossing
See Detail 2, Sheet 6.8
Proposed Construction Entrance
See Detail 1, Sheet 6.9
Use Existing Drive Entrance
Staging/Stockpile Areas
See Detail 1, Sheet 6.11
Straw Wattles
See Detail 1, Sheet 6.8
LOD LOD
Proposed Rock Step
Proposed Log Step
Proposed Cascading
Riffle-Pool Sequence
Proposed Level Spreader
See Sheet 6.10, Detail 2
Proposed Rock Slide
Proposed Rock Drop
Proposed Tree Removal
Proposed Lunker Log
Proposed Floodplain Pool
See Sheet 6.10, Detail 1
OU OU OU
OUE OUE
SAFSAFProposed Tree SaveXXXOUOUOU
Proposed Rock Cascade
Proposed Live Willow Logs
Proposed Live Tag Alder Rootball T
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTIONX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Cover Notes.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaConstruction Sequence005-45020HBERJM0.3.1August 4, 2020Construction Sequence:
THE FOLLOWING FOUR ITEMS MAY BE COMPLETED IN THE ORDER PREFERRED BY CONTRACTOR, EXCEPT AS DIRECTED BY THE DESIGNER:
21.Install all in-stream and in-bank bioengineering such as brush toe and sod mats according to details and specifications.
22.Sod mats may be used in lieu of coir fiber matting to stabilize all stream banks on site at the discretion of the Designer. Coir fiber matting may be used
where sod mats are not available or if coir fiber matting is preferred at the discretion of the Designer.
23.Seed (with specified temporary and permanent seed mix) and straw mulch areas where the coir fiber matting is to be installed.
24.Complete grading and shaping of the adjacent floodplain areas according to grades shown on the plan.
25.Once the new channel and banks are stabilized, follow pump around system detail to turn flow from the existing channel into the new channel.
26.At this time, or a later time, backfill abandoned channel sections with stockpiled soil according to the grades shown on the Plans. Non-native and invasive
vegetation (e.g. Chinese privet and multiflora rose) shall be entirely removed from the existing channel prior to backfilling. Vegetation on abandoned
channel banks to receive fill shall be removed prior to the backfilling of abandoned channels to ensure flow paths are blocked and backfill can be
compacted.
27.General note: Prepare floodplain for seeding by applying stockpiled topsoil to any areas of floodplain that have been cut below the topsoil horizon
between bankfull (top of bank) and the top of terrace or grading limits, ripping, and raking/smoothing. Seed with specified temporary and permanent
seed mix and mulch. Any areas within the conservation easement that have not been graded with topsoil shall be treated according to the planting plan.
28.If at any time circumstances should arise where water has been turned into the new channel and additional work must be done on the floodplain, erosion
control devices will be installed to protect the new channel from sedimentation.
29.Stabilize areas of the upper portion of the site that will not be further disturbed. Close out any access, haul or staging areas that are no longer necessary.
Permanent close out of such areas shall include soil ripping to address compaction.
30.Proceed to the lower portion of the site that has both online and offline channel reaches to be constructed (UT4 Reach 2, UT3 Reach 3, UT5 Reach 2, and
East Buffalo Creek Reach 3). Where applicable, construct the proposed stream channels in the dry to the grade and dimensions specified in the
cross-sections and profile. When dry channels cannot be constructed without impacting existing channel due to proximity, pump around existing channel
during work on offline channel.
31.Construct crossings and stabilize and prepare associated erosion and sediment controls along haul roads prior to crossing creeks. Install silt fence and/or
safety fence to protect stream and wetlands from primary or secondary impacts from the work.
32.Utilize pump around operation for all bank grading and clearing on these reaches and return to same day stabilization requirements for all in-stream
work.
BIOTA HARVESTING
33.Contractor or Designer, as determined by final agreement between Contractor and Designer, shall collect and relocate aquatic biota wherever possible
along the existing stream before completely dewatering or applying fill to old channel.
34.Existing stream channels to be abandoned may be cleared (without grubbing) to provide access to streams for harvesting of biota. Minimize disturbance
to the maximum extent possible. Do not clear potential transplant material without designer approval (alders and other small diameter native trees and
shrubs)
35.Using kick nets and seines, capture and relocate animals from existing channels to be abandoned and relocate them to stable channels that will undergo
minimal or no additional disturbance during the project construction activities.
36.After relocation, attempt to relocate substrate to new channels while both channels have water facilitated through groundwater, pumping or other
diversion or partial diversion. Implement measures to ensure that flowing water does not come into contact with work area and cause erosion and
sedimentation to live water downstream. This may involve partial pumping of flow to reduce flow below erosive levels while still facilitating adequate
habitat to support organisms being relocated. Construct and/or seed riffles and/or pools with native material retrieved from wet existing channel.
ROAD AND CROSSING DECOMMISSIONING (SOUTH SIDE OF EAST BUFFALO ROAD)
37.Utilize existing entrances for one-time access. Existing entrances may be supplemented as necessary due to site conditions to address erosion control
concerns. Maintain road free of sediment and ensure road is protected from equipement during access to these entrances.
38.Do not haul in imported materials or export materials without installing a temporary construction entrance.
39.Existing primary roads should be decommissioned from the highest elevation to the lowest, removing access and crossings as the contractor progresses
toward the construction entrance.
40.Crossing decommissioning shall utilize on-site materials to the maximum extent possible. Any grading not shown in the Additional Grading plans or called
for in the details or specifications will require designer approval.
41.After crossings have been decommissioned, regraded entries shall be established to deter further entry at existing entrances. Contractor shall utilize local
materials and fill to establish restriction of access.
CONSTRUCTION DEMOBILIZATION
42.Remove any remaining temporary stream crossings.
43.The Contractor shall ensure that the site is free of trash and leftover materials prior to demobilization of equipment from the site.
44.Complete the removal of any additional stockpiled material from the site.
45.Demobilize grading equipment from the site.
46.All rock and other stockpiled materials not utilized in site grading must be removed from the limits of disturbance and conservation easement. All areas
outside the conservation easement shall be returned to pre-project conditions or better.
47.Rip, seed, mulch, and stabilize staging areas, stockpile areas, haul roads, and construction entrances. Pasture seed mix is to be applied to areas of
disturbance outside of the conservation easement. Staging areas and hauls roads which have been compacted due to heavy equipment traffic must be
ripped and/or disked to depth of 8” at a minimum.
PLANTING
48.Complete transplanting of on-site material as directed during the course of construction.
49.Following construction, by area, or after all site grading activities are complete, install live stakes and herbaceous plugs along the stream banks according
to the plans and specifications.
General Construction Notes for All Reaches
1.All erosion and sediment control practices shall comply with the North Carolina Erosion and Sediment Control Planning and Design Manual. All project
activities shall comply with all permit and waiver requirements and conditions. Issued permits and waivers, as applicable, will be included in the project
manual.
2.Where feasible, more than one offline section may be constructed concurrently. Offline sections shall be tied online sequentially from downstream to
upstream. Refer to pump around system notes for other tie-in requirements. See Biota Harvesting Sequence when diverting existing stream flow to proposed
channel.
3.Contractor will install pump around systems to divert flow while working in live, flowing channels and when executing tie-ins. The Contractor shall operate
and maintain the pump around system continuously until the disturbed area is stabilized.
4.Contractor shall disturb only as much channel bank as can be stabilized with temporary seeding, mulch, and erosion control matting by the end of each work
day.
5.Clearing and grubbing activities on active channels shall not extend more than 150 linear feet ahead of in-stream work. When these activities may result in
erosion and sedimentation to the stream channel, a pump around system is required to be in place until all cleared and grubbed areas are stabilized.
6.All graded areas with slopes steeper than 3:1 will be stabilized within seven (7) working days. All other areas will be stabilized within 14 working days.
7.When crossing an active section of new or old stream channel, a temporary stream crossing – timber mat shall be installed according to the detail and
specification.
8.Locations for staging and stockpile areas and temporary stream crossings have been provided on the Plans. Alternative staging and/or stockpile areas and
stream crossings may be used by the Contractor provided that the areas are within the limits of disturbance, all practices comply with the North Carolina
Erosion and Sediment Control Planning and Design Manual, and that the Designer approves the areas prior to implementation. The type of stream crossing
may not be modified without modification to the permit.
9.Various types of constructed riffles are specified on the plans. Contractor shall build the specific types of constructed riffles at locations shown on the Plans.
Changes in constructed riffle type must be approved by the Designer.
10.Contractor is to make every effort to avoid damaging or removing existing trees where possible and as directed by the designer.
11.Under no circumstances will the Contractor exceed the limits of disturbance as shown on the Plans.
12.Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of
1971, or a landfill regulated by the Division of Solid Waste Management. No borrow or waste soil is anticipated on the project and the designer shall be
notified if any borrow or waste of soil is to occur in order to update permits as necessary prior to commencement of such activities.
13.Existing trash/debris generated from demolition activities and/or denoted within the plans must be disposed of at a facility regulated by the NC Division of
Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources Rules and Regulations.
INITIAL SITE PREPARATION
1.Contact North Carolina “One Call” Center (811) before any excavation.
2.Contact Division of Energy, Mineral and Land Resources before any work begins on the project and notify them of the start date.
3.Mobilize equipment and materials to the Site.
4.Identify and establish construction entrance, staging and stockpile areas, haul roads, silt fence, tree protection fencing, safety fencing, and temporary stream
crossings as indicated on the Plans for work areas.
5.All haul roads shall be monitored for sediment loss daily. In the event of anticipated sediment loss, divert water off haul roads into grassed strips, install silt
fence or other acceptable sediment and erosion control practices to reduce velocities and trap sediment. In area where temporary diversions or barriers are
necessary when roads are not in use, wattles may be used
6.Set up temporary facilities, locate equipment outside of 25’ trout buffers and preferably within designated staging areas. Use staging areas to contain
materials and stockpile soil for future use.
7.Install and maintain an onsite rain gauge and log book to record the rainfall amounts and dates. Complete the self-inspection as required by NCDEQ and
NCG01 permit.
STREAM, WETLAND AND ADJACENT CONSTRUCTION
8.Perform any necessary clearing and grubbing in phases as work progresses. Bank vegetation and vegetation immediately adjacent to live channels shall be left
undisturbed as long as possible. When physical invasive removal is proposed (see plans, Sheet 3.4), remove all non-native and invasive vegetation prior to
beginning the channel or wetland construction using a pump around and restabilizing these areas upon completion when the work may result in erosion and
sedimentation to streams or wetlands. Remove or restabilize all fine material that may be washed downstream prior to returning flow to channels.
9.Prior to mobilization, Contractor shall prepare a refined sequence of work and construction schedule for review and approval by Designer.
10.Contractor shall begin work on the Northeast side of the site. Install construction entrances, staging areas, and crossings and stabilize haul roads for
mobilization to active work areas.
11.Flag trees and clearing and grubbing areas for designer approval prior to commencing removal.
12.When clearing and grubbing or conducting grading work in or on the bank of creeks, set up pump around system prior to commencing grading operations.
Disturb only that area along the creek channel and banks that can be stabilized with seed and permanent matting, or temporary matting, by the end of the
day.
13.Remove and grub invasive species prior to commencing earth moving activities. Where applicable, harvest and stockpile topsoil (separately) for reuse.
14.When grading the wetland reestablishment area, commence by locating subsurface drainage pipes. Complete larger cuts prior to commencing fine grading of
adjacent areas. Install slope breaks using soil berms to reduce the effective slope length that water will travel. Use silt fence or wattles to divert flow from
upgradient around the work area to East Buffalo Creek across original ground. Any areas that have been disturbed should be matted and/or stabilized with
check dams prior to routing diverted flow across these areas.
15.Soil obtained from wetland grading may be stockpiled utilizing designated haul roads and staging/stockpile areas, thoroughly dried, then used as fill
throughout the entire site .
16.Offline sections shall be tied online sequentially from downstream to upstream. When directed, the contractor shall pump or divert water into the new online
channel before constructing tie-in in order to wash riffles free of excess sediment and remove sediment prior to tying into live downstream channel.
17.When grading access road to electric utility corridor adjacent to UT2 Reach 2, install sediment barrier to protect downgradient areas, properly compact all
placed material in accordance with grading specification, apply matting to side slopes steeper than 3:1.
18.Close out any access, haul or staging areas that are no longer necessary. Permanent close out of such areas shall include soil ripping to address compaction.
19.Proceed to the middle portion of the site that has multiple offline channel reaches to be constructed (East Buffalo Creek Reach 2, UT2 Reach 2 offline portion,
UT3 Reach 2). Construct the proposed stream channels in the dry to the grade and dimensions specified in the cross-sections and profile. Same day
stabilization may not be required when constructing offline channel segments (when these areas are depressional with no inflow or outflow).
20.The first offline channel will use harvested onsite stone material from a non-channel source, supplemented with offsite material as necessary. There-after,
transfer biota from existing streams to be abandoned to existing or new online channels, then transfer coarse material for use in new channel structures
(riffles, rock sills, rock vanes, etc.). See Biota Harvesting Sequence for additional details.
Construction Sequence (continued):
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTION005-45020HBERJM1.1August 4, 2020X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Typicals.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaEast Buffalo Creek Reach 2Typical SectionsEast Buffalo Creek Reach 2 - Riffle
STA 1005+50 - 1013+92
East Buffalo Creek Reach 2 - Pool
STA 1005+50 - 1013+92
2.5:
1
(
V
A
R
I
E
S
)
2.5:1 (
V
A
RI
E
S)
9.75'
20'
0.5'
9.75'
3.5'
(VARIES 2.5-4.5')
VARIES4.5'VARIES 4.5'
6:1
3:1
6:1
3:1
PROPOSED STREAM
CENTERLINE
PROPOSED
BANKFULL
TIE TO EXISTING GROUND
3.5:1 3.5:1
4.5'
15'
6'4.5'VARIES6'VARIES 6'
6:1
3:1
6:1
3:1
1.3'1.6'
PROPOSED STREAM
CENTERLINE
PROPOSED
BANKFULL
TIE TO EXISTING GROUND
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTION005-45020HBERJM1.2August 4, 2020X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Typicals.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaEast Buffalo Creek Reach 3Typical SectionsEast Buffalo Creek Reach 3 - Riffle
Areas designated in plan view only from
STA 1013+92 - 1017+16
East Buffalo Creek Reach 3 - Pool.
POOL TYPICAL NOTE:
MINIMAL PROFILE WORK IS PROPOSED. AT INSTALLED CHANNEL
NARROWING STRUCTURES, CONTRACTOR SHALL ADAPT REACH 2 POOL
TYPICAL AS DIRECTED BY ENGINEER.
4.5'
15'
6'4.5'
VARIESVARIES
6'
3:1
1.3'1.6'3.5:1
PROPOSED STREAM
CENTERLINE
PROPOSED
BANKFULL
REMOVE LEVY AND/OR REMOVE
INVASIVES AND RESLOPE BANK
WHERE NECESSARY TO PHYSICALLY REMOVE
PRIVET FROM BANKS OR GRADE BANKS FOR
STABILITY, USE TYPICAL DIMENSIONS AND
BENCHING SLOPES AND APPLY MATTING.
ADAPT AS NECESSARY TO SAVE DESIRABLE
VEGETATION.
IN OVERWIDE CHANNEL SEGMENTS THAT ARE
IMPACTING HABITAT OR STABILITY, APPLY
STREAM STRUCTURES AND NARROW CHANNEL
BY BACKFILLING VANE ARM WITH COBBLE
NOTE: TYPICAL SECTION DOES NOT APPLY THROUGHOUT. THE
INTENT IS FOR CONTRACTOR TO APPLY SLOPES AND WIDTHS
FROM TYPICAL SECTION PROVIDED IN APPROXIMATE TERMS
WHEN REMOVING PRIVET, GRADING OUT EXISTING LEVY ON
CREEK, OR INSTALLING STRUCTURES TO NARROW BASE FLOW
CHANNEL.
4 TO 6:1 (A
L
L
B
E
N
C
H
I
N
G
)
6'
REFER TO GRADING PLAN -
SHAPE VALLEY PER PROPOSED CONTOURS
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTION005-45020HBERJM1.3August 4, 2020X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Typicals.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaUT2 Reach 2Typical SectionsUT 2 Reach 2 - Riffle
STA 3003+95 - 3007+33
UT2 Reach 2 - Pool
STA 3003+80 - 3007+42
2.2
5
:
1
(
V
A
R
I
E
S
)
2.25:1 (
V
A
RI
E
S)
2.0'
(VARIES 1.0'-2.0')
9'
4.5'
3'
6:1 6:1
3'
PROPOSED STREAM
CENTERLINE
PROPOSED
BANKFULL
3:1 3:1
VARIESMIN 2' (OR 0.66' VERT.)
TIE TO EXISTING GROUND
3:1±3:1±
2.25'
7'
2.5'2.25'
0.7'0.8'
4'
6:1
3:1
4'
6:1
3:1
PROPOSED STREAM
CENTERLINE
PROPOSED
BANKFULL
VARIESMIN 2' (OR 0.66' VERT.)
TIE TO EXISTING GROUND
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTION005-45020HBERJM1.4August 4, 2020X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Typicals.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaUT3 Reach 2ATypical SectionsUT 3 Reach 2A - Riffle
STA: 4000+52 - 4004+53
UT 3 Reach 2A - Pool
STA: 4000+52 - 4004+53
2.2
5
:
1
2.25:1
10'
5'
2.0'
(VARIES 1.1'-2.3')
6:1
3:1
VARIES
3:1
6:1
3'VARIES
PROPOSED STREAM
CENTERLINE
EXISTING GROUND
PROPOSED
BANKFULL
3'
3:1 3:1
0.7'
6:1
3:13:1
6:1
2.1'
8'
1.9'1.9'2.1'
0.9'
4'VARIES4'VARIES
PROPOSED STREAM
CENTERLINE
EXISTING GROUND
PROPOSED
BANKFULL
VARIES
3:1
REFER TO GRADING PLAN -
SHAPE VALLEY PER PROPOSED CONTOURS
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTION005-45020HBERJM1.5August 4, 2020X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Typicals.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaUT3 Reach 2BTypical SectionsUT 3 Reach 2B - Riffle
STA: 4004+53 - 4010+46
UT 3 Reach 2B - Pool
STA: 4004+53 - 4010+46
2.5:
1
10'
5'
2.0'
(VARIES 1.0' - 2.0')
1.2'VARIES1.2'VARIES
0.3'
PROPOSED STREAM
CENTERLINE
EXISTING GROUND
PROPOSED
BANKFULL
2:1
2:1
2.5:1
3:13:1
2.5:
1
2.5:10.5'
2:1
2:1
1.5'
10'
3.5'3.5'1.5'
0.7'
1.2'VARIES1.2'VARIES
0.9'
PROPOSED STREAM
CENTERLINE
PROPOSED
BANKFULL
EXISTING GROUND
REFER TO GRADING PLAN -
SHAPE VALLEY PER PROPOSED CONTOURS
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTION005-45020HBERJM1.6August 4, 2020X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Typicals.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaUT3 Reach 3Typical SectionsUT 3 Reach 3 - Riffle
STA: 4010+46 - 4014+26
UT 3 Reach 3 - Pool
STA: 4010+46 - 4014+26
2.5:
1 2.5:1
6.25'
13'
0.5'6.25'
2.5'
VARIES 2' - 4'
3'VARIES3'VARIES
6:1
3:1
PROPOSED STREAM
CENTERLINE
EXISTING GROUND
PROPOSED
BANKFULL
3:1
6:1
1.26'
REFER TO GRADING PLAN -
SHAPE 3' WIDE BERM PER PROPOSED CONTOURS
2:1
3:1
+
/
-
3:1 +/-
2.3'
11'
3.2'3.2'2.3'
1'0.8'
6:1
3:1
3:1
6:1
4'VARIES4'VARIES
PROPOSED STREAM
CENTERLINE
EXISTING GROUND
PROPOSED
BANKFULL
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTION005-45020HBERJM1.7August 4, 2020X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Typicals.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaUT4 Reach 2Typical SectionsUT 4 Reach 2 - Riffle
STA: 5000+52 - 5002+29
UT 4 Reach 2 - Pool
STA: 5000+52 - 5002+29
2.5:1
4.6'
12'
4.6'2.8'
PROPOSED STREAM
CENTERLINE
PROPOSED
BANKFULL
2.2'
VARIES 2.0' - 4.0'
2.25'MIN 1.5' (OR 0.5' VERT.)
6:1
3:1
(VARIE
S
)
3:1
6:1
2.25'VARIES
TIE TO EXISTING GROUND
FILL EXISTING CHANNEL
3:1 +
/
-3:1 +/-
2.5'
8.5'
2.5'
0.8'
3.5'
PROPOSED STREAM
CENTERLINE
PROPOSED
BANKFULL
1'
4'
6:1
3:1
6:1
4'VARIES MIN 1.5' (OR 0.5' VERT.)
3:1
(VARIE
S
)
FILL EXISTING CHANNEL
TIE TO EXISTING GROUND
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTION005-45020HBERJM1.8August 4, 2020X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Typicals.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaUT5 Reach 2Typical SectionsUT 5 Reach 2 - Riffle
STA: 6000+67 - 6002+48
UT 5 Reach 2 - Pool
STA: 6000+65 - 6002+48
3.5'
8'
1'3.5'
1.16'
REMOVE PRIVET AND GRADE SLOPEAPPLY MATTING OR SOD
MAT WHEN AVAILABLE
PLACE STONY MATERIAL
HARVESTED FROM
EXISTING BED
REMOVE INVASIVES AS
DIRECTED
APPLY SAME NOTE AS ABOVE
WITH REFERENCE TO TYPICAL
AND EXISTING BED GRADING
APPLY MATTING OR OVEREXCAVATE
AND PLACE SOD MAT
4 TO 6:1 (A
L
L
B
E
N
C
H
I
N
G
)
EXISTING GROUND
TRENCH IN MATTING
WHERE USED
3:1 3:1
3:1 3:1
2.4'
5.8'
1'2.4'
0.8'
REMOVE PRIVET AND OTHER
INVASIVES AND RESLOPE
APPLY SOD MAT, OR APPLY SOIL IN LIGHTLY
COMPACTED 12" LIFTS AND WRAP OVER
ONE ROLL OF COIR MATTING
TRENCH IN MATTING
WHERE USED
PLACE STONY MATERIAL
HARVESTED FROM
EXISTING BED (TYP)
TREAT OR PHYSICALLY
REMOVE INVASIVES AS
DIRECTED
TYPICAL SECTION, DO NOT BUILD TO EXACT DIMENSIONS BUT INSTEAD ACHIEVE
APPROXIMATE DIMENSIONS BY FITTING STONE AND MATTED SOIL LIFTS TO
EXISTING CHANNEL SHAPE AND MAINTAINING BED STRUCTURE (PROFILE)
MINIMIZE DISTURBANCE TO EXISTING STREAM BED BUT MOVE AROUND MATERIAL AS
NECESSARY TO CREATE DESIRED LOW FLOW CHANNEL ~1' IN WIDTH
APPLY SOD MAT TO
APPROXIMATE
TYPICAL
4 TO 6:14 TO 6:1 (A
L
L
B
E
N
C
H
I
N
G
)
EXISTING GROUND
PROPOSED
BANKFULL
208020852090209521002105211020802085209020952100210521101000+001000+501001+001001+501002+001002+501003+001003+501004+001004+20EXISTING GROUNDCECECECECECECECECECECECECECECE CE CECE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECECECECE
209521002
0
9
0
2
0
9
5
2100
2105 2110 2115 2120
2085209020952100210521102115 STA. 1003+66EAST BUFFALO CREEK REACH 1 - ENHANCEMENT IISTA. 3+96END UT1 - ENHANCEMENT IISTA 1000+00BEGIN EAST BUFFALO CREEK REACH 1 - ENHANCEMENT IISTA 1000+00 TO 1001+50CUT-STUMP TREATMENT OF INTERMITTENTINVASIVES ALONG BANKSUPPLEMENTAL LIVESTAKING AS NEEDEDREMOVE UPSTREAM TREE IN ROW OF 3REMOVE/RELOCATE 2" ALDER AS NECESSARYREMOVE TREES AND LEVYPHYSICAL REMOVAL OF MULTIFLORAROSE AND HONEYSUCKLE -RESEED AND MAT BANKSTA 1003+66 TO 1005+50 LEFT BANKREMOVE LARGE PRIVET ANDLAY BACK TERRACE SLOPE AT 3:1HARVEST PLACED BOULDERS FOR REUSESTA 1004+80 TO 1005+00RESTORE USING EAST BUFFALO R2 TYPSHIFT ALIGNMENT TO RIGHT1000+001001+001002+001003+001004+0020802085 STABILIZE WITH MATTINGEAST BUFFALO CREEKUT1MATCH LINE - STA
1
0
0
4
+
2
0
2.1.12.1.22.1.32.1.42.4.42.4.32.4.22.4.12.2.12.5.12.3.12.3.22.6.1EAST BUFFALO
CREEKUT1UT2UT3UT4UT
5
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION 0'20'40'60'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Profiles.dwg August 4, 2020
005-45020
HB
ER
JM
2.1.1
August 4, 2020 Sheet IndexEast Buffalo Mitigation Site
Graham County, North Carolina
East Buffalo Creek
Stream Plan and Profile 0'4'8'12'(VERTICAL)ENHANCEMENT II1. TREAT PRIVET AND INVASIVE SPECIES2. RIPARIAN BUFFER RESTORATION ON RIGHTBANK PER PLANTING PLAN3. SUPPLEMENTAL PLANTING ON LEFT BANK4. SAVE ALL TREES NOT SPECIFICALLYIDENTIFIED FOR REMOVAL- EAST BUFFALO REACH 1:
20502055206020652070207520802085205020552060206520702075208020851004+201004+501005+001005+501006+001006+501007+001007+501008+001008+50-8.9%-6.7%-0.0%STA = 1005+50ELEV = 2074.28STA = 1005+70ELEV = 2072.31STA = 1005+76ELEV = 2070.20STA = 1005+95
ELEV = 2070.51STA = 1006+00ELEV = 2068.51STA = 1006+17
ELEV = 2069.09STA = 1006+21ELEV = 2067.59STA = 1006+45ELEV = 2065.43STA = 1006+76ELEV = 2063.45STA = 1006+81
ELEV = 2065.26
STA = 1006+99
ELEV = 2063.51STA = 1007+07ELEV = 2060.61STA = 1007+13
ELEV = 2062.91
STA = 1007+32
ELEV = 2061.34STA = 1007+41ELEV = 2059.14STA = 1007+46
ELEV = 2060.64
STA = 1007+64
ELEV = 2058.89STA = 1007+68ELEV = 2057.25STA = 1007+72ELEV = 2058.69STA = 1007+73ELEV = 2058.69STA = 1007+79ELEV = 2056.78STA = 1007+81
ELEV = 2058.49
STA = 1007+92
ELEV = 2057.33
STA = 1008+07
ELEV = 2056.83
STA = 1008+22
ELEV = 2055.46STA = 1008+28ELEV = 2053.46STA = 1008+32ELEV = 2055.36STA = 1008+00ELEV = 2055.13STA = 1008+42
ELEV = 2054.69
STA = 1005+81ELEV = 2071.91
STA = 1006+04
ELEV = 2070.11 STA = 1006+25ELEV = 2068.69STA = 1006+50
ELEV = 2067.23 STA = 1006+25ELEV = 2068.69STA = 1006+28ELEV = 2067.79STA = 1006+30ELEV = 2068.37STA = 1006+39
ELEV = 2067.63
STA = 1006+52ELEV = 2067.23STA = 1006+57ELEV = 2064.84STA = 1006+60
ELEV = 2066.39STA = 1006+67ELEV = 2065.86EXISTING GROUNDPROPOSED GRADEPROPOSED BANKFULLXXXXXXXXXXX20
7
0
2075 20802085
2060
2065
2070
20
7
5
2080
STA 1008+37EAST BUFFALO CREEK - RESTORATIONSTA 3025+33UT2 REACH 2 - END ENHANCEMENT ISTA 1005+50END EAST BUFFALO CREEK REACH 1 - ENHANCMENT IIBEGIN EAST BUFFALO CREEK REACH 2 - RESTORATIONREMOVE EXISTING FENCEWITHIN EASEMENT (TYP)HARVEST EXISTING MATERIAL FOR REUSE INEAST BUFFALO CREEK, REACH 2 RESTORATION,THEN FILL EXISTING CHANNELROUGHEN FLOOD FLOW PATHUSING ONSITE WOOD ANDDENSE LIVESTAKINGPHYSICAL REMOVAL OF MULTIFLORAROSE AND HONEYSUCKLE -RESEED AND MAT BANKFILL EXISTING CHANNELSTA 1004+80 TO 1005+00OVERWIDE STREAMRESTORE USING EAST BUFFALO R2 TYP3007+333005+003006+003007+001004+001005+001006+001007+001008+002075
2
0
7
0 2075208020852
0
6
020652070
205520602065EAST BUFFALO CREEKUT2MATCH LINE - STA 1004+20
MATCH L
I
N
E
-
S
T
A
1
0
0
8
+
5
0
2.1.12.1.22.1.32.1.42.4.42.4.32.4.22.4.12.2.12.5.12.3.12.3.22.6.1EAST BUFFALO
CREEKUT1UT2UT3UT4UT
5
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION 0'20'40'60'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Profiles.dwg August 4, 2020
005-45020
HB
ER
JM
2.1.2
August 4, 2020 Sheet IndexEast Buffalo Mitigation Site
Graham County, North Carolina
East Buffalo Creek
Stream Plan and Profile 0'4'8'12'(VERTICAL)ENHANCEMENT II1. TREAT PRIVET AND INVASIVE SPECIES2. RIPARIAN BUFFER RESTORATION ON RIGHTBANK PER PLANTING PLAN3. SUPPLEMENTAL PLANTING ON LEFT BANK4. SAVE ALL TREES NOT SPECIFICALLYIDENTIFIED FOR REMOVAL- EAST BUFFALO REACH 1:
20302035204020452050205520602065203020352040204520502055206020651008+501009+001009+501010+001010+501011+001011+501012+001012+501013+00-3.7%-5.8%-4.8%-4.2%-4.5%-3.7%-4.3%-3.2%-4.1%STA = 1008+52ELEV = 2051.22STA = 1008+77ELEV = 2052.51STA = 1008+82ELEV = 2049.61STA = 1009+04ELEV = 2050.86STA = 1009+11ELEV = 2048.59STA = 1009+29ELEV = 2049.36STA = 1009+33ELEV = 2047.36STA = 1009+37ELEV = 2049.36STA = 1009+46ELEV = 2048.55STA = 1009+53ELEV = 2046.39STA = 1009+58ELEV = 2048.05STA = 1009+69ELEV = 2047.08STA = 1009+73ELEV = 2045.08STA = 1009+77ELEV = 2046.98STA = 1009+90ELEV = 2046.00STA = 1009+95ELEV = 2043.30STA = 1010+16ELEV = 2044.47STA = 1010+20ELEV = 2042.97STA = 1010+37ELEV = 2043.14STA = 1010+45ELEV = 2041.04STA = 1010+51
ELEV = 2042.54
STA = 1010+67
ELEV = 2041.37
STA = 1010+83
ELEV = 2039.45
STA = 1010+99
ELEV = 2040.32STA = 1011+04ELEV = 2038.18STA = 1011+09
ELEV = 2040.02
STA = 1011+25
ELEV = 2039.27STA = 1011+30ELEV = 2037.47STA = 1011+34
ELEV = 2039.27
STA = 1011+46
ELEV = 2038.79STA = 1011+51ELEV = 2036.68STA = 1011+56
ELEV = 2038.38
STA = 1011+75
ELEV = 2037.52STA = 1011+80ELEV = 2035.62STA = 1011+84
ELEV = 2037.52STA = 1012+08ELEV = 2034.63STA = 1012+13
ELEV = 2036.33
STA = 1012+32
ELEV = 2035.61STA = 1012+37ELEV = 2033.71STA = 1012+42
ELEV = 2035.51
STA = 1012+61
ELEV = 2034.69STA = 1012+66ELEV = 2032.79STA = 1012+70
ELEV = 2034.59
STA = 1012+89
ELEV = 2033.98STA = 1012+97ELEV = 2031.88STA = 1010+26ELEV = 2043.97 STA = 1009+17ELEV = 2050.36
STA = 1012+03
ELEV = 2036.73
STA = 1008+60ELEV = 2053.72STA = 1008+88ELEV = 2052.11STA = 1010+01ELEV = 2045.40
STA = 1010+90
ELEV = 2040.82
EXISTING GROUNDPROPOSEDGRADEPROPOSED BANKFULLOUEOUEOUEOUEXXXX
XXX2040204520502055
20352040
2045 20502055ROUGHEN FLOOD FLOW PATHUSING ONSITE WOOD ANDDENSE LIVESTAKINGCONSTRUCT FLOOD FLOWREENTRY POINT USING NATIVESTONE AND SOIL MIXSCARIFY AND RESEEDEXISTING FARM ROADEXISTING FA
R
M
R
O
A
D
EAST BUFFALO CREEKEA
S
T
B
U
F
F
A
L
O
C
R
E
E
K
-
R
E
S
T
O
R
A
T
I
O
N REMOVE EXISTING FENCE(LIVESTOCK TO BE REMOVEDFROM SITE)SEE UT5 ENHANCEMENT IIPLAN SHEET 2.6.13007+331009+001010+001011+001012+001013+006002+0020502055204020452035204
0 ROUGHEN FLOOD FLOW PATHUSING ONSITE WOOD ANDDENSE LIVESTAKINGUT5EAST BUFFALO
CREEK
MATCH LINE - STA 1008+50
MATCH LINE - STA 1013+00
2.1.12.1.22.1.32.1.42.4.42.4.32.4.22.4.12.2.12.5.12.3.12.3.22.6.1EAST BUFFALO
CREEKUT1UT2UT3UT4UT
5
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION 0'20'40'60'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Profiles.dwg August 4, 2020
005-45020
HB
ER
JM
2.1.3
August 4, 2020 Sheet IndexEast Buffalo Mitigation Site
Graham County, North Carolina
East Buffalo Creek
Stream Plan and Profile 0'4'8'12'(VERTICAL)
201520202025203020352040204520152020202520302035204020451013+001013+501014+001014+501015+001015+501016+001016+501017+001017+50-3.7%-3.2%-4.1%-4.3%-3.3%STA = 1017+15
ELEV = 2019.15EXISTING GROUNDPROPOSEDGRADEPROPOSED BANKFULLSTA = 1013+02ELEV = 2033.58STA = 1013+26ELEV = 2032.59STA = 1013+35ELEV = 2030.59STA = 1013+39ELEV = 2032.39STA = 1013+86ELEV = 2029.03STA = 1013+94ELEV = 2030.63STA = 1013+56ELEV = 2029.86STA = 1013+63ELEV = 2031.71STA = 1013+77ELEV = 2031.09
STA = 1014+98
ELEV = 2027.20
SAFSAFSAFCECECECECECECECECECECECECECECECESAFSAFSAFCECECECECECECECECECECECECECECECEXXXXXXXXXXXXXXXX
X
X
XX2020
20
2
5
2030
2030203520402045202520252030 STA. 1013+57EAST BUFFALO CREEK R2 - RESTORATIONSTA 6002+48END UT5 - ENHANCEMENT IISTA 1013+92END EAST BUFFALO CREEK REACH 2- RESTORATIONBEGIN EAST BUFFALO REEK REACH 3 - ENHANCEMENT IISTA 1017+16END EAST BUFFALO CREEK REACH 3 - ENHANCEMENT IIREMOVE EXISTING FENCEWITHIN EASEMENT (TYP)PROPOSED SINGLE LOG VANE1013+001014+001015+001016+001
0
1
7
+00
10
1
8
+
0
06002+00203520352035AS DIRECTED, REMOVE LARGEPRIVET CLUMPS FROM RIGHTBANK AND REBUILD TOTYPICAL DIMENSIONPROPOSED BANK GRADINGSHALL REMOVE LEVY ANDAPPLY LEFT BANK BENCHINGFROM TYPICAL SECTIONSEE SHEET 1.2EAST BUFFALO CREEKEXISTING
R
E
S
I
D
E
N
T
I
A
L
R
O
A
D
MATCH LINE - STA 1013+00
2.1.12.1.22.1.32.1.42.4.42.4.32.4.22.4.12.2.12.5.12.3.12.3.22.6.1EAST BUFFALO
CREEKUT1UT2UT3UT4UT
5
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION 0'20'40'60'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Profiles.dwg August 4, 2020
005-45020
HB
ER
JM
2.1.4
August 4, 2020 Sheet IndexEast Buffalo Mitigation Site
Graham County, North Carolina
East Buffalo Creek
Stream Plan and ProfileENHANCEMENT II:1. REMOVE PRIVET AND INVASIVE SPECIES2. RIPARIAN BUFFER RESTORATION ON LEFT BANK PER PLANTING PLAN3. SUPPLEMENTAL PLANTING ON RIGHT BANK4. REMOVE LIVESTOCK5. APPLY STEP PROFILE AT TOP OF REACH. MAKEMINOR ADJUSTMENTS TO CHANNEL BOTTOMWIDTH USING STRUCTURES. CONDUCT LEVYREMOVAL AND BENCHING ON LEFT BANKWHERE SHOWN.0'4'8'12'(VERTICAL)
20802085209020952100210521102115208020852090209521002105211021150+000+501+001+502+002+503+003+504+00EXISTING GROUNDCE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECE
20952
1
0
0 21052110 211521202125
2090
209521002105211021152120
208520902095 0+001+002+003+00UT1E
A
S
T
BU
F
F
A
LO
C
R
E
E
KUT1 STA: 0+00BEGIN UT1 ENHANCEMENT IISTA. 1003+66EAST BUFFALO CREEK REACH 1 - ENHANCEMENT IISTA. 3+96END UT1 - ENHANCEMENT II1002+0010
0
3
+
0
0
1
0
0
4
+
0
0HARVEST PLACED BOULDERS FOR REUSE2.1.12.1.22.1.32.1.42.4.42.4.32.4.22.4.12.2.12.5.12.3.12.3.22.6.1EAST BUFFALO
CREEKUT1UT2UT3UT4UT
5
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION 0'20'40'60'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Profiles.dwg August 4, 2020
005-45020
HB
ER
JM
2.2.1
August 4, 2020 Sheet IndexEast Buffalo Mitigation Site
Graham County, North Carolina
UT1
Stream Plan and Profile 0'4'8'12'(VERTICAL)ENHANCEMENT II - UT1:1. TREAT PRIVET AND INVASIVE SPECIES2. SUPPLEMENTAL PLANTING ON BOTH BANKS PER PLANTING PLAN
2095210021052110211521202125213021352095210021052110211521202125213021352999+503000+003000+503001+003001+503002+003002+503003+003003+50STA = 3001+01
ELEV = 2128.16
STA = 3001+56
ELEV = 2117.39
STA = 3001+89
ELEV = 2110.23
STA = 3002+22
ELEV = 2107.07
STA = 3002+35
ELEV = 2104.05
STA = 3002+48
ELEV = 2102.53STA = 3002+29ELEV = 2104.33STA = 3001+43
ELEV = 2118.98 STA = 3001+03ELEV = 2127.75STA = 3001+31
ELEV = 2120.62
-9.6%-21.4%-12.8%-4.4%-11.8%-38.5%-13.1%-19.2%-26.3%EXISTING 36" CMPINV.IN 2035.69'INV.OUT 2028.01'EXISTING GROUNDPROPOSED GRADEPROPOSED BANKFULLOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUECE CE CE CECE CE CE CE CE CE CECECE CECE CE CE
C
E
C
E
CE
CE
CE CE CE CE CE CECECECECECE
C
E
C
E
C
E
C
E
C
E
CE
CE
CE
CE
CE
OUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUECE CE CE CECE CE CE CE CE CE CECECE CECE CE CE
C
E
C
E
CE
CE
CE CE CE CE CE CECECECECECE
C
E
C
E
C
E
C
E
C
E
CE
CE
CE
CE
CE
XXXX2100
2105
2
1
1
0 212021252090
2095
2100
2105
21
1
0
2
1
1
521202125213021352140
2090
2095
2
1
0
0
2135214021452150215521602165217021752180218521502155
2105
21
1
0
2
1
1
52120STATION 3000+95BEGIN UT2 REACH 2 - ENHANCEMENT INO CREDITPROPOSED START OF UTILITYRELOCATION BY DUKE POWERFILL AND ABANDONEXISTING DITCHCONSTRUCT ACCESS ROADTO PROPOSED OVERHEADUTILITY EASEMENTSTATION 3001+46END UTILITY EASEMENTENHANCEMENT ICREDIT BEGINSREMOVE OR CUT-STUMPTREAT PRIVET, SLOPE AND MATBANKS WHERE DISTURBEDSTA 3002+48 TO 3003+953001+003002+003003+0021
1
0
21
1
5
21
2
02125 RETAIN EXISTING 36" CMPINV. IN 2035.69'INV. OUT 2028.01'STA. 3002+48BEGIN BANK GRADING INERODED SEGMENTS ANDWHERE NECESSARY FORINVASIVE REMOVALREMOVE OR CUT-STUMPCONDUCT MECHANICAL REMOVAL OFINVASIVES PRIOR TO STREAMWORKMAKE FIELD MODIFICATIONS TO LEFTBANK GRADING AS DIRECTED TO SAVELARGE TREESREMOVE LOCUST TREESREMOVE FENCE,CONDUCT PHYSICALINVASIVES REMOVALFROM FENCE TO UT2MATCHLIN
E
-
S
T
A
3
0
0
3
+
4
5UT2UT2 EA
S
T
B
U
F
F
A
L
O
R
O
A
D
2.1.12.1.22.1.32.1.42.4.42.4.32.4.22.4.12.2.12.5.12.3.12.3.22.6.1EAST BUFFALO
CREEKUT1UT2UT3UT4UT
5
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION 0'20'40'60'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Profiles.dwg August 4, 2020
005-45020
HB
ER
JM
2.3.1
August 4, 2020 Sheet IndexEast Buffalo Mitigation Site
Graham County, North Carolina
UT2
Stream Plan and Profile 0'4'8'12'(VERTICAL)NOTE:APPLY CASCADING RIFFLE-POOLSEQUENCE WHERE INDICATED IN PLANVIEW, USE WITH DETAIL 3, SHEET 6.1
2050205520602065207020752080208520902050205520602065207020752080208520903003+503004+003004+503005+003005+503006+003006+503007+003007+50STA = 3003+99ELEV = 2080.86
STA = 3007+33
ELEV = 2055.40
STA = 3006+55
ELEV = 2059.66
STA = 3004+35ELEV = 2077.50STA = 3004+69ELEV = 2074.62
STA = 3006+24
ELEV = 2062.11
-8.0%-9.3%-8.0%-8.1%-5.5%EXISTING GROUNDPROPOSED GRADEPROPOSED BANKFULLOUEOUEXXXXXXXXXXXXXXXX2060206520702065207020
7
5
2075
2080 2085 2090 2095 20802085209020952100
UT2EA
S
T
BU
F
FA
LO
CR
E
EK STA. 3003+95RESUME FULL APPLICATIONOF TYPICAL SECTIONSREMOVE EXISTING FENCEWITHIN CONSERVATIONEASEMENTFILL EXISTING CHANNELSTA 1008+41EAST BUFFALO CREEK - RESTORATIONSTA 3007+33END UT2 REACH 2 - ENHANCEMENT IROUGHEN FLOOD FLOW PATHUSING ONSITE WOOD ANDDENSE LIVESTAKING3007+333003+003004+003005+003006+003007+001007+001
0
0
8
+
0
020752060
2
0
6
5
2
0
7
0
205520602065REMOVE FENCE,CONDUCT PHYSICALINVASIVES REMOVAL FROMFENCE TO UT2MATCHLINE - STA 3003+45
2.1.12.1.22.1.32.1.42.4.42.4.32.4.22.4.12.2.12.5.12.3.12.3.22.6.1EAST BUFFALO
CREEKUT1UT2UT3UT4UT
5
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION 0'20'40'60'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Profiles.dwg August 4, 2020
005-45020
HB
ER
JM
2.3.2
August 4, 2020 Sheet IndexEast Buffalo Mitigation Site
Graham County, North Carolina
UT2
Stream Plan and Profile 0'4'8'12'(VERTICAL)NOTE:APPLY CASCADING RIFFLE-POOLSEQUENCE WHERE INDICATED INPLAN VIEW, USE DETAIL 3, SHEET 6.1
2060206520702075208020852090209521002105211021152060206520702075208020852090209521002105211021154000+004000+504001+004001+504002+004002+504003+004003+504003+80STA = 4000+49ELEV = 2104.10STA = 4003+71ELEV = 2062.37STA = 4003+75
ELEV = 2063.95
STA = 4000+55ELEV = 2103.12STA = 4000+56ELEV = 2100.14STA = 4000+62ELEV = 2102.44STA = 4000+70ELEV = 2101.30STA = 4000+71ELEV = 2098.97STA = 4000+77ELEV = 2100.68STA = 4000+79ELEV = 2100.22STA = 4000+80ELEV = 2097.36STA = 4000+88ELEV = 2099.24 STA = 4000+94ELEV = 2098.33STA = 4000+94ELEV = 2096.45STA = 4001+48ELEV = 2091.50STA = 4001+68ELEV = 2088.90
STA = 4001+85
ELEV = 2086.80
STA = 4002+02
ELEV = 2084.60
STA = 4002+20
ELEV = 2082.38
STA = 4002+38
ELEV = 2080.08
STA = 4002+61
ELEV = 2077.21
STA = 4002+77
ELEV = 2075.11
STA = 4002+94
ELEV = 2073.02
STA = 4003+08
ELEV = 2071.17
STA = 4003+25
ELEV = 2068.96STA = 4003+27ELEV = 2066.54STA = 4003+30ELEV = 2068.51STA = 4003+33ELEV = 2068.22STA = 4003+33ELEV = 2065.99STA = 4003+38
ELEV = 2067.72
STA = 4003+47
ELEV = 2066.75STA = 4003+48ELEV = 2064.48STA = 4003+53
ELEV = 2066.29
STA = 4003+56ELEV = 2065.81STA = 4003+57ELEV = 2063.35STA = 4003+63
ELEV = 2065.25STA = 4003+69
ELEV = 2064.43
STA = 4001+22ELEV = 2094.76STA = 4001+00ELEV = 2097.57
-12.7%-16.6%-13.7%-19.1%-15.7%-12.7%-12.8%-12.6%-12.7%-12.7%-12.7%-12.7%-12.7%-12.7%-12.7%-12.7%-11.4%-11.2%-14.7%-12.3%-12.8%EXISTING 36" CMPINV.IN 2108.24'INV.OUT 2104.07'EXISTING GROUNDPROPOSED GRADEPROPOSED BANKFULLSTATION 4001+00REPEAT CASCADINGRIFFLE-POOL SEQUENCEOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUECE CE CE CE CE CE CE CE CE CECECECECECE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUECE CE CE CE CE CE CE CE CE CECECECECECE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECEX2
0
6
5
2070
2075
2080
2085
2090
2095
2090
2095
210021052110211521202125STA. 4000+52BEGIN UT3 REACH 2A - RESTORATIONHARVEST BOULDERS AND STONEAND FILL EXISTING CHANNELEXISTING POWER LINETHROUGH FIELD TOBE ABANDONEDSTABILIZE ROAD PIPEOUTLET AND SPREAD FLOWINTO PROPOSED BUFFERROUGHEN FLOOD
FLOW
PATHUSING
ONS
ITE
WOOD
ANDDENSE L
IVESTAK
INGCONSTRUCT ACCESS ROADSTA. 4000+70END ROWBEGIN UT3 REACH 2ARESTORATION CREDIT4000+004001+004002+004003+004004+0020
7
5
20
8
0
2
0
8
5
2
0
9
0
20
9
5
2100
20652070207520802085209020952100RETAIN EXISTING 36" CMPINV. IN 2108.24'INV. OUT 2104.07'RETAIN EXISTING 24" CMPINV. IN 2093.58'INV. OUT 2089.30'MAKE FIELD MODIFICATIONS TO LEFTBANK GRADING AS DIRECTED TO SAVELARGE TREESUT3EAST BUFFALO ROAD
MATCH L
I
N
E
-
S
T
A
4
0
0
3
+
8
0
2.1.12.1.22.1.32.1.42.4.42.4.32.4.22.4.12.2.12.5.12.3.12.3.22.6.1EAST BUFFALO
CREEKUT1UT2UT3UT4UT
5 ABCD20652070DEPTH VARIES1.1' TO 2.3'SEE TYP SECTIONSHEET 1.4Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION 0'20'40'60'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Profiles.dwg August 4, 2020
005-45020
HB
ER
JM
2.4.1
August 4, 2020 Sheet IndexEast Buffalo Mitigation Site
Graham County, North Carolina
UT3
Stream Plan and Profile 0'4'8'12'(VERTICAL)NOTE:APPLY CASCADING RIFFLE-POOLSEQUENCE WHERE INDICATED INPLAN VIEW, USE INSET PROFILEWITH DETAIL 3, SHEET 6.1INSET 1INSET 1
2030203520402045205020552060206520702030203520402045205020552060206520704003+804004+004004+504005+004005+504006+004006+504007+004007+504008+004008+30-4.8%-4.8%STA = 4006+10ELEV = 2046.13STA = 4006+12ELEV = 2045.63STA = 4006+20
ELEV = 2045.75STA = 4006+25ELEV = 2044.15STA = 4006+45
ELEV = 2044.62STA = 4006+50ELEV = 2043.02STA = 4006+61
ELEV = 2043.91STA = 4006+66ELEV = 2042.31STA = 4006+80
ELEV = 2043.05STA = 4006+85ELEV = 2041.45STA = 4007+02
ELEV = 2042.04STA = 4007+07ELEV = 2040.44STA = 4007+22
ELEV = 2041.15STA = 4007+27ELEV = 2039.55STA = 4007+45
ELEV = 2040.07STA = 4007+50ELEV = 2038.47STA = 4007+69
ELEV = 2038.99STA = 4007+74ELEV = 2037.39STA = 4007+83
ELEV = 2038.36STA = 4007+88ELEV = 2036.76STA = 4008+03
ELEV = 2037.45STA = 4008+08ELEV = 2035.85STA = 4008+19
ELEV = 2036.79
STA = 4008+25ELEV = 2035.09STA = 4004+76ELEV = 2053.98STA = 4004+81ELEV = 2052.38STA = 4004+95ELEV = 2052.78STA = 4005+00ELEV = 2051.18STA = 4005+22ELEV = 2051.18STA = 4005+27ELEV = 2049.58STA = 4005+38ELEV = 2050.17STA = 4005+43ELEV = 2048.57STA = 4005+57ELEV = 2049.02STA = 4005+62ELEV = 2047.42STA = 4005+83
ELEV = 2047.21STA = 4005+86ELEV = 2046.21STA = 4008+29ELEV = 2036.39STA = 4004+85ELEV = 2053.68STA = 4005+04ELEV = 2052.48STA = 4005+31ELEV = 2050.88 STA = 4005+47ELEV = 2049.87STA = 4005+66ELEV = 2048.72
STA = 4005+91
ELEV = 2047.20
STA = 4006+14
ELEV = 2046.13
STA = 4006+29
ELEV = 2045.45
STA = 4006+54
ELEV = 2044.32
STA = 4006+70ELEV = 2043.61STA = 4006+89
ELEV = 2042.75
STA = 4007+11
ELEV = 2041.74
STA = 4007+31ELEV = 2040.85STA = 4007+78
ELEV = 2038.69
STA = 4007+92ELEV = 2038.06STA = 4008+12
ELEV = 2037.15
STA = 4007+54
ELEV = 2039.77
STA = 4003+92ELEV = 2062.23STA = 4004+07ELEV = 2060.62STA = 4004+21ELEV = 2059.26STA = 4004+40ELEV = 2057.26STA = 4004+66ELEV = 2054.60
-4.5%-6.1%-10.2%-5.5%-6.3%-5.2%-5.9%-5.7%-5.3%-5.5%-5.3%-5.3%-6.7%-5.5%-4.8%-6.6%-8.4%-7.5%-9.3%-8.6%-9.1%-10.6%-10.2%-10.2%-10.2%-10.2%EXISTING GROUNDPROPOSEDGRADEPROPOSEDBANKFULLSTATION 4004+66END CASCADINGRIFFLE-POOL SEQUENCEOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECEOUEOUECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECE20402045
20502055 2060 20652070
2040
2
0
4
5
2050
20552060206520702075
HARVEST EXISTING STREAM BEDMATERIAL AND FILL EXISTINGCHANNELEXISTING POWER LINETHROUGH FIELD TOBE RELOCATEDOUTSIDE OF BUFFERSTA 4004+53END UT3 R2ABEGIN UT3 R2BROUGHEN FLOOD FLOW PATHUSING ONSITE WOOD ANDDENSE LIVESTAKINGROUGHEN FLOOD FLOW PATHUSING ONSITE WOOD ANDDENSE LIVESTAKINGSTABILIZE ROAD PIPEOUTLET AND SPREAD FLOWINTO PROPOSED BUFFERROUGHEN FLOOD FLOW PATHUSING ONSITE WOOD ANDDENSE LIVESTAKING4004+004005+004006+004007+004008+0020
4
0
2
0
4
52050205520602065207020602065 RETAIN EXISTING 18" CMPINV. IN 2052.31'INV. OUT 2048.23'UT3EAST BUFFALO ROADMATCH LINE - STA 4003+80
MATCH LINE - STA 4008+30
2.1.12.1.22.1.32.1.42.4.42.4.32.4.22.4.12.2.12.5.12.3.12.3.22.6.1EAST BUFFALO
CREEKUT1UT2UT3UT4UT
5
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION 0'20'40'60'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Profiles.dwg August 4, 2020
005-45020
HB
ER
JM
2.4.2
August 4, 2020 Sheet IndexEast Buffalo Mitigation Site
Graham County, North Carolina
UT3
Stream Plan and Profile 0'4'8'12'(VERTICAL)NOTE:APPLY CASCADING RIFFLE-POOLSEQUENCE WHERE INDICATED IN PLANVIEW, USE INSET 1 PROFILE (PREVIOUSPAGE) WITH DETAIL 3, SHEET 6.1APPLY CASCADERIFFLE-POOL SEQUENCEFROM INSET 1, PAGE 2.4.1
201020152020202520302035204020102015202020252030203520404008+304008+504009+004009+504010+004010+504011+004011+504012+004012+50STA = 4008+48ELEV = 2034.08STA = 4008+73ELEV = 2033.09STA = 4008+88ELEV = 2033.93STA = 4008+93ELEV = 2032.33STA = 4009+07ELEV = 2033.19STA = 4009+15ELEV = 2032.89 STA = 4008+68ELEV = 2034.69STA = 4009+35ELEV = 2032.05STA = 4009+39ELEV = 2030.49STA = 4009+51ELEV = 2030.93 STA = 4009+57ELEV = 2030.43STA = 4009+79ELEV = 2028.90STA = 4010+01ELEV = 2026.42STA = 4010+04ELEV = 2026.42STA = 4010+06
ELEV = 2027.17
STA = 4010+25
ELEV = 2026.18STA = 4010+27ELEV = 2025.43STA = 4010+30ELEV = 2025.43STA = 4010+32ELEV = 2026.18STA = 4010+33ELEV = 2026.14STA = 4010+36ELEV = 2025.17STA = 4009+55ELEV = 2029.33STA = 4009+85ELEV = 2028.39STA = 4009+99
ELEV = 2027.17 STA = 4008+43ELEV = 2035.68STA = 4010+60
ELEV = 2024.99STA = 4010+65ELEV = 2023.19STA = 4010+70ELEV = 2024.69STA = 4010+82
ELEV = 2024.32STA = 4010+87
ELEV = 2022.52 STA = 4010+92
ELEV = 2024.02
STA = 4011+11
ELEV = 2023.21STA = 4011+21ELEV = 2021.31STA = 4011+26
ELEV = 2022.81
STA = 4011+34
ELEV = 2022.41
STA = 4011+86ELEV = 2018.78STA = 4011+91
ELEV = 2020.28
STA = 4011+51
ELEV = 2021.85STA = 4011+57ELEV = 2020.05STA = 4011+61
ELEV = 2021.55
STA = 4011+81
ELEV = 2020.58STA = 4011+37ELEV = 2021.66STA = 4011+40
ELEV = 2022.26
STA = 4012+04
ELEV = 2019.57STA = 4012+09ELEV = 2017.77STA = 4012+14ELEV = 2019.27STA = 4012+32
ELEV = 2018.33STA = 4012+38ELEV = 2016.53STA = 4012+42
ELEV = 2018.03
STA = 4008+52ELEV = 2035.38STA = 4008+77ELEV = 2034.39STA = 4008+97ELEV = 2033.63 STA = 4009+42ELEV = 2031.57STA = 4010+39
ELEV = 2025.92STA = 4009+83ELEV = 2027.30STA = 4009+11ELEV = 2031.59
-3.0%-4.4%-3.9%-7.2%-3.8%-4.3%-4.4%-4.3%-4.3%-7.1%-7.2%-5.3%-3.8%-9.1%-4.9%-4.6%-3.0%-4.1%-20.5%-4.9%-3.6%-5.0%-5.4%-5.1%-5.4%EXISTING GROUNDPROPOSED GRADEPROPOSED BANKFULLOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUECECECECEOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUECECECECE20202
0
2
5 20302020
2025
20302035 2030 2035 2040UT4
UT3STA. 4010+46END UT3 REACH 2B - RESTORATIONBEGIN UT3 REACH 3 - ENHANCEMENT ISTA. 5002+29END UT4 REACH 2 - ENHANCEMENT IEXISTING POWER LINETHROUGH FIELD TOBE ABANDONED4008+004009+004010+004011+004012+004013+005002+295002+00
20302035
202020202025203020202025REMOVE EXISTING CULVERTMATCH LINE - STA 4008+30
MATCH LINE - STA 4012+50
2.1.12.1.22.1.32.1.42.4.42.4.32.4.22.4.12.2.12.5.12.3.12.3.22.6.1EAST BUFFALO
CREEKUT1UT2UT3UT4UT
5
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION 0'20'40'60'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Profiles.dwg August 4, 2020
005-45020
HB
ER
JM
2.4.3
August 4, 2020 Sheet IndexEast Buffalo Mitigation Site
Graham County, North Carolina
UT3
Stream Plan and Profile 0'4'8'12'(VERTICAL)
20052010201520202025200520102015202020254012+504013+004013+504014+004014+50-0.1%-4.5%-3.1%-4.4%-2.2%-3.4%-0.1%-4.5%-3.1%-4.4%-2.2%-3.4%STA = 4014+29
ELEV = 2011.99
STA = 4012+89ELEV = 2016.06STA = 4012+84ELEV = 2014.56STA = 4013+93
ELEV = 2012.87STA = 4013+88ELEV = 2011.37STA = 4013+59
ELEV = 2013.65
STA = 4013+50
ELEV = 2012.15
STA = 4013+41
ELEV = 2014.14
STA = 4013+21
ELEV = 2015.04
STA = 4013+12
ELEV = 2015.35STA = 4013+17ELEV = 2013.54STA = 4012+79ELEV = 2016.43 STA = 4012+65ELEV = 2017.04STA = 4012+55ELEV = 2017.34STA = 4012+60ELEV = 2015.54STA = 4013+83
ELEV = 2013.12
STA = 4014+19
ELEV = 2012.00-2.6%-3.1%EXISTING GROUNDPROPOSED GRADEPROPOSED BANKFULLOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHECECECECECECECECECECECECECECECECECECECECECECECECECECECECEOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHECECECECECECECECECECECECECECECECECECECECECECECECECECECECEX
X X X X X
20102015202020252030203520402020202520302015202020252030203020302
0
1
5
2020
STA. 4014+26END UT3 REACH 3 - ENHANCEMENT IPROPOSED STARTOF POWERLINERELOCATIONNO CHANNEL WORK OR STREAMCREDITING PROPOSED ON UT4AREMOVE EXISTING FENCEWITHIN EASEMENT (TYP)4012+004013+004014+004014+47OUE MIN. 30 FT FROMSTREAM BANKFULL2020202020152020UT3UT4AEAST BUFFALO ROADMATCH LINE - STA 4012+50
2.1.12.1.22.1.32.1.42.4.42.4.32.4.22.4.12.2.12.5.12.3.12.3.22.6.1EAST BUFFALO
CREEKUT1UT2UT3UT4UT
5
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION 0'20'40'60'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Profiles.dwg August 4, 2020
005-45020
HB
ER
JM
2.4.4
August 4, 2020 Sheet IndexEast Buffalo Mitigation Site
Graham County, North Carolina
UT3
Stream Plan and Profile 0'4'8'12'(VERTICAL)
202020252030203520402045205020202025203020352040204520505000+005000+505001+005001+505002+005002+30-2.6%-4.1%-2.6%-4.1%STA = 5000+52ELEV = 2035.00
STA = 5002+29ELEV = 2026.23STA = 5000+94
ELEV = 2031.36
STA = 5002+02
ELEV = 2026.96
-2.6%-8.6%-4.1%EXISTING 24" CMPINV.IN 2037.40'INV.OUT 2033.90'STA = 5000+08ELEV = 2037.40STA = 5000+52ELEV = 2033.90
EXISTING GROUNDPROPOSED GRADEPROPOSED BANKFULLOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECE
CE
CE
CE
CE
CE
CE
CE
OUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECE
CE
CE
CE
CE
CE
CE
CE
2025203020302035STA. 5000+52BEGIN UT4 REACH 2 - ENHANCEMENT ISTA. 4010+46END UT3 REACH 3 - RESTORATIONBEGIN UT3 REACH 4 - ENHANCEMENT IISTA. 5002+29END UT4 REACH 2 - ENHANCEMENT IREMOVE SPRING HOUSEPROTECT 24" CMP CULVERT TO REMAININV IN: 2037.40INV OUT: 2033.90'STRUCTURE LOCATION TO BEDESIGNATED IN THE FIELD BASEDON JUNCUS STABILIZATION4010+0
0
401
1
+
0
0
5
0
0
2
+
2
95000+005001+005002+00203020252030
2025 STA. 5000+65END ROWBEGIN UT4 REACH 2 -RESTORATION CREDITU
T
3UT4EAST BUFFALO ROAD
UT
3
2.1.12.1.22.1.32.1.42.4.42.4.32.4.22.4.12.2.12.5.12.3.12.3.22.6.1EAST BUFFALO
CREEKUT1UT2UT3UT4UT
5
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION 0'20'40'60'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Profiles.dwg August 4, 2020
005-45020
HB
ER
JM
2.5.1
August 4, 2020 Sheet IndexEast Buffalo Mitigation Site
Graham County, North Carolina
UT4
Stream Plan and Profile 0'4'8'12'(VERTICAL)NOTE:APPLY CASCADING RIFFLE-POOLSEQUENCE WHERE INDICATED IN PLANVIEW, USE DETAIL 3, SHEET 6.1
20252030203520402045205020552060202520302035204020452050205520606000+006000+506001+006001+506002+006002+50-4.4%-4.4%-4.4%-4.4%-4.4%-4.4%STA = 6000+67ELEV = 2042.49STA = 6000+76ELEV = 2041.47
STA = 6000+99
ELEV = 2040.04
STA = 6001+21
ELEV = 2039.08
STA = 6001+37
ELEV = 2038.36
STA = 6001+69
ELEV = 2036.96
STA = 6001+87
ELEV = 2036.17
STA = 6002+07
ELEV = 2035.25
STA = 6002+43
ELEV = 2032.81
STA = 6000+92
ELEV = 2040.36STA = 6000+81ELEV = 2040.12STA = 6000+86
ELEV = 2040.81STA = 6001+06ELEV = 2038.75STA = 6001+11
ELEV = 2039.50STA = 6001+24ELEV = 2038.23STA = 6001+28
ELEV = 2038.75STA = 6001+42ELEV = 2037.13STA = 6001+49
ELEV = 2037.83STA = 6001+55ELEV = 2036.89STA = 6001+59
ELEV = 2037.41STA = 6001+72ELEV = 2036.12STA = 6001+75
ELEV = 2036.67STA = 6001+92ELEV = 2034.92STA = 6001+97
ELEV = 2035.71
STA = 6002+15
ELEV = 2034.76STA = 6002+18ELEV = 2033.56STA = 6002+23
ELEV = 2034.19STA = 6002+26ELEV = 2033.02STA = 6002+31
ELEV = 2033.65STA = 6002+10ELEV = 2034.13-12.0%-4.4%-4.4%-4.4%-4.4%-4.4%-4.4%-7.1%-6.9%-19.7%-24.0%-24.0%-17.2%-22.6%-12.0%-6.9%-4.4%-7.1%EXISTING GROUNDPROPOSED GRADEPROPOSED BANKFULLXXXXXXXXXXXXXXX2040
2035UT5EAST BUFFALO CREEKSTA. 1013+57EAST BUFFALO CREEK - RESTORATIONSTA 6002+48END UT5 - ENHANCEMENT IISTA 6000+67BEGIN UT5 - ENHANCEMENT IIREMOVE EXISTING CULVERTOLD EAST BUFFALO CREEK CHANNELTO BE FILLED AFTER REUSE OFMATERIAL IN NEW CHANNEL1012+001013+00
1014+006000+006001+006002+002035
2040
2035 2040204520452035
2.1.12.1.22.1.32.1.42.4.42.4.32.4.22.4.12.2.12.5.12.3.12.3.22.6.1EAST BUFFALO
CREEKUT1UT2UT3UT4UT
5
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION 0'20'40'60'(HORIZONTAL)N
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Profiles.dwg August 4, 2020
005-45020
HB
ER
JM
2.6.1
August 4, 2020 Sheet IndexEast Buffalo Mitigation Site
Graham County, North Carolina
UT5
Stream Plan and Profile 0'4'8'12'(VERTICAL)ENHANCEMENT II:1. REMOVE PRIVET AND INVASIVE SPECIES2. PLANT MINIMUM 150' TYP. BUFFER ON RIGHTBANK3. SUPPLEMENTAL PLANTING ON LEFT BANK4. SAVE ALL TREES NOT SPECIFICALLY IDENTIFIEDFOR REMOVAL
Streambank Planting ZoneLive Stakes: > 8' TOBSpeciesCommon NameMax SpacingIndiv. SpacingMin. SizeStratumPercent OfStemsSalix nigraBlack Willow840.5" cal.Canopy10%Salix sericeaSilky Willow840.5" cal.Subcanopy30%Cornus amomumSilky Dogwood840.5" cal.Subcanopy25%Sambucus canadensisElderberry840.5" cal.Subcanopy10%Physocarpos opulifoliusNinebark840.5" cal.Shrub25%*Percentages may be altered by designer to maximum of 40%Total100%Herbaceous PlugsJuncus effususCommon Rush103-52.0" plugHerb50%Carex luridaShallow Sedge103-52.0" plugHerb20%Carex crinitaFringed Sedge103-52.0" plugHerb15%Cyperus strigosusStraw-colored Flatsedge103-52.0" plugHerb15%Total100%*Plug species and spacing may be adjusted by designer, minimum 3 species. Max spacing may be increased by designer.X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Planting.dwg August 4, 2020
East Buffalo Mitigation Site
Graham County, North Carolina
Planting Plan
005-45020
HB
ER
JM
3.0
August 4, 2020 Note:Permanent Riparian seeding in all disturbed areas within Conservation Easement andright-of-ways.NCDOT Right-of-way planting subject to NCDOT approval.See Detail 1, Sheet 6.7 forLive Staking instructions onstreambanks.Note:OPTIONAL: TRANSPLANTS andCONTAINERIZED PLANTS to beused at Engineer's discretionfor streambank and floodplainplanting.Low Growing Species Utility Right-of-way Planting ZoneSheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTIONRiparian Seeding - Open CanopyPure Live Seed (20 lbs/acre)Approved DateSpecies NameCommon NameStratumDensity (lbs/acre)All YearPanicum ancepsFall PanicumHerb2.0All YearPanicum virgatumSwitchgrassHerb1.0All YearSchizachyrium scopariumLittle BluestemHerb1.5All YearSorghastrum nutansIndiangrassHerb2.0All YearEchinochloa muricataBarnyard GrassHerb1.0All YearDichantheliumclandestinumDeertongueHerb2.0All YearElymus virginianaVirginia Wild RyeHerb2.5All YearElymus ripariusRiver Bank Wild RyeHerb1.0All YearCarex vulpinoideaFox SedgeHerb1.5All YearJuncus effususCommon RushHerb0.5All YearJuncus tenuisPath RushHerb0.5All YearHeliopsis helianthoidesOxeye SunflowerHerb1.0All YearSenna hebecarpaWild SennaHerb1.0All YearBidens aristosaBur-marigoldHerb1.0All YearRudbeckia hirtaBlackeyed SusanHerb1.0All YearCephalanthus occidentalisButton BushShrub0.520.0Riparian Planting ZoneSpecies***Common NameMax SpacingIndiv.SpacingMin. Caliper SizeStratumPercent OfStemsPlatanus occidentalisSycamore126-12'0.25"Canopy5%Prunus serotinaBlack Cherry126-12'0.25"Canopy10%Populus deltoidesEastern Cottonwood126-12'0.25"Canopy10%Tilia AmericanaAmerican Linden126-12'0.25"Canopy10%Diospyros virginianaPersimmon126-12'0.25"Canopy10%Quercus rubraNorthern Red Oak126-12'0.25"Canopy10%Acer negundoBoxelder126-12'0.25"Canopy10%Ulmus rubraSlippery Elm126-12'0.25"Canopy10%Betula lenta*Sweet Birch126-12'0.25"Canopy5%Nyssa sylvaticaBlack Gum126-12'0.25"Canopy5%Asimina trilobaPaw Paw126-12'0.25"Subcanopy5%Corylus americana**American Hazelnut126-12'0.25"Subcanopy5%Liriodendron tulipiferaTulip Poplar126-12'0.25"Canopy3%* Preferred substitutes: B. alleghaniensis or Magnolia fraseri, acuminata or fraseri or other substitutes if not available98%**Preferred substitutes: Lindera benzoin, Halesia caroliniana, or other substitutes if not available***A minimum of 10 species will be planted from this list. Other substitutes are allowable as follows (up to 10% each): Fagus grandifolia,Quercus falca, Oxydendrum arboreum , Hamamelis virginiana, Quercus alba, Carpinus caroliniana, Betula alleghaniensis, Aesculus flava, Acerrubrum (as volunteer only)Wetland Planting ZoneSpeciesCommon NameMax SpacingIndiv.SpacingMin. Caliper SizeStratumPercentOf StemsBare Root or Tubling*Plantanus occidentalisSycamore12 ft6-12'0.25"Canopy8%Liriodendron tulipiferaTulip Poplar12 ft6-12'0.25"Canopy2%Alnus serrulataTag Alder12 ft6-12'0.25"Subcanopy10%Populus deltoidesEastern Cottowood12 ft6-12'0.25"Canopy8%Malus angustifoliaSouthern Crabapple12 ft6-12'0.25"Canopy8%Tilia americanaWhite Basswood12 ft6-12'0.25"Canopy5%Acer negundoBoxelder12 ft6-12'0.25"Canopy6%Ulmus rubraSlippery Elm12 ft6-12'0.25"Canopy6%Oxydendrum arboreumSourwood12 ft6-12'0.25"Canopy5%Euonymus americanusStrawberry Bush12 ft6-12'0.25"Shrub2%Quercus rubraNorthern Red Oak12 ft6-12'0.25"Canopy5%Betula lentaSweet Birch12 ft6-12'0.25"Canopy5% Carpinus carolinianaAmerican Hornbeam12 ft6-12'0.25"Canopy2%Hamamelis virginianaWitch Hazel12 ft6-12'0.25"Subcanopy2%Nyssa sylvaticaBlack Gum12 ft6-12'0.25"Shrub6%Clethra acuminatasweet-pepperbush12 ft6-12'0.25"Shrub2%Ilex montanaMountain winterberry12 ft6-12'0.25"Shrub1%Bare Root, Live Stake or Tubling*Salix nigraBlack Willow12 ft6-12'0.25"Canopy7%Salix sericeaSilky Willow12 ft6-12'0.25"Subcanopy5%Cephalanthus occidentalisButtonbush12 ft6-12'0.25"Subcanopy5%100%Elective Wetland Plugs**SpeciesCommon NameMax SpacingIndiv.SpacingMin. SizeStratumPercentOf PlugsXanthorhiza simplicissimaYellowrootN/ATBDN/AHerbN/AOsmunda cinnamomeaCinnamon fernN/ATBDN/AHerbN/AOsmunda claytonianaInterrupted fernN/ATBDN/AHerbN/AArisaema triphyllum spp.TriphyllumJack-in-the-pulpitN/ATBDN/AHerbN/ACarex atlanticaPricky bog sedgeN/ATBDN/AHerbN/AScirpus spp.WoolgrassN/ATBDN/AHerbN/A*A minimum of 10 species will be planted from this list. It is anticipated that some species listed will be unavailable from commerical source asbare root species. Designer has the option to increase any species to maximum of 15%. Where available in larger size plant material, designerwill consider using in larger size as a smaller percentage. Acer rubrum may be used as a volunteer species.**The purpose of elective wetland plugs list is to allow designer to elect, at their discretion, to plant species not available in seed mix, butavailable as plugs, 4" containers or similar. The number of wetland plugs to be planted will be determined by the designer and the purpose willbe to establish small colonies that can expand over time. Where unavailable or infeasible to obtain, wetland plugs may be eliminated.Temporary SeedingApproved DateTypePlanting Rate (lbs/acre)Jan 1 - May 1Rye Grain (Secale cereale)120Humic DG (Lime)200Soil conditioner (Humic DG)50In-houseStraw Mulch4000May 1 - Aug 15German Millet (Setaria italica)40Ladino/Red/Crimson Clover20Humic DG (Lime)200Soil conditioner (Humic DG)50In-houseStraw Mulch4000Aug 15 - Dec 30Rye Grain (Secale cereale)120Ladino/Red/Crimson Clover20Humic DG (Lime)200Soil conditioner (Humic DG)100In-houseStraw Mulch4000Note:All disturbed areas.See Detail 3, Sheet 6.7 forBare Root installation instructions.Utility Right-of Way Planting Zone - Shrub and Low Growing SpeciesSpeciesCommon NameMax SpacingIndiv. SpacingMin. Caliper SizeStratumPercent OfStemsAlnus serrulataTag Alder12 ft6-12'0.25"Subcanopy15%Itea virginicaVirginia Sweetspire12 ft6-12'0.25"Shrub10%Ilex verticillataWinterberry12 ft6-12'0.25"Subcanopy10%Rhododendron maximumRosebay Rhododendron12 ft6-12'0.25"Shrub10%Kalmia latifoliaMountain Laurel12 ft6-12'0.25"Shub10%Physocarpus opulifoliusNinebark12 ft6-12'0.25"Shrub10%Sambucus canadensisElderberry12 ft6-12'0.25"Subcanopy10%Cephalanthus occidentalisButtonbush12 ft6-12'0.25"Subcanopy5%Euonymus americanusStrawberry Bush12 ft6-12'0.25"Shrub10%Lindera benzoinSpicebush12 ft6-12'0.25"Subcanopy10%*No planting within access ways (15-20' corridor used for vehicular maintenance access)100%**Substitutes include Calycanthus floridus, Clethra acuminata, Viburnum acerfolium, and Leucothoe fotanesiana***Minimum of five species shall be planted in utility ROW, ROW species may be livestaked or installed as tubling where applicable.Supplemental Shaded Area Riparian Planting ZoneSpecies*Common NameMaxSpacingIndiv.SpacingMin.CaliperSizeStratumPercentOf StemsAlnus serrulataTag alder126-12'0.25"Subcanopy20%Itea virginica Virginia sweetspire126-12'0.25"Shrub20%Itex veritcillata Winterberry126-12'0.25"Subcanopy10%Physocarpus opulifolius Ninebark126-12'0.25"Shrub20%Sambucus canadenis Elderberry126-12'0.25"Shrub20%Viburnum lentago Nannyberry126-12'0.25"Shrub10%*Shade tolerant Riparian Planting Zone or Wetland Planting species may be substituted100%Wetland Seeding - Open CanopyPure Live Seed (20 lbs/acre)Approved DateSpecies NameCommon NameStratumDensity (lbs/acre)All YearPolygonum sagittatumArrowleaf TearthumbHerb0.5All YearColeatoenia ancepsBeaked PanicgrassHerb1.5All YearPanicum virgatumSwitchgrassHerb2.0All YearVernonia noveboracensisIronweedHerb1.0All YearEupatorium fistulosumJoe Pye WeedHerb0.5All YearSagittaria latifoliaBroadleaf ArrowheadHerb0.5All YearDichanthelium clandestinumDeertongueHerb1.5All YearElymus virginianaVirginia Wild RyeHerb2.0All YearScirpus cyperinusWoolgrassHerb1.0All YearCarex vulpinoideaFox SedgeHerb1.5All YearJuncus effususCommon RushHerb1.0All YearJuncus tenuisPath RushHerb1.0All YearCarex frankiiFrank's SedgeHerb1.0All YearCarex luridaShallow SedgeHerb1.0All YearBidens aristosaBur-marigoldHerb1.0All YearCarex crinitaFringed SedgeHerb1.0All YearHamamelis virginianaWitchhazelShrub1.0All YearCephalanthus occidentalisButton BushShrub1.020.0
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Planting.dwg August 4, 2020
005-45020
HB
ER
JM
3.1
August 4, 2020 East Buffalo Mitigation Site
Graham County, North Carolina
Planting Plan
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION0'80'160'240'(HORIZONTAL)NOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOHE OHE
CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECE
CE
CE
CE
CE
CE
CE
CE
CE
CE CECECECECECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECESHEET 3.2SHEET 3.3EAST BUFFALO CREEKUT1UT2UT3UT4UT5 UT7 UT6UT4A
EAST BUFFALO
CREEKUT3E
A
S
T
B
U
F
F
A
L
O
R
O
A
D
EAST BUFFALO ROAD
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Planting.dwg August 4, 2020
005-45020
HB
ER
JM
3.2
August 4, 2020 East Buffalo Mitigation Site
Graham County, North Carolina
Planting Plan
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION0'40'80'120'(HORIZONTAL)NOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOHE OHE OHE OHE OHE
SAFCE
CE
CE
CE
CECECECECECECECECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECEMATCHLINE SHEET 3.2EAST BUFFALO CREEKUT4UT
5UT4AUT3
E
A
S
T
B
U
F
F
A
L
O
R
O
A
D
0'40'80'120'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Planting.dwg August 4, 2020
005-45020
HB
ER
JM
3.3
August 4, 2020 East Buffalo Mitigation Site
Graham County, North Carolina
Planting Plan
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTIONOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECEMATCHLINE SHEET 3.2
UT1UT2UT3EAST BUFFA
LO
CREEKEAST BUFFALO ROAD
0'80'160'240'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Planting.dwg August 4, 2020
005-45020
HB
ER
JM
3.4
August 4, 2020 East Buffalo Mitigation Site
Graham County, North Carolina
Invasives Treatment Plan
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTIONINVASIVE REMOVAL NOTES:*NO EXCAVATED SOIL TO BE USED ON PROPOSED STREAMBANKS DUE TO INVASIVE ROOT PRESENCEDENSE INFESTATION APPROXIMATE LIMITSOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUERICHARD WAYNE PENNINGTON, JR &WIFE, CYNTHIA PENNINGTONPORTION OF PIN: 5662-00-09-0042DB: 240 PG: 770RICHARD PENNINGTON ANDWIFE, MARGARET PENNINGTONPORTION OF PIN: 5662-00-09-0042DB: 128 PG: 799REF: DB: 126 PG: 713REF: DB: 117 PG: 746HANNU MELARTI ANDWIFE, ULRIKA MELARTIPIN: 5662-00-04-0006DB: 288 PG: 501CARL D. LEE ANDWIFE, JOAN B. LEEPIN: 5662-00-09-0024DB: 260 PG: 609PG: 5 PG: 980BO COLLINS AND WIFE,HELEN M. COLLINSPIN: 5662-00-09-0033DB: 367 PG: 550HUGH DARRELL ORR ANDWIFE, PATRICIA ORRPIN: 5662-00-09-0028DB: 72 PG: 553RAMLONGHORN, LLCPORTION OF PIN: 5662-00-09-0043DB: 374 PG: 420PC: DB PG: 1000HANNU MELARTI ANDWIFE, ULRIKA MELARTI(THROUGH SUBDIVISION ANDRECOMBINATION)OUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOHE OHE
CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECE
CE
CE
CE
CE
CE
CE
CE
CE
CE CECECECECECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECESTAGING AREAAREA TO BE MONITORED FORINVASIVE BULL THISTLE ANDCANADA THISTLEDENSE PRIVET AND MULTIFLORAINFESTATION TO BE PHYSICALLYREMOVED DURING SITE GRADINGREMOVE DENSE PRIVET ANDMULTIFLORA ROSE INFESTATIONSPHYSICALLY CLEAR CUT WHEREPOSSIBLE AND THROUGHCUT-STUMP/SPRAY TREATMENTELSEWHEREINVASIVE ENGLISHIVY TO BEREMOVED DURINGSITE GRADINGINVASIVE ENGLISH IVY TO BECHEMICALLY TREATED MULTIPLESEASONS BEGINNING SPRING 2020(APPROXIMATE AREA)CLEAR CUT ANDCHEMICALLY TREATPRIVET IN WOODSBETWEEN UT5 & UT7DENSE PRIVET INFESTATION ON BOTH BANKSTO BE REMOVED DURING SITE GRADING *DENSE PRIVET INFESTATION ON BOTH BANKSTO BE REMOVED DURING SITE GRADING *MULTIFLORA AND PRIVET TO BECHEMICALLY TREATED(APPROXIMATE AREA)PRIVET ALONG BANK TO BECHEMICALLY TREATED WITHCUT-STUMP METHOD ANDBANKS SUPPLEMENTALLYLIVESTAKEDSEE PLANTING NOTES FORPRIMARY AND SECONDARYROAD NATURALIZATION ONSHEET 5.0EAST BUFFALO CREEKUT1UT2UT3UT4UT5 UT7 UT6UT4A
EAST BUFFALO
CREEKUT3E
A
S
T
B
U
F
F
A
L
O
R
O
A
D
EAST BUFFALO ROADWOOD LINE TO BEMECHANICALLY TREATED(APPROXIMATELY 10' INTOWOODS)
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - ESC Plan.dwg August 4, 2020
005-45020
HB
ER
JM
4.0
August 4, 2020 East Buffalo Mitigation Site
Graham County, North Carolina
ESC Overview
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION0'80'160'240'(HORIZONTAL)NNOTES:1.NO OFFSITE WASTE OR BORROW SITE SHALL BE USED.2.CONDUCT STREAMBED AND BANK WORK STABILIZING DISTURBEDAREAS PRIOR TO THE END OF EACH WORK DAY SO THAT FLOW MAYBE TURNED BACK INTO THE CHANNEL.3.PROTECT INTEGRITY OF PAVEMENT AT ALL CONSTRUCTIONENTRANCES OFF EAST BUFFALO ROAD.4.MAINTAIN ENTRANCES PER DETAIL.LOD: 23 ACRESOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOULOD LOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODL
O
D
LOD
L
O
D
L
O
D
LODLODLODLODLOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLOD
LO
D
L
O
D
LO
D
LOD
LO
D
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LO
D
LODLODLOD LOD LOD LOD
LODLO
D
LOD
LODLODLOD LOD
LOD
LOD
L
O
D
LODL
O
D
LO
D
LOD LODLODLODOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOHE OHE
CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE CECECECECECECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECESHEET 3.2SHEET 3.3[x][x
][x][x][x][x][x][
x
][x][x][x][x][x][x][x]T[x][x]SAFSAFSAFSAFSAFLODLODLODLODLODLODLODLODLODLODLODSAF[x][x][x][x][x][x]TEND UT3 REACH 2ABEGIN UT3 REACH 2BEND UT3 REACH 1BEGIN UT3 REACH 2AEND UT3 REACH 2ABEGIN UT3 REACH 3END UT4 REACH 2END UT2 REACH 1BEGIN UT2 REACH 2END EAST BUFFALO CREEK REACH 1BEGIN EAST BUFFALO CREEK REACH 2END EAST BUFFALO CREEK REACH 2BEGIN EAST BUFFALO CREEK REACH 3TTTEAST BUFFALO CREEKUT1UT2UT3UT4UT7 UT6UT4A
EAST BUFFA
LO
CREEKUT3U
T
5EAST BUFFALO ROADEAST BUFFALO ROADEND EAST BUFFALO CREEK REACH 3BEGIN UT4 REACH 2END UT3 REACH 3WETLAND RE-ESTABLISHMENTTBEGIN EAST BUFFALO CREEK REACH 1END UT2 REACH 2END UT5T
LOD
LOD LOD
LO
D
LOD
LODLODLODLODLODLODLODROAD NATURALIZATION SEEDECOMMISSIONING NOTESON SHEET 5.0ROAD NATURALIZATION SEEDECOMMISSIONING NOTESON SHEET 5.0INVASIVE SPECIESMANAGEMENT[x
][x][x]TUSE EXISTING SITEENTRANCEUSE EXISTING SITEENTRANCEOHEOHEBEGIN UT1END UT1
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - ESC Plan.dwg August 4, 2020
005-45020
HB
ER
JM
4.1
August 4, 2020 East Buffalo Mitigation Site
Graham County, North Carolina
ESC
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTION0'40'80'120'(HORIZONTAL)NOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOULOD LOD
LOD
LO
D
LO
D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODL
O
D
L
O
D
L
O
D
LOD
L
O
D
L
O
D
L
O
D
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD
LOD
LODLODLODLODLODLODOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOHE OHE OHE OHE OHE
SAFCE
CE
CE
CE
CECECECECECECECECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECEEAST BUFFALO CREEKUT4UT
5UT4AUT3EAST BUFFALO ROAD[x][x][x
]
[x
][x][x][x][x][
x
]
[
x
][x][x][x][x][x][x][x][x]SAFSAFSAFSAFSAFSAFSAFSAFSAFSAFLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLODLODLODLODLODLODSAFSAF[x]
[x][x][x][x][x][x][x][x][x][x]
[x][x][x][x]TTTEAST BUFFA
LO
ROADEND UT3 REACH 2ABEGIN UT3 REACH 3END UT4 REACH 2END EAST BUFFALO CREEK REACH 2BEGIN EAST BUFFALO CREEK REACH 3MATCHLINE SHEET 3.2WILDLANDS IS OBTAININGAN ENCROACHMENTAGREEMENT WITH NCDOTFOR WORK WITHIN THERIGHT OF WAY LIMITS.TEMPORARY CROSSING OVEREXISTING PIPE, REMOVE UPONCOMPLETION OF PROJECT.UT
5
T
LO
D
LOD
LODLODEND EAST BUFFALOCREEK REACH 3END UT3 REACH 3BEGIN UT4 REACH 2END UT5
0'40'80'120'(HORIZONTAL)NX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - ESC Plan.dwg August 4, 2020
005-45020
HB
ER
JM
4.2
August 4, 2020 East Buffalo Mitigation Site
Graham County, North Carolina
ESC
Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTIONOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOULODLODLODLODLODLOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD
LOD L
O
D
LODLODLODL
O
D
L
O
D
LO
D
LO
D
LOD LODLODLODLODLODLODOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECEUT1UT2UT3EAST BUFFA
LO
CREEK[x][x][x][x][x][x][x][x][x][x][x]
[x][x][x][x][x]TWETLAND RE-ESTABLISHMENTTEND UT3 REACH 2ABEGIN UT3 REACH 2BEND UT3 REACH 1BEGIN UT3 REACH 2AEND UT2 REACH 1BEGIN UT2 REACH 2END EAST BUFFALO CREEK REACH 1BEGIN EAST BUFFALO CREEK REACH 2MATCHLINE SHEET 3.2WILDLANDS IS OBTAINING ANENCROACHMENT AGREEMENTWITH NCDOT FOR WORK WITHINTHE RIGHT OF WAY LIMITSALL SLOPES STEEPER THAN 3:1SUBJECT TO 7-DAY STABILIZATIONREQUIREMENTS. SEED ANDSTRAW IMMEDIATELY, APPLYSLOPE MATTING IF DIRECTEDALL SLOPES STEEPER THAN 3:1SUBJECT TO 7-DAY STABILIZATIONREQUIREMENTS. SEED ANDSTRAW IMMEDIATELY, APPLYSLOPE MATTING IF DIRECTEDTEND UT2 REACH 2[x][x][x][x][x][x]TOHEOHEOHEOHEOHEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEBEGIN EAST BUFFALO REACH 1BEGIN UT1END UT1
OUOUOUOUOUOUOUOUOUOUO
U
O
U
O
U
E
O
U
E
O
U
E
O
U
E0'100'200'300'(HORIZONTAL)East Buffalo Mitigation Site
Graham County, North Carolina
Road Naturalization and Crossing Removal Overview
Additional Grading
005-45020
HB
ER
JM
5.0
August 4, 2020 NUT2 REACH 1 CULVERTSHEET 5.1UT3 REACH 1 CULVERTSHEET 5.2UT4 REACH 1 CULVERTSHEET 5.3Sheet
Checked By:
Job Number:
Drawn By:
Project Engineer:
Date:Revisions:
167-B Haywood Rd
Asheville, NC 28806
Tel: 828.774.5547
License No. F-0831JACOB P. MCLEA
N 033578N
O
R
TH CAROLINAPR
OFESSIONALENGINEER SEALP
R
E
L
IM
INA
R
YDO NO
T
U
S
E
FO
RCONSTRUCTIONX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Culvert Details.dwg August 4, 2020UT5UT7UT6EAST BUFFALO
CREEKUT2UT1UT4UT4AUT4BUT3PRIMARY SOIL ROAD DECOMMISSIONING·OBSTRUCT VEHICULAR PASSAGE THROUGH INTERMITTENT OBSTRUCTION OF THE ROAD WITH BOULDERS, TREES OR BERMS/GRADING TO REDUCE THEPASSABLE WIDTH FOR THE PREVENTION OF TRUCKS AND 4-WHEELER TRAFFIC TO THE EXTENT PRACTICABLE USING ON-SITE MATERIALS.·NATURALIZE EXISTING FORD AND CULVERTED STREAM CROSSINGS AS PROVIDED ON SUBSEQUENT SHEETS, RESTORING PROPER DIMENSION, PATTERN ANDPROFILE TO STREAMS.·CROSSINGS WILL BE LIVE-STAKED AND VARIABLY DECOMMISSIONED WITH TRANSPLANTS, WOOD OR BOTH FROM ADJACENT AREAS.·RESTORE FLOW ALONG ROADS BY REGRADING ROADS TO DISPERSE RUNOFF AND SHED WATER BEFORE FLOW IS CONCENTRATED. ·INSTALL AN AVERAGE OF TWO WATER SHEDDING SECTIONS AND AT LEAST 10 TREES WILL BE PLANTED EVERY 300', AND MORE FREQUENTLY WHERE THEFACTORS OF CONTRIBUTING DRAINAGE AREA, GRADIENT, AND EXISTING ROAD CONDITIONS WARRANT. SECTIONS WILL BE SELECTED TO MAXIMIZE THEIREFFECTIVENESS AND WITH CONSIDERATION OF CONTRIBUTING DRAINAGE AREA FROM UPGRADIENT SLOPES. WATER SHEDDING SECTIONS WILL INCLUDEDOWNSLOPE BRUSH AND DEBRIS TO REDISTRIBUTE FLOWS NATURALLY WITHIN THE BUFFER. DUE TO THE FREQUENCY OF PROPOSED ENHANCEMENTS, ITIS ANTICIPATED THAT ONLY SMALL SCALE SHORT-TERM DISPERSAL MEASURES WILL BE NECESSARY.·MAJOR GULLIES ALONG ROADS WILL BE PLUGGED AND GRADED OUT OVER SIGNIFICANT PORTIONS OF THEIR LENGTH IN ORDER TO PROMOTEREVEGETATION OF OLD ROAD BEDS.·NATURALIZE THE ROAD PARALLELING UT3 REACH 1 UPSTREAM OF WHERE IT CROSSES THE LOWER ROAD. DUE TO THE STEEP NATURE OF THE AREA ANDSUNKEN CONDITION OF THE ROAD, THIS MAY REQUIRE ROCKY SWALE OUTLETS TO THE CREEK WITH BRUSH CHECK DAMS TO REDUCE SHORT-TERM RISK OFSEDIMENT LOADING. INSTALL A MINIMUM OF THREE OUTLETS TO THE CREEK TO FORCE WATER OFF OF THE SUNK-IN ROAD, AND APPLY BRUSH AND OTHERBLOCKAGES INTERMITTENTLY ALONG THE ROAD TO FURTHER DIMINISH IMPACTS AND DISPERSE CONCENTRATED RUNOFF.SECONDARY SOIL ROAD DECOMMISSIONING·ALONG THE UPPER ROAD, THE FORD CROSSINGS NEAR THE STREAM ORIGINS OF UT4 & UT4B WILL BE LIVE-STAKED AND NATURALIZED WITH HAND-WORK. IN ADDITION, THE APPROACHES TO THESE UPPER CROSSINGS WILL BE TREATED TO DIVERT RUNOFF OFF OF THE ROAD SECTION INTO THE BUFFER IN THESAME MANNER AS FOR THE PRIORITY 1 ROAD SECTIONS WHERE A MINIMUM OF TWO WATER SHEDDING SECTIONS ARE ESTABLISHED EVERY 300'. ·ALL PRIORITY 2 ROADS WILL BE TREATED TO ENSURE THEY SHED WATER AT THIS FREQUENCY WHERE THEY ARE NOT CURRENTLY SHEDDING WATER IN ANATURAL PATTERN. ·ALONG ROADS SITUATED ON RIDGELINES, OBSTRUCTIONS WILL BE ESTABLISHED AND TREES PLANTED AT A FREQUENCY OF ONE OBSTRUCTION AND 10TREES PER 300'. END PRIMARY ROAD DECOMMISSIONINGSTART SECONDARY ROADDECOMMISSIONINGEND SECONDARY ROADDECOMMISSIONINGSTART PRIMARY ROADDECOMMISSIONINGSTART SECONDARY ROADDECOMMISSIONINGEND SECONDARY ROAD DECOMMISSIONINGSTART PRIMARY ROADDECOMMISSIONINGEND PRIMARY ROAD DECOMMISSIONINGSTART SECONDARY ROADDECOMMISSIONINGEND SECONDARY ROADDECOMMISSIONINGEND SECONDARY ROADDECOMMISSIONINGSTART SECONDARY ROADDECOMMISSIONINGSTART PRIMARY ROADDECOMMISSIONINGSTART PRIMARY ROADDECOMMISSIONINGEAST BUFFALO ROA
D
REGRADE ENTRY OFF PAVED ROAD TODETER VEHICULAR ACCESSREGRADE ENTRY OFF PAVED ROADTO DETER VEHICULAR ACCESSEND PRIMARY ROADDECOMMISSIONINGSTART PRIMARY ROADDECOMMISSIONINGEXCLUSION AREA #2LOOSEN SOIL ALONG EXISTINGFARM ACCESS ROAD FORPLANTING - ACCESS ROAD TOBE ABANDONEDREGRADE ACCESS FROM EXCLUSION AREATO DETER VEHICULAR ACCESSREGRADE ACCESS FROM EXCLUSION AREATO DETER VEHICULAR ACCESS
0+00
0+
6
7
2170
2175
218
0
2185
EXISTING SOIL ROAD
BEGIN
PROFILE
RESTORATION
END
PROFILE
RESTORATION
REMOVE
EXISTING
SUBSURFACE
DRAIN
EXISTING
STREAM
ALIGNMENT
APPLY
CASCADING
RIFFLE-POOL
SEQUENCE
DETAIL ON
SHEET 6.1 0+000+80CONDUCT
PRIMARY
DECOMMISSIONING
ALONG SOIL
ROAD PER
BULLETS ON
SHEET 5.0
2165
2170
2175
2180
2185
2165
2170
2175
2180
2185
0+00 0+50 0+80
REMOVE
EXISTING
SUBSURFACE
DRAIN
USE RIFFLE
CROSS SECTION
DIMENSIONS
FROM
UPSTREAM
REFERENCE
REACH.
EXISTING
GRADE
STABILIZE
ERODING
SLOPE
2163
2165
2170
2175
2163
2165
2170
2175
0+00 0+50 0+67
STA = 0+18.78
ELEV = 2169.86
STA = 0+46.75
ELEV = 2166.94
REMOVE EXISTING
SUBSURFACE DRAIN
USE POOL AND RIFFLE
DIMENSION FROM
UPSTREAM REFERENCE
EXISTING GRADE
NPLAN VIEW
PROFILE AT CROSSING ℄ - LOOKING DOWNSTREAM
PROFILE
(HORIZONTAL)
0'10'20'30'
(HORIZONTAL)
0'5'10'15'
(HORIZONTAL)
0'5'10'15'
(VERTICAL)
0'1'2'3'
(VERTICAL)East Buffalo Mitigation SiteGraham County, North CarolinaUT2 Reach 1 Crossing RemovalAdditional Grading005-45020HBERJM5.1August 4, 2020SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTIONX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Culvert Details.dwgAugust 4, 2020UT2
0+000
+
7
8
0+00
0+80
22
1
0
22
1
5
2220
2
2
2
5
2
2
3
0
EXISTING
STREAM
ALIGNMENT
PROPOSED
STREAM
ALIGNMENT
APPROXIMATE
LOCATION OF
EXISTING
SUBSURFACE DRAIN
BEGIN
PROFILE
RESTORATION
APPLY
CASCADING
RIFFLE-POOL
SEQUENCE
DETAIL ON
SHEET 6.1
CONDUCT PRIMARY DECOMMISSIONING
ALONG SOIL ROAD PER BULLETS ON SHEET
5.0
2210
2215
2220
2225
2230
2235
2210
2215
2220
2225
2230
2235
0+00 0+50 0+80
EXISTING
GRADE
APPROXIMATE LOCATION OF
EXISTING SUBSURFACE DRAIN TO
BE REMOVED
USE RIFFLE CROSS SECTION
DIMENSIONS FROM UPSTREAM
REFERENCE REACH.
2205
2210
2215
2220
2205
2210
2215
2220
0+00 0+50 0+78
USE POOL AND RIFFLE
DIMENSION FROM
UPSTREAM REFERENCE
APPLY WOOD AND ROCK
GRADE CONTROL
FEATURES AT DROPS PER
DETAIL SHEET 6.1
REMOVE PIPE
NPLAN VIEW
PROFILE AT CROSSING ℄ - LOOKING DOWNSTREAM
PROFILE
(HORIZONTAL)
0'10'20'30'
(HORIZONTAL)
0'5'10'15'
(HORIZONTAL)
0'5'10'15'
(VERTICAL)
0'1'2'3'
(VERTICAL)East Buffalo Mitigation SiteGraham County, North CarolinaUT3 Reach 1 Crossing RemovalAdditional Grading005-45020HBERJM5.2August 4, 2020SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTIONX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Culvert Details.dwgAugust 4, 2020U
T
3
0+
0
0
0
+
8
00+000+80239023952400APPLY CASCADING
RIFFLE-POOL SEQUENCE
DETAIL ON SHEET 6.1
USE PRIMARY
DECOMMISSIONING ALONG SOIL
ROAD PER BULLETS ON SHEET
5.0
PROPOSED/EXISTING
STREAM ALIGNMENT
EXISTING FORD CROSSING. NO
CULVERT FOUND DURING SITE
INVESTIGATION.
APPROXIMATE BEGIN STREAM
PROFILE RESTORATION
APPROXIMATE END
STREAM WORK
2390
2395
2400
2405
2390
2395
2400
2405
0+00 0+50 0+80
EXISTING GRADE
USE RIFFLE AND POOL CROSS
SECTION DIMENSIONS FROM
UPSTREAM REFERENCE REACH.
LOCATION OF EXISTING FORD
CROSSING 2383
2385
2390
2395
2400
2383
2385
2390
2395
2400
0+00 0+50 0+80
EXISTING GRADE
USE POOL AND RIFFLE
DIMENSION FROM
UPSTREAM REFERENCE
APPLY WOOD AND ROCK
GRADE CONTROL
FEATURES AT DROPS PER
DETAIL SHEET 6.1
NPLAN VIEW
PROFILE AT CROSSING ℄ - LOOKING DOWNSTREAM
PROFILE
(HORIZONTAL)
0'10'20'30'
(HORIZONTAL)
0'5'10'15'
(HORIZONTAL)
0'5'10'15'
(VERTICAL)
0'1'2'3'
(VERTICAL)East Buffalo Mitigation SiteGraham County, North CarolinaUT4 Reach 1 Ford NaturalizationAdditional Grading005-45020HBERJM5.3August 4, 2020SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTIONX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Culvert Details.dwgAugust 4, 2020U
T
4
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Details.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaDetails005-45020HBERJM6.1August 4, 2020Cascading Riffle
Not to Scale
2
6.1
Cascade / Step-Pool Spacing Table
Species Name POOL SPACING (PS)
RANGE
PS-A PS-B PS-C POOL
LENGTH
CASCADE
SLOPE
RANGE1
East Buffalo Creek -
Reach 2 12-42'2-9'3-11%
UT2 - Reach 2 6-20'4.5-15%
4 CASCADE-POOL
SEQUENCES
PS-A
CASCADING
RIFFLE, SEE DETAIL
PS-B PS-CPOOLLENGTH(VARIES)ADD BRUSH OR
LOG REVETMENTS
AS SHOWN IN
PLAN VIEW AND
PER THE
ASSOCIATED
DETAILS
INCORPORATE WOOD INTO EVERY 10TH
CASCADE (APPROXIMATELY 1 PER 100')
PS-D
UT3 - Reach 2B 8-28'2-6%
UT3 - Reach 2A 6-22'4-18%
PS-D
5-10'
2-9'
3-10.5'
9-24'UT4 - Reach 2 3-11%9-24'
1 Low and high ranges to be used sparingly, individual segments may exceed high range in which case rock cascade and/or rock slide details shall apply
MATCH PROPOSED
GRADE (BANKFULL -
Dmax) TO WITHIN -0.2
TO +0.1' AT HEAD OF
EACH CASCADE
MICROPOOL (TYP) - INCORPORATE
INTO CASCADING RIFFLES
POOL(TYP)
9-25'UT5
POOL SPACING (PS)
NOTES:
·CONTRACTOR MAY VARY POOL
SPACING BUT SHALL COMPLETE
SEQUENCES TOTALING TO
SEQUENCE LENGTH PROVIDED IN
TABLE
·ROCK CASCADE OR ROCK SLIDE
STRUCTURES SHALL BE USED
INSTEAD OF CASCADING RIFFLES
FOR SLOPES >15-20%
·INCORPORATE LOG OR ROCK STEPS
(FOOTERED STRUCTURES) FROM
SHEET 6.2 AS DIRECTED
·SEQUENCES ARE DETAILED OUT ON
THE PLANS FOR EAST BUFFALO
CREEK AND UT3 BRANCHES-
CHANGES TO THESE REACHES MUST
BE APPROVED BY DESIGNER
SEQUENCE
LENGTH
A+B+C+D
DROPS OF UP TO 1.0' MAY BE USED AT POOL
ENTRANCES OR STEEPER WHEN PROTECTED
TOE OF SLOPE (TYP)
TOP OF BANK (TYP)
SEE SECTION B-B' FOR
SIZE
LENGTH VARIES PER PLAN
Section A-A'
TOP OF BANK (TYP)
Section B-B'
A
B
B'
STRUCTURE SIZE
RIFFLE MATERIAL
(MIN)
2" MAX
TAIL OF RIFFLE
ELEVATION POINT
PER PROFILE
HEAD OF RIFFLE
ELEVATION POINT
PER PROFILE
12-18" RIFFLE THICKNESS
RIFFLE MATRIX
MUST CONTAIN AT LEAST 30% GRAVEL AND SAND FINES
TO MAINTAIN FLOW AT SURFACE OF RIFFLE
RIFFLE INVERT PER PROFILE
STONE TO ALSO BE WORKED INTO
BANKS MIN 2' TO PREVENT WEAK
SPOTS ALONG CHANNEL MARGINS
STRUCTURE OR 60% STRUCTURE SIZE
RIFFLE MATERIAL
Cascading Riffle-Pool Sequence
Not to Scale
3
6.1
Rock Cascade
Not to Scale
1
6.1
NOTES:
·USE AS DIRECTED WITH DETAIL 3/6.1 IN LIEU OF
CASCADING RIFFLES WHERE AVERAGE SLOPE EXCEEDS
15-20% (ROCK SLIDE MAY ALSO BE USED FOR THIS
SCENARIO).
·MINIMUM SIZE FOR BOULDERS SHALL BE 2' x 2' x 1'.
·VOID SPACES BETWEEN BOULDERS ON CASCADE
SHALL BE FILLED WITH SMALLER NATIVE ROCK WHERE
AVAILABLE.
·IF NATIVE ROCK IS NOT AVAILABLE, QUARRIED ROCK
MAY BE SUBSTITUTED IN THE SAME SIZES.
·ALL SMALLER ROCK SHALL BE HETEROGENEOUS AND
WELL MIXED.
Profile
5:1
Section A-A'
BACKFILL WITH GRADED MIX OF
SMALL BOULDERS, COBBLE, GRAVEL
AND SAND
CASCADE HEIGHT VARIESPER PROFILEDOUBLE STACK
BOULDER / ROCK MIX.
FILL ALL GAPS BETWEEN
LARGE BOULDERS
SL
O
P
E
V
A
R
I
E
S
(3
3
%
M
A
X
)
NATIVE ROCK EQUIVALENT
TO CLASS I RIPRAP, VOIDS FILLED
WITH ONSITE GRAVEL AND SAND
(TYP)
FILTER FABRIC
EXISTING SOIL
TERRACE EXISTING
SLOPE
FOOTER BOULDER TO EXTEND
18" BELOW POOL INVERT
Riffle Sequence Plan View
TOP OF BANK
TOE OF BANK
A B
A'B'
CASCADE
FLOW
C
C'
Section B-B'
5:1 5:1
FOOTER BOULDER
HEADER BOULDER
DmaxDmaxOVEREXCAVATE 1-2', BACKFILL WITH
WELL-GRADED MIX OF SMALL BOULDERS,
COBBLE, GRAVEL AND SAND
5:1
DpoolVEGETATED STONE TOE PROTECTION
AROUND POOL MARGINS AS SPECIFIED BY
DESIGNER, SEE SECTION C-C'
POOL INVERT PER TYPICAL
SECTION OR PROFILE
Section C-C'
VEGETATED STONE TOE PROTECTION
AROUND POOL MARGINS WHERE
SPECIFIED BY DESIGNER.
SEE DETAIL 4, SHEET 6.3
ROCK DROPS, SEE 2/6.2, VARY
CONFIGURATIONS AS SHOWN
MICROPOOLS
NOTE ABOUT DETAILS:
DETAILS 1/6.1, 2/6.1, 1/6.2, 2/6.2 ARE TO BE USED
TO CONSTRUCT SEQUENCES SHOWN IN 3/6.1.
DESIGNER MAY INCORPORATE OTHER GRADE CONTROL
STRUCTURES.
A'
2 UT2 Reach 2 is Enhancement, use where indicated on plans
Plan View
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMINARYDO
N
OT
USE F
OR
CONSTR
U
CTI
O
N
7-15%5-8'
SPACE AS INDICATED ON PLANS
10'20'12'22'64'
7'15'9'14'45'
Low Mobility Mix Material
Species Name
Class A (2-6")
Class 1 (5-17")
Minimum
Structure Size
Riffle Material
East Buffalo Creek -
Reach 2
60% Class A / 1
equal mix
UT2 - Reach 2
UT3 - Reach 2B
UT3 - Reach 2A
UT4 - Reach 2
14.5"UT5 - Reach 2
8"
11"
15"
12"
8.5"
UT3 - Reach 2B 7"
60% Class A / B
equal mix
Class B (5-12")
60% Class A / 1
equal mix
60% Class A / B
equal mix
60% Class A / B
equal mix
60% Class A / B
equal mix
60% Class A / B
equal mix
Riffle
Matrix 2'2'7'15'9'14'45'
N/ASPACE AS INDICATED ON PLANS
SPACE AS INDICATED ON PLANS N/A
N/A
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTIONX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Details.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaDetails005-45020HBERJM6.2August 4, 2020Log Step
Not to Scale
3
6.2
POOL(TYP)
Rock Drop
Not to Scale
2
6.2
BACKFILL EQUAL RIFFLE
MIX FROM PROJECT
RIFFLE TABLE
Arched
Angled
Irregular
ELEVATION POINT
VARIES BY STEP
ARRANGEMENT
SEE PROFILE FOR
ELEVATION
DOUBLE THALWEG OR
VARIABLE THALWEG
PLACEMENT
THALWEG ON UPSTREAM 1/3 OF
ANGLED STEP (SIMILAR TO SINGLE
ARM VANE). e.g. SEE LOG STEP
DETAIL SECTION A-A'
Types of Step
Configurations
FLOW
Section C-C'
Rock Step
Not to Scale
4
6.2
TOP OF BANK (TYP)
TOE OF SLOPE (TYP)
A'
Profile View
Plan View
STREAMBED
RIFFLE BACKFILL
EXTEND FILTER FABRIC
5' MIN. UPSTREAM
FLOW
SILL ELEVATION
PER PROFILE (TYP)
FLOW
POOL LENGTH PER PROFILE
SILL ELEVATION PER
PROFILE
POOL DEPTH PER PROFILE
12" - 15" DIAMETER
HEADER LOG
Section A - A'
EMBED LOG
5' (MIN.)
SILL ELEVATION
PER PROFILE (TYP)12" - 15" DIAMETER LOG
CHANNEL
BOTTOM WIDTH
0° - 15° ANGLE
PER FIELD DIRECTION
BACKFILL
0'-0.2'PER PLANS ORFIELD DIRECTIONA
NONWOVEN FILTER FABRIC
POOL
ADD ROOT WAD, BRUSH TOE,
OR TRANSPLANTS TO LARGER
STREAMS AS DIRECTED BY
ENGINEER
NOTE:
·FOOTER LOG TO BE ADDED IF DROP IS
MORE THAN HEADER LOG DIAMETER.
12" - 15" DIAMETER
FOOTER LOG
2-4"
BOTTOM WIDTH (TYPICAL SECTIONS)
NONWOVEN
FILTER FABRIC
POOL
Profile View
HEADER BOULDER
FOOTER BOULDER
NONWOVEN
FILTER FABRICPlan View
AA'
ANCHOR BOULDERS 2' INTO
BANK (HEADERS AND
FOOTERS), BOTH SIDES
FLOW
POOL WIDEN BOTTOM WIDTH
TO TYPICAL STRUCTURE
POOL DIMENSION
MAY BE HORSE SHOE SHAPED, ARCHED
(SHOWN), ANGLED OR IRREGULAR.
CONTRACTOR TO VARY OR SHAPE AS
DIRECTED. IN OUTSIDE OF BEND, ANGLED
WITH SLOPING ARM IS TYPICALLY REQUIRED.
Section A-A'12" (MIN.)BACKFILL EQUAL RIFFLE
MIX FROM PROJECT
RIFFLE TABLE
BACKFILL
DEPTH 18"
MINIMUM
BY 3' LENGTH
BASE FLOW
THALWEG TO BE 2-4"
LOWER THAN ADJACENT
AREAS OF ROCK STEP
ARCHED DROPIRREGULAR DROPANGLED DROP
NOTES:
·DROP TYPE MAY BE VARIED IN THE FIELD BY DESIGNER. IN GENERAL,
VARY DROP TYPE OFTEN WITH ROUGHLY EQUAL NUMBERS OF EACH
DROP TYPE WITHIN A REACH.
·DETAIL TO BE APPLIED IN CONJUNCTION WITH DETAIL 3/6.1
(CASCADING RIFFLE-POOL SEQUENCE).
·SECTION VIEWS REPRESENT ARCHED ROCK DROP VARIATION.
MODIFY SECTIONS AS NEEDED TO ACCOMMODATE OTHER
VARIATIONS .
·BOULDER SIZE TABLES PER REACH TO BE ADDED TO 100% PLANS.A'A2-4"
BOTTOM WIDTH (TYPICAL SECTIONS)
NONWOVEN
FILTER FABRIC
HEADER BOULDER
FOOTER BOULDER
ANCHOR BOULDERS 2' INTO
BANK (HEADERS AND
FOOTERS), BOTH SIDES18" (MIN.)MIDDLE OF ROCK STEP 2-4"
LOWER THAN BANKS OF ROCK STEP
Section A-A'
POOL
Profile View
BOULDER
NONWOVEN
FILTER FABRIC
BACKFILL
DEPTH 12"
MINIMUM
BY 2' LENGTH
BASE FLOW
SEE DETAIL 3/6.1 FOR CASCADE CONSTRUCTION
BETWEEN ROCK DROPS
Rock Slide
Not to Scale
1
6.2
Plan View
MATERIAL VARIES FROM CLASS I OR
II STONE TO BOULDERS TO LARGE
ON-SITE STONE IF AVAILABLE - USE
LARGEST STONE AVAILABLE
NOTES:
·USE AS DIRECTED WITH DETAIL 3/6.1 IN LIEU OF
CASCADING RIFFLES WHERE AVERAGE SLOPE EXCEEDS
15-20% (ROCK CASCADE MAY ALSO BE USED FOR THIS
SCENARIO).
·MINIMUM SIZE FOR BOULDERS SHALL BE 4' x 2' x 1'.
·VOID SPACES BETWEEN BOULDERS ON SLIDE SHALL BE
FILLED WITH SMALLER NATIVE ROCK WHERE
AVAILABLE.
·IF NATIVE ROCK IS NOT AVAILABLE, QUARRIED ROCK
MAY BE SUBSTITUTED IN THE SAME SIZES.
·ALL SMALLER ROCK SHALL BE HETEROGENEOUS AND
WELL MIXED.
Profile SLIDE HEIGHT VARIES(3' MAX)DOUBLE STACK
BOULDER SLIDE ROCK ATOP ROCK MIX
FILL ALL GAPS BETWEEN
LARGE BOULDERS
SL
O
P
E
V
A
R
I
E
S
(4
5
%
M
A
X
)
NATIVE ROCK EQUIVALENT
TO CLASS I RIPRAP, VOIDS FILLED
WITH ONSITE GRAVEL AND SAND
(TYP)
FILTER FABRIC
EXISTING SOIL
TERRACE EXISTING
SLOPE
FOOTER OR LARGE SLOPING
HEADER BOULDER TO EXTEND
18" BELOW POOL INVERT
OVEREXCAVATE 1-2', BACKFILL WITH
WELL-GRADED MIX OF SMALL BOULDERS,
COBBLE, GRAVEL AND SAND
POOL INVERT PER TYPICAL
SECTION OR PROFILE
NOTE:
·BOULDER SIZE TABLES PER REACH
TO BE ADDED TO 100% PLANS.BANKFULLWIDTH2' MIN2' MIN
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Details.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaDetails005-45020HBERJM6.3August 4, 2020Brush Toe
Not to Scale
1
6.3
Vegetated Stone Toe Protection
Not to Scale
3
6.3
FLOW
A
A'
Plan View
EROSION CONTROL MATTING
TOP
O
F
B
A
N
K
(
T
Y
P)
TOE
O
F
S
L
O
P
E
(
T
Y
P)
TOE
O
F
S
L
O
P
E
(
T
Y
P)
TOP
O
F
B
A
N
K (
T
Y
P
)
DENSELY PACKED WOODY DEBRIS
BRUSH MATERIAL TO BE INSTALLED
FLUSH WITH BANK
TOP OF BANK (BANKFULL)
Section A-A'
DENSELY PACKED BRUSH, WOODY DEBRIS AND SOIL
EROSION CONTROL MATTING
BACKFILL
TOE OF SLOPE
3'
NATIVE SOIL
ELEV. 6" BELOW
POOL DEPTH
ELEV. 6" ABOVE
DOWNSTREAM
RIFFLE INVERT
NOTES:
·OVEREXCAVATE 2-3' BEYOND TOE OF BANK.
·INSTALL A DENSE LAYER OF BRUSH/WOODY DEBRIS, WHICH SHALL
CONSIST OF SMALL BRANCHES AND ROOTS COLLECTED ON-SITE
AND SOIL TO FILL ANY VOID SPACE. LIGHTLY COMPACT
BRUSH/WOODY DEBRIS LAYER.
·BRUSH SHOULD BE ALIGNED SO STEMS ARE ROUGHLY PARALLEL
AND IS INSTALLED POINTING SLIGHTLY UPSTREAM.
·INSTALL FILTER FABRIC OVER BRUSH/WOODY DEBRIS.
·INSTALL EARTH BACKFILL OVER BRUSH/WOODY LAYER ACCORDING
TO TYPICAL SECTION DIMENSIONS.
·SEED, MULCH AND INSTALL EROSION CONTROL MATTING AND
BANK STABILIZATION PER PLANS.
FILTER FABRIC (WHERE
SPECIFIED BY DESIGNER)
WIDTH PER TYPICAL SECTIONS
3-6" PER DESIGNER
CHANNEL BOTTOMSection A-A'
ON-SITE ALLUVIUM/SOIL BACKFILL
CLASS 1/A/B, OR EQUAL SIZE,
STONE TOE (TYPICAL)
CHANNEL BED
A'
A
EXISTING ERODED BANK
WHERE APPLICABLE
(IN OTHER SITUATIONS
OVEREXCAVATION MAY BE
REQUIRED TO PLACE STONE)
Plan View
FLOW
EMBED STONE 1.0' (MIN)
BELOW CHANNEL BED
Profile View
BASE FLOW
ELEVATION 0.25-0.5'FLOW
MATTING
FILL VOIDS WITH ALLUVIUM
AND SOIL
NOTES:
·APPLY LIVE STAKING AND JUNCUS PLUGS
DETAIL 1, SHEET 6.7
·CONTRACTOR TO USE NATIVE STONE AND
MATERIAL WHENEVER AVAILABLE.
·IN POOLS, RUN TO 1' BELOW MAX POOL
THALWEG DEPTH AT 1:1 MAX SLOPE.
·AS DIRECTED, USE LARGER OR SMALLER MIX
OF ON-SITE OR OFF-SITE MATERIAL FOR STONE
TOE AND BACKFILL.
·WHERE SPECIFIED AS BID ALTERNATE,
ENGINEER MAY REQUIRE THAT COIR
WATTLE/LOG BE USED - INSTALL PER
MANUFACTURER RECOMMENDATIONS.
FILL BETWEEN TOE AND
BANK PER PLAN OR AS
SPECIFIED IN FIELD
KEY INTO BANK AT UPSTREAM
AND DOWNSTREAM LIMITS TO
PROTECT AGAINST FLOW
CUTTING BEHIND
APPLY JUNCUS SEED, TOPDRESS
TO PROTECT SEED
DISTANCE FROM BASE FLOW
TO THALWEG (DEPTH OF STONE
TOE) VARIES BASED ON RIFFLE
AND POOL DEPTHS
CHANNEL BED (THALWEG)1' MIN.BELOWTHALWEGSheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTION
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Details.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaDetails005-45020HBERJM6.4August 4, 2020Log J-Hook
Not to Scale
4
6.4Yθ
SCOUR
POOL
FLOW
Plan View TOE OF SLOPE
FILTER FABRIC
EXTENDS 5' MIN.
Section B-B'
Section A-A'
A'
A
B
B'HTOP OF BANK
OFFSET HEADER LOG
0.25' TO 0.5' UPSTREAM
OF FOOTER LOG
TOP OF BANK (TYP)
TOE OF SLOPE (TYP)
FLOW
VANE
A
R
M
LENG
T
H
(X)
SLOPE (S)
6" SALVAGED ONSITE
COBBLE/GRAVEL
BED MATERIAL
HEADER LOG
FOOTER LOG
HEADER LOG
FOOTER LOGNONWOVEN
FILTER FABRIC
6" SALVAGED ONSITE
COBBLE/GRAVEL
BED MATERIAL
PLACE HEADER BOULDER
TO PREVENT LOG FROM SHIFTING.
INVERT ELEVATION
PER PROFILE
EXCAVATE POOL
PER PROFILE
PLACE HEADER BOULDERS
WITH 1' TO 2' CLEAR SPACE
BETWEEN ROCKS
EXTE
N
D
5
'
INTO
B
A
N
K
BANK TIE IN
NOTE:
·MEASURE FROM BANK TIE ALONG
BACK OF LOG
1
6.4
Constructed Riffle - Large Stream
Not to Scale
FLOW
TOE OF SLOPE (TYP)RIFFLE BOTTOMWIDTH PERTYPICAL SECTIONSPlan View
A A'
SEE PROFILE
FOR LENGTH OF RIFFLE
B
B'
HEAD OF RIFFLE
Profile A-A'
Section B-B'
TOP OF BANK (TYP)
6" SALVAGED ONSITE
COBBLE/GRAVEL
BED MATERIAL
6" SALVAGED ONSITE
COBBLE/GRAVEL
BED MATERIAL RIFFLE INVERT PER PROFILE
TOP OF BANK (TYP)
HEAD OF RIFFLE ELEVATION
POINT PER PROFILE
TAIL OF RIFFLE ELEVATION
POINT PER PROFILE
CR-CR
FLOW
NOTES:
·IF A RIFFLE ENDS WITH A SILL IT
WILL BE SHOWN IN THE PLANS.
REFER TO LOG/ROCK SILL
DETAIL FOR THIS FINAL
STRUCTURE.
·RIFFLE MATERIAL SHALL BE A
WELL-GRADED MIXTURE OF FINE
GRAVELS TO LARGE COBBLE
WITH A D50 = 6 INCHES.
NONWOVEN
FILTER FABRIC
NONWOVEN
FILTER FABRIC
Jazz Riffle Structure
Not to Scale
Plan View
Profile View
A-A'
TOE OF SLOPE
Log Section
B-B'
TOP OF BANK
FLOWFLOWA'
B
FLOW
B'
NOTES:
·STRUCTURES SHOULD VARY IN SIZE AND TYPE
WITHIN EACH RIFFLE.
·ROCK MAY BE SUBSTITUTED FOR LOGS AT
ENGINEER'S DISCRETION.
·IF A RIFFLE ENDS WITH A SILL IT WILL BE
SHOWN IN THE PLANS. REFER TO LOG/ROCK
SILL DETAIL FOR THIS FINAL STRUCTURE.
·RIFFLE MATERIAL SHALL BE A WELL-GRADED
MIXTURE OF FINE GRAVELS TO LARGE COBBLE
WITH A D50 = 6 INCHES.TOE OF SLOPETOP OF BANKA3
6.4
TAIL OF RIFFLE ELEVATION
POINT PER PROFILE
ROCK VANES MAY
BE USED IN PLACE
OF LOGS AT
ENGINEER'S DISCRETION
BURY INTO BANK 3' MIN. (TYP)
BANKFULL
HEAD OF RIFFLE ELEVATION
POINT PER PROFILE
6" SALVAGED ONSITE
COBBLE/GRAVEL
BED MATERIAL
LOG STRUCTURE
EXPOSED UNTIL
CENTER OF CHANNEL
CR-JZ
NONWOVEN
FILTER FABRIC
NONWOVEN
FILTER FABRIC
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTIONHFOOTER LOG
INVERT ELEVATION
PER PROFILE
HEADER LOG
Y
EXCAVATE POOL
PER PROFILE
θ
1'
1'
CLASS A STONE
BACKFILL (ON-SITE NATIVE
MATERIAL OR NO. 57 STONE)
NONWOVEN
FILTER FABRIC
HEADER LOG
CLASS B STONE
EXTEND FILTER FABRIC
5' MIN. UPSTREAM
FOOTER LOG
STABILIZE VANE
WITH ONE BOULDER
ON EACH SIDE
X5'Log Vane
Not to Scale
2
6.4
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Details.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaDetails005-45020HBERJM6.5August 4, 2020NCG01 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19
GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH
THE NCG01 CONSTRUCTION GENERAL PERMIT
Implementing the details and specifications on this plan sheet will result in the construction
activity being considered compliant with the Ground Stabilization and Materials Handling
sections of the NCG01 Construction General Permit (Sections E and F, respectively). The
permittee shall comply with the Erosion and Sediment Control plan approved by the
delegated authority having jurisdiction. All details and specifications shown on this sheet
may not apply depending on site conditions and the delegated authority having jurisdiction.
GROUND STABILIZATION SPECIFICATION
Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the
techniques in the table below:
POLYACRYLAMIDES (PAMS) AND FLOCCULANTS
1.Select flocculants that are appropriate for the soils being exposed during
construction, selecting from the NC DWR List of Approved PAMS/Flocculants.
2.Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.
3.Apply flocculants at the concentrations specified in the NC DWR List of Approved
PAMS/Flocculants and in accordance with the manufacturer's instructions.
4.Provide ponding area for containment of treated Stormwater before discharging
offsite.
5.Store flocculants in leak-proof containers that are kept under storm-resistant cover
or surrounded by secondary containment structures.
HAZARDOUS AND TOXIC WASTE
1.Create designated hazardous waste collection areas on-site.
2.Place hazardous waste containers under cover or in secondary containment.
3.Do not store hazardous chemicals, drums or bagged materials directly on the ground.
EQUIPMENT AND VEHICLE MAINTENANCE
1.Maintain vehicles and equipment to prevent discharge of fluids.
2.Provide drip pans under any stored equipment.
3.Identify leaks and repair as soon as feasible, or remove leaking equipment from the
project.
4.Collect all spent fluids, store in separate containers and properly dispose as
hazardous waste (recycle when possible).
5.Remove leaking vehicles and construction equipment from service until the problem
has been corrected.
6.Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products
to a recycling or disposal center that handles these materials.
LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE
1.Never bury or burn waste. Place litter and debris in approved waste containers.
2.Provide a sufficient number and size of waste containers (e.g dumpster, trash
receptacle) on site to contain construction and domestic wastes.
3.Locate waste containers at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
4.Locate waste containers on areas that do not receive substantial amounts of runoff
from upland areas and does not drain directly to a storm drain, stream or wetland.
5.Cover waste containers at the end of each workday and before storm events or
provide secondary containment. Repair or replace damaged waste containers.
6.Anchor all lightweight items in waste containers during times of high winds.
7.Empty waste containers as needed to prevent overflow. Clean up immediately if
containers overflow.
8.Dispose waste off-site at an approved disposal facility.
9.On business days, clean up and dispose of waste in designated waste containers.
PAINT AND OTHER LIQUID WASTE
1.Do not dump paint and other liquid waste into storm drains, streams or wetlands.
2.Locate paint washouts at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
3.Contain liquid wastes in a controlled area.
4.Containment must be labeled, sized and placed appropriately for the needs of site.
5.Prevent the discharge of soaps, solvents, detergents and other liquid wastes from
construction sites.
PORTABLE TOILETS
1.Install portable toilets on level ground, at least 50 feet away from storm drains,
streams or wetlands unless there is no alternative reasonably available. If 50 foot
offset is not attainable, provide relocation of portable toilet behind silt fence or place
on a gravel pad and surround with sand bags.
2.Provide staking or anchoring of portable toilets during periods of high winds or in high
foot traffic areas.
3.Monitor portable toilets for leaking and properly dispose of any leaked material.
Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace
with properly operating unit.
HERBICIDES, PESTICIDES AND RODENTICIDES
1.Store and apply herbicides, pesticides and rodenticides in accordance with label
restrictions.
2.Store herbicides, pesticides and rodenticides in their original containers with the
label, which lists directions for use, ingredients and first aid steps in case of
accidental poisoning.
3.Do not store herbicides, pesticides and rodenticides in areas where flooding is
possible or where they may spill or leak into wells, stormwater drains, ground water
or surface water. If a spill occurs, clean area immediately.
4.Do not stockpile these materials onsite.
CONCRETE WASHOUTS
1.Do not discharge concrete or cement slurry from the site.
2.Dispose of, or recycle settled, hardened concrete residue in accordance with local
and state solid waste regulations and at an approved facility.
3.Manage washout from mortar mixers in accordance with the above item and in
addition place the mixer and associated materials on impervious barrier and within
lot perimeter silt fence.
4.Install temporary concrete washouts per local requirements, where applicable. If an
alternate method or product is to be used, contact your approval authority for
review and approval. If local standard details are not available, use one of the two
types of temporary concrete washouts provided on this detail.
5.Do not use concrete washouts for dewatering or storing defective curb or sidewalk
sections. Stormwater accumulated within the washout may not be pumped into or
discharged to the storm drain system or receiving surface waters. Liquid waste must
be pumped out and removed from project.
6.Locate washouts at least 50 feet from storm drain inlets and surface waters unless it
can be shown that no other alternatives are reasonably available. At a minimum,
install protection of storm drain inlet(s) closest to the washout which could receive
spills or overflow.
7.Locate washouts in an easily accessible area, on level ground and install a stone
entrance pad in front of the washout. Additional controls may be required by the
approving authority.
8.Install at least one sign directing concrete trucks to the washout within the project
limits. Post signage on the washout itself to identify this location.
9.Remove leavings from the washout when at approximately 75% capacity to limit
overflow events. Replace the tarp, sand bags or other temporary structural
components when no longer functional. When utilizing alternative or proprietary
products, follow manufacturer's instructions.
10.At the completion of the concrete work, remove remaining leavings and dispose of
in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance
caused by removal of washout.
EARTHEN STOCKPILE MANAGEMENT
1.Show stockpile locations on plans. Locate earthen-material stockpile areas at least
50 feet away from storm drain inlets, sediment basins, perimeter sediment controls
and surface waters unless it can be shown no other alternatives are reasonably
available.
2.Protect stockpile with silt fence installed along toe of slope with a minimum offset of
five feet from the toe of stockpile.
3.Provide stable stone access point when feasible.
4.Stabilize stockpile within the timeframes provided on this sheet and in accordance
with the approved plan and any additional requirements. Soil stabilization is defined
as vegetative, physical or chemical coverage techniques that will restrain accelerated
erosion on disturbed soils for temporary or permanent control needs.
A
A
BELOW GRADE WASHOUT STRUCTURE
1:1
SIDE SLOPE
(TYP.)
10 MILPLASTICLINING
3'-0"MIN.& X'MAX.SECTION A-A
NOT TO SCALE
ABOVE GRADE WASHOUT STRUCTURE
NOT TO SCALE
PLAN
SECTION B-B
HIGHCOHESIVE &LOW FILTRATION
SOIL BERM
8"6"
2'
HIGHCOHESIVE &
LOW FILTRATIONSOIL BERM1:1 SIDE SLOPE
(TYP.)
10 MIL
PLASTIC LINING
B
B
3'-0"MIN.& X'MAX.A
SANDBAGS (TYP.)
OR STAPLES
SANDBAGS (TYP.)
OR STAPLES
SANDBAGS (TYP.)
OR STAPLES
SANDBAGS (TYP.)
OR STAPLES
NOTES:
1. ACTUAL LOCATION DETERMINED IN FIELD
2. THE CONCRETE WASHOUT STRUCTURES SHALL BE
MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES
75% OF THE STRUCTURES CAPACITY.
3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY
MARKED WITH SIGNAGE NOTING DEVICE.
NOTES:
1. ACTUAL LOCATION DETERMINED IN FIELD
2. THE CONCRETE WASHOUT STRUCTURES
SHALL BE MAINTAINED WHEN THE LIQUID
AND/OR SOLID REACHES 75% OF THE
STRUCTURES CAPACITY TO PROVIDE ADEQUATE
HOLDING CAPACITY WITH A MINIMUM 12
INCHES OF FREEBOARD.
3.CONCRETE WASHOUT STRUCTURE NEEDS TO
BE CLEARY MARKED WITH SIGNAGE NOTING
DEVICE.
ONSITE CONCRETE WASHOUT
STRUCTURE WITH LINER
CONCRETE
WASHOUT
CONCRETE
WASHOUT
PLAN
CLEARLY MARKED SIGNAGE
NOTING DEVICE (18"X24" MIN.)
CLEARLY MARKED SIGNAGE
NOTING DEVICE (18"X24" MIN.)
SILT FENCE
10'MIN10'
MIN
SECTION E: GROUND STABILIZATION
Required Ground Stabilization Timeframes
Note: After the permanent cessation of construction activities, any areas with temporary
ground stabilization shall be converted to permanent ground stabilization as soon as
practicable but in no case longer than 90 calendar days after the last land disturbing
activity. Temporary ground stabilization shall be maintained in a manner to render the
surface stable against accelerated erosion until permanent ground stabilization is achieved.
Site Area Description Timeframe variations
-7 days for perimeter dikes, swales,
ditches, perimeter slopes and HQW Zones
-10 days for Falls Lake Watershed unless
there is zero slope
Stabilize within this
many calendar
days after ceasing
land disturbance
7
7
7
14
None
None
(a)Perimeter dikes,
swales, ditches, and
perimeter slopes
(b)High Quality Water
(HQW) Zones
(c)Slopes steeper than
3:1
If slopes are 10' or less in length and are
not steeper than 2:1, 14 days are
allowed
(d)Slopes 3:1 to 4:1
(e)Areas with slopes
flatter than 4:1 14
-7 days for slopes greater than 50' in
length and with slopes steeper than 4:1
-7 days for perimeter dikes, swales,
ditches, perimeter slopes and HQW
Zones
-10 days for Falls Lake Watershed
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTION
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Details.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaDetails005-45020HBERJM6.6August 4, 2020NCG01 SELF-INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19
PART III
SELF-INSPECTION, RECORDKEEPING AND REPORTING
SECTION A: SELF-INSPECTION
Self-inspections are required during normal business hours in accordance with the table
below. When adverse weather or site conditions would cause the safety of the inspection
personnel to be in jeopardy, the inspection may be delayed until the next business day on
which it is safe to perform the inspection. In addition, when a storm event of equal to or
greater than 1.0 inch occurs outside of normal business hours, the self-inspection shall be
performed upon the commencement of the next business day. Any time when inspections
were delayed shall be noted in the Inspection Record.
NOTE: The rain inspection resets the required 7 calendar day inspection requirement.
PART III
SELF-INSPECTION, RECORDKEEPING AND REPORTING
SECTION B: RECORDKEEPING
1.E&SC Plan Documentation
The approved E&SC plan as well as any approved deviation shall be kept on the site. The
approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The
following items pertaining to the E&SC plan shall be documented in the manner described:
2. Additional Documentation
In addition to the E&SC Plan documents above, the following items shall be kept on the site
and available for agency inspectors at all times during normal business hours, unless the
Division provides a site-specific exemption based on unique site conditions that make this
requirement not practical:
(a)This general permit as well as the certificate of coverage, after it is received.
(b)Records of inspections made during the previous 30 days. The permittee shall record the
required observations on the Inspection Record Form provided by the Division or a similar
inspection form that includes all the required elements. Use of electronically-available
records in lieu of the required paper copies will be allowed if shown to provide equal access
and utility as the hard-copy records.
(c)All data used to complete the Notice of Intent and older inspection records shall be
maintained for a period of three years after project completion and made available upon
request. [40 CFR 122.41]
PART III
SELF-INSPECTION, RECORDKEEPING AND REPORTING
SECTION C: REPORTING
1.Occurrences that must be reported
Permittees shall report the following occurrences:
(a)Visible sediment deposition in a stream or wetland.
(b)Oil spills if:
·They are 25 gallons or more,
·They are less than 25 gallons but cannot be cleaned up within 24 hours,
·They cause sheen on surface waters (regardless of volume), or
·They are within 100 feet of surface waters (regardless of volume).
(a)Releases of hazardous substances in excess of reportable quantities under Section 311
of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA
(Ref: 40 CFR 302.4) or G.S. 143-215.85.
(b)Anticipated bypasses and unanticipated bypasses.
(c)Noncompliance with the conditions of this permit that may endanger health or the
environment.
2.Reporting Timeframes and Other Requirements
After a permittee becomes aware of an occurrence that must be reported, he shall contact
the appropriate Division regional office within the timeframes and in accordance with the
other requirements listed below. Occurrences outside normal business hours may also be
reported to the Division's Emergency Response personnel at (800) 662-7956, (800)
858-0368 or (919) 733-3300.SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTION
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Details.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaDetails005-45020HBERJM6.7August 4, 2020TOP OF BANK
TRANSPLANTED SOD
AND ROOTMASS
TOP OF BANK
TOE OF SLOPE
NOTES:
·PREPARE THE BANK WHERE THE SOD MAT WILL BE
TRANSPLANTED BY RAKING & FERTILIZING.
·EXCAVATE TRANSPLANT SOD MATS WITH A WIDE BUCKET
AND AS MUCH ADDITIONAL SOIL MATERIAL AS POSSIBLE.
·PLACE TRANSPLANT ON THE BANK TO BE STABILIZED.
·SECURE WITH SOD STAPLES.
·FILL IN ANY HOLES AROUND THE TRANSPLANT AND COMPACT.
·ANY LOOSE SOIL LEFT IN THE STREAM SHOULD BE REMOVED.
·PLACE MULTIPLE TRANSPLANTS CLOSE TOGETHER SUCH THAT
THEY TOUCH.
Section View
Riffle Installation Plan View
Riffle Installation CONSTRUCTED RIFFLE
Transplanted Sod Mats
Not to Scale
FLOW
TRANSPLANTED SOD AND ROOTMASS
4
6.7
Live Staking & Juncus Plugs
Not to Scale
Plan View
2' TO 3' LIVE STAKETAPERED AT BOTTOM1/2" TO 2"
DIAMETER
Live Stake Detail
NOTES:
·LIVESTAKES TO BE PLANTED IN RIPARIAN CORRIDOR
PLANTING ZONES DESIGNATED ON PLANTING PLAN.
·PLUGS TO BE PLANTED ON RESTORATION REACHES ONLY
UNLESS DIRECTED OTHERWISE.
·IN ENHANCEMENT II AREAS, LIVESTAKES ONE OR BOTH
BANKS ONLY AS DIRECTED BY DESIGNER.
·LIVESTAKE NATURALIZED CROSSINGS ALONG EXISTING DIRT
ROAD SOUTH OF EAST BUFFALO (PAVED ROAD).
OTHERWISE, NO LIVESTAKING IN PRESERVATION AREAS.
2 ROWS AT 4'
STAGGERED SPACING
1 ROW AT 3' SPACING
3' OUTSIDE TOP OF BANK
BANKFULLTOE OF SLOPE
JUNCUS PLUG (TYP)
Section View
LIVE STAKE (TYP)3'
TOE OF SLOPE
Containerized Planting
Not to Scale
2x CONTAINER WIDTH1.5x CONTAINERDEPTH2' TYPICAL
2
6.7
1
6.7
Bare Root Planting
Not to Scale
1 2 3 4 5 6
INSERT THE DIBBLE, OR
SHOVEL, STRAIGHT
DOWN INTO THE SOIL
TO THE FULL DEPTH OF
THE BLADE AND PULL
BACK ON THE HANDLE
TO OPEN THE PLANTING
HOLE. (DO NOT ROCK
THE SHOVEL BACK AND
FORTH AS THIS CAUSES
SOIL IN THE PLANTING
HOLE TO BE
COMPACTED,
INHIBITING ROOT
GROWTH.
REMOVE THE DIBBLE, OR
SHOVEL, AND PUSH THE
SEEDLING ROOTS DEEP
INTO THE PLANTING HOLE.
PULL THE SEEDLING BACK
UP TO THE CORRECT
PLANTING DEPTH (THE
ROOT COLLAR SHOULD BE
1 TO 3 INCHES BELOW THE
SOIL SURFACE). GENTLY
SHAKE THE SEEDLING TO
ALLOW THE ROOTS TO
STRAIGHTEN OUT. DO
NOT TWIST OR SPIN THE
SEEDLING OR LEAVE THE
ROOTS J-ROOTED.
INSERT THE DIBBLE, OR
SHOVEL, SEVERAL
INCHES IN FRONT OF
THE SEEDLING AND
PUSH THE BLADE
HALFWAY INTO THE
SOIL. TWIST AND PUSH
THE HANDLE FORWARD
TO CLOSE THE TOP OF
THE SLIT TO HOLD THE
SEEDLING IN PLACE.
PUSH THE DIBBLE, OR
SHOVEL, DOWN TO
THE FULL DEPTH OF
THE BLADE.
PULL BACK ON THE
HANDLE TO CLOSE THE
BOTTOM OF THE
PLANTING HOLD. THEN
PUSH FORWARD TO CLOSE
THE TOP, ELIMINATING AIR
POCKETS AROUND THE
ROOT.
REMOVE THE DIBBLE, OR
SHOVEL, AND CLOSE AND
FIRM UP THE OPENING
WITH YOUR HEEL. BE
CAREFUL TO AVOID
DAMAGING THE SEEDLING.
NOTES:
1.ALL SOILS WITHIN THE BUFFER
PLANTING AREA SHALL BE
DISKED, AS REQUIRED, PRIOR
TO PLANTING.
2.ALL PLANTS SHALL BE
PROPERLY HANDLED PRIOR TO
INSTALLATION TO INSURE
SURVIVAL.
DIBBLE BAR
PLANTING BAR SHALL HAVE A
BLADE WITH A TRIANGULAR
CROSS-SECTION, AND SHALL
BE 12 INCHES LONG, 4
INCHES WIDE AND 1 INCH
THICK AT CENTER.
ROOTING PRUNING
ALL ROOTS SHALL BE PRUNED
TO AN APPORIATE LENGTH
TO PREVENT J-ROOTING.
RESTORED
CHANNEL
BANKFULL
BUFFER WIDTH
VARIES
SPACING PER
PLANTING PLAN
Section View
3
6.7
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTIONRUBBER MALLET
HAMMER LIVE STAKES WITH
A RUBBER MALLET OR
COMPARABLE HAMMER
THAT WILL PREVENT LIVE
STAKE CRACKING OR
DAMAGE DURING
INSTALLATION
CUT LIVE STAKE
WITH A 2-3" TAPER
AT THE BOTTOM,
ENSURING GROWTH
IS ANGLED AWAY
FROM THE TAPERED
EDGE
INSTALL LIVE STAKE
TO A MINIMUM
DEPTH OF 1'
LIVE STAKES TO BE
INSTALLED DURING
DORMANT SEASON
(TYP)
IF LIVE STAKE IS
SEVERELY DAMAGED
DURING INSTALLATION,
REMOVE AND REPLACE
WITH A NEW LIVE
STAKE
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Details.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaDetails005-45020HBERJM6.8August 4, 20203
6.8
6' MAX. WITH WIRE
ORANGE SAFTY
FENCE
"T" OR "U" POST DRIVEN
MINIMUM OF 18" INTO GROUND
ATTACH SAFETY FENCE
TO METAL POSTS USING
METAL WIRE TIES
4' MIN.MATERIAL SPECIFICATIONS
PHYSICAL PROPERTY TESTS REQUIREMENTS
MATERIAL N/A POLYETHYLENE
RECOMENDED COLOR N/A "INTERNATIONAL ORANGE"
TENSILE YIELD ASTM D638 AVE. 2000 LBS. PER 4' WIDE
ULTIMATE TENSILE STRENGTH ASTM D638 AVE. 2900 LBS. PER 4' WIDE
ELONGATION AT BREAK (%)ASTM D638 GREATER THAN 1000%
CHEMICAL RESISTANCE N/A INERT TO MOST CHEMICALS AND ACIDS
18" MIN.Safety Fence
Not to Scale Soil Road Naturalization
Not to Scale
4
6.8
WATER DIVERSION CHANNEL
MUD MATS
SUPPORT LOG
12" Ø MIN.FILTER FABRIC
CLASS B
STONE
10
5' DIM
Temporary Stream Crossing - Mud Mat
Not to Scale
2
6.8
Straw Wattles
Not to Scale
1
6.8
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTION10:1 (MI
N
)
EXISTING GROUND
GULLEYING OF
SOIL ROAD
PROPOSED GROUND -
BUILD UP FOR DRAINAGE
AT OUTLETS UPSTREAM OF
BUILT UP SECTIONS, INSTALL
BRUSH OR OTHER NATIVE
MATERIALS TO DISPERSE
FLOW ACROSS HILLSIDE
Section View - Road
Grading to Route
Runoff into Buffer
FL
O
W
3:1 (
M
I
N
)
EXISTING GROUND
GULLEYING OF
SOIL ROAD
PROPOSED GROUND - ADD
IRREGULARITY IN GRADING,
AND/OR WITH BOULDERS
AND FELL TREES TO DETER USE
AT OUTLETS UPSTREAM OF
BUILT UP SECTIONS, INSTALL
BRUSH OR OTHER NATIVE
MATERIALS TO DISPERSE
FLOW ACROSS HILLSIDE
FL
O
W
Section View -
Road Demo to
Prevent Use
NOTES:
PRIMARY SOIL ROAD DECOMMISSIONING (SEE SHEET 5.X)
·OBSTRUCT VEHICULAR PASSAGE THROUGH INTERMITTENT
OBSTRUCTION OF THE ROAD WITH BOULDERS, TREES OR 3:1 MIN.
BERMS/GRADING TO REDUCE THE PASSABLE WIDTH FOR THE
PREVENTION OF TRUCKS AND 4-WHEELER TRAFFIC.
·REGRADING ROADS AT INTERVALS OF TWO PER 300' TO DISPERSE
RUNOFF AND SHED WATER BEFORE FLOW IS CONCENTRATED, AND
MORE FREQUENTLY WHERE THE FACTORS OF CONTRIBUTING
DRAINAGE AREA, GRADIENT, AND EXISTING ROAD CONDITIONS
WARRANT.
·PLANT A MINIMUM OF 10 TREES EVERY 300'
·MAJOR GULLIES ALONG ROADS SHALL BE GRADED OUT OVER AT LEAST
30% OF THEIR LENGTH, IT IS ACCEPTABLE TO LEAVE HUMMOCKY
TOPOGRAPHY.
·WHERE ROAD IS SUNK INTO LANDSCAPE, CUT SWALES EVERY 200-400'
TO CREEK TO OUTLET UPSLOPE RUNOFF. INSTALL BRUSH AND STONE
CHECK DAMS TO REDUCE WATER VELOCITIES AND TRAP SEDIMENT
FROM UPSLOPE.
SECONDARY SOIL ROAD DECOMMISSIONING (SEE SHEET 5.X)
·ALONG THE UPPER ROAD, NEAR THE STREAM ORIGINS OF UT4 & UT4B,
TREAT THE APPROACHES TO THESE UPPER CROSSINGS USING THE
ROAD GRADING TO ROUTE RUNOFF INTO BUFFER SECTION AT THE
SAME FREQUENCY AS FOR PRIMARY ROAD DECOMISSIONING.
·APPLY DETAIL IN OTHER LOCATIONS AS NEEDED TO ENSURE THAT
WATER FLOWS THROUGH BUFFER INSTEAD OF ALONG ROAD.
·ALONG ROADS SITUATED ON RIDGELINES, OBSTRUCTIONS WILL BE
ESTABLISHED AND TREES PLANTED AT A FREQUENCY OF ONE
OBSTRUCTION AND 10 TREES PER 300'.
EXISTING GROUND
ROAD SUNK
BELOW GRADE
CUT SWALE THROUGH
EMBANKMENT TO OUTLET
WATER OFF CONFINED ROAD
INTO CREEK
INSTALL CHECK DAMS TO
REDUCE WATER VELOCITIES,
LIVESTAKE SWALEFL
O
W
Section View - Road Sunk
Below Adjacent Grade CREEK
MAINTENANCE NOTES:
·ALL TEMPORARY STREAM CROSSINGS SHOULD BE INSPECTED AT LEAST
ONCE WEEKLY OR AFTER 0.25" OF PRECIPITATION WITHIN 24 HOURS.
·IF EXCESSIVE SEDIMENT IS BEING TRACKED ON TOP OF MATS THEN
REMOVE WITH SHOVEL AND DISPOSE OF PROPERLY.
·TERRACE SLOPES ENTERING AND EXITING FROM CROSSINGS MUST BE
WELL MAINTAINED. DIVERT SURFACE RUNOFF AWAY FROM
CROSSINGS, APPLY WATTLES AT THE END OF EACH DAY WHEN RAIN IS
ANTICIPATED, APPLY SURFACE STONE AS NECESSARY.
INSTALLATION NOTES:
·CONSTRUCT STREAM CROSSING WHEN FLOW IS AT OR BELOW NORMAL
BASEFLOW.
·BRIDGE MATS SHALL BE PLACED FROM ABOVE RATHER THAN DRAGGED
INTO PLACE.
·MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT
EXCAVATE CHANNEL BOTTOM.
·INSTALL STREAM CROSSING PERPENDICULAR TO THE FLOW.
·MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD DOES
NOT ENTER CHANNEL. SMALL DIVERSION CHANNELS, ADDITIONAL ROCK,
OR STRAW/COIR WATTLES MAY BE REQUIRED. INSTALL AS DIRECTED.
·STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE EDGE OF THE MUD
MAT.
·CONTRACTOR SHALL DETERMINE APPROPRIATE RAMP ANGLE ACCORDING
TO EQUIPMENT USED.
·PLUG GAPS BETWEEN MATS WITH FILTER FABRIC TO PREVENT LOSS OF SOIL
THROUGH GAPS.
·ADDRESS STEEP TRANSITIONS TO THE CROSSING THAT PRESENT AN
EROSION OR SEDIMENTATION RISK WITH APPROPRIATE
COUNTERMEASURES SUCH AS STONE OR END OF DAY COVER OR SEDIMENT
BARRIER APPLICATIONS.2"TRENCH
24" MIN24" MINDOW
N
S
L
O
P
E
WOODEN STAKE WITH WATTLE
ANCHORED TO THE TOP
Profile View
Section View - Ditch Application
NOTE:
1.COIR LOGS CAN BE USED FOR BANK TOE
ESTABLISHMENT OR IN A SIMILAR FASHION TO
ROCK/LOG SPURS, USING 1" X 1" X 36"
HARDWOOD STAKES. INSTALLATION SHALL BE
DIRECTED BY ENGINEER.
MAINTENANCE NOTES:
1.ALL WATTLES/LOGS SHOULD BE INSPECTED AT
LEAST ONCE WEEKLY OR AFTER 0.25" OF
PRECIPITATION WITHIN 24 HOURS.
2.WATTLES/LOGS COLLAPSING, TEARING, WATER
BYPASSING THE WATTLES/LOGS, OR OTHER
FAILURES SHOULD BE REPAIRED WITHIN 24
HOURS.
3.SEDIMENT TRAPPED BEHIND ROCK SILT CHECK
DAMS SHOULD BE CAREFULLY REMOVED ONCE
DEPTH REACHES 6".
TOP OF EROSION
CONTROL MATTING
SLOPE SURFACE
DOW
N
S
L
O
P
E
SLOPE SURFACE
WOOD STAKE (TYP)
12' DIA. STRAW
WATTLE
DITCH OR SLOPE
GRADETRENCH IN WATTLE
ON BARE SOIL
COMPACTED SOIL
ALONG FRONT AND
BACK (TYP)
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Details.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaDetails005-45020HBERJM6.9August 4, 2020Erosion Control Matting
Not to Scale
Section View
ECOSTAKE (TYP)
EROSION CONTROL
MATTING (TYP)
Plan View
ECO STAKE (TYP)TOP OF BANK
TOE OF SLOPE
TOE OF SLOPE 11"1.25"0.4"Eco Stake
TOP OF BANK
3' M
A
X
.
SPAC
I
N
G
6" MIN. OVERLAP IN
DOWNSTREAM DIRECTION
AT MAT ENDS
TOE STAKE (TYP)
0.6"
NOTES:
·ALL EROSION CONTROL MATTING SHOULD BE
INSPECTED AT LEAST ONCE WEEKLY OR AFTER
0.25" OF PRECIPITATION WITHIN 24 HOURS.
·ANY MATTING FAILURES SHOULD BE REPAIRED
WITHIN 24 HOURS.
·TENTING (EROSION OCCURRING UNDERNEATH
INSTALLED MATTING) WILL REQUIRE PEELING
BACK MATTING, REPAIRING ANY RILLS, AND
REAPPLYING THE MATTING.
·USE 780 g/m2 DENSITY COIR MATTING.18"4"2"Toe Stake
2
6.9
8"4"
Temporary Silt Fence
Not to Scale
NOTES:
·USE WIRE A MINIUM OF 32" IN WIDTH AND WITH A
MINIMUM OF 6 LINES OF WIRES WITH 12" STAY SPACING.
·USE SILT FENCE A MINIMUM OF 36" IN WIDTH AND
FASTEN ADEQUATELY TO THE WIRES AS DIRECTED BY THE
ENGINEER.
·PROVIDE 5' STEEL POST OF THE SELF-FASTENER ANGLE
STEEL TYPE. ANGLE STEEL TYPE.
WIRE
TOP AND BOTTOM STRAND
SHALL BE 10 GAUGE MIN.
MIDDLE AND VERTICAL WIRES
SHALL BE 12 1
2 GAGE MIN.
8' MAX. WITH WIRE
(6' MAX. WITHOUT WIRE)
SILT FENCE
EXISTING GROUND
SILT FENCE
COMPACTED FILL
STEEL POST2'-0" DEPTHEXTEND FABRIC
INTO TRENCH
3
6.9
IMPERVIOUS DIKE
(SEE INSET "B")
INTAKE
HOSE
PUMP
DISCHARGE HOSE
IMPERVIOUS DIKE
(SEE INSET "B")
10' X 5' STABILIZED OUTLET
USING CLASS B RIPRAP AND
NCDOT TYPE 2 FILTER FABRIC.
(SEE INSET "C")
INTAKE HOSE
DEWATERING
PUMP
DISCHARGE HOSE
DEWATERING BAG
(SEE INSET "A")
SAND BAG
(24" X 12" X 6")
OR STONE.IMPERVIOUS SHEETING
FLOW
FLEXIBLE DISCHARGE HOSE FROM
PUMP AROUND PUMP HELD IN PLACE
WITH SAND BAGS AS NEEDED.
10' MIN.
STABILIZED OUTLET USING CLASS B
RIPRAP TRENCHED INTO EXISTING
GROUND A MINIMUM OF 6". SIZE AND
LOCATION TO BE DETERMINED IN THE
FIELD BY THE ENGINEER.
FILTER FABRIC Inset "C"
Stabilized Outlet
Plan View
Inset "B"
Impervious Dike
EXISTING TERRAIN DEWATERING BAG
STREAM BED
FILTER FABRIC
8" of CLASS B RIPRAP
15' to 20'10'15'
BAG PLACED ON
AGGREGATE
HIGH STRENGTH
DOUBLE STITCHED
"J" TYPE SEAMS.
SEWN IN SPOUT
HIGH STRENGTH STRAPPING
FOR HOLDING HOSE
IN PLACE.
FLEXIBLE
DISCHARGE HOSE
WATER FLOW
FROM PUMP
Inset "A"
Dewatering Bag
ACTIVE WORK AREA
DEWATERING
BAG
Pump Around System
Not to Scale
4
6.950'12'PUBLIC ROADCLASS A STONE
8" MIN. DEPTH
NOTES:
·PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE
LARGE TRUCKS.
·LOCATE CONSTRUCTION ENTRANCE AT ALL POINTS OF INGRESS
AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE FREQUENT
CHECKS OF THE DEVICE AND TIMELY MAINTENANCE.
·MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. PERIODIC
TOP DRESSING WITH STONE WILL BE NECESSARY.
·ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE
CLEANED IMMEDIATELY.
·USE CLASS A STONE OR OTHER COARSE AGGREGATE
APPROVED BY THE ENGINEER.
·PLACE FILTER FABRIC BENEATH STONE.
Construction Entrance
Not to Scale
1
6.9
FLOW
PUMP-AROUND SEQUENCE:
1.IMPLEMENT PUMP-AROUND WHERE REQUIRED BY THE PLANS AND SPECIFICATIONS OR AS DIRECTED BY THE DESIGNER.
2.IDENTIFY THE EXPECTED ACTIVE WORK AREA OF THE STREAM FOR EACH WORK DAY. THE CONTRACTOR SHALL DISTURB ONLY AS MUCH CHANNEL AS
CAN BE STABILIZED WITH SEEDING, MULCH, AND EROSION CONTROL MATTING BY THE END OF EACH WORK DAY. STREAM WORK SHOULD NOT BE
PERFORMED, AND PUMP-AROUND SHOULD NOT BE IMPLEMENTED, IF STREAM FLOW EXCEEDS PUMP CAPACITY.
3.MOBILIZE PUMP-AROUND EQUIPMENT TO THE ACTIVE WORK AREA. POSITION PUMP INTAKE JUST UPSTREAM OF THE ACTIVE WORK AREA AND
POSITION DISCHARGE HOSE DOWNSTREAM OF THE ACTIVE WORK AREA. STABILIZE OUTLET AREA OF DISCHARGE HOSE AS SHOWN IN DETAIL. PUMP
AND HOSES MUST HAVE SUFFICIENT CAPACITY TO HANDLE TYPICAL BASE FLOW CONDITIONS IN THE RESPECTIVE STREAMS, OR ANY CONDITION UNDER
WHICH THE CONTRACTOR DESIRES TO CONTINUE WORK.
4.INSTALL IMPERVIOUS DIKES DOWNSTREAM OF THE INTAKE HOSE AND UPSTREAM OF THE DISCHARGE HOSE. ENSURE NO WATER BYPASSES DIKES AND
ACTIVE WORK AREA IS ISOLATED FROM THE FLOWING STREAM.
5.START PUMP AND BEGIN PUMPING AROUND IMMEDIATELY AFTER IMPERVIOUS DIKE INSTALLATION. MONITOR PUMP AND WATER LEVELS AT THE
UPSTREAM IMPERVIOUS DIKE THROUGHOUT THE DAY. ADJUST DIKE OR PUMP SIZE AS NEEDED TO ENSURE THAT ALL STREAM FLOW BYPASSES THE
ACTIVE WORK AREA.
6.DE-WATER THE ACTIVE WORK AREA BY POSITIONING A SEPARATE PUMP NEAR THE DOWNSTREAM END OF THE ACTIVE WORK AREA. WATER PUMPED
FORM THE ACTIVE WORK AREA SHOULD PASS THOROUGH A DE-WATERING BAG BEFORE DISCHARGING TO THE STREAM. SEE DETAIL AND
SPECIFICATIONS FOR PROPER DE-WATERING BAG TYPE AND INSTALLATION. THE ACTIVE WORK AREA SHOULD BE DE-WATERED WHENEVER A
SUFFICIENT AMOUNT OF WATER ACCUMULATES IN THE ACTIVE WORK ZONE TO IMPEDE CONSTRUCTION PROGRESS.
7.WITH FLOW DIVERTED, HARVEST COBBLE AND GRAVEL MATERIALS FROM THE BED OF THE DE-WATERED CHANNEL FOR RE-USE IN CONSTRUCTED
RIFFLES AND OTHER IN-STREAM STRUCTURES.
8.COMPLETE ALL STREAM GRADING AND IN-STREAM STRUCTURES WITHIN THE ACTIVE WORK AREA.
9.WHEN STREAM WORK WITHIN THE ACTIVE WORK AREA IS COMPLETE, FULLY STABILIZE THE NEWLY CONSTRUCTED CHANNEL BEFORE SHUTTING DOWN
THE PUMP-AROUND SYSTEM. STABILIZATION CONSISTS OF SEEDING, MULCHING, AND INSTALLING EROSION CONTROL MATTING ALONG GRADED
BANKS AS INDICATED IN THE DETAILS.
10.ONCE THE ACTIVE WORK AREA IS STABILIZED, TURN OFF PUMPS AND REMOVE IMPERVIOUS DIKES. MOBILIZE THE SYSTEM TO THE NEXT ACTIVE WORK
AREA.SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTIONMAINTENANCE NOTES:
·ALL EROSION CONTROL MATTING SHOULD BE INSPECTED
AT LEAST ONCE WEEKLY OR AFTER 0.25" OF PRECIPITATION
WITHIN 24 HOURS.
·ANY MATTING FAILURES SHOULD BE REPAIRED WITHIN 24
HOURS.
·TENTING (EROSION OCCURRING UNDERNEATH INSTALLED
MATTING) WILL REQUIRE PEELING BACK MATTING,
REPAIRING ANY RILLS, AND REAPPLYING THE MATTING.
MAINTENANCE NOTES:
·ALL SILT FENCE SHOULD BE INSPECTED AT LEAST ONCE
WEEKLY OR AFTER 0.25" OF PRECIPITATION WITHIN 24
HOURS.
·TEARS IN THE FENCE, UNTRENCHED AREAS, OR OTHER
FENCE FAILURES SHOULD BE REPAIRED WITHIN 24 HOURS.
·SEDIMENT TRAPPED BEHIND SILT FENCE SHOULD BE
CAREFULLY REMOVED ONCE DEPTH REACHES 6".
MAINTENANCE NOTES:
·ALL CONSTRUCTION ENTRANCES SHOULD BE INSPECTED AT LEAST
ONCE WEEKLY OR AFTER 0.25" OF PRECIPITATION WITHIN 24 HOURS.
·EXCESSIVE AMOUNTS OF SEDIMENT SHOULD BE REMOVED FROM
THE CONSTRUCTION ENTRANCE IMMEDIATELY.
·ANY SEDIMENT TRACKED ONTO PUBLIC ROADS SHOULD BE CLEANED
IMMEDIATELY AND THE SOURCE OF THE SEDIMENT ADDRESSED.
NOTES:
·DEWATER SILT-LADEN WATER IN WORK AREA TO REMOVE VISUAL TURBIDITY. DEWATERING INTO
GRASS IS ACCEPTABLE IF TURBIDITY CAN BE REMOVED USING THIS METHOD. ALL DISCHARGE
MUST BE RETURNED TO THE STREAM ALONG A STABILIZED, NON-EROSIVE OUTLET.
·PUMP-AROUND SYSTEM AND PHYSICAL FLOW DIVERSIONS SHALL NOT BE LEFT UNATTENDED
WHILE SYSTEMS ARE IN-PLACE/OPERATING.
·INSTREAM DIVERSIONS AND PUMP-AROUND EQUIPMENT SHALL BE REMOVED FROM THE STREAM
IN ANTICIPATION OF OR DURING BANKFULL PRECIPITATION EVENTS. INSTREAM GRADING AND
STRUCTURE CONSTRUCTION WILL NOT BE ALLOWED DURING BANKFULL FLOW EVENTS.
·THE CONTRACTOR SHALL TAKE PRECAUTION TO PROTECT AGAINST EROSION AND SEDIMENTATION
WHEN TURNING WATER BACK INTO NEWLY CONSTRUCTED CHANNEL. PUMPING, STONE AND
SANDBAGS SHOULD BE USED AS NECESSARY TO DIRECT FLOW IN A NON-EROSIVE WAY. CHANNELS
MUST BE FULLY STABILIZED WITH MATTING AND PERMANENT OR TEMPORARY BED STABILIZATION
MATERIAL/STRUCTURES PRIOR TO RELEASING WATER INTO THESE AREAS.
SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTIONX:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Details.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaDetails005-45020HBERJM6.10August 4, 20205' MIN6"
MIN
NOTES:
·VOID SPACES BETWEEN ROCKS ON BERM SHALL
BE FILLED WITH NATIVE SOILS.
·SIZE PER NCDEQ STORMWATER MANUAL
GUIDANCE FOR LEVEL SPREADERS.R/WR/WR/WA A'
POROUS ROCK
AND SOIL BERM
BOTH ENDS SHALL
TIE IN AT Z + 1'
Plan View
B
1.5' MIN
1' MIN
Earthen Level Spreader Dimensions
B C D E
18" CMP 5'5'5'10'
24" CMP 5'8'10 15'
1.5' MIN
1' MIN
Section A-A'
DE
6"
MINC
1' MIN
Floodplain Depression
Not to Scale
1
6.10
A
A'
Plan View
NOTES:
·INSTALL A DENSE LAYER OF BRUSH/WOODY DEBRIS, AT POOL
BOTTOM, WHICH SHALL CONSIST OF SMALL BRANCHES AND ROOTS
COLLECTED ON-SITE AND SOIL TO FILL ANY VOID SPACE. LIGHTLY
COMPACT BRUSH/WOODY DEBRIS LAYER.
·TIGHTLY COMPACT EARTH BACKFILL TO PREVENT EXISTING
CHANNEL EROSION
·SEED, MULCH AND INSTALL EROSION CONTROL MATTING AND
BANK STABILIZATION PER PLANS.
POOL BOTTOM
EXISTING CHANNEL
FLOW
B B'
Section A-A'
Earthen Level Spreader
Not to Scale
2
6.10
FLOW
PROPO
S
E
D
G
R
A
D
E
PROPO
S
E
D
G
R
A
D
E 2:1 MAX
POOL BOTTOM
Section B-B'
1.5'
(TYP)
TOP OF BANK (TYP)
0TOE OF SLOPE (TYP)
ELEVATION AS DESIGNATED
IN GRADING PLANS
NATIVE SOIL
PROPOSED GROUND
5:1 MAX
8" MIN EARTH WITH MIX OF
RAILROAD BALLAST
SOD COVER
EROSION CONTROL MATTING
AND INTEGRATED WOODY DEBRIS AS
DIRECTED BY THE ENGINEER
DEPRESSION OUTLET AS
DESIGNATED IN PLANS
NATIVE SOIL
6" CLASS A/B MIX WITH
FILTER FABRIC AS SHOWN
IN PLANS
FILTER FABRIC AS DIRECTED
BY THE ENGINEER
PROPOSED FILL
POROUS ROCK AND SOIL BERM
CLASS A/B MIX OR EQUAL
POROUS ROCK AND SOIL BERM
CLASS A/B MIX OR EQUAL
ELEVATION Z
AS SHOWN
ON GRADING
PLANS
ELEVATION Z
AS SHOWN
ON GRADING
PLANS
2:
1
M
A
X
2
:
1
M
AX2:1 MAX
X:\Shared\Projects\005-45020 Little Tennessee East Buffalo\Cadd\Plans\45020 - Details.dwgAugust 4, 2020East Buffalo Mitigation SiteGraham County, North CarolinaDetails005-45020HBERJM6.11August 4, 2020SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:167-B Haywood RdAsheville, NC 28806Tel: 828.774.5547License No. F-0831JAC
OB P. M C L E AN033578NORTH CAROLIN
A
PRO F E SSION
A
L
ENGIN E E RSEAL
PRELIMIN
ARY
DO
N
OT
USE F
OR
CONSTRUCTION2.5 MIN.
1
NOTES:
1.STOCKPILES STAGING AREAS SHALL ONLY BE
PLACED IN AREAS DESIGNATED ON THE PLANS.
2.SILT FENCE SHALL BE PLACED ON STREAM SIDE
OF ALL STOCKPILES.
3.STOCKPILES SHALL BE LOCATED A MINIMUM OF
50 FEET FROM STORMWATER DRAINS OR
INLETS.
MAINTENANCE NOTES:
1.ALL STOCKPILE AREAS AND SILT FENCES SHALL
BE INSPECTED AT LEAST ONCE PER WEEK OR
AFTER 0.25" OF PRECIPITATION WITHIN 24
HOURS.
2.SILT FENCE SHOULD BE INSPECTED FOR TEARS,
UNTRENCHED AREAS, OR OTHER FAILURES AND
REPAIRED WITHIN 24 HOURS
3.SEDIMENT SHALL BE REMOVED FROM BEHIND
THE SILT FENCE ONCE DEPTH REACHES 6"
4.ANY SOIL STOCKPILES LEFT IN PLACE FOR
LONGER THAN 7 DAYS SHALL BE SEEDED AND
MULCHED OR OTHERWISE STABILIZED.
SILT FENCE
STOCKPI
L
E
Stockpile and Staging Areas
Not to Scale
1
6.11
2
6.11
Haul Roads
Not to Scale
STREAM
PRIMARY HAUL ROAD TO BE
USED THROUGHOUT PROJECT,
SEE NOTE 1 (NOTE 1 APPLIES
TO ALL HAUL ROADS)
NOTES:
1.IF HAUL ROADS ARE A SOURCE OF EROSION, ONE OR
MORE OF SILT FENCE, DIVERSIONS, TEMPORARY
STABILIZATION (STRAW) OR OTHER MEASURES SHALL
BE APPLIED TO PREVENT SEDIMENTATION TO STREAM.
2.ONCE NO LONGER NEEDED TO CONDUCT PROJECT
ACTIVITIES, RENATURALIZE HAUL ROADS AND
CONDUCT RIPPING, DISCING OR PULVERIZING AND
AMENDMENT. THEN SEED AND APPLY MULCH.
HAUL ROADS TO BE
DECOMMISSIONED AND
NATURALIZED IMMEDIATELY
AFTER USE IS NO LONGER
REQUIRED
HAUL ROADS TO BE
DECOMMISSIONED AND
NATURALIZED IMMEDIATELY
AFTER USE IS NO LONGER
REQUIRED