HomeMy WebLinkAbout20181252 Ver 1_Compliance Evaluation Inspection_20200820Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20181252
NCDOT - US 19/US 74/US 64/US 129 Improvements
(R-5735)Cherokee
NCDOT - US 19/US 74/US 64/US 129 Improvements (R-5735)
NC DOT Division 14 - Sylva
8/19/2020
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Road
maintenance/repair/improveme
ntsRegion:Asheville
Longitude:-84° 02' 39''+35° 04'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on August 19, 2020. Project impacts
have not begun. Jurisdictional areas are flagged with high visibility fencing.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20181252
8/19/2020
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Project impacts have not begun.Comment:
page:2