HomeMy WebLinkAboutNCC202836_ESC Approval Submitted_20200820ROY COOPER
V-r. en?rr'
MICHAEL, S. REGAN
Ar'rr,ur
MAN WRENN
Cii� rH C,ARQLINW,
Environmental Quality
May 14, 2020
U,A'TER OF APPROVAL
Smithfield Ventures, LLC
ATTN: John Sandlin, Co -Managing Member
107 Stokley Dr. Suite 100
Wilmington, NC 28403
RC: Project Name: Tru Hotel Smithfield
Acres Approved: 2.01
Project ID: JOHNS-2020-030
County: Johnston City: Smithfield Address: S. Fquity Dr.
River Basin: Neuse Stream Classification: Other
Submitted By: McGill Associates, P.A.
Date Received by LQS: April 14, 2020
Plan Type: New
Dear Mr, Sandiin:
The subject erosion and sedimentation control plan has been approved. The enclosed Certificate of
Approval must be posted at the job site. This plan approval shall expire three (3) years following the date
of'approval, if no land -disturbing activity has been undertaken, as is required by Title 1 5A NCAC 4B .0129.
As of April 1, 2019, all new construction activitie, are required to complete and submit an electronic Notice
of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction
General Pennit. Alter the form is reviewed and found to be complete, you will receive a link with payment
instructions for the S100 annual Pennit Ice. After the fec is received, you will receive the COC via
email. You MUST obtain the COC prior to commencement of any land disturbing activity. 'I lie cNOI
form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to i\nnette
Lucas at Annett_e.1,ticaS u ncdcnr.Loy or PaCil Clark at I'auLClark r,ncdctir.�rov. if the owner.'operator of
this project changes in the future, the new responsible party is required to apply for his -leer own COC.
Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on
I He at the job site:
1. The approved E&:SC plan as well as any approved deviation.
2. 'The NCG01 pernit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
CQ
II C, 11 na N f,)l lmerl ;;' En: 1'- ll M'dl [ 1 . i i
;� 1 i, .4 ralillinc Ir.2>\i':IS1. . it, (e is i
Letter of Approval
Smithfield Ventures, LLC
May 14, 2020
Page 2 of)
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
Title 15A NCAC 4B .01 18(a) requires that a copy of the approved erosion control plan be on file at the job
site. Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part Oil the ilCCUracy of the information provided in the financial
Responsibility Fonn, which you provided. You are requested to file an amended form if there is Tiny change
in the inforiation included on the form. I his permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincerely,
Sally Castle, El
Regional Engineering Associate
I -and Quality Section
Ivnclosures: Certificate of Approval
NPDES NCGO1 Fact Shect
cc: Mattllew Lassiter, PE (Matthew,I-assiter-'a nlc+uillassociates.corn Electronic Copy
Regional Office file