Loading...
HomeMy WebLinkAboutNCC202836_ESC Approval Submitted_20200820ROY COOPER V-r. en?rr' MICHAEL, S. REGAN Ar'rr,ur MAN WRENN Cii� rH C,ARQLINW, Environmental Quality May 14, 2020 U,A'TER OF APPROVAL Smithfield Ventures, LLC ATTN: John Sandlin, Co -Managing Member 107 Stokley Dr. Suite 100 Wilmington, NC 28403 RC: Project Name: Tru Hotel Smithfield Acres Approved: 2.01 Project ID: JOHNS-2020-030 County: Johnston City: Smithfield Address: S. Fquity Dr. River Basin: Neuse Stream Classification: Other Submitted By: McGill Associates, P.A. Date Received by LQS: April 14, 2020 Plan Type: New Dear Mr, Sandiin: The subject erosion and sedimentation control plan has been approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of'approval, if no land -disturbing activity has been undertaken, as is required by Title 1 5A NCAC 4B .0129. As of April 1, 2019, all new construction activitie, are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Pennit. Alter the form is reviewed and found to be complete, you will receive a link with payment instructions for the S100 annual Pennit Ice. After the fec is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. 'I lie cNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to i\nnette Lucas at Annett_e.1,ticaS u ncdcnr.Loy or PaCil Clark at I'auLClark r,ncdctir.�rov. if the owner.'operator of this project changes in the future, the new responsible party is required to apply for his -leer own COC. Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on I He at the job site: 1. The approved E&:SC plan as well as any approved deviation. 2. 'The NCG01 pernit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. CQ II C, 11 na N f,)l lmerl ;;' En: 1'- ll M'dl [ 1 . i i ;� 1 i, .4 ralillinc Ir.2>\i':IS1. . it, (e is i Letter of Approval Smithfield Ventures, LLC May 14, 2020 Page 2 of) Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. Title 15A NCAC 4B .01 18(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part Oil the ilCCUracy of the information provided in the financial Responsibility Fonn, which you provided. You are requested to file an amended form if there is Tiny change in the inforiation included on the form. I his permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Sally Castle, El Regional Engineering Associate I -and Quality Section Ivnclosures: Certificate of Approval NPDES NCGO1 Fact Shect cc: Mattllew Lassiter, PE (Matthew,I-assiter-'a nlc+uillassociates.corn Electronic Copy Regional Office file