Loading...
HomeMy WebLinkAboutNCC203501_ESC Approval Submitted_20200820ROY COOPER Governor MICHAEL S. REGAN Secretary Brian Wrenn Director Slippery Elm Properties, LLC ATTN: Mitchell T. Murphy, Manager PO Box 90427 Raleigh, NC 27675 NORTH CAROL€NA Enytronmottat Quatfty June 30, 2020 LETTER OF APPROVAL RE: Project Name: Middlefield Towns Subdivision Acres Approved: 5.9 Project ID: ALAMA-2020-046 County: Alamance City: Graham Address: NC HWY 87 River Basin: Cape Fear Stream Classification: WS-V ; NSW — Jordan Lake Watershed Submitted By: Penny Engineer Design Date Received by LQS: June 23, 2020 Plan Type: New —Express Dear Mr. Murphy, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG01O0O0 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Ann ette.lucasPncdenr.gov or Paul Clark at Paul. clarkPncdenr.gov. After you submit a complete and correct NOT Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. D� North f WWM Departrwrkt affnA ff mtal QuafRy I DMsiw&Er1n9yA*l ra€a dLand Resources VAn5aon-Sakes R.eg1n d0fR— € ..lix 27103 s.w 336,M9800 Letter of Approval Slippery Elm Properties, LLC June 30, 2020 Page 2 of 2 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturhing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Zachary Lentz, EI Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet cc: Jacob Levan, El (email) WSRO File