Loading...
HomeMy WebLinkAbout20061617 Ver 1_More Info Letter_20070327d ~Q~ W ATFR p Michael F. Easley, Governor `Q (i William G. Ross Jr., Secretary Vj~..- North Carolina Department of Environment and Natural Resources ~ ~ 0 .,C Alan W. Klimek, P.E. Director Division of Water Quality March 27, 2007 DWQ Project # 06-1617 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Greg Ferguson Mercury Development, LLC 5660 Six Forks Road, Suite 202 Raleigh, NC 27609 Subject Property: Wendell Falls Marks Creek [030402, 27-38, C, NSW] REQUEST FOR MORE INFORMATION Dear Mr. Ferguson: On October 13, 2006, the Division of Water Quality (DWQ) received your application dated September 26, 2006, to impact 5.2 acres of 404/wetland, 3,4161inear feet of stream, and 355,450 square feet of Neuse River basin protected riparian buffer, to construct the proposed Wendell Falls residential subdivision, commercial development, road improvements, and US Highway 64/264 interchange. On October 13, 2006, the DWQ received the Public Notice issued October 13, 2006, for the project. On January 26, 2007, and February 9, 2007, the DWQ received additional information from you, however, the DWQ has determined that your application remains incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 1 SA NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional- information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. As previously requested, please resubmit plans on full plan sheets at a scale of no smaller than 1"=50', and please include topographic information, i.e., contour intervals on the plan. 2. As previously requested, please submit your mitigation plan. The DWQ cannot issue your Certification without an approved mitigation plan. 3. Please provide a table of clearly indicating all permanent and temporary impacts. Also, please be sure to differentiate between Zone 1 and Zone 2 buffer impacts. None hCarolina 401 Oversight/Express Review Permitting Unit ~QtuCQ«y 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, NoRh Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: httv://h2o.enr.state.nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Mercury Development, LLC Page 2 of 4 March 27, 2007 4. As previously requested, please clearly indicate all Zone 1 and Zone 2 buffers, and impacts to these, on the site plan. 5. Please clearly locate all isolated or non-isolated wetland, stream, and other waters of the State as overlays on the site plan at the larger scale. 6. As previously requested, please submit information on proposed project imperviousness, i.e., an inventory of proposed impervious surfaces. 7. As previously mentioned, deed notifications must be placed on all lots that abut buffers or wetlands. 8. As previously requested, please provide detail for the stormwater BMPs as required by GC3402. 9. As previously noted, the applicant is advised that constructed wetlands will be required for this project as the stormwater BMP. 10. As previously requested, please provide proposed lot layout with building envelopes. 11. As previously requested, please quantify intermittent and perennial stream impacts, and .provide documentation from a DWQ representative that the stream is determined to be intermittent or perennial. 12. Please specify the linear footage of sewer line and water line impacts in the buffers. Also be aware that sewer and water line impacts are not "temporary" as stated on your impact table. Please revise your impact table entitled, "Impact Tables Temporary Impacts", to reflect these changes. 13. You have proposed bottomless culverts for your site. Please provide a signed and sealed geotechnical report per, NCDOT - DIVISION OF HIGHWAYS -GUIDELINES FORDRAINAGE STUDIES AND HYDRA ULIC DESIGN, PREPARED BYA. L. HANKINS, JR., P.E. STATE HYDRAULICS ENGINEER -1999. This report states, "When a shallow (3-5 foot max. depth) non-erosive rock foundation is found throughout the proposed site, the structure can be built on footings without a bottom allowing retention of the natural channel bed. Please verify that your proposed bottomless culverts comply with the above- referenced manual. 14. Please address the following: R-1 -This office recommends shifting the proposed crossing to the southwest in order to avoid some stream impact. The current crossing is not at the best perpendicular location. R-3 -Three proposed lots near R-3 appear unbuildable without further impacts. Please address this situation. Mercury Development, LLC Page 3 of 4 March 27, 2007 • R-7 - Is this a proposed culvert crossing or fill? A culvert should be emplaced to ensure proper drainage. • R-11 -This office recommends shifting the proposed road to reduce buffer and stream impacts. • S2/G2 -Please address why this proposed crossing is not perpendicular. • S/6 -Please address whether the two proposed manholes in the wetland may be moved out of the wetland. • R8A -Your proposed project design includes a stub road after crossing an unnamed tributary of Marks Creek. You have not provided details related to the development planned on the other side of the stream, or a potential connecting road to be tied to your proposed road. Please revise your site plan to either eliminate this stub road altogether, or re-design it so that it ends as a cul-de-sac with the surrounding properties, including the area adjacent to the stream, incorporated into the lots. If this stub road has been required by the local municipality, please note that a full alternatives analysis must be provided to justify the future crossing currently being established at this location. If this stream crossing would merely provide for interconnectivity where reasonable access already exists, the proposed crossing would not be approvable. If the crossing would be required within or between developments for safety purposes, please provide documentation from the local municipality or emergency services to support this claim. 15. As previously requested, further information is need for the justification of impacts at the areas R4 and R9. In the City of Wendell letter, they reference R8, R3, R4, and R2 as the necessary impacts for interconnectivity. However, R4 and R9 were not mentioned as necessary impacts for interconnectivity. Please revise your plans eliminating impacts R4 and R9. 16. This office believes that the greenway trail can be bridged to avoid the stream and buffer impacts. Please revise your plans to avoid the impacts. 17. The DWQ still has concerns regarding the proposed interchange and Wendell Falls Parkway. John Hennessy, Supervisor, with the DWQ-TPU unit will be formalizing these concerns and a follow-up "Request For More Information" letter will be forthcoming. Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and to provide us with a date that we may expect to receive this requested information. If we do not receive this requested information within one week of the date you indicate it will be forthcoming, your project will be withdrawn and you will need to reapply with a new application and a new fee. Please contact me in writing and Lauren Cobb of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919- 733-1786, or John Hennessy at 919-733-5694, if you have any questions regarding or would like to set up a meeting to discuss this matter. Mercury Development, LLC Page 4 of 4 March 27, 2007 Sin.~erely, /! CCU., Cy di Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/ijm cc: John Hennessy, Supervisor, DWQ-TPU Central Office Lauren Cobb, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Todd Preuninger, Withers & Ravenel, 111 MacKenan Drive, Cary, NC 27511 Filename: 061617W endellFa lls(W a ke)On_Hold3