HomeMy WebLinkAbout20171156 Ver 1_IRT Review Request As-Built Baseline MR_20200812Strickland, Bev
From:
Sent:
To:
Cc:
Subject:
Attachments:
Follow Up Flag:
Flag Status:
Casey, Erin, Kim and Todd;
Wiesner, Paul
Wednesday, August 12, 2020 2:46 PM
Haywood, Casey M CIV USARMY CESAW (USA); Davis, Erin B; Kim Browning; Tugwell,
Todd J CIV USARMY CESAW (US)
Allen, Melonie; Reid, Matthew; Kayne Van Stell; tomsic@waterlandsolutions.com;
Harmon, Beth; Stanfill, Jim
IRT Review Request: As -Built Baseline Monitoring Report (MYO) - Horne Creek
Tributaries (DMS#100026) - (SAW-2017-01510) (DWR#20171156) - Yadkin 03040101
(Surry County)
Horne Creek_100026_STR_Initial Release.pdf
Follow up
Flagged
The FINAL As -Built Baseline Monitoring Report and Record Drawings for the Horne Creek Tributaries Site (DMS# 100026)
were received by DIMS on August 10, 2020 and posted to the IRT SharePoint site and DWR Laserfiche on August 10, 2020
for your review.
2020 is Monitoring Year 1 for this project. The credit ledger for the 30% release is attached for your review.
DMS requests that the IRT conduct a site visit as part of the IRT MYO review. At your convenience, please let us know
any potential dates for a site visit.
Pro iect information and location of the FINAL As -Built Baseline Monitorine Resort (MYO):
Horne Creek Tributaries Site
DIMS Project # 100026
RFP# 16-006993 — Issued 9/16/2016
Institution Date: 5/25/2017 — Full Delivery
Yadkin River Basin
Cataloging Unit 0304101
Surry County, North Carolina
Mitigation Plan Protect Credits:
5,389.000 SMUs (warm)
As-Built-MYO Protect Credits:
5,389.000 SMUs (warm)
Mitigation Plan Lengths/ Acreages:
5,428 ft.
As-Built-MYO Lengths/ Acreages:
5,428 ft.
FD Provider: Water & Land Solutions — Contact: Christopher Tomsic, tomsic@waterlandsolutions.com, (828) 493-3287
1
NCDEQ- DMS PM: Matthew Reid, matthew.reid@ncdenr.gov, (828)-231-7912
FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS Share Point site
here:
IRT-DMS SharePoint Page (Updated):
https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx
HorneCrk_100026_MYO_2020. pdf
https://ncconnect.sharepoi nt.com/sites/I RT-
DMS/AsBuilt%20Report%20%20Drawing/Forms/Allltems.aspx?id=%2Fsites%2FIRT%2DDMS%2FAsBuilt%20Report%20/
20Drawi ng % 2FHorne % 20Creek% 20% 28100026% 29 % 2FHorneCrk%5F100026%5FMYO%5F2020%2Epdf&pa re nt=%2Fsites
%2FIRT%2DDMS%2FAsBuilt%2OReport%20%2ODrawing%2FHorne%2OCreek%20%28100026%29
HorneCrk_100026_AB_2020. pdf
https://ncconnect.sharepoi nt.com/sites/I RT-
DMS/AsBuilt%20ReDort%20%20Drawinia/Forms/Allltems.aspx?id=%2Fsites%2FIRT%2DDMS%2FAsBuilt%20ReDort%20%
20Drawi ng% 2FHorne%20Creek%20%28100026%29% 2FHorneCrk%5F100026%5FAB%5F2020%2Epdf&parent=%2Fsites%
2FIRT% 2DDMS% 2FAsBuilt%20Report%20%20Drawi ng%2FHorne%20Creek%20%28100026%29
Please let me know if you have questions or call to discuss.
Thanks
Paul Wiesner
Western Regional Supervisor
North Carolina Department of Environmental Quality
Division of Mitigation Services
828-273-1673 Mobile
Pau l.wiesnera-ncdenr.gov
Western DMS Field Office
5 Ravenscroft Drive
Suite 102
Asheville, N.C. 28801
D E
Q
OwfN MF1ry�/A��%
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Mitigation Project Name Horne Creek Tributaries USACE Action ID 2017-01510
DMS ID 100026 DWR Permit 2017-1156
River Basin Yadkin Date Project Instituted 5/25/2017
Cataloging Unit 03040101 Stream/Wet. Service Area Yadkin 03040101
County Surry Date Printed 8/4/2020
Signature of Official Approving Credit Release
Credit Release Milestone
Warm Stream Credits
Project Credits
Scheduled
o
Releases /
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
#Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
1,616.700
1,616.700
0.000
1,616.700
2020
8/4/2020
3 - Year 1 Monitoring
10.00%
538.900
2021
4 - Year 2 Monitoring
10.00%
538.900
2022
5 - Year 3 Monitoring
10.00%
538.900
2023
6 - Year 4 Monitoring
5.00%
269.450
2024
7 - Year 5 Monitoring
10.00%
538.900
2025
8 -Year 6 Monitoring
5.00%
269.450
2026
9 -Year 7 Monitoring
10.00%
538.900
2027
Stream Bankfull Standard
10.00%
538.900
Totals
1,616.700
Total Gross Credits
5,389.000
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1,616.700
Total Percentage Released
30.00%
Remaining Unreleased Credits
3,772.300
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Warm Stream
Restoration
5,344.000
Warm Stream
Enhancement II
84.000
Page 1 of 2
Mitigation Project Name Horne Creek Tributaries USACE Action ID 2017-01510
DMS ID 100026 DWR Permit 2017-1156
River Basin Yadkin Date Project Instituted 5/25/2017
Cataloging Unit 03040101 Stream/Wet. Service Area Yadkin 03040101
County Surry Date Printed 8/4/2020
Debits
Warm Stream
Restoration
Credits
Beginning Balance (mitigation credits)
5,389.000
Released Credits
1,616.700
Unrealized Credits
0.000
Converted Credits
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE
Permit #
DWR Permit
#
DCM Permit
#
Remaining Balance (Released credits)
1,616.700
Remaining Balance (Unreleased credits)
3,772.300
Total Remaining Balance (Released and Unreleased credits)
5,389.000
Page 2 of 2