HomeMy WebLinkAbout20181349 Ver 1_IRT Review Request_20200818Strickland, Bev
From:
Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>
Sent:
Tuesday, August 18, 2020 8:03 AM
To:
Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B; Wilson, Travis W.; Bowers,
Todd; Haywood, Casey M CIV USARMY CESAW (USA); Byron Hamstead; Leslie, Andrea
J; Merritt, Katie; Jones, M Scott (Scott) CIV USARMY CESAW (USA); McLendon, C S CIV
USARMY CESAW (USA); Crumbley, Tyler A CIV USARMY CESAW (USA); Kim Browning
Cc:
Allen, Melonie; Reid, Matthew; Tim Morris; Adam Spiller; Wiesner, Paul; Stanfill, Jim;
Harmon, Beth
Subject:
[External] [Non-DoD Source] IRT Review Request: As -Built Baseline Monitoring Report
(MYO) - Mill Dam Creek Restoration Project (DMS#97136) - (SAW-2016-01335)
(DWR#20181349) - Yadkin 03040101 (Yadkin County)
Follow Up Flag: Follow up
Flag Status: Completed
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good morning,
The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section
332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT
review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day
comment deadline shown below. When providing comments please indicate if your concerns are great enough that you
recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may
not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
15-Day Comment Start Date: August 18, 2020
15-Day Comment Deadline: September 02, 2020
45-Day Credit Release Approval Deadline: October 02, 2020
Protect information and location of the FINAL As -Built Baseline Monitoring Report (MYO):
Mill Dam Creek Restoration Site
DMS Project # 97136
RFP# 16-006706 — Issued 10/21/2015
Institution Date: 5/23/2016 — Full Delivery
Yadkin River Basin
Cataloging Unit 0304101
Yadkin County, North Carolina
Mitigation Plan Protect Credits:
10,290.000 SMUs (warm)
As-Built-MYO Protect Credits:
10,290.666 SMUs (warm)
(Minor credit change due to a rounding error in the IRT approved mitigation plan)
Mitigation Plan Lengths/ Acreages:
13,506 linear ft.
As-Built-MYO Lengths/ Acreages:
13,505 linear ft.
FD Provider: KCI Associates of NC, PA — Contact: Tim Morris, tim.morris@KCI.com, (919)-783-9214
NCDEQ- DIMS PM: Matthew Reid, matthew.reid@ncdenr.gov, (828)-231-7912
FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site
here:
IRT-DMS SharePoint Page (Updated):
https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx
M i I I Dam_97136_MYO_2020. pdf
https://ncconnect.sharepoint.com/sites/IRT-
DMS/AsBui lt%20Report%20%2ODrawi ng/Mi 11%20Dam%20(97136)/Mi I I Dam 97136 MYO 2020.pdf
M i I I Dam_97136_AB_2020. pdf
https://ncconnect.sharepoint.com/sites/IRT-
DMS/AsBui lt%20Report%20%2ODrawi ng/Mi 11%20Dam%20(97136)/Mi I I Dam 97136 AB 2020.pdf
Please contact the Mitigation Office if you have any questions.
V/ r,
Casey Haywood
Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1
BUILDING STRONG