Loading...
HomeMy WebLinkAbout20181349 Ver 1_IRT Review Request As-Built Baseline MR_20200810Strickland, Bev From: Sent: To: Cc: Subject: Attachments: Follow Up Flag: Flag Status: Casey, Erin, Kim and Todd; Wiesner, Paul Monday, August 10, 2020 3:20 PM Haywood, Casey M CIV USARMY CESAW (USA); Davis, Erin B; Kim Browning; Tugwell, Todd J CIV USARMY CESAW (US) Allen, Melonie; Reid, Matthew; Tim Morris; Adam Spiller; Stanfill, Jim; Harmon, Beth IRT Review Request: As -Built Baseline Monitoring Report (MYO) - Mill Dam Creek Restoration Project (DMS#97136) - (SAW-2016-01335) (DWR#20181349) - Yadkin 03040101 (Yadkin County) Mill Dam Creek_97136_YD 101_STR_Initial Release.pdf Follow up Flagged The FINAL As -Built Baseline Monitoring Report and Record Drawings for the Mill Dam Creek Restoration Project (DMS# 97136) were received by DIMS on July 27, 2020 and posted to the IRT SharePoint site and DWR Laserfiche on July 27, 2020 for review. 2020 is Monitoring Year 1 for this project. The credit ledger for the 30% release is attached for your review. Pro iect information and location of the FINAL As -Built Baseline Monitorine Report (MY0): Mill Dam Creek Restoration Site DIMS Project # 97136 RFP# 16-006706 — Issued 10/21/2015 Institution Date: 5/23/2016 — Full Delivery Yadkin River Basin Cataloging Unit 0304101 Yadkin County, North Carolina Mitigation Plan Protect Credits: 10,290.000 SMUs (warm) As-Built-MYO Protect Credits: 10,290.666 SMUs (warm) (Minor credit change due to a rounding error in the IRT approved mitigation plan) Mitigation Plan Lengths/ Acreages: 13,506 linear ft. As-Built-MYO Lengths/ Acreages: 13,505 linear ft. FD Provider: KCI Associates of NC, PA — Contact: Tim Morris, tim.morris@KCI.com, (919)-783-9214 NCDEQ- DIMS PM: Matthew Reid, matthew.reid@ncdenr.gov, (828)-231-7912 1 FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS Share Point site here: IRT-DMS SharePoint Page (Updated): https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx M i I I Dam_97136_MYO_2020. pdf https://ncconnect.sharepoint.com/sites/IRT DMS/AsBuilt%20Report%20%2ODrawing/Mill%2ODam%20(97136)/MiI I Dam 97136 MYO 2020.pdf M i I I Dam_97136_AB_2020. pdf https://ncconnect.sharepoint.com/sites/IRT DMS/AsBuilt%20Report%20%2ODrawing/Mill%2ODam%20(97136)/MiI I Dam 97136 AB 2020.pdf Please let me know if you have questions or call to discuss. Thanks Paul Wiesner Western Regional Supervisor North Carolina Department of Environmental Quality Division of Mitigation Services 828-273-1673 Mobile Pau l.wiesnera-ncdenr.gov Western DMS Field Office 5 Ravenscroft Drive Suite 102 Asheville, N.C. 28801 pwltiTy rin/1�/iTl��� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Mitigation Project Name Mill Dam Creek Restoration USACE Action ID 2016-01335 DMS ID 97136 DWR Permit 2018-1349 River Basin Yadkin Date Project Instituted 5/23/2016 Cataloging Unit 03040101 Stream/Wet. Service Area Yadkin 03040101 County Yadkin Date Printed 8/7/2020 Signature of Official Approving Credit Release Credit Release Milestone Warm Stream Credits Project Credits Scheduled o Releases / Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Actual Release Date 1 -Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 3,087.200 3,087.200 0.000 3,087.200 2020 7/27/2020 3 - Year 1 Monitoring 10.00% 1,029.067 2021 4 - Year 2 Monitoring 10.00% 1,029.067 2022 5 - Year 3 Monitoring 10.00% 1,029.067 2023 6 - Year 4 Monitoring 5.00% 514.533 2024 7 - Year 5 Monitoring 10.00% 1,029.067 2025 8 -Year 6 Monitoring 5.00% 514.533 2026 9 -Year 7 Monitoring 10.00% 1,029.067 2024 Stream Bankfull Standard 10.00% 1,029.067 Totals Total Gross Credits 10,290.666 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 3,087.200 Total Percentage Released 30.00% Remaining Unreleased Credits 7,203.466 Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 7,166.000 Warm Stream Enhancement I 2,209.000 Warm Stream Enhancement II 4,130.000 Page 1 of 2 Mitigation Project Name Mill Dam Creek Restoration USACE Action ID 2016-01335 DMS ID 97136 DWR Permit 2018-1349 River Basin Yadkin Date Project Instituted 5/23/2016 Cataloging Unit 03040101 Stream/Wet. Service Area Yadkin 03040101 County Yadkin Date Printed 8/7/2020 Debits Warm Stream Restoration Credits Beginning Balance (mitigation credits) 10,290.666 Released Credits 3,087.200 Unrealized Credits 0.000 Converted Credits 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 3,087.200 Remaining Balance (Unreleased credits) 7,203.466 Total Remaining Balance (Released and Unreleased credits) 10,290.666 Page 2 of 2