HomeMy WebLinkAbout20180196 Ver 1_Notice of FINAL As-Built MR and Record Drawings Review_20200729Strickland, Bev
From: Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>
Sent: Wednesday, July 29, 2020 3:50 PM
To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B; Wilson, Travis
W.; Byron Hamstead; Bowers, Todd; Munzer, Olivia; Jones, M Scott (Scott) CIV
USARMY CESAW (USA); Steve Kichefski; Crumbley, Tyler A CIV USARMY CESAW (USA);
McLendon, C S CIV USARMY CESAW (USA)
Cc: Crocker, Lindsay; Dow, Jeremiah J
Subject: [External] RE: Notice of FINAL As-Built/MYO Baseline Monitoring Report and Record
Drawings Review/ NCDMS Catfish Stream Mitigation Site/ Davie Co./
SAW-2017-01506
Follow Up Flag: Follow up
Flag Status: Completed
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good afternoon,
I hope this email finds you well. The below referenced FINAL Record Drawing (As -Built) Report review has been
requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review
process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any
comments by 5 PM on the 15-day comment deadline shown below. If any IRT member would like to schedule a field visit
prior to credit release then all comments will be due 15 days after the site visit occurs. When providing comments
please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments
provided after the 15-day comment deadline (shown below) may not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
15-Day Comment Start Date: July 29, 2020 15-Day Comment Deadline: August 13, 2020 45-Day Credit Release Approval
Deadline: September 12, 2020
Project Information:
Name: Catfish Pond Mitigation Site
USACE ID: SAW-2018-00424
INN IffiellypX411
Institution Date: 6/21/2017 — Full Delivery
DMS Project#: 100039
River Basin: Neuse
CU#: 03020201
County: Durham
Mit Plan Assets: 3,748.800 SMUs & 522,327.500 RBMU
As -built Assets: 3,745.200 SMUs & 523,358.865 RBMU
Provider: Wildlands
DMS PM: Jeremiah Dow ieremiah.dow@ncdenr.gov
Minor change in As -Built stream length on Catfish Creek Reach 6 due to stream alignment modifications for bedrock in the
floodplain. Change reduced overall reach length by 10 ft. No change in project stream credits from Mitigation Plan is
requested.
Link to IRT SharePoint Page
**Drone/video is available for this site**
Please contact the Mitigation Office if you have any questions.
V/ r,
Casey Haywood
Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1
BUILDING STRONG