Loading...
HomeMy WebLinkAbout20180196 Ver 1_Notice of FINAL As-Built MR and Record Drawings Review_20200729Strickland, Bev From: Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil> Sent: Wednesday, July 29, 2020 3:50 PM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B; Wilson, Travis W.; Byron Hamstead; Bowers, Todd; Munzer, Olivia; Jones, M Scott (Scott) CIV USARMY CESAW (USA); Steve Kichefski; Crumbley, Tyler A CIV USARMY CESAW (USA); McLendon, C S CIV USARMY CESAW (USA) Cc: Crocker, Lindsay; Dow, Jeremiah J Subject: [External] RE: Notice of FINAL As-Built/MYO Baseline Monitoring Report and Record Drawings Review/ NCDMS Catfish Stream Mitigation Site/ Davie Co./ SAW-2017-01506 Follow Up Flag: Follow up Flag Status: Completed External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good afternoon, I hope this email finds you well. The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. If any IRT member would like to schedule a field visit prior to credit release then all comments will be due 15 days after the site visit occurs. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: July 29, 2020 15-Day Comment Deadline: August 13, 2020 45-Day Credit Release Approval Deadline: September 12, 2020 Project Information: Name: Catfish Pond Mitigation Site USACE ID: SAW-2018-00424 INN IffiellypX411 Institution Date: 6/21/2017 — Full Delivery DMS Project#: 100039 River Basin: Neuse CU#: 03020201 County: Durham Mit Plan Assets: 3,748.800 SMUs & 522,327.500 RBMU As -built Assets: 3,745.200 SMUs & 523,358.865 RBMU Provider: Wildlands DMS PM: Jeremiah Dow ieremiah.dow@ncdenr.gov Minor change in As -Built stream length on Catfish Creek Reach 6 due to stream alignment modifications for bedrock in the floodplain. Change reduced overall reach length by 10 ft. No change in project stream credits from Mitigation Plan is requested. Link to IRT SharePoint Page **Drone/video is available for this site** Please contact the Mitigation Office if you have any questions. V/ r, Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 BUILDING STRONG