Loading...
HomeMy WebLinkAboutNCC201875_Modification Review_20200818Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 8/18/2020 1:04:18 PM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 8/18/2020 4:51:35 PM (Construction COC ADD TO FILE Review- NCC201875) • The task was assigned to Georgoulias, Bethany. The due date is: August 21, 2020 5:00 PM 8/18/2020 1:04 PM Y . Ta4M1 NORTH CAPOLINA EnYlrenmemf& Qualay Certificate of NCC201875 Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters) No.* Information associated with this permit Project Name Albemarle Beach Solar Farm - Phase B Address Cross Rd., Roper, NC County Washington Latitude 35.9132 Longitude -76.6271 Permittee Listed Albemarle Beach Solar, LLC Legally Responsible Kenny Habul Individual NC Reference No. NCG01-2020-1875 E&SC Plan ID Washi-2020-006 Original NOI 25248 Tracking No.* Date COC Issued* 05/11/2020 Prior Rescission This field will populate only if CCChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * r Additional Lots/Outparcels Approved - E&SC Revised F Other Revision(s) to E&SC Plan r Legally Responsible Individual Has Changed r Multiple Reasons (List) Addional Mire information if necessary Explanation Addition to Limits of Disturbance You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Docurrentation (%vised IRSCApproval, (lose -Cut Doc, etc.) Documentation Washi-2020-006 Revision Albemarle Beach Solar 765.05KB Farm - Phase B - 08172020 (REV).pdf Wst be FDFfornat North Carolina General Statute 143-215.6113 (i) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand dollars ($10,000). � I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual f Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Kenny Habul Title * Manager Organization* Albemarle Beach Solar, LLC Date * 08/18/2020 Email Address* Kenny@sunenergy1.com En -ail for confin-ration Telephone Number* 704-662-0375 Contact nunber if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email jeffrey.mcdermott@sunenergy1.com (Optional) Additional en -ail for confin-ation Original Permittee Kenny@SunEnergy1.com Email Original Site Contact jeffrey.mcdermott@SunEnergy1.com Email Review Date 08/18/2020 Rescinded Since Submitted? Request Date 20200818 Formatted Review Date 20200818 Formatted