NCDEQ Coal Ash Impoundment Closure Plan
Decision
HF Lee Energy Complex
August 14, 2020
HF LEE CLOSURE PLAN DECISION —AUGUST 14, 2020
NCDEQ Coal Ash Impoundment Closure Plan Decision — H. F. Lee Energy Complex
On December 31, 2019, Duke Energy submitted its proposed Closure Plan for the H. F.
Lee Energy Complex ("H. F. Lee") as required by the Coal Ash Management Act ("CAMA").
The North Carolina Department of Environmental Quality ("NCDEQ") conducted a thorough
evaluation of this proposed Closure Plan. In addition to its own evaluation, NCDEQ held a public
hearing, circulated the proposed closure plan for public comment, reviewed written public
comments and analyzed site specific information provided by Duke Energy and the public.' Based
on this evaluation, NCDEQ finds that the proposed Closure Plan is protective of public health,
safety, and welfare; the environment; and natural resources and generally complies with the
requirements of CAMA. Consequently, NCDEQ hereby approves the implementation of the
proposed Closure Plan for H.F. Lee.
Background:
CAMA, enacted in August 2014, required that NCDEQ develop proposed classifications
for all coal combustion residuals (CCR) surface impoundments, including active and retired sites,
for the purpose of closure and remediation based on these sites' risks to public health and the
environment. In July 2016, the North Carolina General Assembly enacted House Bill 630, which
added N.C.G.S. § 130A-309.216 requiring Duke Energy to identify three sites in North Carolina
at which to install and operate ash beneficiation projects capable of processing CCR to
specifications appropriate for cementitious products. The statute requires Duke Energy to use
commercially reasonable efforts to produce 300,000 tons of usable CCR at each site annually. On
December 13, 2016, Duke Energy selected H.F. Lee as one of the three ash beneficiation sites.
Pursuant to subsection (c) of N.C.G.S. § 130A-309.216, CCR surface impoundments located at a
site at which an ash beneficiation project is installed and operating shall be closed no later than
December 31, 2029.
Public process for the proposed Closure Plan:
CAMA required that NCDEQ put the proposed Closure Plan to public notice and conduct
a public meeting to explain the Plan. NCDEQ held the public meeting for H.F. Lee on February
11, 2020 and provided a public comment period through March 3, 2020. One person provided
comment at the hearing and NCDEQ received one additional comment via email during the
comment period. The comments consisted of requests for mitigation of harms to the surrounding
community; for clear information on who will be monitoring air and water releases from the
operation; for parties other than Duke to do the monitoring; for alerts to the community when spills
or other unintended releases occur; for efforts to prevent any further spills, and for financial health-
' The Hearing Officer's Report with NCDEQ response to comments is included as Attachment 1. Public
comments are included in the Hearing Officer's Report. Additional information reviewed by NCDEQ
includes, among other things, environmental data contained in the comprehensive site assessment and
proposed corrective action plan, permit requirements, the closure options analysis, ongoing groundwater
monitoring, groundwater modeling provided by Duke Energy, NCDEQ's Closure Determination for H.F.
Lee, and other data relevant to the CAMA requirements.
HF LEE CLOSURE PLAN DECISION - AUGUST 14, 2020
related benefits to be provided to surrounding residents. A discussion of the substantive concerns
raised in these comments is included as part of the hearing officer's report.
Evaluation of Closure Plan:
CAMA establishes criteria for NCDEQ's evaluation of Closure Plans. Specifically,
CAMA provides that NCDEQ "shall disapprove a proposed Coal Combustion Residuals Surface
Impoundment Closure Plan unless the Department finds that the Closure Plan is protective of
public health, safety, and welfare; the environment; and natural resources and otherwise complies
with the requirements of this Part." N.C. Gen. Stat. § 130A-309-214(c). CAMA sets forth a list
of required contents for Closure Plans, including engineering drawings, schematics, and
specifications for the proposed Closure Plan, a description of the provisions for the final
disposition of the coal combustion residuals, groundwater modeling, and a description of the plan
for post -closure monitoring and care for an impoundment for a minimum of 30 years.
NCDEQ finds that under CAMA, Duke Energy's proposed Closure Plan for H.F. Lee is
protective of public health, safety, welfare, the environment, and natural resources. In the Closure
Plan, Duke Energy proposes to excavate the coal ash in the CCR impoundments, which NCDEQ
has determined is the most environmentally protective closure option. Because the coal ash will
be excavated, there will not be any primary contaminant source remaining that can continue to
leach contaminant into groundwater. Further, without the coal ash in place, there will be additional
options available for remediating contaminated groundwater. As explained in the H.F. Lee
Closure Determination, "removing the primary source of groundwater contamination will reduce
uncertainty and allow for flexibility in the deployment of future remedial measures." H.F. Lee
Closure Determination, p. 1.
Since a significant portion of the coal ash will be excavated and beneficially reused, the
need to transport coal ash over public roads or by rail car will be minimized. Beneficiation also
obviates the need to locate additional communities to accept coal ash.
NCDEQ further finds that Duke Energy's proposed Closure Plan for H.F. Lee complies
with the other requirements of CAMA. Specifically, NCDEQ has determined that Duke Energy
has generally included all required elements of a Closure Plan (either directly or through
incorporation by reference of the proposed Corrective Action Plan for H.F. Lee),2 including the
following:
• site history and history of site operations;
• site maps;
• results of a hydrogeologic, geologic, and geotechnical investigation of the site;
• results of groundwater modeling at the site;
• engineering drawings, schematics, and specifications for the proposed Closure Plan;
• a description of the construction quality assurance and quality control program to be
implemented in conjunction with the Closure Plan;
• a description of the provisions for disposal of wastewater and management of stormwater
2 Note that this document does not constitute an approval of the proposed corrective action plan for H.F.
Lee or any element thereof, NCDEQ will review and take action on that proposal in a separate decisional
document.
HF LEE CLOSURE PLAN DECISION -AUGUST 14, 2020 IN
and the plan for obtaining all required permits;
• a list of required permits;
• a description of the provisions for the final disposition of the coal combustion residuals;
• a description of the plan for post -closure monitoring and care for an impoundment for a
minimum of 30 years;
• an estimate of the milestone dates for all activities related to closure and post -closure;
• projected costs of assessment, corrective action, closure, and post -closure care; and
• a description of the anticipated future use of the site and the necessity for the
implementation of institutional controls following closure.
N.C. Gen. Stat. § 130A-309.214(a)(4). However, NCDEQ noted that Duke Energy did not submit
an updated Comprehensive Site Assessment (CSA) and CAP that would be sufficient to provide
compliance with the applicable requirements under 130A-309.214(a)(4)(c) and (d) and Title 15A of
the North Carolina Administrative Code Subchapter 02L. It should be noted that per NCDEQ's letter
to Duke Energy dated February 26, 2020, the updated CSA is due December 1, 2020.
Conclusion:
NCDEQ approves the implementation of the proposed Closure Plan for H.F. Lee based on
its finding that this Plan "is protective of public health, safety, and welfare; the environment; and
natural resources and generally complies with the requirements of CAMA" and that an updated
CSA will be submitted December 1, 2020 followed by an updated CAP.
HF LEE CLOSURE PLAN DECISION -AUGUST 14, 2020