Loading...
HomeMy WebLinkAbout20011188 Ver 1_Complete File_20010806Michael F. Easley Governor r William G. Ross, Jr., Secretary Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality DWQ Project o.: [7 (I 18 a County: A"T4u 6 0 Applicant: I 'D s'7. 2. Project Name: 5 22 EES b7 /cat SSG Date of Issuance of 401 Water Quality Certification: US7 / D ZDo / "NN Certificate of Completion . j ' Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621.This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer.It is not necessary to send certificates from all of these. Applicant's Certification I, 2!4e,,92 4 C-, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature. Date: Agent's Certification I, . hereby state that, to the best of my abilities, due care.and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, . as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, ect.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date ?t? NOD ENtR Division of Water Quality Wetlands/401 Unit: (919) 733-1786 Fax: (919) 733-6893 1650 Mail Service Center Raleigh, NC 27699-1650 WAlF Michael F. Easley, Governor \O?O RQG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D. > Acting Director .? Division of Water Quality August 10, 2001 Watauga County DWQ Project No. 011188 SR 1226 (Reese Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. Heath Slaughter, Division Environmental Officer NCDOT Division 11 P.O. Box 250 North Wilkesboro, NC 28659 Dear Mr. Slaughter: You have our approval, in accordance with the attached conditions and those listed below, to impact 90 linear feet of Jones Branch and its unnamed tributaries in order to improve SR 1226 (Reese Road) in Watauga County. The project must be constructed in accordance with your application dated 31 July 2001 (received 6 August 2001). After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No. 3289, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you must acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. In-stream work and land disturbance within the 25-foot wide buffer zone are prohibited during the rainbow trout spawning season of January 1 through April IS, or as otherwise determined by the North Carolina Wildlife Resources Commission, to protect the egg and fry stages of trout from sedimentation during construction 2. Stormwater must be directed to buffer areas or retention basins and must not be routed directly into streams. 3. Sediment and erosion control measures shall adhere to the design standards for sensitive watersheds [15A NCAC 4B .0024]. 4. Temporary or permanent herbaceous vegetation must be planted on all bare soil within 10 days of ground-disturbing activities to provide long term erosion control. 5. All culverts required for this project shall be installed in such a manner that the original stream profile are not altered (i.e. the depth of the channel must not be reduced by a widening of the streambed). Existing stream dimensions are to be maintained above and below locations of culvert extensions. 6. All work shall be performed during low flow conditions. North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), httpl/h2o.enr.state.nc.us/ncwetiands/ 7. Disturbance of the stream channel must be limited to only what is necessary to perform the culvert installation. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 8. Mowing of existing vegetated buffers is strongly discouraged, so that they may be utilized for storm water sheet flow. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715 or Ms. Jennifer Frye of the Winston-Salem Regional Office at 336.771.4600. Sincerely, Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Asheville Field Office NCDWQ Winston-Salem Regional Office Central Files File Copy e y. sort a? STATE OF NORTH CAROLINA ? i DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY P. O. Box 25201, Raleigh, NC 27611-5202 LYNDO TIPPETF GOVERNOR Pf ioNE: 919-733-2520 SECRETARY Mrs. Jean Manuele U. S. Army Corps of Engineers Raleigh Regulatory Field Office 6508 Falls of Neuse Road, Suite 120 Raleigh, NC 27615 Subject: Nationwide Permit 914 July 31, 2001 SR 1226 (Reese Road) Watauga County, North Carolina Project Number: 6.752071T Dear Mrs. Manuele: p 'SSUED The NC Department of Transportation is scheduled to grade, drain, base, and pave primarily along the existing roadway of SR 1226 (Reese Road) in Watauga County. Total project length is approximately 0.9 miles. This project will require the replacement of four (4) wet cross lines as shown below: 1) Replace existing 30' x 24" CMP at station 24+20 with a 40'x 48" CMP. 2) Replace existing 30' x 48" RCP at station 28+15 with a 40' x 48" CMP. 3) Replace existing 20' x 18" CMP at station 34+00 with a 40' x 24" CMP. 4) Replace existing 30' x 24" CMP at station 42+40 with a 40' x 48" CMP. Miscellaneous rip-rap impacts will total 40 linear feet or less (approximately 10 feet per crossing). New stream impacts = 90 In. feet. Construction of the project will necessitate impacts to waters of the United States in the Watauga River Basin. The crossing at station 28+15 carries Jones Branch. All of the remaining wet cross lines carry different perennial unnamed tributaries to Jones Branch (Class: Q. The Division 11 Environmental Officer reviewed this project for the presence of threatened and endangered species on July 30, 2001. The subject project has been determined to have no effect on any listed threatened or endangered plant or animal species. P. O. Box 250, N. WILKESBORO, NC 28659 PHONE (336) 667-9111 FAX (336) 667-4549 ?? %^ Mrs. Jean Manuele SR 1226 (Reese Road) Page 2 July 30, 2001 According to the NCDOT web site, the NCDOT Historical Architecture Section has reviewed this project and determined that there are no NR/SL/DOE projects along this roadway that will be impacted by the proposed project. Since this is an existing roadway, the minor modifications proposed in this application should not remove or degrade existing water quality uses. Much of the existing roadway lies within the 25 foot wide buffer zone of Jones Branch and/or its UTs. As a result, any widening of the existing roadway will be directed away from any adjacent creek whenever possible with minimum fill placed in any buffer area. A small berm will be constructed along the edge of the road closest to any adjacent stream in order to minimize sedimentation impacts. Pipe sizes used will be the minimum necessary to create a safe roadway. By utilizing the erosion control measures outlined in the attachments to this application, downstream water quality standards will be protected. Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control measures, a marked county map, a marked topography map and photographs. A trout buffer variance from the Division of Land Quality is not required since this Jones Branch and its UTs are classified as Class: C waters. By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with the North Carolina Wildlife Resources Commission comment directly to you concerning the 404 Nationwide Permit application with a copy sent to me. By copy of this letter, I am forwarding seven (7) copies of this application package to Cynthia Van Der Wiele, NCDENR, Division of Water Quality, 401/Wetland Unit, for her review. A $200.00 check is enclosed for the 401 certification processing fee. It is requested that any comments related to the 401 certification be forwarded directly to the Corps with a copy sent to me. We would like to begin construction as soon as possible. If further information is required, please let me know. Your early review and consideration will be greatly appreciated. Sincerely, 7o Heath Slaughter Division Environmental Officer 4 x? Enclosures Mrs. Jean Manuele SR 1226 (Reese Road) Page 3 July 30, 2001 cc: Jean Manuele, US Army Corps of Engineers (1 additional copy) Ron Linville, Western Piedmont Region Coordinator, NCWRC Brian Cole, US Fish and Wildlife Service Cynthia Van Der Wiele, Division of Water Quality (7 copies) R. C. McCann, PE, Division Engineer Martin Bolick, District Engineer Johnny Brown, County Maintenance Engineer Heath Slaughter, Division Environmental Officer Neil Trivette, Area Roadside Environmental Engineer Office Use Only: Form Version April 2001 01 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. L Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ® 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: P. O. Box 250, North Wilkesboro, NC 28659 Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239 E-mail Address: hslau hterndot.state, nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Heath Slaughter, Division Environmental Officer Company Affiliation: North Carolina Department of Transportation Mailing Address: P. O. Box 250, North Wilkesboro, NC 28659 Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239 E-mail Address: hslaughter a dot. state. nc.us III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1226, Reese Road 2. T.I.P. Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Watauga Nearest Town: Reese (,NW Watauga County) Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From Reese, travel north on SR 1221. Turn left onto SR 1226. 5. Site coordinates, if available (UTM or Lat/Long): UTM: 17 426659E 4021612N (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Residential/Farm 7. Property size (acres): Approximately 2.15 acres. 8. Nearest body of water (stream/river/sound/ocean/lake): _ Jones Branch and UTs (Class: C). 9. River Basin: Watauga (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) "- -- 4 10. Describe the purpose of the proposed work: Improvement of SR 1226. 11. List the type of equipment to be used to construct the project:_ Trackhoe, backhoe, and motor grader. 12. Describe the land use in the vicinity of this project: Residential/Farm IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. r%__.. r -rill 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres) Located within 100-year Floodplain** (cs/no Distance to Nearest Stream linear feet) Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. *• 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http /htiltiw.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: 0 acres Total area of wetland impact proposed: 0 acres 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Strea m Before Impa Perennial or Intermittent? (please specify) Station No. 24+20 Pipe replacement 10 feet UT #1 of Jones Branch 3 feet Perennial Station No. 28+15 Pipe replacement 10 feet Jones Branch 3 feet Perennial Station No. 34+00 Pipe replacement 20 feet UT #2 of Jones Branch 2 feet Perennial Station No. 42+40 Pipe replacement 10 feet UT #3 of Jones Branch 3 feet Perennial All of the above Miscellaneous placemen -rap for t stabilization 40 feet or less. per feet crossing) Jones Branch and UTs 2-3 feet Perennial List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be includes. Strewn names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at wv' Ne.us's."1OV. Several Internet sites also allow direct download and printing of USGS maps (e.g., wuNv.tapo7.one.com, xvww maMuest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 901n. ft. of new impacts, n...-- C -C t' 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U. S. Open Water Impact Site Number indicate on ma) Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The existing roadway must be widened to achieve an acceptable section width, thus increasing public safety. The existing pipes must be replaced for the same reason. By utilizing the erosion control measures as shown in the attached drawings, adverse impacts to streams in the area will be minimized. Since this is an existing roadway, the stream impacts cannot be avoided. However, the replacement pipe lengths will be the minimum needed to construct the widened roadway. The roadway will be widened away from Jones Branch and its UTs where possible A small berm will be constructed along the side of the road closest to any adjacent stream to minimize sedimentation impacts. n._..-,-CIIN VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/newetiands/strmgide.htmi. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A r%--.. 0 -C 1 ? 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at htg2lih2o.cnr.state.nc.u-,/«vrr/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No 0 If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Required Zone* (sq uuaarree feet) Multiplier Miti tion 1 3 2 1.5 Total Gone 1 extends out JU Ieet perp=d1CWar trom near bank 01 citattnel; Gone 1 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. XL Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. All appropriate best management practices for sediment and erosion control will be implemented during construction. XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XM. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No r%-- IA _r III YIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). 7/3//0 Applicant/Agent's Signature 41' Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Imdell Mitchell US Army Corps of Engineers Avery Clay Jackson Polk 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes 6508 Falls of the Ncuse Road Ashe Franklin Nash Sunry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones US Army Corps Of Engineers Bertie Dare Lenoir Post Office Box 1000 Camden Gates Martin Washington, NC 27889-1000 Carteret* Green Pamlico Telephone: (252) 975-1616 Chowan Hertford Pasquotank Fax: (252) 975-1399 Craven Hyde Perquimans Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladen Harnett Ponder Post Office Box 1890 Brunswick Hoke Richmond Wilmington, NC 28402-1890 Carteret Montgomery Robeson Telephone: (910) 251-4511 Columbus Moore Sampson Pitt Tyrrell Washington Wayne Union Watauga Yancey Wilson Yadkin *Croatan National Forest Only n.,... 11 c i ll e E s s J + • I • I ii Iv I lo, t. r •3 I ?, ° I ? • 271 r:f 1271 '<A i / A ?• 'N Jt, l ? 1,73 ? I??'J) • -_ .? S i 2Y7 MMuI , \ ? 1271 Iwi? 12:H 1 y'9 n • !?I I -`v-°s ? •? r7 12JI 12- \?" I1 s 1 1211 ?.7 ?•\ IiJ3 \ h It'4 ( Q .. 1_L ! 12 \ 121 `r 1T h • 2 9 1I)S '2 _3 N 103 Ilw j'7 321 IC 1r ?? n2s ? `^I jI IIiJ 112 li?l ?, _ P I _l t-. I 111)' ICS Il?d ? •???•"J?? \\ -I ', \ 1?? ? Q a YCg O 112 r• '\• V (?r ELEv .253 'I '•\ i.•\ I \ 170 L ; 1 1 BEECH IaOVNI.N•1 I` \ ? \,OI. ItI -• 1127 t<` o i PISGAH: j ,P '\ \ '"\111zY \ \ und t1n9 'VJ ? M1 ? V 1 ?ro 71 TC NTV, ELU. ;Z3 , G w V 1?0 \ ` E O (1 •\ 1 0 ? 1 .9\,? hIM2 '\ .ro 1 , \ S\4rE u7Y. EAR •'.C3 / •\ :_EV. 5574 1 E -V.5555 \ a 14 7» \..\c _PI - -\ - •\ 13+0 1 I E_E/.5372 F'el 'her 1 /` / I y `' Sonde a? I \ 6 11S /'t . I Nit i__-?? ?? y 5 y? i t I t ?< t t l?} 1 i ;! t! J, ra i/ 5? 1 ...i` ??..? '? ?' !<t t rt ? ?? : ? yY ? ? ? -`?'fi ? f / r ii 4. r .- 1 '?',! f t ? r f? , •..?. =? r f ? .? Ji 1 / > I t _ ?Gl.1ti `?e? ? t k r( -"'?"•? 1 f i?-.rn ?r® •; f .- ?? ,L' tV?.; 0 'r r-- 1 r /U ? ? ?`-`-=-_ F1 'r f }? I:o Q-, UY, 17, ?f "tip- i r ?, V" .,!0: ?Ir ?itr •? t •?°tp R/ l _:l?'°r ?!' N:V Cr'f •3}??. i r r r /)? ?. 'V{\?_,?„'"'-'f ti/? /.,'lays ?•t'..?t `,y^..ti?,.? ? ?,`J n f 1: ?, .. ,. l f i J 't•... ? r. Ay'1 ? r ? , ? ?t? t ?t "? ? 1_ lr?~~rt7? '"' .,'` -3 ? " /~??. '7 ? '_ ?? ` ??.? ? t ? ~t \.?i?i? •?t mil- -'_ "1 `??f??f?" ? J..?'. ?,?'^`? f l or• ? `.? ?, '??,! ??.. tt}i'.f31???e ^' ,?`?a?'i, ,-JF??? F ?"'t? ??!_r?,_,-?.., ? -?' 1 ; ? + jS{? ? }7 f`f Itlr• l S1\ ?•JE7L,J i"? +-,f ?l r.:.`? ' ? .?, ? r:'._-^ 3?'Q,? t•t4+/7'?i/? - i '?,.{I t ??? :??`? ? ?`',y? r r/,?. jf }1 ?`,{r' ? ..,?.? ? -- r l 'IV ,r_ ?- I i_ J3. :. r `?? 1 ? It-_ ? t ? fr r _Ly • l `- \ r i it s ? i , , ?- } II ? `? y t_ ? ?, 41 ? ? 1 to t ? .?•? t - a ??• '+< ,.. a- ?' } .• ' ', t f t '`. ': ?' ' r' r `, t; `\ r_,_._.: t ? ? ?- ?.r'^ t.' _. , ?iti ,, - ? t' ? r '. ?? Y' ? % r r ? ?,?,? jt 45 •y c U. ??1 t 4 1- 1 f e r, (',,?tr? tl l_ s { 4 t - '. Wig`-'..?+"_ -..-?. QJ i.? - - n -- 1 ? ?i wr, 1 ? 4.l`' ?•,,,,; i ?'r-ll1+? i t \`__•;- _._,_,a,' t?}1. ?-?`? .'- ?_ (i {fit, f',??? I`.ti /".. /J I i ?r Y .: r J t '_ 1 7 T j?\ i ?+( ?\ t r ! / ;. ?-?/r 1 _ /71 ? t i ?- ' ?°; .C"' , _ ?•.} ?-,r s ?? / ?..?/ fr r?1 3 ark ?' y 5?r.-:?. ? ...,: ? ?, ..f 1'r. ta, -?r -? ?v ,?? t4t1.f ,+iS i t tr il! ?? i ` ? t ;./-, ? - , t f j`?.? a ?u'? . ?`?WTµ` ???! `E' .`1i,'\i' 4 `,? ? ? ? ? r L 1 ?` ? ?.. fJ •?-? ,,: ?-.. 't y:'. .'-- ?-.? 1_r•^- ?:.,C+-ZL!/ ?';`t. LS ?JP?:1. .?: t{- 1.1 ,.`.µ Ol t0 (D rt C 3 r V N rn rn 1.17 tD m .A O N r Q1 r N z m 0 °v C Ol CL PC iv a i? O H 0 'LS N 0 CD CD a, ?-3 0 A? 'C3 n `13 >v CD 0 N ?•\ 1?. 11r? `\J, `+I r? /?: '?? !i i ? t? - i? i ??t? •1 i.??-?- ?-? t .u°I ???J\ j,?-?)/I I ?. I?i?/ 1( -? „ram 1 ?? ?._-_'Y)?/.?• ?. ??\ ? J I 0 00 1??0/ 12 ? .. 1`''I ?1 l 0 ?Jl 1\M?1 1. a UHL 212 i ?1?1?' t. LT T 3108 to ` - 12 J,oo ' v ? -? ??• ?' , r,l? ? jy¢aw,rdnm Sch 1' : 1 Hollow= I, Reese 1.1 1 ?( 8M C 123 c } ) ti •?., ?', /' 3026. r ?--Z?_. `r fry O. , - ??- ^RFG 13 \ "1 E 123 i I ?\` \ \ 2900- 1 \h q i ?. j I , Forest rl` M ? arylttiT 342 ? rove © \M G 123 ! 2"?' f,l r L 1 87 c '1 ti )` ?-w? ? \127 \ I l•?? i ? \ I ?' ,Sent _ ?I? . / r NORTH CAROLINA DEPARTMENT OF TRANSPORTATION EROSION AND SEDIMENTATION CONTROL PLAN PROJECT /, ? r-2,9 7/ ,L SR PREPARED BY 4 ?',ren A. APPROVED BY -/ ? COUNTY COUNTY DATE ,) ' r o??Jr7 1 ` s .riptinn Svm nl Page 245.03 Temporary Silt Ditch .............................. n o J VI 245.05 Temporary Diversion VI 4 893.01 Temporary Silt Fence ______ __ VI - 6 890.05 Temporary Slope Drain with Earth Berm .......... --- ? - VI.3 245.01 Silt Basin Type A .-----• .......................... ---------- VI -10 -- 245.02 Silt Basin TYp e B -:- .................................. VI 12 - 892.04 Temporary Rock Silt Check Type-A .......... . _________ __ VI-14 895.10 Temporary Rock Silt Check Type-B __________ __ VI -16 892.01 Temporary Rock Sediment Dam Type-A __ - VI -1s 892.02 Temporary Rock Sediment Dam Type-B -------- - V, - 20 897.01 Rock Pipe Inlet Protection VI-22 894.01 Rock Silt Screen ...................................... ... - --`='=='=--- -- VI-24 245.04 Stilling Basin ........................................ - - ------ - --- -- - 26 Rock Inlet Protection: 896.01 Type A ............................... A ? -- OR •- A ----- VI - 30 896.02 Type B ............................... B •- OR B ;J ----- VI - 32 896.03 Type C ............................... C OR •- C ; ---- VI - 34 Pipe Outlet Energy Dissipator ...... 4010 VI - 35 0000 Inlet/Outlet Protection ............ > "V rc7, 1993 ,- I? ;,In??tl ?2 -?2y-QI ROADSIDE ENVIRONMENTAL ENGINEER General Notes on Erosion Control Silt Basin Type B's will be constructed to the dimension of six feet by three feet by three feet unless otherwise noted on the plans. Where slope protection treatment is required, Section 868 and Section 1042 of the 1995 Standard Specifications for Roads and Structures will be followed. Any material obtained from the project must be clean before being placed. Generally, the order of installation of the erosion control measures will be as follows: Temporary Silt Basins shall be installed before clearing and grubbing begins. Silt Fences and Temporary Silt Ditches shall be installed after clearing and before grading. Temporary Stone Ditch Checks shall be installed as soon as ditchline is established. Pipe Outlet and Inlet Protection will be done as soon as the pipe is installed. Seeding and other permanent erosion control measures are to be implemented as soon as practical. DITCH LINER REQUIREMENTS ROAD: Aee,- Xo/ fw 1j n COUNTY: Watauga STATION FROM STATION TO RT./LT. TYPE LINER REQUIRED // r19 /? / % Xi:a ?. _a -J/ 7 Y T Yi 9? 3? 0 7- /1442 S1 ?Vo/ f?q l 27 .'? n u U V ?h/' if 1! Y i /) V 3 ?o o- d t ?a U 0 r J 300- 6 tra u u u u U LZx/)o I Oj0 00-_ V f j U u U -- U v U v N v v v a ,yfvo d Q U 11 ? 90 U U N a ,P}o o - ///- 7r 6;ro ? tra 1-•?j r J ?b0 - d f-Ib /? t yo /'/V/- Aw /,)Tvo v V V Q V v V V V V v V ?J i V D Q u V V V v V V - V V V V V a V r V T 1 9 OU Chi p?? !/an r ?/' ? .y ?+,•? 2) 41? rl /?! c+ /l? Y? / / /? ?? / ?1 In or ?/f -2r- . P,g Y?oo- 11f r ITITI ? 44 T 9,~ ?G good /ftdo T T V c v v v u u U v u ?a -24?o l ? f?? J6 t PD ti v yo U U It5 N C/ /' T'0 /r ?o jovi eS aruhcl?. -2 lie ai?aa i I ? t fD'u ?-r06 soot es v v -),L v I C? 16,r.1 >r'.Q .?,.? ?a .? /fo0 d ,? g 1`OD ap t ?T ?. C D fd0 U G v v L./ Q r? j o`1 ? ran c,l?, rP yn"/?I/?- ? , a ? ter d :?.?rQrZ y /? ' j ?llJ/'L_i?uA?v U v V v v . v v L v v v v v v ?2 CiZ v 0 ?--- u7 ? ?'vN-eo /jc??vt G? 1, ire 3?1 faowi7? 24"e-m-401 a /e? 'Aiy f% ?igoo- 2.2.?.so U U U U G G v v v u v v G v vi U U v i Q n -U.Z2D- ?a} gQ ,1 ?nt0? v v v _r/ v 3?trb-/a? 10 v ?G /P „ eAO- 3 c ?-? r 79 v v u 3 too- 2;vr o U v v v I 'f09 I r IX r t ta () Ala ?,? o - %6`t >r 111,171 Yo? >1` U U U v v v - v G U U v v v U v v v v v a v u v v v v v i I U v rl - u T c-8 j-&)u4 lI br.nGV,, ??fD 0 ?PfPo- Na?.?o a zr--7o P 1/6 " 9 / yG?3t' v v v v v V U U G v v E-0 1--r y6 f9/ Ad6l 614 2Sr )% 1/G t0 O ?ff?D? 7-7 ----jam-- T- i I OJ.?.? _- vv - -; --- a 9 --- - - -; - f??- --- - -- -- -= --+D Ov I _ -- IV= - - - _? 4--E-D?__ _ --f ?? - - - I ice` - ry •--•y---- - - 5 f-- ----- - - - -?- -- - --- ??Q--y- -??? -).?O- -- - -- =a1 ou f i I + i -'7- - 1•D- rG-a=,-T ?--- L l y, -• -_--_?? ' I ; 1 -I 1 I I I I j I r I 1 I I I 1 I I 1 1? ' I? 1 1 1 I 1 1 i 1 1 1 1 1 1 1 1 - r I I i ; r I r I 1 1 IT PP.-a ' I I 1 1 1! 1 I I • l i I , L I 1' I 1 I I Cam!--lt- I I 11 I I? I^`: I 1 I ! I I 1 I 1 I I I r I 1 r ??_ I! r 11 I ?l i t 1 1 Tom- I 1 ' , r, --?""+ , -,-. ' L? • ? ? 1 7- ? - 1 D 1 1 ? I , 1 I }?1 ?? I I I + I? _? t_ 11 I I I I I i1.=- 1. r 1 -t r ' 1-'--•_' 11 ! I I I I I r _?_ 1 I . ' , I I /J I 1 I 77 77- F -145 - 0 - ? - -1 ----- - 7 7 7 -77- _ 1__' j Li 1 I r I I r I I ' '_ I 1 1 I i ( 1 I 1 ' 1 1 1 1 I I I r 1 I i l 1 1 I T-?- : ' 1! 1 1 1 1 I I, , -}I?- I ' I'- I I l r I I 1 1 1 I- I 1 1 1 I l l l l, l i =--?I 11 77- ' ; I , 1 1' I 1 j? I I, 1 1 1.61 : I l f I 1 r I I I ? 11% I I-I I I T I r 1 I 11 I I I- 1 1 I I 1? t r? l l II-L-L{ ' I I 1 ; - _ ' -^I-.-_.T'??' I I t i 1 1 ? -1 I I ! I ? I , 1 r i 1 I I I f l l l i l Y I I f ji I .I 1` !! I? I I t i hI? 1 ?• 1 I I _ • I I' 1 I 1. I 1 I I ? ! i i I . I J I I -_ 1 •???7 i T-? ? I I , I I , -!J I I 1 1 1 1? )71 ' 7-1 ' + '' ? 1 ' ' I I ? I ' I i ?'_: 1 r I I 1-?1 I 1?? 1 I I - 1 ?. ' r 1 i? ? 7- 7 - ?-- n. T ! 77 "'T?'I I - 1--? 1 ! I j 7,7 ' ?-ter I ? 1 1 1 1 I ; f .77 1 ;-5j ZL 11 I I r I- ' - 7-7 --?' ?-1_' 1 •_?_-•_ I ? I ? '' 1'?_ I ---`^??I_--?- I i? I I I 11 1?? I 1 ? I, I -L.?Y •T. 1 '- i I r 7- -- - .3?t _- - ---- --- - - 7-7 ----,Jo_ _--? ---? - _ ---- - -- - - `-- --?- - --= - - -- --:?-Y?7? _ - --- - i_ - --- - ----- 1--- -_L - --- - -----=_-- _- ---_'--- -- _ ---------- --- --_ ---- i--- _ - -=- - -- - ?r - _ i _ --_ j- - -_ 1- - -71 _ 4_ --1f ?..-- --_-??.-----'-'-? - - {--- --__ ??- - r--- --r- - - -- ---- I -- ' _.-- -? ?- J SST---------_-? - ?- ? ? -' ' -r---- Wit---?- --7 --- = ------? -- -7- - ---`-_? -?___t Photo #1 MMOM"M men= Ph oto #5 rflOTO MA Photo #4 Photo #1- Inlet end of crossing at station 24+20 on SR 1226, F Photo #2 - Outlet end of crossing at station 28+15 on SR 1226, Photo #3 - Outlet end of crossing at station 34+00 on SR 1226, Photo #4 - Outlet end of crossing at station 42+40 on SR 1226, Photo #5- General photo near station 42+00 of SR 1226, Reese that an unnamed tributary of Jones Branch travels along the exh right comer in photo). 011188 FILE COPY Load, Watauga County. Road, Watauga County. Road, Watauga County. Road, Watauga County. Watauga County. Note iadway in this area (lower TO: Jean Manuele, USACOE Raleigh Regulatory Field Office FROM: Ron Linville, Regional Coordinator Habitat Conservation Program DATE: August 2, 2001 SUBJECT: North Carolina Department of Transportation (NCDOT), SRI 226 Improvements and Paving, Jones Branch and Associated Tributaries, Watauga County These comments are provided in accordance with the provisions of the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d) and the North Carolina Environmental Policy Act (G.S. 113A-1 through 113A-10; NCAC 25). The NCDOT proposes to grade, drain, base and pave the referenced road. A total of 90 linear feet of impacts (including riprap) will occur. We will not object to the project provided the following conditions are implemented: Pipes 36" to 48" diameter or larger should be designed and constructed large enough so that they can be installed approximately one foot below streambed grade so that all waters can flow through without freefalling or damming on either end during low flow conditions to maintain aquatic life and or fish passage. Similarly, smaller pipes should be installed into the stream substrate to the extent practicable to ensure aquatic life passage. Riprap must be placed so that it does not interfere with passage during low flows. The dimension, pattern, and profile of the streams should not be modified by widening the stream channel or reducing the depth of the stream. Previously disturbed floodplains and streams should be restored to natural geomorphic conditions whenever practicable. NCSR 1226 Improvements 2 August 2, 2001 2. If any concrete will be used, work must be accomplished so that wet concrete does not contact stream water. This will lessen the chance of altering the stream's water chemistry and causing a fish kill. 3. Heavy equipment should be operated from the bank rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 4. Stringent erosion control measures should be installed where soil is disturbed and maintained until project completion. 5. Temporary or permanent herbaceous vegetation should be planted on all bare soil within 10 days of ground disturbing activities to provide long-term erosion control. We encourage NCDOT to utilize onsite vegetation and materials for streambank stabilization when practicable. 6. Instream work and land disturbance within the 25-foot wide buffer zone are prohibited during the rainbow trout spawning season of January 1 through April 15 to protect the egg and fry stages of trout. Thank you for the opportunity to review and comment on this project during the early planning stages. If you have any questions regarding these comments, please contact me at 336/769-9453. Cc: Heath Slaughter, NCDOT Cyntia Van Der Wiele, DWQ