HomeMy WebLinkAboutNCC203554_ESC Approval Submitted_20200817ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
AcMg Director
NORTH CAROLINA
EnvironmenW Quality
February 24, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
Indian Trail Towne Center, LLC
Attention: Marcus Arroyo
2593 West Roosevelt Blvd.
Monroe, North Carolina 28110
RE: Project Name: Indian Trail Town Center
Acres Approved: 24.99
Project ID: UNION-2020-054
County: Union
City: Indian Trail
Address: South Indian Trail Road & East Park Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Indian Trail Towne Center, LLC
Date Received by LQS: February 13, 2020
Plan Type: New
Dear Mr. Arroyo,
IE G IE 0 IV E
i'
MAR 3 2020
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required
by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction
General Permit. After the form is reviewed and found to be complete, you will receive a link with payment
instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email.
You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may
be accessed at deq,nc.gov/NCGOI. Please direct questions about the eNOI form to Annette Lucas at
Annette. Lucas@ncdenr.g ov or Paul Clark at Paul, clark cicdenr. ov. If the owner/operator of this project
changes in the future, the new responsible party is required to apply for his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation,
2. The NCGO1 permit and the COC, once it is received,
3. Records of inspections made during the previous 12 months.
DNN North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
E Mooresville Regional office 1610 East Center Avenue, Suite 3.0.1 I Mooresville, North Carolina 2$115
Kcgar. i osaouFea
°a"°`°"°"'a�"b"'"".0-fl` 704,663,1699
Letter of Approval .with Modifications
Indian Trail Towne Center, LLC
February 24, 2020
Page 2 of 3
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
-_ quality laws, regulations, and rules. In addition. local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincer
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: _ Certificate of Approval .............
Modifications Required for Approval
NCG01 .Fact Sheet
c: Eagle Engineering
Attention: Matthew C. Kirchner, PE
2013 A Van Buren avenue
Indian Trail, North Carolina 28079
Inspection Department
Letter of Approval with Modifications
Indian Trail Towne Center, LLC
February 24, 2020
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Indian Trail Town Center
Project ID: UNION-2020-054
County: Union
1. Implement the latest NCGOI Standards for Self -Inspection & Ground Cover approved April
1, 2019.