HomeMy WebLinkAbout330064_Compliance Evaluation Inspection_20200813- (1( -
Facility Number - O Division of Soil and Water Conservation
O Other Agency
Type of Visit: Inspection 0 Operation Review O Structure Evaluation O Technical Assistance
��Routine
Reason for Visit: O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: /j- Arrival Time: Q 7 Departure Time: a3e County: Region:
Farm Name: lZ 5*1114 6$_ D6 -fez-1 Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Phone:
Title:
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Ed La er I I ::::]
Non -Layer
Pullets
Poults
Design Current
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
.Non -Dairy
Beef Stocker
Beef Feeder
Beef BTood Cow
Discharees and Stream Impacts
1. is any discharge observed from any part of the operation? [-]Yes No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes VNoo
❑NA ❑NE
b. Did the discharge reach waters of the State'? (if yes, notify DWR) ❑Ycs ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (if yes, notify DWR) [] Yes ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes *�O�
❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3 21412015 Continued
ti
Facility Number: - Date of Ins ection: -13 - a-b
Waste Collection & Treatment
4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes �NLNA
❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ NA ❑ NE
Structure l Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ��Nq ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes �No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental real, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes - ❑ NA [] NE
8. Do any of the structures lack adequate markers as required by the pen -nit?❑ Yes �No ❑ NA [] NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes o ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): 5'
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ yes 6 DNA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ yes f I ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable [] Yes rNo ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment'? ❑ YesVNp
❑NA ❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE
the appropriate box.
❑ WUP ❑Checklists ❑ Dcsign ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE
Page 2 of 3 21412015 Continued
liacili Number: 3 3 Date of Inspection: d -/3 -Ae
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge'? If yes, check ❑ Yes�Zo [DNA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? El Yes No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes ❑ No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes [:]No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes ❑ No ❑ NA ❑ NE
permit? (i.e., discharge, ffeeboard problems, over -application)
31. Do subsurface tile drains exist at the facility`? If yes, check the appropriate box below.
❑ Yes ❑ No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes ❑ No D NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes ❑ No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes ❑ No ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
Z'Ow _6 0 1kh MAt pit IV V I�W)5 r
Reviewer/Inspector Name:
Reviewerllnspector Signature:
S4'e �d
Phone: Q !q 7q l (/ zo 6
Dale: � - /.3 - I- a
Page 3 of 3 f21412015