Loading...
HomeMy WebLinkAbout20070506 Ver 1_More Info Letter_20070327~QF W Ar~RQ Michael F. Easley, Governor `(~ ~ William G. Ross Jr., Secretary Vj r... North Carolina Department of Environment and Natural Resources ~ -~ O ~. Alan W. Klimek, P.E. Director Division of Water Quality March 27, 2007 DWQ Project # 07-0506 Polk County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Ryan and Ester Lail 1051 Sandy Springs Road Columbus, NC 28722 Subject Property: Lail Property - DWROS Ut to Buck Creek [030806, 9-55-2-1, C] REQUEST FOR MORE INFORMATION Dear Sir or Madam On March 19, 2007, the Division of Water Quality (DWQ) received your application dated March 14, 2007, to fill or otherwise impact 185 linear feet of perennial stream to construct the proposed streambank stabilization. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below.. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Please resubmit your application (five copies) on the attached, most current, March 2005, Pre-Construction Notification (PCN) application. Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and to provide us with a date that we may expect to receive this requested information. If we do not receive this requested information within one week of the date you indicate it will be forthcoming, your project will be withdrawn and you will need to reapply with a new application and a new fee. Please contact me in writing and Kevin Barnett of the DWQ Asheville Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application No°e Carolina 401 Oversight/Express Review Permitting Unit ~ITICR~~If 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: h~•/lh2o.enr state no,us/ncwetlands An Equal Opportunity/Affirmative Action Employer - 50% Recycled/] 0% Post Consumer Paper Ryan and Ester Lail Page 2 of 2 March 27, 2007 are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-1786 if you have any questions regarding or would to discuss this matter. to set up a meeting di Karoly, Supervisor Oversight/Express Review Permitting CBK/ijm Enclosures: March 2005 Pre-Construction Notification (PCN) application cc: Kevin Barnett, DWQ Asheville Regional Office Polk County Soil and Water Conservation District, P.O. Box 236, #4 Annex Bldg, Columbus, NC 28722 Stuart Ryman, Altamount Environmental, Inc., 50 College Street, Asheville, NC 28801 USACE Asheville Regulatory Field Office File Copy Central Files Filename: 070506LaiIPro pertyD WR05(Pol k)On_Hold