HomeMy WebLinkAbout250039_Plan of Action_20200814PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID): ,-
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c x fine d x 7.48 gallons =
12 ft3
!L - inches
inches
r inches
ftz
1-2 2�,� gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design /yd days
g. volume of waste produced according to structural design _JIO, 355 .. ft3
h. actual waste produced = current herd # x line g = �, ft3
certified herd #
i. volume of wash water according to structural design Q ft3
j. excess rainfall over evaporation according to design / (j ft3
e
k. (lines h + i +i) x 7.48 x 30 dam = ?) 9,7 gallons
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated , y `, ,` lb/1000 gal.
m. Hines e + k) x line I W 1 spy lb PAN
1000
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
PoA (30 Day) 2121/00 1
1.
structure ID:
— '
m �„G
line = '�"
lb PAN
2.
structure ID:
line m = lb PAN
3.
structure ID:
line m = lb PAN
4.
structure ID:
line m = lb PAN
5.
structure ID:
line m = lb PAN
6.
structure ID:
line m = lb PAN
n.
lined +2+3+4+5+6 =
/ lb PAN
III. TOTAL. PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING
Pr-PlAn
nr% ken'r 1 1er .-,r-. ,-
30 DAYDRAW DOWN
o. tract #
—
S.3 7
"�-.+
p. field #
' �. ■rn�.n i-r���
q. crop
A
h
t>Hry ryU I
r. acres
�
t5t APPLIES DURING
s_ remaining
IRR-2 PAN
balance
(lb/acre)
G B3
3�
THIS 30
DAY PERIOD,
t. TOTAL PAN
BALANCE
FOR FIELD
(lbs•)
column r x s
�,.
FU.
application
window'
� 6
-�iaie currem crop enaing application aate or next crop application beginning date for available receiving crops
during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) S3 b. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) _ lb. PAN
PoA (30 Day) 2121100 2
i]
x. Crop's remaining PAN balance (fine v from section 111) _ / '� "
y. Overall PAN balance (w - x) _ - lb. PAN
Y, lb. P N
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. if animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
PoA (30 Day) 2/21/00 3