Loading...
HomeMy WebLinkAbout250039_Plan of Action_20200814PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): ,- 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c x fine d x 7.48 gallons = 12 ft3 !L - inches inches r inches ftz 1-2 2�,� gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design /yd days g. volume of waste produced according to structural design _JIO, 355 .. ft3 h. actual waste produced = current herd # x line g = �, ft3 certified herd # i. volume of wash water according to structural design Q ft3 j. excess rainfall over evaporation according to design / (j ft3 e k. (lines h + i +i) x 7.48 x 30 dam = ?) 9,7 gallons line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated , y `, ,` lb/1000 gal. m. Hines e + k) x line I W 1 spy lb PAN 1000 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2121/00 1 1. structure ID: — ' m �„G line = '�" lb PAN 2. structure ID: line m = lb PAN 3. structure ID: line m = lb PAN 4. structure ID: line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line m = lb PAN n. lined +2+3+4+5+6 = / lb PAN III. TOTAL. PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING Pr-PlAn nr% ken'r 1 1er .-,r-. ,- 30 DAYDRAW DOWN o. tract # — S.3 7 "�-.+ p. field # ' �. ■rn�.n i-r��� q. crop A h t>Hry ryU I r. acres � t5t APPLIES DURING s_ remaining IRR-2 PAN balance (lb/acre) G B3 3� THIS 30 DAY PERIOD, t. TOTAL PAN BALANCE FOR FIELD (lbs•) column r x s �,. FU. application window' � 6 -�iaie currem crop enaing application aate or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) S3 b. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ lb. PAN PoA (30 Day) 2121100 2 i] x. Crop's remaining PAN balance (fine v from section 111) _ / '� " y. Overall PAN balance (w - x) _ - lb. PAN Y, lb. P N Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. if animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2/21/00 3