HomeMy WebLinkAbout20201046 Ver 1_Riparian Buffer Authorization_20200811State of North Carolina
n Department of Environmental Quality
"DDvvislon of Water Resources Division of Water Resources
15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization
FORM: BA 10-2013
Riparian Buffer Authorization Form
A. Applicant Information
Project Information
1a. Name of project:
-f L4�;
1 b. County:
LU- if-
1c. Nearest municipality:
okl<-is
1d. Subdivision name:
k-o i 0
le. Is the project located in any of North Carolina's twenty coastal counties?
If yes, answer 1f below.
Yes ®'No
1f. Is the project located within a NC Division of Coastal Management Area of
Environmental Concern (AEC)?
❑ Yes No
2. Owner Information
2a. Name on Recorded Deed:
2b. Deed Book and Page No.
2c. Map Book and Page No.�
(include a copy of the
recorded map that indicates
when the lot was created):
2d. Responsible Party
(for Corporations):
�--
2e. Street address:
C170q S R13 '-ROVQ
2f. City, state, zip:
-31 1C- „-7
2g. Telephone no.:
6i I q --71 ,7
2h. Fax no.:
2i. Email address:
off . ; , r.-,-
3. Applicant Information (if different from owner)
3a. Applicant is:
❑ Agent LJ Other, specify:
3b. Name:
3c. Business name
if a licable :
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
4. Agent/Consultant Information (if applicable)
4a. Name:
4b. Business name
if applicable):
4c. Street address:
4d. City, state, zip:
4e. Telephone no.:
4f. Fax no.:
4g. Email address:
FORM: BA 10-2013 Page 1 of 4
B. Project Information and Prior Project History
Property Identification
la. Property identification no. (tax PIN or parcel ID):
1 b. Site coordinates (in decimal degrees):
Latitude: Longitude:
1c. Property size:
acres
2• Surface Waters
2a. Name of nearest body of water to proposed project
2b. Water Quality Classification of nearest receiving water:
2c. River basin:
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of
this application: a ^4 c-,ZwVP _ T H-Vwke5l Tts •-ta i 5 8's -mot I ; JAq_L_
Pl-:& 'ML5; i .
3b. Attach an 8 '/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location
of the site See t� i µ rv�L�J A
3c. Attach an 8 Y2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map
depicting the project site St'E Ylc t7vt i
3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
3e. Explain the purpose of the proposed project:5r+ 2-
rb1% i 5 a 2- , i*—
3f. Describe the overall project in detail, including the type of equipment to be used: W 1'- 0,J L-�CisTi r� iz
1YteTiT J 1 VC-11JA14 34 ' v " AtT to 'I e 7 k , N4 cc- ✓mil%d i
4. Jurisdictional Determinations 1n4-0_ti /YiA�(U---Rt i^
i
4a. Have jurisdictional wetland or stream determinations by
the Corps or State been requested or obtained for this
property/ project(including all priorphases) in thepast?
Yes ❑ No El Unknown
Comments:
4b. If yes, who delineated the jurisdictional areas?
Name (if known):
Agency/ Consultant Company:
Other:
4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach
documentation.
5• Project History
5a. Have permits or certifications been requested or obtained
for this project(including all priorphases) in thepast?
Yes ❑ No ❑ Unknown
5b. If yes, explain and detail according to "help file" instructions.
see 4a Y-6 -"1 e�-Jr
s• Future Project Plans
6a. Is this a phased project? ❑ Yes No
6b. If yes, explain.
C. Proposed Impacts Inventory
1. Buffer Impacts
1a. Project is in which protected basin?
Neuse ❑ Tar -Pamlico ❑ Catawba
❑ Randleman ❑ Jordan ❑ Goose Creek
1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of
this form.
Buffer impact
Reason for
Type of impact
Stream name
Buffer
Zone 1
Zone 2
a- wi r-
FORM: BA 10-2013 Page 2 of 4
number—
Permanent (P)
or Temporary
T
impact
(exempt, allowable,
allowable w/
mitigation)
mitigation
required?
impact
(sq ft)
impact
(sq ft)
B1 MP T
��� 4' �`
,�� ,
Yes ❑ No
Fi
(�
B2 P T
Ll Yes Ll No
133 P T
❑ Yes ❑ No
64 ❑ P ❑ T
❑ Yes ❑ No
65 P T
❑ Yes No
136 LJP LJT
❑ Yes ❑ No
Total buffer impacts
1c. Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a.
Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
54-i i
1 b. Specifically describe measures takenTo a oid or minimize the proposed impacts through construction
techniques. C . sw r z
2. Buffer Mitigation
2a.
Will the project result in an impact within a protected riparian buffer that
requires buffer mitigation?
Yes No
2b.
If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and
calculate the amount of mitigation required in the table below.
Zone
Reason for impact
Total impact
(square feet
Multiplier
Required mitigation
s uare feet
Zone
1Eva
3 (2 for
Catawba)
Zone
2
tji�tJ JV x:5i5 0G k-v-JS
1.5
Total buffer mitigation required:
2c.
If buffer mitigation is required, is payment to a mitigation bank or NC DMS
proposed?
Yes ❑ No
2d.
If yes, attach the acceptance letter from the mitigation bank or NC DMS.
2e.
If no, then discuss what type of mitigation is proposed.
2f.
Comments:
E. Diffuse Flow Plan
All buffer impacts and high ground impacts require diffuse flow or other form of
❑ Diffuse flow
stormwater treatment. Include a plan that fully documents how diffuse flow will be
❑ Other BMP
maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form.
If due to site constraints, a BMP other than a level spreader is proposed, please provide a
plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP
Manual and attach a BMP Supplement Form.
F. Supplementary Information
FORM: BA 10-2013 Page 3 of 4
1. Environmental Documentation
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the
LJ Yes L4No
use of public federal/state land?
1 b. If you answered "yes" to the above, does the project require preparation of an
❑ Yes ❑ No
environmental document pursuant to the requirements of the National or State (North
Carolina) Environmental Policy Act NEPA/SEPA ?
1 c. If you answered "yes" to the above, has the document been finalized by the State
❑ Yes No
Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.)
Comments:
2. Violations
2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated
Yes No
Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards,
or Riparian Buffer Rules 15A NCAC 02B .0200 ?
2b. Is this an after -the -fact permit application?
❑ Yes No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
-TTr6,J lftk-5( % P Cat- {I A06-2-0
Applicant/Agent's Printed Name Appiican Agent's Signature _
(Agent's signature is valid only if an authorization letter from the applicant is provided.) Date
Send 3 complete sets of this form and accompanying documents to the following:
For government transportation projects sent For government transportation projects sent by
by First Class Mail via the US Postal Service: delivery service (UPS, FedEx, etc.):
NC DWR, Transportation Permitting Unit OR NC DWR, Transportation Permitting Unit
1617 Mail Service Center 512 N. Salisbury Street
Raleigh, NC 27699 - 1617 Raleigh, NC 27604
For all other projects sent by First Class Mail via For all other projects sent by delivery service
the US Postal Service (UPS, FedEx, etc.):
Karen Higgins Karen Higgins
NCDWR — 401 & Buffer Permitting Branch OR NCDWR — 401 & Buffer Permitting Branch
1617 Mail Service Center 512 N. Salisbury Street
Raleigh, NC 27699 - 1617 Raleigh, NC 27604
FORM: BA 10-2013 Page 4 of 4
rest,
4
. . ....
wi
tic
J 6�'
PROJECT SITE
fo
X.
SITE LOCATION MAP
Engineer:
1 Rice & Associates
Project:
Porto Fino
i 7.5 min. Topo Quad:
-Wake Forest" dated 1987
Location:
Wake Forest- NC
Approximate Scale:
1 1500'
Date:
April 13, 2004
Site Soils Map
Project: Porto Fino Subdivision Location: Wake Forest. NC
Wake County Soil Survey: `beet � 1-1 Engineer: Rice & Associates
Approximate Scale: 1" = 700` Date: April 13. 2004
�CF WA TF9O Michael F. Easley, Goven
William G. Ross It., Secret;
G North Carolina Department of Environment and Natural Resourc
co Alan Alan W. Klimek, P.E., Direct
- l Division of Water QuaL
Q T Coleen H. sullins, Deputy Direct
Division of Water Quali
Apri126, 2004
Wake County
DWQ# 04-0591
APPROVAL of 401 Water Quality Certification and Neuse River Buffer Rules
Trevi Fountain Associates, LLC
Attn: Daryl Cady
123 South White Street
Wake Forest, NC 27587
Subject Property: Port Funo Subdivision Sanitary Sewer Extension
Dear Mr. Cady:
You have our approval, in accordance with the attached conditions, to impact 0.0236 acres of forested Wetlands,
70 feet of perennial stream and 0.2894 acres of protected riparian buffers for the purpose of extension of sanitary
sewer service as you described in your application dated April 13, 2004. After reviewing your application we
have decided, this fill is covered by General Water Quality Certification Number 3374. This Certification allows
you to use Nationwide Permit Number 12 when the Corps of Engineers issues it. This approval is also valid for
the Neuse River buffer rules (15A NCAC 2B .0233). In addition, you should get any other federal, state or local
permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control,
Coastal Stormwater, Non -Discharge and Water Supply Watershed regulations. Also this approval win expire
when the accompanying 404 or CAMA permit expires unless otherwise specified in the General
Certification.
This approval is only valid for the purpose and design that you described in your application. If you change your
project, you must notify us and send us a new application. If the property is sold, the new owner must be given a
copy of this Certification and approval letter and is thereby responsible for complying with all conditions. This
approval shall expire when the corresponding Nationwide Permit expires or as otherwise provided in the General
Certification. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation
may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the
conditions listed in the attached certification and those listed below.
Conditions of Certification:
1. Buffer M_ +6-at:on (EEP)
You.are required to mitigate for impacts to the protected riparian buffers. The required area of mitigation to
compensate for impacts to the protected riparian buffers is 3,594 square feet as required under this Authorization
Certificate and 15A NCAC 2B .0242. We understand that you wish to make a payment into the Riparian Buffer
Restoration Fund administered by the NC Ecological Enhancement Program (EEP) to meet this mitigation
requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. h
accordance with ISA NCAC 2B .0242(7), this contribution will satisfy our compensatory mitigation requirements
under 15A NCAC 2B .0233(10). Until the EEP receives and clears your check (made payable to: DENR -
Ecological Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. W.
Ron Ferrell should be contacted at (919) 733-5208 if you have any questions concerning payment into the EEP.
You have one month from the date of this approval to make this payment. For accounting purposes, this
N. C Division of water Quality, 401 Wetlands Certification unit,
t,
1650Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
7'471 r,-,;v— rth..i D-, rd:..s, x3f- ocnn '"[n fT ..—.z--.
Page 2
Mr. Cady
Apri126, 2004
Authorization Certificate authorizes payment into the Riparian Buffer Restoration Fund to compensate fox
3,594 of required riparian buffer mitigation for impacts to 1,198 W of protected riparian buffers; 03-04-
river and subbasin, 27-23-(2) stream index number_"
2. Certification of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, an(
any subsequent modifications, the applicant is required to return the attached certificate of completion to the
401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699
1650.
3. Diffuse Flow
An additional condition is that all stormwater shall be directed as diffuse flow at non -erosive velocities through
the protected stream buffers and will not re -concentrate before discharging into the stream as identified within
15A NCAC 2B .0243(5).
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. This Certification shall become null and void unless the above conditions are
made conditions of the Federal 404 and/or coastal Area Management Act Permit.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You
must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which
conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714
Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless
you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If
you have any questions, please telephone John Dorney at 919-733-9646 or Bob Zarzecla at 919-733-9726.
Sincerely,
Alan W. Klimek, P.E.,
NC DWQ, Director
UsiT�:y7
Attachments_ Certificate of Completion
Cc: USACE Raleigh Regulatory Field Office
DWQ Raleigh Regional Office
File Copy
Central Files
Rice & Associates, 978 Trinity Road, Raleigh, NC 27607
DWQ # 04-0591
ROY COOPER
Governor
MICHAEL REGAN
Secretory
LINDA CULPEPPER
Interim
Director
April 17, 2018
DWR #04-0746 v2
Wake County
Trevi Fountain Associates; LLC
Attn: Ekaterina Cady
847 Wake Forest Business Park, Suite 101
Wake Forest, NC 27587
Subject: AUTHORIZATION CERTIFICATE PER THE NEUSE'RIVER-BASIN RIPARIAN BUFFER
PROTECTION RULES (15'A NCAC 02B .0233) WITH ADDITIONAL CONDITIONS
Porto Fino Subdivision -Shared Lots
Dear Ms. Cady:
You have our approval for the impacts listed below for the purpose described in your
application dated March 7, 2018 and 'received by the Division of Water Resources (Division) on
March-8, 2018 with additional information received on April -16,.2018. Please note that you
should get- any other federal, state or, local permits before proceeding with your project,
including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge,
and Water Supply Watershed regulations. This authorization Certificate shall expire five
(5) years from.the date of this letter.
This approval requires you to comply with the following.conditions:
1. The following impacts are hereby approved provided that.all of the other specific and
'general conditions of the Buffer Rules•are met. No other impacts are approved, including
'incidental impacts [15A,NCAC 02B. 0233(8)].
Type of Impact
Amount,Approved
Amount Approved
(units)
(units) ;
J
Permanent
Temporary
Buffers —Zone 2
131-Driveway,
949 (square feet)
0 (square feet)
Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section- http://poital.nedenr.org/ixeh`wq/aps
1628 Mail Service Center, Raleigh, NC 27699-1628 Phone: (919) 791-4200 .
Location: 3800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788-7159
Porto Fino Subdivision -Shared Lots
DWR #17-0746 v2
BUFFER APPROVAL,
Page 2 of 4
2. Diffuse Flow
All stormwater must be.directed and maintained as diffuse flow at: non-erosive"velocities
through the protected stream buffers such that it will not re -concentrate before discharging
into a stream. [15A NCAC 02H .0506(b)(5)],
3. Compensatory Mitigation Using a Private Mitigation, Bank
Mitigation must be provided for the proposed impacts as specified in the table below. The
Division has'receive,d an acceptance letter from .Restoration Systems, LLC to meet this
mitigation. requirement. Until Restorations Systems, LLC receives and clears your payment,
and proof of payment has been provided to this Office, no impacts'specified in this
Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate
authorizes payment to.; Restoration Systems, LLC to meet the following compensatory
mitigation requirement [1'5A NCAC 02H .0506 (b)(6)]:
Compensatory
Mitigation Required
Bank Sponsor
River & Sub -basin Number
Buffer -Zone 2
1,423.5 (square feet)
'Weaver Farm
'03020201 (Not in Falls Lake)
4. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas.
beyond the. footprint of the impacts dep,icted in the Pre -Construction Notification. All
construction, activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of.state water quality standards, statutes, or rules occur [15A NCAC 02H .0501
and .05021.
5. Protective Fencing
All wetlands, streams, surface waters, and riparian buffers located, within 50 feet of the
construction area on the project site shall be clearly marked (example- orange fabric
fencing) prior to any land disturbing activities and must be maintained on the property until
the project phase is completed. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H
.0507 (c)]
6. This approval is for the purpose and design described in your application. The plans and
specifications for this project are incorporated by reference as part of the Buffer
Authorization. If you change your project, you must notify the Division and you may be
required to submit a, new application package with the appropriate fee. If the property is
sold,'the new owner must be given a copy of this approval letter and is responsible,for
complying with all conditions.
7. This approval and its conditions are final and binding unless contested. [G.S. 143-215.51
Porto Fino Subdivision -Shared Lots
DWR #17-0746 v2
BUFFER_ APPROVAL
Page 3 of 4
This Buffer. Authorization can be contested as provided in Articles 3 and,4 of General Statute
150B by filing a written petition for an. administrative hearing to the Office of Administrative
Hearings (hereby, known as OAH): A petitionform may be obtained from the OAH at
http://www.ncoah.com/ or'by calling the OAH Clerk's Office at (919) 43173000 for information.
Withi.n'thirty (60,) calendar days of receipt of this notice, a petition must be filed with the .
OAH: A petition is'considered filed when, the original and one (1),,'co0y along with any
applicable OAH filing fee is received in the OAH 'during normal office hours (M'onday through
Friday between, 8:00am and,5:00pm, excluding official state holidays).
The petition may be.faxed!to the OAH at (919) 431-3100, provided the original and .one copy of
the petition along with any applicable OAH filing fee is received by the OAH within five (5)
business days following the faxed transmission.
Mailing address for the OAH:
If sending by First Class Mail
via the US Postal Service:
Office of Administrative -Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
If sending via deliver_ y service
(e.g. UPS, FedEx):.
Office of Administrative, Hearings
1711 New Hope Church Road
Raleigh, NC 27609-6285
One. (1) copy of the petition must .also be served to Department of Environmental Quality:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
Please send one (1) copy of the petition to DWR:
If sending by First:Class Mail If sending via delivery service
via the US Postal Service: (e.g. UPS, FedEx):
Karen Higgins Karen Higgins
NC DWR-401 & Buffer Permitting NC DWR-401 & Buffer Permitting Unit
Unit 512 N.Salisbury Street
1617 Mail Service Center Raleigh, NC 27604
Raleigh, NC 27699-1617
Porto Fino Subdivision -Shared Lots
DWR #17-0746 v2
BUFFER APPROVAL
Page 4 of 4
This letter completes the review of the Division under the Neuse Riparian Buffer Rules as
described in 15A NCAC 02B .0233. Please contact Stephanie Goss at 919-791-4256 or
stephanie. oss ncdenr.gov if you have any questions or concerns.
Sincere ,
Danny Smith
Supervisor, Water Quality Regional Operations Section
cc: DWR RRO 401/Buffer Authorization file
DWR 401 & Buffer Permitting Unit file
Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ❑ uplands ❑ stream ❑ wetlands
Describe the method of construction (e.g., dam/embanknient, excavation, installation of
draw -down valve or spillway, etc.): n/a
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): n/a
Size of watershed draining to pond: n/a Expected pond surface area: n/a
VII. Impact JVstification (Avoidance and Minimization)
A44a canner)+
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower -impact
( site layouts, and explain why these design options were not feasible. Also discuss how impacts
I! were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
To minimize impacts to the existing streams and wetlands an environmentally
friendly route was chosen for access to lots 88-91. Access from NCDOT State Road
(Ligon Mill) is prohibited at this project site. The private driveway was selected for
access to avoid taking a road across the perennial stream, which would have
resulted in considerably more impact to the stream, wetlands and buffers. Site
constraints include wetlands, Neuse River Basin Buffers, CSX Transportation Railroad
and prohibited access off of Ligon Mill Road. To protect the buffers and existing
wetlands and stream, an earthen, grassed Swale is proposed between the edge of
the proposed driveway pavement and the Zone 2/Zone 1 limit. The grading for the
road and for the swale will be mostly cut and only a small portion will require fill
based upon the Terrain. Avoidance of fill should help to minimize the impacts during
construction. Also, avoidance of impact to the streams and buffers was considered in
the layout of the subdivision such that there are no road crossings or other impacts
proposed to the streams, buffers or wetlands other than the sewer lines as described
in 401 Approval (DWQ project # 04-0591).
V III. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
Page 9 of 13
/ 11
fires
EBX Buffer Mitigation Banks
Statement of Availability August 11, 2020
NC Division of Water Resources
Stephanie Goss
512 N. Salisbury St.
Archdale Building, 9th floor
Raleigh, NC 27604
Re Project: Porto Fino Shared Driveway Widening
This document confirms that John Mascho (Applicant) for the Porto Fino Shared Driveway Widening
(Project) has expressed an interest to utilize 1,440.00 Square Feet of Riparian Buffer Mitigation
Credits from one of the following banks, EBX-Neuse I, LLC Neuse Riparian Buffer Umbrella Mitigation
Bank, RES Neuse Buffer and Nutrient Offset Umbrella Mitigation Bank, RES Poplar Creek Buffer &
Nutrient Offset Umbrella Mitigation Bank, or EBX Upper Neuse Riparian Buffer Umbrella Mitigation
Bank. Specific bank sites that may be debited are Buffalo Branch, Selma Mill, Cedar Grove, Hatley,
Ezell, Hannah Bridge, Stone Creek, Meadow Spring, Uzzle, Poplar Creek, Bucher and Polecat, all located
in HUC 03020201. As the official Bank Sponsor, EBX-Neuse I, LLC and EBX, attests to the fact that
mitigation is available for reservation at this time.
These mitigation credits are not considered secured, and consequently are eligible to be used for alternate
purposes by the Bank Sponsor, until payment in full is received from the Applicant resulting in the
issuance of a Mitigation Credit Transfer Certificate by the bank acknowledging that the Applicant has
fully secured credits from the bank and the Banker has accepted full responsibility for the mitigation
obligation requiring the credits/units.
The Banker will issue the Mitigation Credit Transfer Certificate within three (3) days of receipt of the
purchase price. Banker shall provide to Applicant a copy of the Mitigation Credit Transfer Certificate and
a documented copy of the debit of credits from the Bank Official Credit Ledger(s), indicating the permit
number and the resource type secured by the applicant. A copy of the Mitigation Credit Transfer
Certificate, with an updated Official Credit Ledger will also be sent to regulatory agencies showing the
proper documentation.
Please contact me at 919-209-1075 or cparker@res.us if you have any questions.
Best,
��FT�
Caitlan B. Parker
Resource Environmental Solutions, LLC
701 E. Bay Street, Suite 306
Charleston, SC 29403
Bank Sponsor — EBX-Neuse I, LLC and Environmental Banc & Exchange (EBX)